# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-21 15:18:38 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO2 (Individual Flasks) # Thomas J Conway # tel: (303) 497-6681 # email: Thomas.J.Conway@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Centro de Investigacion de la Baja Atmosfera, Univ. # of Valladolid [CIBA]" without whom these measurements would # not be possible. # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # site yr mo dy hr mn id me formula value unc flag inst ayr amo ady ahr amn lat lon masl evn CIB 2009 05 05 10 35 1829-99 G co2 385.900 -999.990 ... L8 2009 05 22 12 34 41.8100 -4.9300 850.00 275650 CIB 2009 05 05 10 35 1830-99 G co2 385.990 -999.990 ... L8 2009 05 22 12 49 41.8100 -4.9300 850.00 275651 CIB 2009 05 11 09 22 2905-99 G co2 388.280 -999.990 -.. L8 2009 05 22 12 03 41.8100 -4.9300 850.00 275652 CIB 2009 05 11 09 22 2906-99 G co2 388.840 -999.990 +.. L8 2009 05 22 12 18 41.8100 -4.9300 850.00 275653 CIB 2009 05 18 09 40 2257-99 G co2 388.880 -999.990 ... L10 2009 06 18 12 19 41.8100 -4.9300 850.00 276705 CIB 2009 05 18 09 40 2258-99 G co2 389.360 -999.990 ... L10 2009 06 18 12 35 41.8100 -4.9300 850.00 276706 CIB 2009 05 25 09 22 4091-99 G co2 390.680 -999.990 ... L10 2009 06 18 11 48 41.8100 -4.9300 850.00 276703 CIB 2009 05 25 09 22 4092-99 G co2 390.450 -999.990 ... L10 2009 06 18 12 04 41.8100 -4.9300 850.00 276704 CIB 2009 06 01 09 06 3927-99 G co2 382.600 -999.990 ... L10 2009 07 01 11 43 41.8100 -4.9300 850.00 277508 CIB 2009 06 01 09 06 3928-99 G co2 382.870 -999.990 ... L10 2009 07 01 11 59 41.8100 -4.9300 850.00 277509 CIB 2009 06 08 09 23 2239-99 G co2 389.850 -999.990 ... L10 2009 07 01 11 13 41.8100 -4.9300 850.00 277506 CIB 2009 06 08 09 23 2240-99 G co2 389.660 -999.990 ... L10 2009 07 01 11 28 41.8100 -4.9300 850.00 277507 CIB 2009 06 15 09 00 1311-99 G co2 391.330 -999.990 ... L10 2009 07 10 11 43 41.8100 -4.9300 850.00 278456 CIB 2009 06 15 09 00 1312-99 G co2 391.830 -999.990 ... L10 2009 07 10 11 59 41.8100 -4.9300 850.00 278457 CIB 2009 06 22 09 05 3299-99 G co2 386.180 -999.990 ... L10 2009 07 10 12 14 41.8100 -4.9300 850.00 278458 CIB 2009 06 22 09 05 3300-99 G co2 386.370 -999.990 ... L10 2009 07 10 12 30 41.8100 -4.9300 850.00 278459 CIB 2009 06 29 09 24 529-99 G co2 394.800 -999.990 ... L3 2009 07 21 17 13 41.8100 -4.9300 850.00 279375 CIB 2009 06 29 09 24 530-99 G co2 394.940 -999.990 ... L3 2009 07 21 17 27 41.8100 -4.9300 850.00 279376 CIB 2009 07 06 09 04 4881-99 G co2 388.800 -999.990 ... L3 2009 07 21 16 44 41.8100 -4.9300 850.00 279373 CIB 2009 07 06 09 04 4882-99 G co2 388.680 -999.990 ... L3 2009 07 21 16 59 41.8100 -4.9300 850.00 279374 CIB 2009 07 13 09 30 2553-99 G co2 387.240 -999.990 ... L3 2009 08 04 10 27 41.8100 -4.9300 850.00 280503 CIB 2009 07 13 09 30 2554-99 G co2 387.310 -999.990 ... L3 2009 08 04 10 41 41.8100 -4.9300 850.00 280504 CIB 2009 07 20 09 37 653-99 G co2 387.240 -999.990 ... L3 2009 08 04 11 52 41.8100 -4.9300 850.00 280501 CIB 2009 07 20 09 37 654-99 G co2 387.320 -999.990 ... L3 2009 08 04 12 07 41.8100 -4.9300 850.00 280502 CIB 2009 07 27 09 50 3079-99 G co2 384.960 -999.990 ... L3 2009 08 17 14 28 41.8100 -4.9300 850.00 281268 CIB 2009 07 27 09 50 3080-99 G co2 384.980 -999.990 ... L3 2009 08 17 14 42 41.8100 -4.9300 850.00 281269 CIB 2009 08 03 09 07 963-99 G co2 383.510 -999.990 ... L3 2009 08 17 14 56 41.8100 -4.9300 850.00 281266 CIB 2009 08 03 09 07 964-99 G co2 383.680 -999.990 ... L3 2009 08 17 15 11 41.8100 -4.9300 850.00 281267 CIB 2009 08 10 09 16 4823-99 G co2 381.790 -999.990 ... L10 2009 08 27 16 26 41.8100 -4.9300 850.00 282141 CIB 2009 08 10 09 16 4824-99 G co2 381.850 -999.990 ... L10 2009 08 27 16 42 41.8100 -4.9300 850.00 282142 CIB 2009 08 17 09 45 3869-99 G co2 387.270 -999.990 ... L10 2009 08 27 15 55 41.8100 -4.9300 850.00 282139 CIB 2009 08 17 09 45 3870-99 G co2 387.420 -999.990 ... L10 2009 08 27 16 11 41.8100 -4.9300 850.00 282140 CIB 2009 08 24 09 45 1343-99 G co2 380.130 -999.990 ... L10 2009 09 08 15 31 41.8100 -4.9300 850.00 282940 CIB 2009 08 24 09 45 1344-99 G co2 380.070 -999.990 ... L10 2009 09 08 15 46 41.8100 -4.9300 850.00 282941 CIB 2009 08 31 09 40 1389-99 G co2 387.760 -999.990 ... L10 2009 09 08 16 02 41.8100 -4.9300 850.00 282938 CIB 2009 08 31 09 40 1390-99 G co2 387.640 -999.990 ... L10 2009 09 08 16 17 41.8100 -4.9300 850.00 282939 CIB 2009 09 07 09 15 1459-99 G co2 383.930 -999.990 ... L3 2009 09 22 16 50 41.8100 -4.9300 850.00 283716 CIB 2009 09 07 09 15 458-99 G co2 383.740 -999.990 ... L3 2009 09 22 16 35 41.8100 -4.9300 850.00 283715 CIB 2009 09 14 09 45 3666-99 G co2 378.580 -999.990 ... L10 2009 09 22 16 56 41.8100 -4.9300 850.00 283714 CIB 2009 09 14 09 45 528-99 G co2 378.470 -999.990 ... L10 2009 09 22 16 40 41.8100 -4.9300 850.00 283713 CIB 2009 09 21 09 15 2461-99 G co2 381.900 -999.990 ... L10 2009 10 02 11 51 41.8100 -4.9300 850.00 284402 CIB 2009 09 21 09 15 796-99 G co2 382.000 -999.990 ... L10 2009 10 02 11 35 41.8100 -4.9300 850.00 284401 CIB 2009 09 28 09 12 2471-99 G co2 388.240 -999.990 ... L10 2009 10 02 12 37 41.8100 -4.9300 850.00 284400 CIB 2009 10 05 08 30 4427-99 G co2 400.560 -999.990 .X. L10 2009 10 22 17 28 41.8100 -4.9300 850.00 285317 CIB 2009 10 05 08 30 4428-99 G co2 400.470 -999.990 .X. L10 2009 10 22 17 43 41.8100 -4.9300 850.00 285318 CIB 2009 10 13 08 30 3919-99 G co2 385.740 -999.990 ... L10 2009 10 22 16 57 41.8100 -4.9300 850.00 285319 CIB 2009 10 13 08 30 3920-99 G co2 385.680 -999.990 ... L10 2009 10 22 17 13 41.8100 -4.9300 850.00 285320 CIB 2009 10 19 09 05 3019-99 G co2 391.820 -999.990 ... L10 2009 11 16 11 22 41.8100 -4.9300 850.00 285879 CIB 2009 10 19 09 05 3020-99 G co2 391.890 -999.990 ... L10 2009 11 16 11 38 41.8100 -4.9300 850.00 285880 CIB 2009 10 26 10 20 1439-99 G co2 392.810 -999.990 ... L10 2009 11 16 10 52 41.8100 -4.9300 850.00 285877 CIB 2009 10 26 10 20 1440-99 G co2 392.970 -999.990 ... L10 2009 11 16 11 07 41.8100 -4.9300 850.00 285878 CIB 2009 11 03 10 20 1513-99 G co2 390.030 -999.990 ... L10 2009 11 23 13 41 41.8100 -4.9300 850.00 286646 CIB 2009 11 03 10 20 1740-99 G co2 389.950 -999.990 ... L10 2009 11 23 13 56 41.8100 -4.9300 850.00 286647 CIB 2009 11 09 09 15 1497-99 G co2 391.140 -999.990 ... L10 2009 11 23 14 12 41.8100 -4.9300 850.00 286644 CIB 2009 11 09 09 15 2981-99 G co2 391.340 -999.990 ... L10 2009 11 23 14 27 41.8100 -4.9300 850.00 286645 CIB 2009 11 16 09 10 3424-99 G co2 388.490 -999.990 ... L10 2009 12 12 17 29 41.8100 -4.9300 850.00 287589 CIB 2009 11 16 09 10 669-99 G co2 388.420 -999.990 ... L10 2009 12 12 17 14 41.8100 -4.9300 850.00 287588 CIB 2009 11 23 10 10 299-99 G co2 390.870 -999.990 ... L10 2009 12 12 16 43 41.8100 -4.9300 850.00 287590 CIB 2009 11 23 10 10 3244-99 G co2 390.920 -999.990 ... L10 2009 12 12 16 58 41.8100 -4.9300 850.00 287591 CIB 2009 11 30 10 40 4065-99 G co2 391.990 -999.990 ... L10 2010 02 04 14 39 41.8100 -4.9300 850.00 289447 CIB 2009 11 30 10 40 4066-99 G co2 391.830 -999.990 ... L10 2010 02 04 14 54 41.8100 -4.9300 850.00 289448 CIB 2009 12 09 10 30 4105-99 G co2 400.050 -999.990 ... L10 2010 02 23 10 51 41.8100 -4.9300 850.00 289968 CIB 2009 12 09 12 50 379-99 G co2 392.980 -999.990 ... L10 2010 01 19 11 03 41.8100 -4.9300 850.00 288505 CIB 2009 12 09 12 50 380-99 G co2 392.630 -999.990 ... L10 2010 01 19 11 18 41.8100 -4.9300 850.00 288506 CIB 2009 12 14 10 50 349-99 G co2 397.900 -999.990 ... L10 2010 01 19 13 36 41.8100 -4.9300 847.00 288513 CIB 2009 12 14 10 50 350-99 G co2 397.830 -999.990 ... L10 2010 01 19 13 52 41.8100 -4.9300 847.00 288514 CIB 2010 01 04 10 15 297-99 G co2 393.830 -999.990 ... L10 2010 02 04 14 08 41.8100 -4.9300 850.00 289449 CIB 2010 01 04 10 15 298-99 G co2 393.970 -999.990 ... L10 2010 02 04 14 23 41.8100 -4.9300 850.00 289450 CIB 2010 01 18 10 20 2995-99 G co2 396.170 -999.990 ... L10 2010 02 16 14 39 41.8100 -4.9300 850.00 289966 CIB 2010 01 18 10 20 2996-99 G co2 396.150 -999.990 ... L10 2010 02 16 14 55 41.8100 -4.9300 850.00 289967 CIB 2010 01 25 10 50 3563-99 G co2 392.480 -999.990 ... L10 2010 03 02 09 45 41.8100 -4.9300 850.00 290787 CIB 2010 01 25 10 50 3665-99 G co2 392.200 -999.990 ... L10 2010 03 02 09 30 41.8100 -4.9300 850.00 290786 CIB 2010 02 01 09 05 2349-99 G co2 395.900 -999.990 ... L10 2010 03 03 15 49 41.8100 -4.9300 850.00 290789 CIB 2010 02 01 09 05 54-99 G co2 395.840 -999.990 ... L10 2010 03 03 15 34 41.8100 -4.9300 850.00 290788 CIB 2010 02 08 09 10 3392-99 G co2 396.450 -999.990 ... L10 2010 03 15 11 09 41.8100 -4.9300 850.00 291641 CIB 2010 02 08 09 10 4485-99 G co2 396.880 -999.990 ... L10 2010 03 15 11 25 41.8100 -4.9300 850.00 291642 CIB 2010 02 15 10 00 3277-99 G co2 400.620 -999.990 ... L10 2010 03 12 14 30 41.8100 -4.9300 850.00 291643 CIB 2010 02 15 10 00 3345-99 G co2 400.670 -999.990 ... L10 2010 03 12 14 45 41.8100 -4.9300 850.00 291644 CIB 2010 02 22 09 15 4779-99 G co2 394.030 -999.990 ... L10 2010 03 26 13 03 41.8100 -4.9300 850.00 292319 CIB 2010 02 22 09 15 4780-99 G co2 393.950 -999.990 ... L10 2010 03 26 13 18 41.8100 -4.9300 850.00 292320 CIB 2010 03 01 09 15 2967-99 G co2 393.370 -999.990 ... L10 2010 03 26 12 33 41.8100 -4.9300 850.00 292317 CIB 2010 03 01 09 15 2968-99 G co2 393.240 -999.990 ... L10 2010 03 26 12 48 41.8100 -4.9300 850.00 292318 CIB 2010 03 08 10 30 2113-99 G co2 397.700 -999.990 ... L10 2010 04 07 13 50 41.8100 -4.9300 850.00 293280 CIB 2010 03 08 10 30 2114-99 G co2 397.580 -999.990 ... L10 2010 04 07 14 05 41.8100 -4.9300 850.00 293281 CIB 2010 03 15 10 45 4205-99 G co2 397.360 -999.990 -.. L10 2010 04 06 15 45 41.8100 -4.9300 850.00 293278 CIB 2010 03 15 10 45 4206-99 G co2 397.970 -999.990 +.. L10 2010 04 06 16 00 41.8100 -4.9300 850.00 293279 CIB 2010 03 22 09 40 2744-99 G co2 407.800 -999.990 .X. L8 2010 04 13 13 41 41.8100 -4.9300 850.00 293829 CIB 2010 03 22 09 40 2969-99 G co2 407.630 -999.990 .X. L8 2010 04 13 13 56 41.8100 -4.9300 850.00 293830 CIB 2010 03 29 08 20 1003-99 G co2 397.070 -999.990 ... L8 2010 04 13 13 11 41.8100 -4.9300 850.00 293831 CIB 2010 03 29 08 20 2903-99 G co2 396.920 -999.990 ... L8 2010 04 13 13 25 41.8100 -4.9300 850.00 293832 CIB 2010 04 05 10 30 3645-99 G co2 392.440 -999.990 ... L10 2010 04 20 15 35 41.8100 -4.9300 850.00 294900 CIB 2010 04 05 10 30 3646-99 G co2 392.280 -999.990 ... L10 2010 04 20 15 50 41.8100 -4.9300 850.00 294901 CIB 2010 04 12 10 00 4981-99 G co2 391.450 -999.990 ... L8 2010 04 20 14 50 41.8100 -4.9300 850.00 294902 CIB 2010 04 12 10 00 4982-99 G co2 391.410 -999.990 ... L8 2010 04 20 15 05 41.8100 -4.9300 850.00 294903 CIB 2010 04 19 10 05 4909-99 G co2 392.320 -999.990 ... L8 2010 05 11 15 27 41.8100 -4.9300 850.00 295934 CIB 2010 04 19 10 05 4910-99 G co2 392.310 -999.990 ... L8 2010 05 11 15 41 41.8100 -4.9300 850.00 295935 CIB 2010 04 26 09 30 2155-99 G co2 385.700 -999.990 -.. L8 2010 05 11 14 57 41.8100 -4.9300 850.00 295936 CIB 2010 04 26 09 30 2156-99 G co2 387.180 -999.990 +.. L8 2010 05 11 15 12 41.8100 -4.9300 850.00 295937 CIB 2010 05 03 09 00 1329-99 G co2 389.740 -999.990 ... L8 2010 05 25 09 05 41.8100 -4.9300 850.00 296707 CIB 2010 05 03 09 00 1330-99 G co2 390.040 -999.990 ... L8 2010 05 25 09 19 41.8100 -4.9300 850.00 296708 CIB 2010 05 10 09 45 495-99 G co2 390.280 -999.990 +.. L8 2010 05 25 09 34 41.8100 -4.9300 850.00 296705 CIB 2010 05 10 09 45 496-99 G co2 389.610 -999.990 -.. L8 2010 05 25 09 49 41.8100 -4.9300 850.00 296706 CIB 2010 05 18 11 30 4213-99 G co2 384.760 -999.990 ... L10 2010 06 03 12 44 41.8100 -4.9300 850.00 297401 CIB 2010 05 18 11 30 5046-99 G co2 385.170 -999.990 ... L10 2010 06 03 12 59 41.8100 -4.9300 850.00 297402 CIB 2010 05 24 09 00 1574-99 G co2 392.550 -999.990 +.. L10 2010 06 03 12 13 41.8100 -4.9300 850.00 297399 CIB 2010 05 24 09 00 4077-99 G co2 392.020 -999.990 -.. L10 2010 06 03 12 29 41.8100 -4.9300 850.00 297400 CIB 2010 05 31 10 33 3321-99 G co2 389.180 -999.990 ... L8 2010 06 15 12 50 41.8100 -4.9300 850.00 298358 CIB 2010 05 31 10 33 3322-99 G co2 388.960 -999.990 ... L8 2010 06 15 13 05 41.8100 -4.9300 850.00 298359 CIB 2010 06 07 09 05 4181-99 G co2 390.620 -999.990 ... L8 2010 06 15 12 21 41.8100 -4.9300 850.00 298360 CIB 2010 06 07 09 05 4182-99 G co2 390.490 -999.990 ... L8 2010 06 15 12 36 41.8100 -4.9300 850.00 298361 CIB 2010 06 14 10 20 4220-99 G co2 390.220 -999.990 ... L8 2010 06 29 09 11 41.8100 -4.9300 850.00 299135 CIB 2010 06 14 10 20 4429-99 G co2 389.920 -999.990 ... L8 2010 06 29 09 25 41.8100 -4.9300 850.00 299136 CIB 2010 06 21 09 20 377-99 G co2 387.720 -999.990 ... L8 2010 06 29 09 40 41.8100 -4.9300 850.00 299137 CIB 2010 06 21 09 20 4673-99 G co2 387.570 -999.990 ... L8 2010 06 29 09 55 41.8100 -4.9300 850.00 299138 CIB 2010 06 28 09 20 3135-99 G co2 394.810 -999.990 ... L10 2010 07 12 14 04 41.8100 -4.9300 850.00 299887 CIB 2010 06 28 09 20 3136-99 G co2 394.880 -999.990 ... L10 2010 07 12 14 19 41.8100 -4.9300 850.00 299888 CIB 2010 07 02 09 00 3885-99 G co2 389.540 -999.990 ... L10 2010 07 12 13 29 41.8100 -4.9300 850.00 299889 CIB 2010 07 02 09 00 3886-99 G co2 389.930 -999.990 ... L10 2010 07 12 13 44 41.8100 -4.9300 850.00 299890 CIB 2010 07 12 10 35 1008-99 G co2 387.020 -999.990 ... L8 2010 07 30 13 54 41.8100 -4.9300 850.00 300978 CIB 2010 07 12 10 35 4957-99 G co2 387.010 -999.990 ... L8 2010 07 30 14 09 41.8100 -4.9300 850.00 300979 CIB 2010 07 19 09 00 1336-99 G co2 384.810 -999.990 ... L8 2010 07 30 13 25 41.8100 -4.9300 850.00 300980 CIB 2010 07 19 09 00 6072-66 G co2 384.710 -999.990 ... L8 2010 07 30 13 40 41.8100 -4.9300 850.00 300981 CIB 2010 07 26 09 17 5201-99 G co2 385.300 -999.990 ... L10 2010 08 09 13 39 41.8100 -4.9300 850.00 301526 CIB 2010 07 26 09 17 5202-99 G co2 385.190 -999.990 ... L10 2010 08 09 13 54 41.8100 -4.9300 850.00 301527 CIB 2010 08 02 09 10 5207-99 G co2 386.000 -999.990 ... L10 2010 08 09 13 08 41.8100 -4.9300 850.00 301528 CIB 2010 08 02 09 10 5208-99 G co2 385.960 -999.990 ... L10 2010 08 09 13 23 41.8100 -4.9300 850.00 301529 CIB 2010 08 09 09 16 39-99 G co2 389.570 -999.990 ... L8 2010 08 25 11 18 41.8100 -4.9300 850.00 302495 CIB 2010 08 09 09 16 40-99 G co2 389.650 -999.990 ... L8 2010 08 25 11 33 41.8100 -4.9300 850.00 302496 CIB 2010 08 17 09 30 2003-99 G co2 384.140 -999.990 ... L8 2010 08 25 10 49 41.8100 -4.9300 850.00 302497 CIB 2010 08 17 09 30 2004-99 G co2 384.080 -999.990 ... L8 2010 08 25 11 03 41.8100 -4.9300 850.00 302498 CIB 2010 08 23 09 35 703-99 G co2 388.320 -999.990 ... L10 2010 09 07 11 24 41.8100 -4.9300 850.00 303175 CIB 2010 08 23 09 35 704-99 G co2 388.270 -999.990 ... L10 2010 09 07 11 39 41.8100 -4.9300 850.00 303176 CIB 2010 08 30 09 24 4389-99 G co2 382.790 -999.990 ... L10 2010 09 07 11 54 41.8100 -4.9300 850.00 303173 CIB 2010 08 30 09 24 4390-99 G co2 382.760 -999.990 ... L10 2010 09 07 12 09 41.8100 -4.9300 850.00 303174 CIB 2010 09 06 09 06 156-99 G co2 384.840 -999.990 ... L10 2010 09 22 14 25 41.8100 -4.9300 850.00 304083 CIB 2010 09 06 09 06 2383-99 G co2 384.890 -999.990 ... L10 2010 09 22 14 09 41.8100 -4.9300 850.00 304084 CIB 2010 09 13 08 47 3437-99 G co2 386.490 -999.990 ... L10 2010 09 22 14 40 41.8100 -4.9300 850.00 304081 CIB 2010 09 13 08 47 3466-99 G co2 386.440 -999.990 ... L10 2010 09 22 14 55 41.8100 -4.9300 850.00 304082 CIB 2010 09 20 09 52 2939-99 G co2 393.510 -999.990 ... L8 2010 10 06 13 57 41.8100 -4.9300 850.00 304988 CIB 2010 09 20 09 52 4905-99 G co2 393.340 -999.990 ... L8 2010 10 06 14 12 41.8100 -4.9300 850.00 304989 CIB 2010 09 27 10 00 2844-99 G co2 383.620 -999.990 ... L10 2010 10 06 15 10 41.8100 -4.9300 850.00 304987 CIB 2010 09 27 10 00 869-99 G co2 383.350 -999.990 ... L10 2010 10 06 14 55 41.8100 -4.9300 850.00 304986 CIB 2010 10 04 11 00 5073-99 G co2 386.660 -999.990 ... L10 2010 10 21 10 42 41.8100 -4.9300 850.00 305831 CIB 2010 10 04 11 00 5074-99 G co2 386.670 -999.990 ... L10 2010 10 21 10 57 41.8100 -4.9300 850.00 305832 CIB 2010 10 08 10 15 5173-99 G co2 390.430 -999.990 ... L10 2010 10 21 10 11 41.8100 -4.9300 850.00 305833 CIB 2010 10 08 10 15 5174-99 G co2 390.590 -999.990 ... L10 2010 10 21 10 26 41.8100 -4.9300 850.00 305834 CIB 2010 10 18 10 20 2123-99 G co2 389.000 -999.990 ... L8 2010 11 11 14 09 41.8100 -4.9300 850.00 307117 CIB 2010 10 18 10 20 2124-99 G co2 388.910 -999.990 ... L8 2010 11 11 14 24 41.8100 -4.9300 850.00 307118 CIB 2010 10 27 10 00 5183-99 G co2 395.100 -999.990 ... L8 2010 11 11 14 39 41.8100 -4.9300 850.00 307119 CIB 2010 10 27 10 00 5184-99 G co2 394.680 -999.990 ... L8 2010 11 11 14 54 41.8100 -4.9300 850.00 307120 CIB 2010 11 02 10 10 2739-99 G co2 392.510 -999.990 ... L10 2010 11 17 11 56 41.8100 -4.9300 850.00 307786 CIB 2010 11 02 10 10 2740-99 G co2 392.860 -999.990 ... L10 2010 11 17 12 11 41.8100 -4.9300 850.00 307787 CIB 2010 11 08 11 00 2041-99 G co2 392.400 -999.990 ... L10 2010 11 17 12 27 41.8100 -4.9300 850.00 307784 CIB 2010 11 08 11 00 2042-99 G co2 392.400 -999.990 ... L10 2010 11 17 12 42 41.8100 -4.9300 850.00 307785 CIB 2010 11 15 11 40 1386-99 G co2 393.350 -999.990 ... L8 2010 12 07 15 20 41.8100 -4.9300 850.00 308452 CIB 2010 11 15 11 40 2914-99 G co2 393.440 -999.990 ... L8 2010 12 07 15 35 41.8100 -4.9300 850.00 308453 CIB 2010 11 22 10 40 3609-99 G co2 395.200 -999.990 ... L8 2010 12 08 09 52 41.8100 -4.9300 850.00 308451 CIB 2010 11 22 10 40 3785-99 G co2 395.260 -999.990 ... L8 2010 12 08 09 37 41.8100 -4.9300 850.00 308450 CIB 2010 11 29 10 15 2707-99 G co2 400.110 -999.990 ... L8 2010 12 20 15 51 41.8100 -4.9300 850.00 309549 CIB 2010 11 29 10 15 2708-99 G co2 400.130 -999.990 ... L8 2010 12 20 16 06 41.8100 -4.9300 850.00 309550 CIB 2010 12 09 11 05 6203-66 G co2 399.500 -999.990 ... L8 2010 12 20 15 22 41.8100 -4.9300 850.00 309547 CIB 2010 12 09 11 05 6204-66 G co2 399.650 -999.990 ... L8 2010 12 20 15 36 41.8100 -4.9300 850.00 309548 CIB 2010 12 14 11 05 1656-99 G co2 395.160 -999.990 ... L10 2011 01 05 15 24 41.8100 -4.9300 850.00 310363 CIB 2010 12 14 11 05 970-99 G co2 395.000 -999.990 ... L10 2011 01 05 15 08 41.8100 -4.9300 850.00 310362 CIB 2010 12 20 10 20 2422-99 G co2 395.620 -999.990 ... L10 2011 01 05 15 41 41.8100 -4.9300 850.00 310364 CIB 2010 12 20 10 20 4403-99 G co2 395.620 -999.990 ... L10 2011 01 05 15 57 41.8100 -4.9300 850.00 310365 CIB 2010 12 27 11 10 2313-99 G co2 407.450 -999.990 ... L10 2011 01 20 12 05 41.8100 -4.9300 850.00 311090 CIB 2010 12 27 11 10 2314-99 G co2 407.460 -999.990 ... L10 2011 01 20 12 21 41.8100 -4.9300 850.00 311091