# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: assure that ESRL receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: ESRL should be informed at the outset of the nature of this work. # comment: If the ESRL data are essential to the work, or if an important # comment: result or conclusion depends on the ESRL data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the ESRL data should be sent to ESRL # comment: for review before they are submitted for publication so we can # comment: insure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO2 CCGG (Individual Flasks) # contact_name: Thomas J Conway # contact_telephone: (303) 497-6681 # contact_email: Thomas.J.Conway@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Zeppelin Station/University of Stockholm # collaborator_name: Meteorological Institute [MISU] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the ESRL data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: zep # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: date:1900-01-01,2010-12-31 # description_creation-time: 2011-10-14 15:01:53 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude event_number ZEP 1994 02 11 14 30 00 315-91 P co2 CCGG 362.970 -999.990 ... S1 1994 03 30 12 00 00 78.9000 11.8800 475.00 166215 ZEP 1994 02 11 14 30 00 316-91 P co2 CCGG 362.820 -999.990 ... S1 1994 03 30 12 02 00 78.9000 11.8800 475.00 166216 ZEP 1994 02 14 14 30 00 179-91 P co2 CCGG 363.090 -999.990 ... S1 1994 03 23 08 56 00 78.9000 11.8800 475.00 166217 ZEP 1994 02 14 14 30 00 180-91 P co2 CCGG 362.950 -999.990 ... S1 1994 03 23 08 58 00 78.9000 11.8800 475.00 166218 ZEP 1994 02 17 09 45 00 503-91 P co2 CCGG 362.890 -999.990 ... S1 1994 03 30 08 52 00 78.9000 11.8800 475.00 166219 ZEP 1994 02 17 09 45 00 504-91 P co2 CCGG 362.880 -999.990 ... S1 1994 03 30 08 54 00 78.9000 11.8800 475.00 166220 ZEP 1994 02 19 14 00 00 501-91 P co2 CCGG 362.230 -999.990 ... S1 1994 03 30 08 56 00 78.9000 11.8800 475.00 166221 ZEP 1994 02 19 14 00 00 502-91 P co2 CCGG 362.200 -999.990 ... S1 1994 03 30 08 58 00 78.9000 11.8800 475.00 166222 ZEP 1994 02 21 14 00 00 245-91 P co2 CCGG 362.710 -999.990 ... S1 1994 03 30 08 48 00 78.9000 11.8800 475.00 166223 ZEP 1994 02 21 14 00 00 246-91 P co2 CCGG 362.600 -999.990 ... S1 1994 03 30 08 50 00 78.9000 11.8800 475.00 166224 ZEP 1994 02 22 15 00 00 333-91 P co2 CCGG 364.270 -999.990 ... S1 1994 03 30 08 44 00 78.9000 11.8800 475.00 166225 ZEP 1994 02 22 15 00 00 334-91 P co2 CCGG 364.130 -999.990 ... S1 1994 03 30 08 46 00 78.9000 11.8800 475.00 166226 ZEP 1994 02 23 08 00 00 441-91 P co2 CCGG 365.100 -999.990 ... S1 1994 03 30 12 04 00 78.9000 11.8800 475.00 166227 ZEP 1994 02 23 08 00 00 442-91 P co2 CCGG 364.960 -999.990 ... S1 1994 03 30 12 06 00 78.9000 11.8800 475.00 166228 ZEP 1994 02 23 17 15 00 203-91 P co2 CCGG 364.120 -999.990 ... S1 1994 03 30 11 20 00 78.9000 11.8800 475.00 166229 ZEP 1994 02 23 17 15 00 204-91 P co2 CCGG 364.110 -999.990 ... S1 1994 03 30 11 22 00 78.9000 11.8800 475.00 166230 ZEP 1994 04 22 08 55 00 82-91 P co2 CCGG 364.390 -999.990 ... S1 1994 06 21 08 50 00 78.9000 11.8800 475.00 166231 ZEP 1994 04 28 07 40 00 357-91 P co2 CCGG 365.120 -999.990 ... S1 1994 06 21 08 40 00 78.9000 11.8800 475.00 166232 ZEP 1994 04 28 07 40 00 358-91 P co2 CCGG 365.110 -999.990 ... S1 1994 06 21 08 42 00 78.9000 11.8800 475.00 166233 ZEP 1994 05 05 12 34 56 254-91 P co2 CCGG 364.090 -999.990 ... S1 1994 06 14 10 02 00 78.9000 11.8800 475.00 166234 ZEP 1994 05 12 12 34 56 57-91 P co2 CCGG 363.190 -999.990 ... S1 1994 06 09 08 52 00 78.9000 11.8800 475.00 166235 ZEP 1994 05 12 12 34 56 58-91 P co2 CCGG 363.330 -999.990 ... S1 1994 06 09 08 54 00 78.9000 11.8800 475.00 166236 ZEP 1994 05 16 12 45 00 537-91 P co2 CCGG 363.940 -999.990 ... S1 1994 06 09 10 00 00 78.9000 11.8800 475.00 166237 ZEP 1994 05 16 12 45 00 538-91 P co2 CCGG 363.930 -999.990 ... S1 1994 06 09 10 02 00 78.9000 11.8800 475.00 166238 ZEP 1994 05 18 07 30 00 243-91 P co2 CCGG 363.260 -999.990 ... S1 1994 06 09 09 44 00 78.9000 11.8800 475.00 166239 ZEP 1994 05 18 07 30 00 244-91 P co2 CCGG 363.220 -999.990 ... S1 1994 06 09 09 46 00 78.9000 11.8800 475.00 166240 ZEP 1994 05 21 07 45 00 151-91 P co2 CCGG 363.500 -999.990 ... S1 1994 06 09 09 48 00 78.9000 11.8800 475.00 166241 ZEP 1994 05 21 07 45 00 152-91 P co2 CCGG 363.460 -999.990 ... S1 1994 06 09 09 50 00 78.9000 11.8800 475.00 166242 ZEP 1994 05 23 07 30 00 27-91 P co2 CCGG 362.920 -999.990 ... S1 1994 06 09 10 04 00 78.9000 11.8800 475.00 166243 ZEP 1994 05 23 07 30 00 28-91 P co2 CCGG 362.920 -999.990 ... S1 1994 06 09 10 06 00 78.9000 11.8800 475.00 166244 ZEP 1994 05 26 16 15 00 747-91 P co2 CCGG 362.970 -999.990 ... S1 1994 06 21 08 52 00 78.9000 11.8800 475.00 166245 ZEP 1994 05 26 16 15 00 748-91 P co2 CCGG 362.950 -999.990 ... S1 1994 06 21 08 54 00 78.9000 11.8800 475.00 166246 ZEP 1994 05 28 07 25 00 745-91 P co2 CCGG 363.050 -999.990 ... S1 1994 06 21 08 48 00 78.9000 11.8800 475.00 166247 ZEP 1994 05 29 09 30 00 741-91 P co2 CCGG 363.400 -999.990 ... S1 1994 06 21 12 12 00 78.9000 11.8800 475.00 166248 ZEP 1994 05 29 09 30 00 742-91 P co2 CCGG 363.440 -999.990 ... S1 1994 06 21 12 14 00 78.9000 11.8800 475.00 166249 ZEP 1994 05 31 08 00 00 743-91 P co2 CCGG 363.640 -999.990 ... S1 1994 06 21 10 20 00 78.9000 11.8800 475.00 166250 ZEP 1994 05 31 08 00 00 744-91 P co2 CCGG 363.590 -999.990 ... S1 1994 06 21 10 22 00 78.9000 11.8800 475.00 166251 ZEP 1994 06 02 07 20 00 737-91 P co2 CCGG 363.870 -999.990 ... S1 1994 06 30 10 20 00 78.9000 11.8800 475.00 166252 ZEP 1994 06 02 07 20 00 738-91 P co2 CCGG 363.850 -999.990 ... S1 1994 06 30 10 22 00 78.9000 11.8800 475.00 166253 ZEP 1994 06 05 16 10 00 739-91 P co2 CCGG 363.250 -999.990 ... S1 1994 06 30 12 12 00 78.9000 11.8800 475.00 166254 ZEP 1994 06 05 16 10 00 740-91 P co2 CCGG 363.280 -999.990 ... S1 1994 06 30 12 14 00 78.9000 11.8800 475.00 166255 ZEP 1994 06 07 10 09 00 733-91 P co2 CCGG 363.430 -999.990 ... S1 1994 06 30 12 08 00 78.9000 11.8800 475.00 166256 ZEP 1994 06 07 10 09 00 734-91 P co2 CCGG 363.430 -999.990 ... S1 1994 06 30 12 10 00 78.9000 11.8800 475.00 166257 ZEP 1994 06 09 09 38 00 735-91 P co2 CCGG -999.990 -999.990 *.. S1 1994 06 30 12 04 00 78.9000 11.8800 475.00 166258 ZEP 1994 06 09 09 38 00 736-91 P co2 CCGG 363.280 -999.990 +.. S1 1994 06 30 12 06 00 78.9000 11.8800 475.00 166259 ZEP 1994 06 13 08 40 00 800-91 P co2 CCGG 361.930 -999.990 ... S1 1994 07 06 10 06 00 78.9000 11.8800 475.00 166260 ZEP 1994 06 14 08 40 00 803-91 P co2 CCGG 360.930 -999.990 ... S1 1994 07 06 10 00 00 78.9000 11.8800 475.00 166261 ZEP 1994 06 14 08 40 00 804-91 P co2 CCGG 360.890 -999.990 ... S1 1994 07 06 10 02 00 78.9000 11.8800 475.00 166262 ZEP 1994 06 15 08 08 00 795-91 P co2 CCGG 360.090 -999.990 ... S1 1994 07 06 08 52 00 78.9000 11.8800 475.00 166263 ZEP 1994 06 15 08 08 00 796-91 P co2 CCGG 360.070 -999.990 ... S1 1994 07 06 08 54 00 78.9000 11.8800 475.00 166264 ZEP 1994 06 17 08 15 00 793-91 P co2 CCGG 360.550 -999.990 ... S1 1994 07 06 10 24 00 78.9000 11.8800 475.00 166265 ZEP 1994 06 17 08 15 00 794-91 P co2 CCGG 360.630 -999.990 ... S1 1994 07 06 10 26 00 78.9000 11.8800 475.00 166266 ZEP 1994 06 20 08 25 00 791-91 P co2 CCGG 361.920 -999.990 ... S1 1994 07 12 09 12 00 78.9000 11.8800 475.00 166267 ZEP 1994 06 20 08 25 00 792-91 P co2 CCGG 361.880 -999.990 ... S1 1994 07 12 09 14 00 78.9000 11.8800 475.00 166268 ZEP 1994 06 23 07 25 00 197-91 P co2 CCGG 360.820 -999.990 ... S1 1994 07 12 09 24 00 78.9000 11.8800 475.00 166269 ZEP 1994 06 23 07 25 00 198-91 P co2 CCGG 360.810 -999.990 ... S1 1994 07 12 09 26 00 78.9000 11.8800 475.00 166270 ZEP 1994 06 30 07 06 00 213-91 P co2 CCGG 356.530 -999.990 ... S1 1994 07 12 09 20 00 78.9000 11.8800 475.00 166271 ZEP 1994 06 30 07 06 00 214-91 P co2 CCGG 356.520 -999.990 ... S1 1994 07 12 09 22 00 78.9000 11.8800 475.00 166272 ZEP 1994 07 01 08 30 00 789-91 P co2 CCGG 356.800 -999.990 ... S1 1994 07 12 09 16 00 78.9000 11.8800 475.00 166273 ZEP 1994 07 01 08 30 00 790-91 P co2 CCGG 356.760 -999.990 ... S1 1994 07 12 09 18 00 78.9000 11.8800 475.00 166274 ZEP 1994 07 04 09 24 00 801-91 P co2 CCGG 357.150 -999.990 ... S1 1994 07 20 10 04 00 78.9000 11.8800 475.00 166275 ZEP 1994 07 04 09 24 00 802-91 P co2 CCGG 357.100 -999.990 ... S1 1994 07 20 10 06 00 78.9000 11.8800 475.00 166276 ZEP 1994 07 06 08 43 00 797-91 P co2 CCGG 359.080 -999.990 ... S1 1994 07 20 10 32 00 78.9000 11.8800 475.00 166277 ZEP 1994 07 06 08 43 00 798-91 P co2 CCGG 359.100 -999.990 ... S1 1994 07 20 10 34 00 78.9000 11.8800 475.00 166278 ZEP 1994 07 08 08 48 00 787-91 P co2 CCGG 358.200 -999.990 ... S1 1994 08 03 09 44 00 78.9000 11.8800 475.00 166279 ZEP 1994 07 08 08 48 00 788-91 P co2 CCGG 358.250 -999.990 ... S1 1994 08 03 09 46 00 78.9000 11.8800 475.00 166280 ZEP 1994 07 11 09 35 00 785-91 P co2 CCGG 358.000 -999.990 ... S1 1994 08 03 09 20 00 78.9000 11.8800 475.00 166281 ZEP 1994 07 11 09 35 00 786-91 P co2 CCGG 357.990 -999.990 ... S1 1994 08 03 09 22 00 78.9000 11.8800 475.00 166282 ZEP 1994 07 13 07 35 00 781-91 P co2 CCGG 356.290 -999.990 ... S1 1994 07 28 09 16 00 78.9000 11.8800 475.00 166283 ZEP 1994 07 13 07 35 00 782-91 P co2 CCGG 356.240 -999.990 ... S1 1994 07 28 09 18 00 78.9000 11.8800 475.00 166284 ZEP 1994 07 15 08 02 00 783-91 P co2 CCGG 354.780 -999.990 ... S1 1994 07 28 09 12 00 78.9000 11.8800 475.00 166285 ZEP 1994 07 15 08 02 00 784-91 P co2 CCGG 354.770 -999.990 ... S1 1994 07 28 09 14 00 78.9000 11.8800 475.00 166286 ZEP 1994 07 18 08 22 00 813-91 P co2 CCGG 355.060 -999.990 ... S1 1994 08 18 09 28 00 78.9000 11.8800 475.00 166287 ZEP 1994 07 18 08 22 00 814-91 P co2 CCGG 355.010 -999.990 ... S1 1994 08 18 09 30 00 78.9000 11.8800 475.00 166288 ZEP 1994 07 20 08 25 00 815-91 P co2 CCGG 355.350 -999.990 ... S1 1994 08 19 10 32 00 78.9000 11.8800 475.00 166289 ZEP 1994 07 20 08 25 00 816-91 P co2 CCGG 355.370 -999.990 ... S1 1994 08 19 10 34 00 78.9000 11.8800 475.00 166290 ZEP 1994 07 22 12 34 56 811-91 P co2 CCGG 353.070 -999.990 ... S1 1994 08 23 08 22 00 78.9000 11.8800 475.00 166291 ZEP 1994 07 27 08 48 00 807-91 P co2 CCGG 353.500 -999.990 ... S1 1994 08 18 09 24 00 78.9000 11.8800 475.00 166292 ZEP 1994 07 27 08 48 00 808-91 P co2 CCGG 353.400 -999.990 ... S1 1994 08 18 09 26 00 78.9000 11.8800 475.00 166293 ZEP 1994 07 29 08 50 00 810-91 P co2 CCGG 352.700 -999.990 ... S1 1994 08 18 09 18 00 78.9000 11.8800 475.00 166294 ZEP 1994 08 01 09 32 00 805-91 P co2 CCGG 353.200 -999.990 ... S1 1994 08 18 09 52 00 78.9000 11.8800 475.00 166295 ZEP 1994 08 01 09 32 00 806-91 P co2 CCGG 353.170 -999.990 ... S1 1994 08 18 09 54 00 78.9000 11.8800 475.00 166296 ZEP 1994 08 08 08 30 00 121-91 P co2 CCGG 352.300 -999.990 ... S1 1994 09 02 08 28 00 78.9000 11.8800 475.00 166297 ZEP 1994 08 08 08 30 00 122-91 P co2 CCGG 352.250 -999.990 ... S1 1994 09 02 08 30 00 78.9000 11.8800 475.00 166298 ZEP 1994 08 10 08 55 00 385-91 P co2 CCGG 352.710 -999.990 ... S1 1994 09 02 08 52 00 78.9000 11.8800 475.00 166299 ZEP 1994 08 10 08 55 00 386-91 P co2 CCGG 352.630 -999.990 ... S1 1994 09 02 08 54 00 78.9000 11.8800 475.00 166300 ZEP 1994 08 18 09 00 00 355-91 P co2 CCGG 350.660 -999.990 ... S1 1994 09 19 11 00 00 78.9000 11.8800 475.00 166301 ZEP 1994 08 18 09 00 00 356-91 P co2 CCGG 350.760 -999.990 ... S1 1994 09 19 11 02 00 78.9000 11.8800 475.00 166302 ZEP 1994 08 25 08 15 00 539-91 P co2 CCGG 349.550 -999.990 ... S1 1994 09 19 11 04 00 78.9000 11.8800 475.00 166303 ZEP 1994 08 25 08 15 00 540-91 P co2 CCGG 349.500 -999.990 ... S1 1994 09 19 11 06 00 78.9000 11.8800 475.00 166304 ZEP 1994 08 31 13 38 00 353-91 P co2 CCGG 349.070 -999.990 ... S1 1994 10 04 12 24 00 78.9000 11.8800 475.00 166305 ZEP 1994 08 31 13 38 00 354-91 P co2 CCGG 348.990 -999.990 ... S1 1994 10 04 12 26 00 78.9000 11.8800 475.00 166306 ZEP 1994 09 08 07 55 00 217-91 P co2 CCGG 348.950 -999.990 ... S1 1994 10 19 09 16 00 78.9000 11.8800 475.00 166307 ZEP 1994 09 15 08 30 00 199-91 P co2 CCGG 349.150 -999.990 ... S1 1994 10 19 09 12 00 78.9000 11.8800 475.00 166308 ZEP 1994 09 15 08 30 00 200-91 P co2 CCGG 349.160 -999.990 ... S1 1994 10 19 09 14 00 78.9000 11.8800 475.00 166309 ZEP 1994 09 22 08 00 00 717-91 P co2 CCGG 351.170 -999.990 ... S1 1994 10 26 09 32 00 78.9000 11.8800 475.00 166310 ZEP 1994 09 22 08 00 00 718-91 P co2 CCGG 351.150 -999.990 ... S1 1994 10 26 09 34 00 78.9000 11.8800 475.00 166311 ZEP 1994 09 29 08 20 00 715-91 P co2 CCGG 352.950 -999.990 ... S1 1994 10 26 09 44 00 78.9000 11.8800 475.00 166312 ZEP 1994 09 29 08 20 00 716-91 P co2 CCGG 352.960 -999.990 ... S1 1994 10 26 09 46 00 78.9000 11.8800 475.00 166313 ZEP 1994 10 06 08 14 00 273-91 P co2 CCGG 354.270 -999.990 ... S1 1994 11 09 13 08 00 78.9000 11.8800 475.00 166314 ZEP 1994 10 06 08 14 00 274-91 P co2 CCGG 354.170 -999.990 ... S1 1994 11 09 13 10 00 78.9000 11.8800 475.00 166315 ZEP 1994 10 13 08 42 00 323-91 P co2 CCGG 355.570 -999.990 ... S1 1994 11 09 13 12 00 78.9000 11.8800 475.00 166316 ZEP 1994 10 13 08 42 00 324-91 P co2 CCGG 355.560 -999.990 ... S1 1994 11 09 13 14 00 78.9000 11.8800 475.00 166317 ZEP 1994 10 20 08 20 00 669-91 P co2 CCGG 357.160 -999.990 ... S1 1995 01 10 10 24 00 78.9000 11.8800 475.00 166318 ZEP 1994 10 20 08 20 00 670-91 P co2 CCGG 357.070 -999.990 ... S1 1995 01 10 10 26 00 78.9000 11.8800 475.00 166319 ZEP 1994 10 27 10 10 00 305-91 P co2 CCGG 357.660 -999.990 ... S1 1995 01 10 10 36 00 78.9000 11.8800 475.00 166320 ZEP 1994 10 27 10 10 00 306-91 P co2 CCGG 357.970 -999.990 ... S1 1995 01 10 10 38 00 78.9000 11.8800 475.00 166321 ZEP 1994 11 03 10 25 00 83-91 P co2 CCGG 358.360 -999.990 ... S1 1995 01 10 09 44 00 78.9000 11.8800 475.00 166322 ZEP 1994 11 03 10 25 00 84-91 P co2 CCGG 358.340 -999.990 ... S1 1995 01 10 09 46 00 78.9000 11.8800 475.00 166323 ZEP 1994 11 10 08 20 00 69-91 P co2 CCGG 359.100 -999.990 ... S1 1995 01 10 09 48 00 78.9000 11.8800 475.00 166324 ZEP 1994 11 10 08 20 00 70-91 P co2 CCGG 359.030 -999.990 ... S1 1995 01 10 09 50 00 78.9000 11.8800 475.00 166325 ZEP 1994 11 17 08 58 00 109-91 P co2 CCGG 360.580 -999.990 ... S1 1995 02 09 09 44 00 78.9000 11.8800 475.00 166326 ZEP 1994 11 17 08 58 00 110-91 P co2 CCGG 360.520 -999.990 ... S1 1995 02 09 09 46 00 78.9000 11.8800 475.00 166327 ZEP 1994 11 24 08 40 00 119-91 P co2 CCGG 365.040 -999.990 +.. S1 1995 02 09 09 48 00 78.9000 11.8800 475.00 166328 ZEP 1994 11 24 08 40 00 120-91 P co2 CCGG 362.230 -999.990 -.. S1 1995 02 09 09 50 00 78.9000 11.8800 475.00 166329 ZEP 1994 12 01 22 50 00 857-91 P co2 CCGG 416.520 -999.990 N.. S1 1995 02 14 08 48 00 78.9000 11.8800 475.00 166330 ZEP 1994 12 01 23 05 00 27-91 P co2 CCGG 362.670 -999.990 ... S1 1995 02 14 11 20 00 78.9000 11.8800 475.00 166331 ZEP 1994 12 01 23 05 00 28-91 P co2 CCGG 362.610 -999.990 ... S1 1995 02 14 11 22 00 78.9000 11.8800 475.00 166332 ZEP 1994 12 10 10 13 00 229-91 P co2 CCGG 365.390 -999.990 ... S1 1995 02 09 09 32 00 78.9000 11.8800 475.00 166333 ZEP 1994 12 10 10 13 00 230-91 P co2 CCGG 365.400 -999.990 ... S1 1995 02 09 09 34 00 78.9000 11.8800 475.00 166334 ZEP 1994 12 15 08 37 00 441-91 P co2 CCGG 362.590 -999.990 ... S1 1995 02 14 10 16 00 78.9000 11.8800 475.00 166335 ZEP 1994 12 15 08 37 00 442-91 P co2 CCGG 362.580 -999.990 ... S1 1995 02 14 10 18 00 78.9000 11.8800 475.00 166336 ZEP 1994 12 22 14 43 00 145-91 P co2 CCGG 363.870 -999.990 ... S1 1995 03 16 08 48 00 78.9000 11.8800 475.00 166337 ZEP 1994 12 22 14 43 00 146-91 P co2 CCGG 363.830 -999.990 ... S1 1995 03 16 08 50 00 78.9000 11.8800 475.00 166338 ZEP 1994 12 29 10 05 00 295-91 P co2 CCGG 364.260 -999.990 ... S1 1995 03 16 08 52 00 78.9000 11.8800 475.00 166339 ZEP 1994 12 29 10 05 00 296-91 P co2 CCGG 364.230 -999.990 ... S1 1995 03 16 08 54 00 78.9000 11.8800 475.00 166340 ZEP 1995 01 05 08 45 00 1-91 P co2 CCGG 363.520 -999.990 ... S1 1995 03 21 08 16 00 78.9000 11.8800 475.00 166341 ZEP 1995 01 05 08 45 00 2-91 P co2 CCGG 363.580 -999.990 ... S1 1995 03 21 08 18 00 78.9000 11.8800 475.00 166342 ZEP 1995 01 12 09 20 00 549-91 P co2 CCGG 362.720 -999.990 ... S1 1995 03 21 08 24 00 78.9000 11.8800 475.00 166343 ZEP 1995 01 12 09 20 00 550-91 P co2 CCGG 362.680 -999.990 ... S1 1995 03 21 08 26 00 78.9000 11.8800 475.00 166344 ZEP 1995 01 20 09 04 00 139-91 P co2 CCGG 363.530 -999.990 ... S1 1995 03 21 09 16 00 78.9000 11.8800 475.00 166345 ZEP 1995 01 26 08 53 00 717-91 P co2 CCGG 364.740 -999.990 ... S1 1995 03 21 08 56 00 78.9000 11.8800 475.00 166346 ZEP 1995 01 26 08 53 00 718-91 P co2 CCGG 364.740 -999.990 ... S1 1995 03 21 08 58 00 78.9000 11.8800 475.00 166347 ZEP 1995 02 02 09 30 00 739-91 P co2 CCGG 365.480 -999.990 ... S1 1995 03 21 09 48 00 78.9000 11.8800 475.00 166348 ZEP 1995 02 02 09 30 00 740-91 P co2 CCGG 365.540 -999.990 ... S1 1995 03 21 09 50 00 78.9000 11.8800 475.00 166349 ZEP 1995 02 09 09 18 00 733-91 P co2 CCGG 364.850 -999.990 ... S1 1995 03 16 08 40 00 78.9000 11.8800 475.00 166350 ZEP 1995 02 09 09 18 00 734-91 P co2 CCGG 364.830 -999.990 ... S1 1995 03 16 08 42 00 78.9000 11.8800 475.00 166351 ZEP 1995 02 16 08 50 00 747-91 P co2 CCGG 364.820 -999.990 ... S1 1995 05 03 10 00 00 78.9000 11.8800 475.00 166352 ZEP 1995 02 16 08 50 00 748-91 P co2 CCGG 364.740 -999.990 ... S1 1995 05 03 10 02 00 78.9000 11.8800 475.00 166353 ZEP 1995 02 23 09 05 00 809-91 P co2 CCGG 368.610 -999.990 ... S1 1995 05 03 10 20 00 78.9000 11.8800 475.00 166354 ZEP 1995 02 23 09 05 00 810-91 P co2 CCGG 368.630 -999.990 ... S1 1995 05 03 10 22 00 78.9000 11.8800 475.00 166355 ZEP 1995 03 02 09 25 00 815-91 P co2 CCGG 368.370 -999.990 ... S1 1995 05 03 10 24 00 78.9000 11.8800 475.00 166356 ZEP 1995 03 02 09 25 00 816-91 P co2 CCGG 368.260 -999.990 ... S1 1995 05 03 10 26 00 78.9000 11.8800 475.00 166357 ZEP 1995 03 09 09 21 00 787-91 P co2 CCGG 365.450 -999.990 ... S1 1995 05 03 10 28 00 78.9000 11.8800 475.00 166358 ZEP 1995 03 16 09 55 00 177-91 P co2 CCGG 366.990 -999.990 ... S1 1995 06 06 09 52 00 78.9000 11.8800 475.00 166359 ZEP 1995 03 16 09 55 00 178-91 P co2 CCGG 366.990 -999.990 ... S1 1995 06 06 09 54 00 78.9000 11.8800 475.00 166360 ZEP 1995 03 23 10 30 00 593-91 P co2 CCGG 366.300 -999.990 ... S1 1995 06 05 08 48 00 78.9000 11.8800 475.00 166361 ZEP 1995 03 23 10 30 00 594-91 P co2 CCGG 366.290 -999.990 ... S1 1995 06 05 08 50 00 78.9000 11.8800 475.00 166362 ZEP 1995 03 31 08 25 00 345-91 P co2 CCGG 367.040 -999.990 ... S1 1995 06 05 08 52 00 78.9000 11.8800 475.00 166363 ZEP 1995 03 31 08 25 00 346-91 P co2 CCGG 366.940 -999.990 ... S1 1995 06 05 08 54 00 78.9000 11.8800 475.00 166364 ZEP 1995 04 06 07 56 00 511-91 P co2 CCGG 366.110 -999.990 ... S1 1995 06 05 08 56 00 78.9000 11.8800 475.00 166365 ZEP 1995 04 06 07 56 00 512-91 P co2 CCGG 366.100 -999.990 ... S1 1995 06 05 08 58 00 78.9000 11.8800 475.00 166366 ZEP 1995 04 13 08 35 00 59-91 P co2 CCGG 366.860 -999.990 ... S1 1995 07 18 09 44 00 78.9000 11.8800 475.00 166367 ZEP 1995 04 13 08 35 00 60-91 P co2 CCGG 366.620 -999.990 ... S1 1995 07 18 09 46 00 78.9000 11.8800 475.00 166368 ZEP 1995 04 20 08 06 00 643-91 P co2 CCGG 365.930 -999.990 ... S1 1995 07 18 09 48 00 78.9000 11.8800 475.00 166369 ZEP 1995 04 20 08 06 00 644-91 P co2 CCGG 365.970 -999.990 ... S1 1995 07 18 09 50 00 78.9000 11.8800 475.00 166370 ZEP 1995 04 27 08 30 00 537-91 P co2 CCGG 365.870 -999.990 -.. S1 1995 08 04 08 08 00 78.9000 11.8800 475.00 166371 ZEP 1995 04 27 08 30 00 538-91 P co2 CCGG 366.880 -999.990 +.. S1 1995 08 04 08 10 00 78.9000 11.8800 475.00 166372 ZEP 1995 05 04 08 17 00 1173-91 P co2 CCGG 365.070 -999.990 ... S1 1995 08 04 08 20 00 78.9000 11.8800 475.00 166373 ZEP 1995 05 04 08 17 00 1174-91 P co2 CCGG 364.970 -999.990 ... S1 1995 08 04 08 22 00 78.9000 11.8800 475.00 166374 ZEP 1995 05 11 08 10 00 157-91 P co2 CCGG 364.810 -999.990 ... S1 1995 08 24 08 52 00 78.9000 11.8800 475.00 166375 ZEP 1995 05 11 08 10 00 158-91 P co2 CCGG 365.070 -999.990 ... S1 1995 08 24 08 54 00 78.9000 11.8800 475.00 166376 ZEP 1995 05 18 07 35 00 859-91 P co2 CCGG 365.350 -999.990 ... S1 1995 08 24 08 44 00 78.9000 11.8800 475.00 166377 ZEP 1995 05 18 07 35 00 860-91 P co2 CCGG 365.300 -999.990 ... S1 1995 08 24 08 46 00 78.9000 11.8800 475.00 166378 ZEP 1995 05 25 07 50 00 661-91 P co2 CCGG 364.970 -999.990 ... S1 1995 08 18 10 24 00 78.9000 11.8800 475.00 166379 ZEP 1995 05 25 07 50 00 662-91 P co2 CCGG 364.970 -999.990 ... S1 1995 08 18 10 26 00 78.9000 11.8800 475.00 166380 ZEP 1995 06 02 14 10 00 669-91 P co2 CCGG 364.530 -999.990 ... S1 1995 08 22 08 08 00 78.9000 11.8800 475.00 166381 ZEP 1995 06 02 14 10 00 670-91 P co2 CCGG 364.560 -999.990 ... S1 1995 08 22 08 10 00 78.9000 11.8800 475.00 166382 ZEP 1995 06 09 08 20 00 167-91 P co2 CCGG 363.940 -999.990 ... S1 1995 07 18 10 36 00 78.9000 11.8800 475.00 166383 ZEP 1995 06 09 08 20 00 168-91 P co2 CCGG 363.930 -999.990 ... S1 1995 07 18 10 38 00 78.9000 11.8800 475.00 166384 ZEP 1995 06 09 08 30 00 801-91 P co2 CCGG 363.990 -999.990 ... S1 1995 08 22 08 12 00 78.9000 11.8800 475.00 166385 ZEP 1995 06 09 08 30 00 802-91 P co2 CCGG 363.850 -999.990 ... S1 1995 08 22 08 14 00 78.9000 11.8800 475.00 166386 ZEP 1995 06 11 08 00 00 100-91 P co2 CCGG 364.090 -999.990 ... S1 1995 07 18 10 18 00 78.9000 11.8800 475.00 166388 ZEP 1995 06 11 08 00 00 99-91 P co2 CCGG 364.050 -999.990 ... S1 1995 07 18 10 16 00 78.9000 11.8800 475.00 166387 ZEP 1995 06 13 07 33 00 793-91 P co2 CCGG 363.920 -999.990 ... S1 1995 08 22 08 16 00 78.9000 11.8800 475.00 166389 ZEP 1995 06 13 07 33 00 794-91 P co2 CCGG 363.900 -999.990 ... S1 1995 08 22 08 18 00 78.9000 11.8800 475.00 166390 ZEP 1995 06 14 17 58 00 813-91 P co2 CCGG 363.500 -999.990 ... S1 1995 07 18 10 52 00 78.9000 11.8800 475.00 166391 ZEP 1995 06 14 17 58 00 814-91 P co2 CCGG 363.470 -999.990 ... S1 1995 07 18 10 54 00 78.9000 11.8800 475.00 166392 ZEP 1995 06 15 12 57 00 25-91 P co2 CCGG 363.610 -999.990 ... S1 1995 08 22 09 32 00 78.9000 11.8800 475.00 166393 ZEP 1995 06 15 12 57 00 26-91 P co2 CCGG 363.570 -999.990 ... S1 1995 08 22 09 34 00 78.9000 11.8800 475.00 166394 ZEP 1995 06 16 18 12 00 811-91 P co2 CCGG 363.400 -999.990 ... S1 1995 07 18 10 20 00 78.9000 11.8800 475.00 166395 ZEP 1995 06 16 18 12 00 812-91 P co2 CCGG 363.370 -999.990 ... S1 1995 07 18 10 22 00 78.9000 11.8800 475.00 166396 ZEP 1995 06 17 14 05 00 741-91 P co2 CCGG 363.040 -999.990 ... S1 1995 08 30 11 08 00 78.9000 11.8800 475.00 166397 ZEP 1995 06 17 14 05 00 742-91 P co2 CCGG 363.060 -999.990 ... S1 1995 08 30 11 10 00 78.9000 11.8800 475.00 166398 ZEP 1995 06 18 13 10 00 791-91 P co2 CCGG 362.090 -999.990 ... S1 1995 08 30 11 00 00 78.9000 11.8800 475.00 166399 ZEP 1995 06 18 13 10 00 792-91 P co2 CCGG 362.110 -999.990 ... S1 1995 08 30 11 02 00 78.9000 11.8800 475.00 166400 ZEP 1995 06 19 13 50 00 735-91 P co2 CCGG 361.610 -999.990 ... S1 1995 07 18 10 24 00 78.9000 11.8800 475.00 166401 ZEP 1995 06 19 13 50 00 736-91 P co2 CCGG 361.530 -999.990 ... S1 1995 07 18 10 26 00 78.9000 11.8800 475.00 166402 ZEP 1995 06 20 13 50 00 797-91 P co2 CCGG 362.090 -999.990 -.. S1 1995 07 18 10 48 00 78.9000 11.8800 475.00 166403 ZEP 1995 06 20 13 50 00 798-91 P co2 CCGG -999.990 -999.990 *.. S1 1995 07 18 10 50 00 78.9000 11.8800 475.00 166404 ZEP 1995 06 22 07 25 00 1175-91 P co2 CCGG 360.890 -999.990 ... S1 1995 08 24 08 12 00 78.9000 11.8800 475.00 166405 ZEP 1995 06 22 07 25 00 1176-91 P co2 CCGG 360.860 -999.990 ... S1 1995 08 24 08 14 00 78.9000 11.8800 475.00 166406 ZEP 1995 06 22 17 10 00 33-91 P co2 CCGG 361.050 -999.990 ... S1 1995 07 18 10 32 00 78.9000 11.8800 475.00 166407 ZEP 1995 06 22 17 10 00 34-91 P co2 CCGG 361.060 -999.990 ... S1 1995 07 18 10 34 00 78.9000 11.8800 475.00 166408 ZEP 1995 06 23 07 50 00 87-91 P co2 CCGG 360.610 -999.990 ... S1 1995 07 19 11 04 00 78.9000 11.8800 475.00 166409 ZEP 1995 06 23 07 50 00 88-91 P co2 CCGG 360.630 -999.990 ... S1 1995 07 19 11 06 00 78.9000 11.8800 475.00 166410 ZEP 1995 06 23 12 50 00 733-91 P co2 CCGG 359.980 -999.990 ... S1 1995 08 22 09 28 00 78.9000 11.8800 475.00 166411 ZEP 1995 06 23 12 50 00 734-91 P co2 CCGG 359.950 -999.990 ... S1 1995 08 22 09 30 00 78.9000 11.8800 475.00 166412 ZEP 1995 06 23 14 35 00 739-91 P co2 CCGG 358.980 -999.990 -.. S1 1995 08 22 08 20 00 78.9000 11.8800 475.00 166413 ZEP 1995 06 23 14 35 00 740-91 P co2 CCGG 384.290 -999.990 +.. S1 1995 08 22 08 22 00 78.9000 11.8800 475.00 166414 ZEP 1995 06 23 17 10 00 799-91 P co2 CCGG 360.050 -999.990 ... S1 1995 08 30 09 56 00 78.9000 11.8800 475.00 166415 ZEP 1995 06 24 07 30 00 745-91 P co2 CCGG 359.320 -999.990 ... S1 1995 08 30 09 52 00 78.9000 11.8800 475.00 166416 ZEP 1995 06 24 07 30 00 746-91 P co2 CCGG 359.150 -999.990 ... S1 1995 08 30 09 54 00 78.9000 11.8800 475.00 166417 ZEP 1995 06 24 16 55 00 815-91 P co2 CCGG 361.980 -999.990 ... S1 1995 08 30 10 56 00 78.9000 11.8800 475.00 166418 ZEP 1995 06 24 16 55 00 816-91 P co2 CCGG 361.890 -999.990 ... S1 1995 08 30 10 58 00 78.9000 11.8800 475.00 166419 ZEP 1995 06 25 12 00 00 747-91 P co2 CCGG 362.090 -999.990 ... S1 1995 08 30 10 20 00 78.9000 11.8800 475.00 166420 ZEP 1995 06 25 12 00 00 748-91 P co2 CCGG 362.080 -999.990 ... S1 1995 08 30 10 22 00 78.9000 11.8800 475.00 166421 ZEP 1995 06 30 07 45 00 789-91 P co2 CCGG 361.990 -999.990 ... S1 1995 08 24 08 48 00 78.9000 11.8800 475.00 166422 ZEP 1995 06 30 07 45 00 790-91 P co2 CCGG 361.930 -999.990 ... S1 1995 08 24 08 50 00 78.9000 11.8800 475.00 166423 ZEP 1995 07 07 07 37 00 737-91 P co2 CCGG 359.570 -999.990 ... S1 1995 08 24 08 40 00 78.9000 11.8800 475.00 166424 ZEP 1995 07 07 07 37 00 738-91 P co2 CCGG 359.620 -999.990 ... S1 1995 08 24 08 42 00 78.9000 11.8800 475.00 166425 ZEP 1995 07 14 07 45 00 795-91 P co2 CCGG 356.580 -999.990 ... S1 1995 09 27 13 00 00 78.9000 11.8800 475.00 166426 ZEP 1995 07 14 07 45 00 796-91 P co2 CCGG 356.560 -999.990 ... S1 1995 09 27 13 02 00 78.9000 11.8800 475.00 166427 ZEP 1995 07 21 08 50 00 803-91 P co2 CCGG 355.900 -999.990 ... S1 1995 09 27 13 04 00 78.9000 11.8800 475.00 166428 ZEP 1995 07 21 08 50 00 804-91 P co2 CCGG 355.760 -999.990 ... S1 1995 09 27 13 06 00 78.9000 11.8800 475.00 166429 ZEP 1995 07 28 09 05 00 807-91 P co2 CCGG 353.890 -999.990 ... S1 1995 09 27 10 32 00 78.9000 11.8800 475.00 166430 ZEP 1995 07 28 09 05 00 808-91 P co2 CCGG 353.840 -999.990 ... S1 1995 09 27 10 34 00 78.9000 11.8800 475.00 166431 ZEP 1995 08 03 08 31 00 743-91 P co2 CCGG 353.540 -999.990 ... S1 1995 09 27 12 12 00 78.9000 11.8800 475.00 166432 ZEP 1995 08 03 08 31 00 744-91 P co2 CCGG 353.470 -999.990 ... S1 1995 09 27 12 14 00 78.9000 11.8800 475.00 166433 ZEP 1995 08 11 07 50 00 155-91 P co2 CCGG 352.420 -999.990 ... S1 1995 10 13 08 12 00 78.9000 11.8800 475.00 166434 ZEP 1995 08 11 07 50 00 156-91 P co2 CCGG 352.380 -999.990 ... S1 1995 10 13 08 14 00 78.9000 11.8800 475.00 166435 ZEP 1995 08 18 09 15 00 383-91 P co2 CCGG 351.210 -999.990 ... S1 1995 10 13 09 12 00 78.9000 11.8800 475.00 166436 ZEP 1995 08 18 09 15 00 384-91 P co2 CCGG 351.140 -999.990 ... S1 1995 10 13 09 14 00 78.9000 11.8800 475.00 166437 ZEP 1995 08 24 07 30 00 277-91 P co2 CCGG 351.630 -999.990 ... S1 1995 10 13 08 40 00 78.9000 11.8800 475.00 166438 ZEP 1995 08 24 07 30 00 278-91 P co2 CCGG 351.590 -999.990 ... S1 1995 10 13 08 42 00 78.9000 11.8800 475.00 166439 ZEP 1995 09 01 09 35 00 15-91 P co2 CCGG 352.300 -999.990 ... S1 1995 10 13 08 44 00 78.9000 11.8800 475.00 166440 ZEP 1995 09 01 09 35 00 16-91 P co2 CCGG 352.270 -999.990 ... S1 1995 10 13 08 46 00 78.9000 11.8800 475.00 166441 ZEP 1995 09 08 08 45 00 649-91 P co2 CCGG 352.410 -999.990 ... S1 1995 11 20 12 44 00 78.9000 11.8800 475.00 166442 ZEP 1995 09 08 08 45 00 650-91 P co2 CCGG 352.380 -999.990 ... S1 1995 11 20 12 46 00 78.9000 11.8800 475.00 166443 ZEP 1995 09 14 08 55 00 623-91 P co2 CCGG 352.720 -999.990 ... S1 1995 11 20 12 40 00 78.9000 11.8800 475.00 166444 ZEP 1995 09 14 08 55 00 624-91 P co2 CCGG 352.700 -999.990 ... S1 1995 11 20 12 42 00 78.9000 11.8800 475.00 166445 ZEP 1995 09 22 09 30 00 179-91 P co2 CCGG 353.170 -999.990 ... S1 1995 11 20 11 40 00 78.9000 11.8800 475.00 166446 ZEP 1995 09 22 09 30 00 180-91 P co2 CCGG 353.240 -999.990 ... S1 1995 11 20 11 42 00 78.9000 11.8800 475.00 166447 ZEP 1995 09 28 09 35 00 203-91 P co2 CCGG 357.290 -999.990 ... S1 1995 11 20 11 52 00 78.9000 11.8800 475.00 166448 ZEP 1995 09 28 09 35 00 204-91 P co2 CCGG 357.240 -999.990 ... S1 1995 11 20 11 54 00 78.9000 11.8800 475.00 166449 ZEP 1995 10 05 07 40 00 1303-91 P co2 CCGG 358.530 -999.990 ... S1 1996 01 10 11 08 00 78.9000 11.8800 475.00 166450 ZEP 1995 10 05 07 40 00 1304-91 P co2 CCGG 358.450 -999.990 ... S1 1996 01 10 11 10 00 78.9000 11.8800 475.00 166451 ZEP 1995 10 13 10 40 00 1327-91 P co2 CCGG 357.450 -999.990 ... S1 1996 01 10 11 20 00 78.9000 11.8800 475.00 166452 ZEP 1995 10 13 10 40 00 1328-91 P co2 CCGG 357.420 -999.990 ... S1 1996 01 10 11 22 00 78.9000 11.8800 475.00 166453 ZEP 1995 10 19 09 00 00 41-91 P co2 CCGG 358.420 -999.990 ... S1 1996 01 10 11 00 00 78.9000 11.8800 475.00 166454 ZEP 1995 10 19 09 00 00 42-91 P co2 CCGG 358.300 -999.990 ... S1 1996 01 10 11 02 00 78.9000 11.8800 475.00 166455 ZEP 1995 10 26 08 45 00 193-91 P co2 CCGG 362.390 -999.990 ... S1 1996 01 10 10 56 00 78.9000 11.8800 475.00 166456 ZEP 1995 10 26 08 45 00 194-91 P co2 CCGG 362.340 -999.990 ... S1 1996 01 10 10 58 00 78.9000 11.8800 475.00 166457 ZEP 1995 11 03 09 22 00 849-91 P co2 CCGG 362.820 -999.990 ... S1 1996 01 10 11 28 00 78.9000 11.8800 475.00 166458 ZEP 1995 11 03 09 22 00 850-91 P co2 CCGG 362.760 -999.990 ... S1 1996 01 10 11 30 00 78.9000 11.8800 475.00 166459 ZEP 1995 11 09 08 30 00 1173-91 P co2 CCGG 362.890 -999.990 ... S1 1996 01 10 11 24 00 78.9000 11.8800 475.00 166460 ZEP 1995 11 09 08 30 00 1174-91 P co2 CCGG 362.730 -999.990 ... S1 1996 01 10 11 26 00 78.9000 11.8800 475.00 166461 ZEP 1995 11 17 07 42 00 625-91 P co2 CCGG 370.180 -999.990 +.. S1 1996 03 08 09 28 00 78.9000 11.8800 475.00 166462 ZEP 1995 11 17 07 42 00 626-91 P co2 CCGG 365.830 -999.990 -.. S1 1996 03 08 09 30 00 78.9000 11.8800 475.00 166463 ZEP 1995 11 23 08 30 00 4-91 P co2 CCGG 365.820 -999.990 ... S1 1996 03 08 12 56 00 78.9000 11.8800 475.00 166464 ZEP 1995 11 30 08 50 00 797-91 P co2 CCGG 365.040 -999.990 +.. S1 1996 03 08 12 04 00 78.9000 11.8800 475.00 166465 ZEP 1995 11 30 08 50 00 798-91 P co2 CCGG 364.360 -999.990 -.. S1 1996 03 08 12 06 00 78.9000 11.8800 475.00 166466 ZEP 1995 12 08 08 35 00 813-91 P co2 CCGG 363.780 -999.990 ... S1 1996 03 08 12 00 00 78.9000 11.8800 475.00 166467 ZEP 1995 12 08 08 35 00 814-91 P co2 CCGG 363.620 -999.990 ... S1 1996 03 08 12 02 00 78.9000 11.8800 475.00 166468 ZEP 1995 12 14 08 30 00 537-91 P co2 CCGG 366.680 -999.990 ... S1 1996 03 18 12 36 00 78.9000 11.8800 475.00 166469 ZEP 1995 12 14 08 30 00 538-91 P co2 CCGG 366.720 -999.990 ... S1 1996 03 18 12 38 00 78.9000 11.8800 475.00 166470 ZEP 1995 12 21 07 40 00 523-91 P co2 CCGG 368.230 -999.990 -.. S1 1996 03 18 13 12 00 78.9000 11.8800 475.00 166471 ZEP 1995 12 21 07 40 00 524-91 P co2 CCGG -999.990 -999.990 *.. S1 1996 03 18 13 14 00 78.9000 11.8800 475.00 166472 ZEP 1995 12 29 08 48 00 259-91 P co2 CCGG 362.980 -999.990 ... S1 1996 03 18 13 04 00 78.9000 11.8800 475.00 166473 ZEP 1995 12 29 08 48 00 260-91 P co2 CCGG 362.880 -999.990 ... S1 1996 03 18 13 06 00 78.9000 11.8800 475.00 166474 ZEP 1996 01 04 10 00 00 837-91 P co2 CCGG 367.140 -999.990 ... S1 1996 03 18 12 28 00 78.9000 11.8800 475.00 166475 ZEP 1996 01 04 10 00 00 838-91 P co2 CCGG 367.060 -999.990 ... S1 1996 03 18 12 30 00 78.9000 11.8800 475.00 166476 ZEP 1996 01 12 09 55 00 301-91 P co2 CCGG 367.000 -999.990 ... S1 1996 03 08 12 08 00 78.9000 11.8800 475.00 166477 ZEP 1996 01 12 09 55 00 302-91 P co2 CCGG 366.940 -999.990 ... S1 1996 03 08 12 10 00 78.9000 11.8800 475.00 166478 ZEP 1996 01 18 08 50 00 521-91 P co2 CCGG 364.560 -999.990 ... S1 1996 03 08 12 12 00 78.9000 11.8800 475.00 166479 ZEP 1996 01 18 08 50 00 522-91 P co2 CCGG 364.600 -999.990 ... S1 1996 03 08 12 14 00 78.9000 11.8800 475.00 166480 ZEP 1996 02 01 10 28 00 1495-91 P co2 CCGG 366.240 -999.990 ... S1 1996 05 23 08 24 00 78.9000 11.8800 475.00 166481 ZEP 1996 02 01 10 28 00 1496-91 P co2 CCGG 366.130 -999.990 ... S1 1996 05 23 08 26 00 78.9000 11.8800 475.00 166482 ZEP 1996 02 16 09 15 00 809-91 P co2 CCGG 366.560 -999.990 ... S1 1996 05 14 11 00 00 78.9000 11.8800 475.00 166483 ZEP 1996 02 16 09 15 00 810-91 P co2 CCGG 366.610 -999.990 ... S1 1996 05 14 11 02 00 78.9000 11.8800 475.00 166484 ZEP 1996 02 22 09 50 00 811-91 P co2 CCGG 366.220 -999.990 ... S1 1996 05 14 10 56 00 78.9000 11.8800 475.00 166485 ZEP 1996 02 22 09 50 00 812-91 P co2 CCGG 366.310 -999.990 ... S1 1996 05 14 10 58 00 78.9000 11.8800 475.00 166486 ZEP 1996 02 29 09 30 00 785-91 P co2 CCGG 366.290 -999.990 ... S1 1996 05 14 10 48 00 78.9000 11.8800 475.00 166487 ZEP 1996 02 29 09 30 00 786-91 P co2 CCGG 366.500 -999.990 ... S1 1996 05 14 10 50 00 78.9000 11.8800 475.00 166488 ZEP 1996 03 08 09 10 00 1315-91 P co2 CCGG 366.530 -999.990 ... S1 1996 09 12 11 00 00 78.9000 11.8800 475.00 166489 ZEP 1996 03 08 09 10 00 1316-91 P co2 CCGG 366.460 -999.990 ... S1 1996 09 12 11 02 00 78.9000 11.8800 475.00 166490 ZEP 1996 03 15 09 40 00 1309-91 P co2 CCGG 369.120 -999.990 ... S1 1996 09 12 10 48 00 78.9000 11.8800 475.00 166491 ZEP 1996 03 16 08 55 00 781-91 P co2 CCGG 366.910 -999.990 ... S1 1996 05 14 10 52 00 78.9000 11.8800 475.00 166492 ZEP 1996 03 16 08 55 00 782-91 P co2 CCGG 366.880 -999.990 ... S1 1996 05 14 10 54 00 78.9000 11.8800 475.00 166493 ZEP 1996 03 19 13 45 00 795-91 P co2 CCGG 367.740 -999.990 ... S1 1996 09 12 10 52 00 78.9000 11.8800 475.00 166494 ZEP 1996 03 19 13 45 00 796-91 P co2 CCGG 367.740 -999.990 ... S1 1996 09 12 10 54 00 78.9000 11.8800 475.00 166495 ZEP 1996 03 20 14 10 00 807-91 P co2 CCGG 366.700 -999.990 ... S1 1996 09 12 10 56 00 78.9000 11.8800 475.00 166496 ZEP 1996 03 20 14 10 00 808-91 P co2 CCGG 366.690 -999.990 ... S1 1996 09 12 10 58 00 78.9000 11.8800 475.00 166497 ZEP 1996 03 21 10 05 00 1190-91 P co2 CCGG 366.340 -999.990 ... S1 1996 09 12 09 18 00 78.9000 11.8800 475.00 166499 ZEP 1996 03 21 10 05 00 583-91 P co2 CCGG 366.430 -999.990 ... S1 1996 09 12 09 16 00 78.9000 11.8800 475.00 166498 ZEP 1996 03 29 10 05 00 1209-91 P co2 CCGG 367.630 -999.990 ... S1 1996 07 16 10 36 00 78.9000 11.8800 475.00 166500 ZEP 1996 03 29 10 05 00 1210-91 P co2 CCGG 367.690 -999.990 ... S1 1996 07 16 10 38 00 78.9000 11.8800 475.00 166501 ZEP 1996 04 04 08 55 00 1325-91 P co2 CCGG 370.540 -999.990 +.. S1 1996 07 16 08 28 00 78.9000 11.8800 475.00 166502 ZEP 1996 04 04 08 55 00 1326-91 P co2 CCGG 368.790 -999.990 -.. S1 1996 07 16 08 30 00 78.9000 11.8800 475.00 166503 ZEP 1996 04 12 16 30 00 735-91 P co2 CCGG 367.790 -999.990 ... S1 1996 07 18 09 28 00 78.9000 11.8800 475.00 166504 ZEP 1996 04 12 16 30 00 736-91 P co2 CCGG 367.830 -999.990 ... S1 1996 07 18 09 30 00 78.9000 11.8800 475.00 166505 ZEP 1996 04 19 09 30 00 787-91 P co2 CCGG 368.440 -999.990 ... S1 1996 07 18 09 32 00 78.9000 11.8800 475.00 166506 ZEP 1996 04 19 09 30 00 788-91 P co2 CCGG 368.500 -999.990 ... S1 1996 07 18 09 34 00 78.9000 11.8800 475.00 166507 ZEP 1996 04 25 08 35 00 783-91 P co2 CCGG 367.560 -999.990 ... S1 1996 07 16 10 04 00 78.9000 11.8800 475.00 166508 ZEP 1996 04 25 08 35 00 784-91 P co2 CCGG 367.610 -999.990 ... S1 1996 07 16 10 06 00 78.9000 11.8800 475.00 166509 ZEP 1996 05 02 10 15 00 743-91 P co2 CCGG 368.810 -999.990 ... S1 1996 07 18 10 20 00 78.9000 11.8800 475.00 166510 ZEP 1996 05 02 10 15 00 744-91 P co2 CCGG 368.750 -999.990 ... S1 1996 07 18 10 22 00 78.9000 11.8800 475.00 166511 ZEP 1996 05 09 08 20 00 803-91 P co2 CCGG 368.710 -999.990 ... S1 1996 07 18 10 28 00 78.9000 11.8800 475.00 166512 ZEP 1996 05 09 08 20 00 804-91 P co2 CCGG 368.670 -999.990 ... S1 1996 07 18 10 30 00 78.9000 11.8800 475.00 166513 ZEP 1996 05 16 08 45 00 813-91 P co2 CCGG 368.220 -999.990 ... S1 1996 07 18 10 24 00 78.9000 11.8800 475.00 166514 ZEP 1996 05 16 08 45 00 814-91 P co2 CCGG 368.160 -999.990 ... S1 1996 07 18 10 26 00 78.9000 11.8800 475.00 166515 ZEP 1996 05 24 09 35 00 805-91 P co2 CCGG 367.600 -999.990 ... S1 1996 07 16 10 24 00 78.9000 11.8800 475.00 166516 ZEP 1996 05 24 09 35 00 806-91 P co2 CCGG 367.700 -999.990 ... S1 1996 07 16 10 26 00 78.9000 11.8800 475.00 166517 ZEP 1996 05 30 08 45 00 341-91 P co2 CCGG 367.560 -999.990 -.. S1 1996 07 16 10 28 00 78.9000 11.8800 475.00 166518 ZEP 1996 05 30 08 45 00 342-91 P co2 CCGG 403.230 -999.990 +.. S1 1996 07 16 10 30 00 78.9000 11.8800 475.00 166519 ZEP 1996 06 06 09 15 00 1413-91 P co2 CCGG 366.480 -999.990 ... S1 1996 07 16 10 32 00 78.9000 11.8800 475.00 166520 ZEP 1996 06 06 09 15 00 1414-91 P co2 CCGG 366.320 -999.990 ... S1 1996 07 16 10 34 00 78.9000 11.8800 475.00 166521 ZEP 1996 06 09 21 05 00 739-91 P co2 CCGG -999.990 -999.990 *.. S1 1996 09 16 08 24 00 78.9000 11.8800 475.00 166522 ZEP 1996 06 09 21 05 00 740-91 P co2 CCGG 365.830 -999.990 -.. S1 1996 09 16 08 26 00 78.9000 11.8800 475.00 166523 ZEP 1996 06 10 23 10 00 793-91 P co2 CCGG 365.940 -999.990 ... S1 1996 09 16 08 40 00 78.9000 11.8800 475.00 166524 ZEP 1996 06 10 23 10 00 794-91 P co2 CCGG 365.860 -999.990 ... S1 1996 09 16 08 42 00 78.9000 11.8800 475.00 166525 ZEP 1996 06 12 19 30 00 733-91 P co2 CCGG 365.890 -999.990 ... S1 1996 09 12 12 12 00 78.9000 11.8800 475.00 166526 ZEP 1996 06 12 19 30 00 734-91 P co2 CCGG 365.950 -999.990 ... S1 1996 09 12 12 14 00 78.9000 11.8800 475.00 166527 ZEP 1996 06 14 09 30 00 801-91 P co2 CCGG 366.250 -999.990 +.. S1 1996 09 12 11 08 00 78.9000 11.8800 475.00 166528 ZEP 1996 06 14 09 30 00 802-91 P co2 CCGG 364.020 -999.990 -.. S1 1996 09 12 11 10 00 78.9000 11.8800 475.00 166529 ZEP 1996 06 16 07 55 00 815-91 P co2 CCGG 366.280 -999.990 ... S1 1996 09 12 10 32 00 78.9000 11.8800 475.00 166530 ZEP 1996 06 16 07 55 00 816-91 P co2 CCGG 366.460 -999.990 ... S1 1996 09 12 10 34 00 78.9000 11.8800 475.00 166531 ZEP 1996 06 17 08 40 00 791-91 P co2 CCGG 366.600 -999.990 ... S1 1996 09 12 10 28 00 78.9000 11.8800 475.00 166532 ZEP 1996 06 17 08 40 00 792-91 P co2 CCGG 366.610 -999.990 ... S1 1996 09 12 10 30 00 78.9000 11.8800 475.00 166533 ZEP 1996 06 18 08 40 00 927-91 P co2 CCGG 366.020 -999.990 ... S1 1996 09 16 09 20 00 78.9000 11.8800 475.00 166534 ZEP 1996 06 18 08 40 00 928-91 P co2 CCGG 366.100 -999.990 ... S1 1996 09 16 09 22 00 78.9000 11.8800 475.00 166535 ZEP 1996 06 19 09 50 00 799-91 P co2 CCGG 366.150 -999.990 ... S1 1996 09 12 11 04 00 78.9000 11.8800 475.00 166536 ZEP 1996 06 19 09 50 00 800-91 P co2 CCGG 366.150 -999.990 ... S1 1996 09 12 11 06 00 78.9000 11.8800 475.00 166537 ZEP 1996 06 20 08 30 00 747-91 P co2 CCGG 366.210 -999.990 ... S1 1996 09 12 10 36 00 78.9000 11.8800 475.00 166538 ZEP 1996 06 20 08 30 00 748-91 P co2 CCGG 366.260 -999.990 ... S1 1996 09 12 10 38 00 78.9000 11.8800 475.00 166539 ZEP 1996 06 22 16 40 00 737-91 P co2 CCGG 364.640 -999.990 ... S1 1996 09 12 09 12 00 78.9000 11.8800 475.00 166540 ZEP 1996 06 22 16 40 00 738-91 P co2 CCGG 364.630 -999.990 ... S1 1996 09 12 09 14 00 78.9000 11.8800 475.00 166541 ZEP 1996 06 23 07 45 00 789-91 P co2 CCGG 363.670 -999.990 ... S1 1996 09 12 09 00 00 78.9000 11.8800 475.00 166542 ZEP 1996 06 23 07 45 00 790-91 P co2 CCGG 363.640 -999.990 ... S1 1996 09 12 09 02 00 78.9000 11.8800 475.00 166543 ZEP 1996 06 23 19 10 00 745-91 P co2 CCGG 365.170 -999.990 ... S1 1996 09 16 08 28 00 78.9000 11.8800 475.00 166544 ZEP 1996 06 23 19 10 00 746-91 P co2 CCGG 365.200 -999.990 ... S1 1996 09 16 08 30 00 78.9000 11.8800 475.00 166545 ZEP 1996 06 24 08 30 00 741-91 P co2 CCGG 364.930 -999.990 ... S1 1996 09 16 09 16 00 78.9000 11.8800 475.00 166546 ZEP 1996 06 24 08 30 00 742-91 P co2 CCGG 364.860 -999.990 ... S1 1996 09 16 09 18 00 78.9000 11.8800 475.00 166547 ZEP 1996 06 25 13 50 00 835-91 P co2 CCGG 365.370 -999.990 ... S1 1996 09 16 08 16 00 78.9000 11.8800 475.00 166548 ZEP 1996 06 25 13 50 00 836-91 P co2 CCGG 365.370 -999.990 ... S1 1996 09 16 08 18 00 78.9000 11.8800 475.00 166549 ZEP 1996 06 26 13 05 00 127-91 P co2 CCGG 365.420 -999.990 ... S1 1996 09 16 08 12 00 78.9000 11.8800 475.00 166550 ZEP 1996 06 26 13 05 00 128-91 P co2 CCGG 365.400 -999.990 ... S1 1996 09 16 08 14 00 78.9000 11.8800 475.00 166551 ZEP 1996 06 28 08 30 00 273-91 P co2 CCGG 365.820 -999.990 ... S1 1996 09 16 08 08 00 78.9000 11.8800 475.00 166552 ZEP 1996 06 28 08 30 00 274-91 P co2 CCGG 365.600 -999.990 ... S1 1996 09 16 08 10 00 78.9000 11.8800 475.00 166553 ZEP 1996 07 05 09 25 00 1735-91 P co2 CCGG 363.400 -999.990 ... S1 1996 09 20 09 00 00 78.9000 11.8800 475.00 166554 ZEP 1996 07 05 09 25 00 1736-91 P co2 CCGG 363.400 -999.990 ... S1 1996 09 20 09 02 00 78.9000 11.8800 475.00 166555 ZEP 1996 07 11 09 07 00 821-91 P co2 CCGG 361.340 -999.990 ... S1 1996 09 16 10 02 00 78.9000 11.8800 475.00 166556 ZEP 1996 07 18 09 15 00 1487-91 P co2 CCGG 360.690 -999.990 ... S1 1996 09 12 08 24 00 78.9000 11.8800 475.00 166557 ZEP 1996 07 18 09 15 00 1488-91 P co2 CCGG 360.670 -999.990 ... S1 1996 09 12 08 26 00 78.9000 11.8800 475.00 166558 ZEP 1996 07 25 09 05 00 849-91 P co2 CCGG 359.450 -999.990 ... S1 1996 09 12 08 20 00 78.9000 11.8800 475.00 166559 ZEP 1996 07 25 09 05 00 850-91 P co2 CCGG 359.490 -999.990 ... S1 1996 09 12 08 22 00 78.9000 11.8800 475.00 166560 ZEP 1996 08 02 08 48 00 811-91 P co2 CCGG 327.060 -999.990 *.. S1 1996 11 05 15 43 00 78.9000 11.8800 475.00 166561 ZEP 1996 08 02 08 48 00 812-91 P co2 CCGG 326.960 -999.990 *.. S1 1996 11 05 15 45 00 78.9000 11.8800 475.00 166562 ZEP 1996 08 08 07 57 00 781-91 P co2 CCGG 355.790 -999.990 ... S1 1996 11 08 15 31 00 78.9000 11.8800 475.00 166563 ZEP 1996 08 08 07 57 00 782-91 P co2 CCGG 355.590 -999.990 ... S1 1996 11 08 15 32 00 78.9000 11.8800 475.00 166564 ZEP 1996 08 15 09 25 00 809-91 P co2 CCGG 355.050 -999.990 ... S1 1996 11 01 14 48 00 78.9000 11.8800 475.00 166565 ZEP 1996 08 15 09 25 00 810-91 P co2 CCGG 355.290 -999.990 ... S1 1996 11 01 14 50 00 78.9000 11.8800 475.00 166566 ZEP 1996 08 22 08 24 00 785-91 P co2 CCGG 355.090 -999.990 ... S1 1996 11 01 14 40 00 78.9000 11.8800 475.00 166567 ZEP 1996 08 22 08 24 00 786-91 P co2 CCGG 355.090 -999.990 ... S1 1996 11 01 14 42 00 78.9000 11.8800 475.00 166568 ZEP 1996 08 31 09 00 00 783-91 P co2 CCGG 354.090 -999.990 ... S1 1996 11 01 14 20 00 78.9000 11.8800 475.00 166569 ZEP 1996 08 31 09 00 00 784-91 P co2 CCGG 354.020 -999.990 ... S1 1996 11 01 14 22 00 78.9000 11.8800 475.00 166570 ZEP 1996 09 05 07 45 00 805-91 P co2 CCGG 353.640 -999.990 ... S1 1996 11 01 14 44 00 78.9000 11.8800 475.00 166571 ZEP 1996 09 05 07 45 00 806-91 P co2 CCGG 353.580 -999.990 ... S1 1996 11 01 14 46 00 78.9000 11.8800 475.00 166572 ZEP 1996 09 13 09 35 00 691-91 P co2 CCGG 354.040 -999.990 ... S1 1996 11 08 15 06 00 78.9000 11.8800 475.00 166573 ZEP 1996 09 13 09 35 00 692-91 P co2 CCGG 354.020 -999.990 ... S1 1996 11 08 15 07 00 78.9000 11.8800 475.00 166574 ZEP 1996 09 19 08 46 00 855-91 P co2 CCGG 353.510 -999.990 ... S1 1996 11 08 15 04 00 78.9000 11.8800 475.00 166575 ZEP 1996 09 19 08 46 00 856-91 P co2 CCGG 353.430 -999.990 ... S1 1996 11 08 15 05 00 78.9000 11.8800 475.00 166576 ZEP 1996 09 26 08 35 00 813-91 P co2 CCGG 354.980 -999.990 ... S1 1997 01 21 15 31 00 78.9000 11.8800 475.00 166577 ZEP 1996 09 26 08 35 00 814-91 P co2 CCGG 354.880 -999.990 ... S1 1997 01 21 15 32 00 78.9000 11.8800 475.00 166578 ZEP 1996 10 03 08 30 00 803-91 P co2 CCGG 356.860 -999.990 ... S1 1997 01 21 15 33 00 78.9000 11.8800 475.00 166579 ZEP 1996 10 03 08 30 00 804-91 P co2 CCGG 356.790 -999.990 ... S1 1997 01 21 15 34 00 78.9000 11.8800 475.00 166580 ZEP 1996 10 10 07 55 00 1209-91 P co2 CCGG 359.610 -999.990 ... S1 1997 01 21 15 15 00 78.9000 11.8800 475.00 166581 ZEP 1996 10 10 07 55 00 1210-91 P co2 CCGG 359.640 -999.990 ... S1 1997 01 21 15 16 00 78.9000 11.8800 475.00 166582 ZEP 1996 10 17 08 30 00 63-91 P co2 CCGG 359.260 -999.990 ... S1 1997 01 16 15 13 00 78.9000 11.8800 475.00 166583 ZEP 1996 10 17 08 30 00 64-91 P co2 CCGG 359.090 -999.990 ... S1 1997 01 16 15 14 00 78.9000 11.8800 475.00 166584 ZEP 1996 10 24 08 45 00 1155-91 P co2 CCGG 360.940 -999.990 ... S1 1997 01 16 15 06 00 78.9000 11.8800 475.00 166585 ZEP 1996 10 24 08 45 00 1156-91 P co2 CCGG 360.770 -999.990 ... S1 1997 01 16 15 08 00 78.9000 11.8800 475.00 166586 ZEP 1996 11 01 09 55 00 1743-91 P co2 CCGG 364.270 -999.990 ... S1 1997 01 16 15 11 00 78.9000 11.8800 475.00 166587 ZEP 1996 11 01 09 55 00 1744-91 P co2 CCGG 364.260 -999.990 ... S1 1997 01 16 15 12 00 78.9000 11.8800 475.00 166588 ZEP 1996 11 07 08 35 00 802-91 P co2 CCGG 364.770 -999.990 ... S1 1997 01 21 16 20 00 78.9000 11.8800 475.00 166589 ZEP 1996 11 15 13 30 00 799-91 P co2 CCGG 365.630 -999.990 ... S1 1997 01 16 16 09 00 78.9000 11.8800 475.00 166590 ZEP 1996 11 15 13 30 00 800-91 P co2 CCGG 365.550 -999.990 ... S1 1997 01 16 16 10 00 78.9000 11.8800 475.00 166591 ZEP 1996 11 22 09 55 00 793-91 P co2 CCGG 365.730 -999.990 ... S1 1997 03 24 15 23 00 78.9000 11.8800 475.00 166592 ZEP 1996 11 22 09 55 00 794-91 P co2 CCGG 365.700 -999.990 ... S1 1997 03 24 15 25 00 78.9000 11.8800 475.00 166593 ZEP 1996 11 28 08 20 00 733-91 P co2 CCGG 364.000 -999.990 ... S1 1997 03 24 15 26 00 78.9000 11.8800 475.00 166594 ZEP 1996 11 28 08 20 00 734-91 P co2 CCGG 363.730 -999.990 ... S1 1997 03 24 15 27 00 78.9000 11.8800 475.00 166595 ZEP 1996 12 05 09 00 00 2043-91 P co2 CCGG 365.390 -999.990 ... S1 1997 03 20 16 24 00 78.9000 11.8800 475.00 166596 ZEP 1996 12 05 09 00 00 2044-91 P co2 CCGG 365.340 -999.990 ... S1 1997 03 20 16 25 00 78.9000 11.8800 475.00 166597 ZEP 1996 12 12 09 00 00 2039-91 P co2 CCGG 365.510 -999.990 ... S1 1997 03 20 16 21 00 78.9000 11.8800 475.00 166598 ZEP 1996 12 12 09 00 00 2040-91 P co2 CCGG 365.510 -999.990 ... S1 1997 03 20 16 22 00 78.9000 11.8800 475.00 166599 ZEP 1996 12 19 09 30 00 795-91 P co2 CCGG 364.920 -999.990 ... S1 1997 03 20 15 27 00 78.9000 11.8800 475.00 166600 ZEP 1996 12 19 09 30 00 796-91 P co2 CCGG 364.910 -999.990 ... S1 1997 03 20 15 28 00 78.9000 11.8800 475.00 166601 ZEP 1996 12 26 08 45 00 789-91 P co2 CCGG 366.170 -999.990 -.. S1 1997 03 24 15 04 00 78.9000 11.8800 475.00 166602 ZEP 1996 12 26 08 45 00 790-91 P co2 CCGG 369.960 -999.990 +.. S1 1997 03 24 15 05 00 78.9000 11.8800 475.00 166603 ZEP 1997 01 03 08 40 00 811-91 P co2 CCGG 367.900 -999.990 ... S1 1997 03 20 16 30 00 78.9000 11.8800 475.00 166604 ZEP 1997 01 03 08 40 00 812-91 P co2 CCGG 367.870 -999.990 ... S1 1997 03 20 16 31 00 78.9000 11.8800 475.00 166605 ZEP 1997 01 09 09 50 00 739-91 P co2 CCGG 368.200 -999.990 ... S1 1997 03 20 16 03 00 78.9000 11.8800 475.00 166606 ZEP 1997 01 09 09 50 00 740-91 P co2 CCGG 368.190 -999.990 ... S1 1997 03 20 16 04 00 78.9000 11.8800 475.00 166607 ZEP 1997 01 16 08 45 00 783-91 P co2 CCGG 372.790 -999.990 .X. S1 1997 04 21 15 34 00 78.9000 11.8800 475.00 166608 ZEP 1997 01 16 08 45 00 784-91 P co2 CCGG 372.590 -999.990 .X. S1 1997 04 21 15 35 00 78.9000 11.8800 475.00 166609 ZEP 1997 01 24 09 30 00 785-91 P co2 CCGG 367.090 -999.990 ... S1 1997 04 21 15 30 00 78.9000 11.8800 475.00 166610 ZEP 1997 01 24 09 30 00 786-91 P co2 CCGG 367.050 -999.990 ... S1 1997 04 21 15 31 00 78.9000 11.8800 475.00 166611 ZEP 1997 01 30 09 45 00 703-91 P co2 CCGG 368.210 -999.990 ... S1 1997 04 21 16 03 00 78.9000 11.8800 475.00 166612 ZEP 1997 01 30 09 45 00 704-91 P co2 CCGG 368.120 -999.990 ... S1 1997 04 21 16 04 00 78.9000 11.8800 475.00 166613 ZEP 1997 02 06 09 20 00 7-91 P co2 CCGG 370.930 -999.990 ... S1 1997 04 21 16 05 00 78.9000 11.8800 475.00 166614 ZEP 1997 02 06 09 20 00 8-91 P co2 CCGG 371.150 -999.990 ... S1 1997 04 21 16 06 00 78.9000 11.8800 475.00 166615 ZEP 1997 02 14 09 25 00 809-91 P co2 CCGG 369.180 -999.990 ... S1 1997 04 21 16 01 00 78.9000 11.8800 475.00 166616 ZEP 1997 02 14 09 25 00 810-91 P co2 CCGG 369.210 -999.990 ... S1 1997 04 21 16 02 00 78.9000 11.8800 475.00 166617 ZEP 1997 02 22 09 55 00 805-91 P co2 CCGG 369.370 -999.990 ... S1 1997 04 21 16 53 00 78.9000 11.8800 475.00 166618 ZEP 1997 02 22 09 55 00 806-91 P co2 CCGG 369.300 -999.990 ... S1 1997 04 21 16 54 00 78.9000 11.8800 475.00 166619 ZEP 1997 02 27 08 45 00 53-91 P co2 CCGG 372.120 -999.990 ... S1 1997 04 21 16 07 00 78.9000 11.8800 475.00 166620 ZEP 1997 02 27 08 45 00 54-91 P co2 CCGG 372.080 -999.990 ... S1 1997 04 21 16 09 00 78.9000 11.8800 475.00 166621 ZEP 1997 03 06 09 59 00 1072-91 P co2 CCGG 368.020 -999.990 ... S1 1997 04 21 15 29 00 78.9000 11.8800 475.00 166622 ZEP 1997 03 21 09 35 00 627-91 P co2 CCGG 369.300 -999.990 ... S1 1997 06 02 15 07 00 78.9000 11.8800 475.00 166623 ZEP 1997 03 21 09 35 00 628-91 P co2 CCGG 369.270 -999.990 ... S1 1997 06 02 15 09 00 78.9000 11.8800 475.00 166624 ZEP 1997 03 21 09 35 00 628-91 P co2 CCGG 369.380 -999.990 ... L3 1997 05 30 12 49 00 78.9000 11.8800 475.00 166624 ZEP 1997 03 27 09 00 00 1915-91 P co2 CCGG 368.960 -999.990 ... S1 1997 06 02 15 03 00 78.9000 11.8800 475.00 166625 ZEP 1997 03 27 09 00 00 1916-91 P co2 CCGG 368.890 -999.990 ... S1 1997 06 02 15 04 00 78.9000 11.8800 475.00 166626 ZEP 1997 03 27 09 00 00 1916-91 P co2 CCGG 368.900 -999.990 ... L3 1997 05 30 13 17 00 78.9000 11.8800 475.00 166626 ZEP 1997 04 03 08 50 00 1321-91 P co2 CCGG 368.570 -999.990 ... S1 1997 06 19 16 13 00 78.9000 11.8800 475.00 166627 ZEP 1997 04 03 08 50 00 1322-91 P co2 CCGG 368.490 -999.990 ... S1 1997 06 19 16 14 00 78.9000 11.8800 475.00 166628 ZEP 1997 04 03 08 50 00 1322-91 P co2 CCGG 368.510 -999.990 ... L3 1997 06 18 14 54 00 78.9000 11.8800 475.00 166628 ZEP 1997 04 10 08 30 00 75-91 P co2 CCGG 368.280 -999.990 ... S1 1997 06 19 16 15 00 78.9000 11.8800 475.00 166629 ZEP 1997 04 10 08 30 00 76-91 P co2 CCGG 368.330 -999.990 ... S1 1997 06 19 16 16 00 78.9000 11.8800 475.00 166630 ZEP 1997 04 10 08 30 00 76-91 P co2 CCGG 368.360 -999.990 ... L3 1997 06 18 14 26 00 78.9000 11.8800 475.00 166630 ZEP 1997 04 10 09 35 00 803-91 P co2 CCGG 372.060 -999.990 ... S1 1997 06 11 16 20 00 78.9000 11.8800 475.00 166631 ZEP 1997 04 10 09 35 00 804-91 P co2 CCGG 372.100 -999.990 ... S1 1997 06 11 16 21 00 78.9000 11.8800 475.00 166632 ZEP 1997 04 10 09 35 00 804-91 P co2 CCGG 372.120 -999.990 ... L3 1997 06 06 10 42 00 78.9000 11.8800 475.00 166632 ZEP 1997 04 17 08 35 00 198-91 P co2 CCGG 369.250 -999.990 ... S1 1997 06 13 13 29 00 78.9000 11.8800 475.00 166634 ZEP 1997 04 17 08 35 00 198-91 P co2 CCGG 369.230 -999.990 ... L3 1997 06 06 13 00 00 78.9000 11.8800 475.00 166634 ZEP 1997 04 17 10 30 00 813-91 P co2 CCGG 368.960 -999.990 +.. S1 1997 06 11 15 58 00 78.9000 11.8800 475.00 166635 ZEP 1997 04 17 10 30 00 814-91 P co2 CCGG 368.060 -999.990 -.. S1 1997 06 11 15 59 00 78.9000 11.8800 475.00 166636 ZEP 1997 04 17 10 30 00 814-91 P co2 CCGG 368.170 -999.990 -.. L3 1997 06 06 12 19 00 78.9000 11.8800 475.00 166636 ZEP 1997 04 25 13 35 00 1677-91 P co2 CCGG 369.690 -999.990 ... S1 1997 06 11 15 56 00 78.9000 11.8800 475.00 166637 ZEP 1997 04 25 13 35 00 1678-91 P co2 CCGG 369.730 -999.990 ... S1 1997 06 11 15 57 00 78.9000 11.8800 475.00 166638 ZEP 1997 04 25 13 35 00 1678-91 P co2 CCGG 369.810 -999.990 ... L3 1997 06 06 12 47 00 78.9000 11.8800 475.00 166638 ZEP 1997 05 02 08 15 00 4191-91 P co2 CCGG 369.470 -999.990 ... S1 1997 06 27 14 09 00 78.9000 11.8800 475.00 166639 ZEP 1997 05 02 08 15 00 4192-91 P co2 CCGG 369.500 -999.990 ... S1 1997 06 27 14 10 00 78.9000 11.8800 475.00 166640 ZEP 1997 05 02 08 15 00 4192-91 P co2 CCGG 369.490 -999.990 ... L3 1997 06 23 14 49 00 78.9000 11.8800 475.00 166640 ZEP 1997 05 08 07 25 00 4189-91 P co2 CCGG 369.670 -999.990 ... S1 1997 06 27 14 11 00 78.9000 11.8800 475.00 166641 ZEP 1997 05 08 07 25 00 4190-91 P co2 CCGG 369.740 -999.990 ... S1 1997 06 27 14 12 00 78.9000 11.8800 475.00 166642 ZEP 1997 05 08 07 25 00 4190-91 P co2 CCGG 369.750 -999.990 ... L3 1997 06 23 14 35 00 78.9000 11.8800 475.00 166642 ZEP 1997 05 15 08 25 00 1175-91 P co2 CCGG 367.860 -999.990 -.. S1 1997 06 23 14 46 00 78.9000 11.8800 475.00 166643 ZEP 1997 05 15 08 25 00 1176-91 P co2 CCGG 368.840 -999.990 +.. S1 1997 06 23 14 47 00 78.9000 11.8800 475.00 166644 ZEP 1997 05 15 08 25 00 1176-91 P co2 CCGG 368.920 -999.990 +.. L3 1997 06 23 10 04 00 78.9000 11.8800 475.00 166644 ZEP 1997 05 22 13 30 00 449-91 P co2 CCGG 368.580 -999.990 ... S1 1997 06 23 14 48 00 78.9000 11.8800 475.00 166645 ZEP 1997 05 22 13 30 00 450-91 P co2 CCGG 368.780 -999.990 ... S1 1997 06 23 14 49 00 78.9000 11.8800 475.00 166646 ZEP 1997 05 22 13 30 00 450-91 P co2 CCGG 368.850 -999.990 ... L3 1997 06 23 09 51 00 78.9000 11.8800 475.00 166646 ZEP 1997 05 29 08 10 00 5-91 P co2 CCGG 367.730 -999.990 ... L3 1997 08 15 15 01 00 78.9000 11.8800 475.00 166647 ZEP 1997 05 29 08 10 00 6-91 P co2 CCGG 367.540 -999.990 ... L3 1997 08 15 15 14 00 78.9000 11.8800 475.00 166648 ZEP 1997 06 06 09 35 00 527-91 P co2 CCGG 370.150 -999.990 ... L3 1997 08 15 15 55 00 78.9000 11.8800 475.00 166649 ZEP 1997 06 06 09 35 00 528-91 P co2 CCGG 370.490 -999.990 ... L3 1997 08 15 16 09 00 78.9000 11.8800 475.00 166650 ZEP 1997 06 12 07 38 00 1983-91 P co2 CCGG 367.830 -999.990 ... S1 1997 08 06 15 23 00 78.9000 11.8800 475.00 166651 ZEP 1997 06 12 07 38 00 1984-91 P co2 CCGG 367.770 -999.990 ... S1 1997 08 06 15 24 00 78.9000 11.8800 475.00 166652 ZEP 1997 06 19 06 55 00 1247-91 P co2 CCGG 365.270 -999.990 ... S1 1997 07 24 14 27 00 78.9000 11.8800 475.00 166653 ZEP 1997 06 19 06 55 00 1248-91 P co2 CCGG 365.240 -999.990 ... S1 1997 07 24 14 28 00 78.9000 11.8800 475.00 166654 ZEP 1997 06 19 06 55 00 1248-91 P co2 CCGG 365.310 -999.990 ... L3 1997 07 23 14 06 00 78.9000 11.8800 475.00 166654 ZEP 1997 06 26 08 00 00 1719-91 P co2 CCGG 365.940 -999.990 ... S1 1997 07 24 14 29 00 78.9000 11.8800 475.00 166655 ZEP 1997 06 26 08 00 00 1720-91 P co2 CCGG 366.170 -999.990 ... S1 1997 07 24 14 30 00 78.9000 11.8800 475.00 166656 ZEP 1997 06 26 08 00 00 1720-91 P co2 CCGG 366.220 -999.990 ... L3 1997 07 23 13 52 00 78.9000 11.8800 475.00 166656 ZEP 1997 07 03 07 00 00 733-91 P co2 CCGG 363.730 -999.990 ... L3 1997 08 29 10 48 00 78.9000 11.8800 475.00 166657 ZEP 1997 07 03 07 00 00 734-91 P co2 CCGG 363.680 -999.990 ... L3 1997 08 29 11 02 00 78.9000 11.8800 475.00 166658 ZEP 1997 07 10 07 50 00 795-91 P co2 CCGG 361.630 -999.990 ... L3 1997 08 08 11 51 00 78.9000 11.8800 475.00 166659 ZEP 1997 07 10 07 50 00 796-91 P co2 CCGG 361.600 -999.990 ... L3 1997 08 08 12 01 00 78.9000 11.8800 475.00 166660 ZEP 1997 07 17 08 55 00 801-91 P co2 CCGG 359.740 -999.990 ... L3 1997 08 11 13 11 00 78.9000 11.8800 475.00 166661 ZEP 1997 07 17 08 55 00 802-91 P co2 CCGG 359.750 -999.990 ... L3 1997 08 11 13 21 00 78.9000 11.8800 475.00 166662 ZEP 1997 07 24 07 05 00 793-91 P co2 CCGG 360.100 -999.990 ... L3 1997 08 29 10 21 00 78.9000 11.8800 475.00 166663 ZEP 1997 07 24 07 05 00 794-91 P co2 CCGG 360.000 -999.990 ... L3 1997 08 29 10 35 00 78.9000 11.8800 475.00 166664 ZEP 1997 07 31 06 50 00 1915-91 P co2 CCGG 356.350 -999.990 ... L3 1997 09 03 08 40 00 78.9000 11.8800 475.00 166665 ZEP 1997 07 31 06 50 00 1916-91 P co2 CCGG 356.430 -999.990 ... L3 1997 09 03 08 53 00 78.9000 11.8800 475.00 166666 ZEP 1997 08 08 08 08 00 1061-91 P co2 CCGG 354.770 -999.990 ... L3 1997 09 02 14 32 00 78.9000 11.8800 475.00 166667 ZEP 1997 08 08 08 08 00 1062-91 P co2 CCGG 354.710 -999.990 ... L3 1997 09 02 14 46 00 78.9000 11.8800 475.00 166668 ZEP 1997 09 04 07 10 00 813-91 P co2 CCGG 354.210 -999.990 ... L3 1997 09 30 09 25 00 78.9000 11.8800 475.00 166669 ZEP 1997 09 04 07 10 00 814-91 P co2 CCGG 354.510 -999.990 ... L3 1997 09 30 09 39 00 78.9000 11.8800 475.00 166670 ZEP 1997 09 11 07 20 00 803-91 P co2 CCGG 355.200 -999.990 ... L3 1997 09 30 11 41 00 78.9000 11.8800 475.00 166671 ZEP 1997 09 11 07 20 00 804-91 P co2 CCGG 355.240 -999.990 ... L3 1997 09 30 11 55 00 78.9000 11.8800 475.00 166672 ZEP 1997 09 25 08 34 00 4441-91 P co2 CCGG 360.040 -999.990 ... L3 1997 11 14 12 48 00 78.9000 11.8800 475.00 166673 ZEP 1997 09 25 08 34 00 4442-91 P co2 CCGG 359.720 -999.990 ... L3 1997 11 14 13 01 00 78.9000 11.8800 475.00 166674 ZEP 1997 10 01 12 37 00 506-91 P co2 CCGG 358.310 -999.990 ... L3 1997 11 03 13 56 00 78.9000 11.8800 475.00 166675 ZEP 1997 10 01 12 37 00 745-91 P co2 CCGG 358.720 -999.990 ... L3 1997 11 03 13 42 00 78.9000 11.8800 475.00 166676 ZEP 1997 10 02 08 36 00 127-91 P co2 CCGG 358.290 -999.990 ... L3 1997 11 14 13 43 00 78.9000 11.8800 475.00 166677 ZEP 1997 10 02 08 36 00 128-91 P co2 CCGG 358.340 -999.990 ... L3 1997 11 14 13 56 00 78.9000 11.8800 475.00 166678 ZEP 1997 10 09 08 15 00 4413-91 P co2 CCGG 358.150 -999.990 ... L3 1997 11 14 14 10 00 78.9000 11.8800 475.00 166679 ZEP 1997 10 09 08 15 00 4414-91 P co2 CCGG 358.080 -999.990 ... L3 1997 11 14 14 23 00 78.9000 11.8800 475.00 166680 ZEP 1997 10 16 07 40 00 523-91 P co2 CCGG 358.460 -999.990 ... L3 1997 11 14 13 14 00 78.9000 11.8800 475.00 166681 ZEP 1997 10 16 07 40 00 524-91 P co2 CCGG 358.440 -999.990 ... L3 1997 11 14 13 28 00 78.9000 11.8800 475.00 166682 ZEP 1997 11 06 07 55 00 4401-91 P co2 CCGG 365.480 -999.990 ... L3 1997 12 17 10 12 00 78.9000 11.8800 475.00 166683 ZEP 1997 11 06 07 55 00 4402-91 P co2 CCGG 365.440 -999.990 ... L3 1997 12 17 10 26 00 78.9000 11.8800 475.00 166684 ZEP 1997 11 13 08 25 00 4379-91 P co2 CCGG 364.620 -999.990 ... L3 1997 12 17 09 45 00 78.9000 11.8800 475.00 166685 ZEP 1997 11 13 08 25 00 4380-91 P co2 CCGG 364.610 -999.990 ... L3 1997 12 17 09 59 00 78.9000 11.8800 475.00 166686 ZEP 1997 11 21 07 43 00 813-91 P co2 CCGG 366.690 -999.990 ... L3 1998 01 20 11 25 00 78.9000 11.8800 475.00 166687 ZEP 1997 11 21 07 43 00 814-91 P co2 CCGG 366.670 -999.990 ... L3 1998 01 20 11 39 00 78.9000 11.8800 475.00 166688 ZEP 1997 11 27 12 31 00 733-91 P co2 CCGG 366.440 -999.990 ... L3 1998 01 20 11 53 00 78.9000 11.8800 475.00 166689 ZEP 1997 11 27 12 31 00 734-91 P co2 CCGG 366.390 -999.990 ... L3 1998 01 20 12 06 00 78.9000 11.8800 475.00 166690 ZEP 1997 12 05 09 23 00 811-91 P co2 CCGG 366.110 -999.990 ... L3 1998 02 11 12 16 00 78.9000 11.8800 475.00 166691 ZEP 1997 12 05 09 23 00 812-91 P co2 CCGG 366.100 -999.990 ... L3 1998 02 11 12 29 00 78.9000 11.8800 475.00 166692 ZEP 1997 12 12 12 58 00 739-91 P co2 CCGG 368.660 -999.990 ... L3 1998 02 11 10 53 00 78.9000 11.8800 475.00 166693 ZEP 1997 12 12 12 58 00 740-91 P co2 CCGG 368.680 -999.990 ... L3 1998 02 11 11 07 00 78.9000 11.8800 475.00 166694 ZEP 1997 12 18 09 52 00 457-91 P co2 CCGG 367.270 -999.990 ... L3 1998 01 26 16 17 00 78.9000 11.8800 475.00 166695 ZEP 1997 12 18 09 52 00 458-91 P co2 CCGG 367.270 -999.990 ... L3 1998 01 26 16 31 00 78.9000 11.8800 475.00 166696 ZEP 1997 12 25 09 32 00 4289-91 P co2 CCGG 494.070 -999.990 +.. L3 1998 01 27 10 25 00 78.9000 11.8800 475.00 166697 ZEP 1997 12 25 09 32 00 4290-91 P co2 CCGG 368.550 -999.990 -.. L3 1998 01 27 10 38 00 78.9000 11.8800 475.00 166698 ZEP 1998 01 01 10 13 00 617-91 P co2 CCGG 367.570 -999.990 ... L3 1998 02 16 10 22 00 78.9000 11.8800 475.00 166699 ZEP 1998 01 01 10 13 00 618-91 P co2 CCGG 367.530 -999.990 ... L3 1998 02 16 10 36 00 78.9000 11.8800 475.00 166700 ZEP 1998 01 08 06 55 00 271-91 P co2 CCGG 370.400 -999.990 ... L3 1998 02 13 16 20 00 78.9000 11.8800 475.00 166701 ZEP 1998 01 08 06 55 00 272-91 P co2 CCGG 370.440 -999.990 ... L3 1998 02 13 16 34 00 78.9000 11.8800 475.00 166702 ZEP 1998 01 16 08 55 00 4685-91 P co2 CCGG 371.880 -999.990 ... L3 1998 02 27 16 15 00 78.9000 11.8800 475.00 166703 ZEP 1998 01 16 08 55 00 4686-91 P co2 CCGG 371.890 -999.990 ... L3 1998 02 27 16 29 00 78.9000 11.8800 475.00 166704 ZEP 1998 01 29 08 45 00 4683-91 P co2 CCGG 371.640 -999.990 ... L3 1998 02 27 14 52 00 78.9000 11.8800 475.00 166705 ZEP 1998 01 29 08 45 00 4684-91 P co2 CCGG 371.670 -999.990 ... L3 1998 02 27 15 05 00 78.9000 11.8800 475.00 166706 ZEP 1998 02 20 08 50 00 155-91 P co2 CCGG 369.500 -999.990 ... L3 1998 03 25 11 58 00 78.9000 11.8800 475.00 166707 ZEP 1998 02 20 08 50 00 156-91 P co2 CCGG 369.480 -999.990 ... L3 1998 03 25 12 11 00 78.9000 11.8800 475.00 166708 ZEP 1998 02 26 09 45 00 1355-91 P co2 CCGG 369.250 -999.990 ... L3 1998 03 25 11 30 00 78.9000 11.8800 475.00 166709 ZEP 1998 02 26 09 45 00 1356-91 P co2 CCGG 369.700 -999.990 ... L3 1998 03 25 11 44 00 78.9000 11.8800 475.00 166710 ZEP 1998 03 05 09 34 00 487-91 P co2 CCGG 372.480 -999.990 ... L3 1998 04 14 11 20 00 78.9000 11.8800 475.00 166711 ZEP 1998 03 05 09 34 00 488-91 P co2 CCGG 372.500 -999.990 ... L3 1998 04 14 11 34 00 78.9000 11.8800 475.00 166712 ZEP 1998 03 12 09 05 00 1683-91 P co2 CCGG 369.830 -999.990 ... L3 1998 04 14 14 35 00 78.9000 11.8800 475.00 166713 ZEP 1998 03 12 09 05 00 1684-91 P co2 CCGG 369.820 -999.990 ... L3 1998 04 14 14 49 00 78.9000 11.8800 475.00 166714 ZEP 1998 03 20 07 55 00 4611-91 P co2 CCGG 371.100 -999.990 ... L3 1998 04 22 10 05 00 78.9000 11.8800 475.00 166715 ZEP 1998 03 20 07 55 00 4612-91 P co2 CCGG 371.080 -999.990 ... L3 1998 04 22 10 18 00 78.9000 11.8800 475.00 166716 ZEP 1998 04 03 08 35 00 4161-91 P co2 CCGG 369.870 -999.990 ... L3 1998 05 19 15 11 00 78.9000 11.8800 475.00 166717 ZEP 1998 04 03 08 35 00 4162-91 P co2 CCGG 369.840 -999.990 ... L3 1998 05 19 15 25 00 78.9000 11.8800 475.00 166718 ZEP 1998 04 09 08 07 00 1079-91 P co2 CCGG 370.340 -999.990 ... L3 1998 05 19 14 44 00 78.9000 11.8800 475.00 166719 ZEP 1998 04 09 08 07 00 1080-91 P co2 CCGG 370.250 -999.990 ... L3 1998 05 19 14 58 00 78.9000 11.8800 475.00 166720 ZEP 1998 04 16 09 12 00 1389-91 P co2 CCGG 371.070 -999.990 ... L3 1998 06 23 12 32 00 78.9000 11.8800 475.00 166721 ZEP 1998 04 16 09 12 00 1390-91 P co2 CCGG 371.090 -999.990 ... L3 1998 06 23 12 46 00 78.9000 11.8800 475.00 166722 ZEP 1998 04 24 06 40 00 759-91 P co2 CCGG 371.080 -999.990 ... L3 1998 06 23 13 01 00 78.9000 11.8800 475.00 166723 ZEP 1998 04 24 06 40 00 760-91 P co2 CCGG 371.180 -999.990 ... L3 1998 06 23 13 15 00 78.9000 11.8800 475.00 166724 ZEP 1998 05 01 07 46 00 131-91 P co2 CCGG 371.270 -999.990 ... L3 1998 06 11 12 36 00 78.9000 11.8800 475.00 166725 ZEP 1998 05 01 07 46 00 132-91 P co2 CCGG 371.260 -999.990 ... L3 1998 06 11 12 50 00 78.9000 11.8800 475.00 166726 ZEP 1998 05 07 08 44 00 4281-91 P co2 CCGG 371.360 -999.990 ... L3 1998 06 11 13 04 00 78.9000 11.8800 475.00 166727 ZEP 1998 05 07 08 44 00 4282-91 P co2 CCGG 371.340 -999.990 ... L3 1998 06 11 13 17 00 78.9000 11.8800 475.00 166728 ZEP 1998 05 14 06 38 00 1021-91 P co2 CCGG 370.400 -999.990 ... L3 1998 07 09 10 27 00 78.9000 11.8800 475.00 166729 ZEP 1998 05 14 06 38 00 1022-91 P co2 CCGG 370.440 -999.990 ... L3 1998 07 09 10 41 00 78.9000 11.8800 475.00 166730 ZEP 1998 05 21 07 30 00 4025-91 P co2 CCGG 371.960 -999.990 ... L3 1998 07 09 10 54 00 78.9000 11.8800 475.00 166731 ZEP 1998 05 21 07 30 00 4026-91 P co2 CCGG 371.760 -999.990 ... L3 1998 07 09 11 08 00 78.9000 11.8800 475.00 166732 ZEP 1998 05 28 08 25 00 815-91 P co2 CCGG 370.950 -999.990 ... L3 1998 07 02 13 41 00 78.9000 11.8800 475.00 166733 ZEP 1998 05 28 08 25 00 816-91 P co2 CCGG 370.970 -999.990 ... L3 1998 07 02 13 55 00 78.9000 11.8800 475.00 166734 ZEP 1998 06 04 07 40 00 737-91 P co2 CCGG 371.220 -999.990 ... L3 1998 07 02 14 09 00 78.9000 11.8800 475.00 166735 ZEP 1998 06 04 07 40 00 738-91 P co2 CCGG 371.170 -999.990 ... L3 1998 07 02 14 22 00 78.9000 11.8800 475.00 166736 ZEP 1998 06 26 07 33 00 6283-66 P co2 CCGG 367.810 -999.990 ... L3 1998 08 07 15 25 00 78.9000 11.8800 475.00 166737 ZEP 1998 06 26 07 33 00 6284-66 P co2 CCGG 367.860 -999.990 ... L3 1998 08 07 15 39 00 78.9000 11.8800 475.00 166738 ZEP 1998 07 03 09 30 00 6663-66 P co2 CCGG 366.720 -999.990 ... L3 1998 08 07 15 53 00 78.9000 11.8800 475.00 166739 ZEP 1998 07 03 09 30 00 6664-66 P co2 CCGG 366.740 -999.990 ... L3 1998 08 07 16 06 00 78.9000 11.8800 475.00 166740 ZEP 1998 07 10 07 50 00 1921-91 P co2 CCGG 359.260 -999.990 .X. L3 1998 08 19 14 39 00 78.9000 11.8800 475.00 166741 ZEP 1998 07 10 07 50 00 1922-91 P co2 CCGG 359.310 -999.990 .X. L3 1998 08 19 14 52 00 78.9000 11.8800 475.00 166742 ZEP 1998 07 17 09 35 00 1923-91 P co2 CCGG 360.380 -999.990 ... L3 1998 08 19 15 06 00 78.9000 11.8800 475.00 166743 ZEP 1998 07 17 09 35 00 1924-91 P co2 CCGG 360.440 -999.990 ... L3 1998 08 19 15 20 00 78.9000 11.8800 475.00 166744 ZEP 1998 07 24 08 05 00 1582-91 P co2 CCGG 356.510 -999.990 .X. L3 1998 09 22 16 45 00 78.9000 11.8800 475.00 166745 ZEP 1998 07 30 08 30 00 4615-91 P co2 CCGG 358.900 -999.990 ... L3 1998 09 22 13 58 00 78.9000 11.8800 475.00 166746 ZEP 1998 07 30 08 30 00 4616-91 P co2 CCGG 358.860 -999.990 ... L3 1998 09 22 14 12 00 78.9000 11.8800 475.00 166747 ZEP 1998 08 07 08 30 00 105-91 P co2 CCGG 359.260 -999.990 ... L3 1998 09 25 12 06 00 78.9000 11.8800 475.00 166748 ZEP 1998 08 07 08 30 00 106-91 P co2 CCGG 359.210 -999.990 ... L3 1998 09 25 12 20 00 78.9000 11.8800 475.00 166749 ZEP 1998 08 13 08 08 00 1613-91 P co2 CCGG 358.220 -999.990 ... L3 1998 09 28 10 13 00 78.9000 11.8800 475.00 166750 ZEP 1998 08 13 08 08 00 1614-91 P co2 CCGG 358.190 -999.990 ... L3 1998 09 28 10 27 00 78.9000 11.8800 475.00 166751 ZEP 1998 08 22 14 30 00 161-91 P co2 CCGG 355.050 -999.990 ... L3 1998 09 23 13 38 00 78.9000 11.8800 475.00 166752 ZEP 1998 08 22 14 30 00 162-91 P co2 CCGG 355.070 -999.990 ... L3 1998 09 23 13 52 00 78.9000 11.8800 475.00 166753 ZEP 1998 08 23 10 25 00 1929-91 P co2 CCGG 355.150 -999.990 ... L3 1998 09 23 14 06 00 78.9000 11.8800 475.00 166754 ZEP 1998 08 23 10 25 00 1930-91 P co2 CCGG 354.980 -999.990 ... L3 1998 09 23 14 19 00 78.9000 11.8800 475.00 166755 ZEP 1998 08 27 08 13 00 1589-91 P co2 CCGG 356.310 -999.990 ... L3 1998 10 14 13 27 00 78.9000 11.8800 475.00 166756 ZEP 1998 08 27 08 13 00 1590-91 P co2 CCGG 356.250 -999.990 ... L3 1998 10 14 13 40 00 78.9000 11.8800 475.00 166757 ZEP 1998 09 03 08 02 00 4695-91 P co2 CCGG 357.430 -999.990 ... L3 1998 10 14 12 59 00 78.9000 11.8800 475.00 166758 ZEP 1998 09 03 08 02 00 4696-91 P co2 CCGG 357.420 -999.990 ... L3 1998 10 14 13 13 00 78.9000 11.8800 475.00 166759 ZEP 1998 09 24 08 12 00 36-98 P co2 CCGG 360.910 -999.990 ... L3 1998 11 17 12 39 00 78.9000 11.8800 475.00 166760 ZEP 1998 09 24 08 12 00 37-98 P co2 CCGG 360.930 -999.990 ... L3 1998 11 17 12 53 00 78.9000 11.8800 475.00 166761 ZEP 1998 10 02 11 23 00 4657-91 P co2 CCGG 360.920 -999.990 ... L3 1998 11 12 16 19 00 78.9000 11.8800 475.00 166762 ZEP 1998 10 02 11 23 00 4658-91 P co2 CCGG 360.910 -999.990 ... L3 1998 11 12 16 33 00 78.9000 11.8800 475.00 166763 ZEP 1998 10 08 08 18 00 255-91 P co2 CCGG 363.790 -999.990 ... L3 1998 11 12 14 58 00 78.9000 11.8800 475.00 166764 ZEP 1998 10 08 08 18 00 256-91 P co2 CCGG 363.880 -999.990 ... L3 1998 11 12 15 11 00 78.9000 11.8800 475.00 166765 ZEP 1998 10 16 08 45 00 6183-66 P co2 CCGG 368.310 -999.990 ... L3 1998 12 01 10 57 00 78.9000 11.8800 475.00 166766 ZEP 1998 10 16 08 45 00 6184-66 P co2 CCGG 368.110 -999.990 ... L3 1998 12 01 11 11 00 78.9000 11.8800 475.00 166767 ZEP 1998 10 22 09 30 00 6043-66 P co2 CCGG 366.080 -999.990 ... L3 1998 12 01 11 25 00 78.9000 11.8800 475.00 166768 ZEP 1998 10 22 09 30 00 6044-66 P co2 CCGG 366.100 -999.990 ... L3 1998 12 01 11 38 00 78.9000 11.8800 475.00 166769 ZEP 1998 10 30 10 07 00 793-91 P co2 CCGG 368.120 -999.990 ... L3 1998 12 04 12 00 00 78.9000 11.8800 475.00 166770 ZEP 1998 10 30 10 07 00 794-91 P co2 CCGG 368.040 -999.990 ... L3 1998 12 04 12 13 00 78.9000 11.8800 475.00 166771 ZEP 1998 11 05 08 45 00 800-91 P co2 CCGG 367.850 -999.990 ... L3 1998 12 04 15 05 00 78.9000 11.8800 475.00 166772 ZEP 1998 11 20 09 15 00 835-91 P co2 CCGG 370.230 -999.990 ... L3 1999 01 05 10 55 00 78.9000 11.8800 475.00 166773 ZEP 1998 11 20 09 15 00 836-91 P co2 CCGG 370.140 -999.990 ... L3 1999 01 05 11 09 00 78.9000 11.8800 475.00 166774 ZEP 1998 11 26 08 45 00 1359-91 P co2 CCGG 368.900 -999.990 ... L3 1999 01 05 09 32 00 78.9000 11.8800 475.00 166775 ZEP 1998 11 26 08 45 00 1360-91 P co2 CCGG 368.710 -999.990 ... L3 1999 01 05 09 45 00 78.9000 11.8800 475.00 166776 ZEP 1998 12 04 10 15 00 4593-91 P co2 CCGG 369.820 -999.990 ... L3 1999 01 15 14 54 00 78.9000 11.8800 475.00 166777 ZEP 1998 12 04 10 15 00 4594-91 P co2 CCGG 369.760 -999.990 ... L3 1999 01 15 15 07 00 78.9000 11.8800 475.00 166778 ZEP 1998 12 11 09 05 00 1589-91 P co2 CCGG 370.160 -999.990 +.. L3 1999 01 15 15 21 00 78.9000 11.8800 475.00 166779 ZEP 1998 12 11 09 05 00 1590-91 P co2 CCGG 363.180 -999.990 -.. L3 1999 01 15 15 35 00 78.9000 11.8800 475.00 166780 ZEP 1998 12 18 09 50 00 79-91 P co2 CCGG 371.840 -999.990 ... L3 1999 02 16 09 48 00 78.9000 11.8800 475.00 166781 ZEP 1998 12 18 09 50 00 80-91 P co2 CCGG 371.750 -999.990 ... L3 1999 02 16 10 01 00 78.9000 11.8800 475.00 166782 ZEP 1998 12 31 08 47 00 1807-91 P co2 CCGG 372.810 -999.990 ... L3 1999 02 16 10 15 00 78.9000 11.8800 475.00 166783 ZEP 1998 12 31 08 47 00 1808-91 P co2 CCGG 372.580 -999.990 ... L3 1999 02 16 10 29 00 78.9000 11.8800 475.00 166784 ZEP 1999 01 07 13 20 00 653-91 P co2 CCGG 372.190 -999.990 ... L3 1999 02 12 14 55 00 78.9000 11.8800 475.00 166785 ZEP 1999 01 07 13 20 00 654-91 P co2 CCGG 372.220 -999.990 ... L3 1999 02 12 15 09 00 78.9000 11.8800 475.00 166786 ZEP 1999 01 09 15 00 00 97-91 P co2 CCGG 372.790 -999.990 ... L3 1999 02 16 09 20 00 78.9000 11.8800 475.00 166787 ZEP 1999 01 09 15 00 00 98-91 P co2 CCGG 372.740 -999.990 ... L3 1999 02 16 09 34 00 78.9000 11.8800 475.00 166788 ZEP 1999 01 14 09 00 00 1290-91 P co2 CCGG 370.740 -999.990 ... L3 1999 02 19 12 16 00 78.9000 11.8800 475.00 166790 ZEP 1999 01 14 09 00 00 469-91 P co2 CCGG 370.740 -999.990 ... L3 1999 02 19 12 30 00 78.9000 11.8800 475.00 166789 ZEP 1999 01 21 09 16 00 1289-91 P co2 CCGG 373.140 -999.990 +.. L3 1999 02 19 13 53 00 78.9000 11.8800 475.00 166792 ZEP 1999 01 21 09 16 00 470-91 P co2 CCGG 372.580 -999.990 -.. L3 1999 02 19 13 40 00 78.9000 11.8800 475.00 166791 ZEP 1999 01 29 09 08 00 1007-91 P co2 CCGG 371.860 -999.990 +.. L3 1999 03 25 10 04 00 78.9000 11.8800 475.00 166793 ZEP 1999 01 29 09 08 00 1008-91 P co2 CCGG 366.740 -999.990 -.. L3 1999 03 25 10 18 00 78.9000 11.8800 475.00 166794 ZEP 1999 02 06 09 00 00 1131-91 P co2 CCGG 372.020 -999.990 ... L3 1999 03 24 09 29 00 78.9000 11.8800 475.00 166795 ZEP 1999 02 06 09 00 00 1132-91 P co2 CCGG 371.900 -999.990 ... L3 1999 03 24 09 42 00 78.9000 11.8800 475.00 166796 ZEP 1999 02 11 09 00 00 4755-91 P co2 CCGG 374.940 -999.990 ... L3 1999 03 30 15 03 00 78.9000 11.8800 475.00 166797 ZEP 1999 02 11 09 00 00 4756-91 P co2 CCGG 374.900 -999.990 ... L3 1999 03 30 15 16 00 78.9000 11.8800 475.00 166798 ZEP 1999 02 18 09 05 00 1085-91 P co2 CCGG 373.620 -999.990 ... L3 1999 03 30 15 30 00 78.9000 11.8800 475.00 166799 ZEP 1999 02 18 09 05 00 1086-91 P co2 CCGG 373.530 -999.990 ... L3 1999 03 30 15 44 00 78.9000 11.8800 475.00 166800 ZEP 1999 02 25 08 55 00 655-91 P co2 CCGG 373.450 -999.990 ... L3 1999 04 23 14 03 00 78.9000 11.8800 475.00 166801 ZEP 1999 02 25 08 55 00 656-91 P co2 CCGG 373.490 -999.990 ... L3 1999 04 23 14 17 00 78.9000 11.8800 475.00 166802 ZEP 1999 03 04 09 18 00 357-91 P co2 CCGG 373.000 -999.990 +.. L3 1999 04 23 13 36 00 78.9000 11.8800 475.00 166803 ZEP 1999 03 04 09 18 00 358-91 P co2 CCGG 370.630 -999.990 -.. L3 1999 04 23 13 50 00 78.9000 11.8800 475.00 166804 ZEP 1999 03 11 08 55 00 302-91 P co2 CCGG 376.880 -999.990 ... L3 1999 04 28 15 08 00 78.9000 11.8800 475.00 166805 ZEP 1999 03 25 09 00 00 2079-91 P co2 CCGG 373.370 -999.990 +.. L3 1999 04 28 15 21 00 78.9000 11.8800 475.00 166806 ZEP 1999 03 25 09 00 00 2080-91 P co2 CCGG 372.000 -999.990 -.. L3 1999 04 28 15 35 00 78.9000 11.8800 475.00 166807 ZEP 1999 04 02 08 05 00 1981-91 P co2 CCGG 374.120 -999.990 ... L3 1999 06 29 11 27 00 78.9000 11.8800 475.00 166808 ZEP 1999 04 02 08 05 00 1982-91 P co2 CCGG 374.040 -999.990 ... L3 1999 06 29 11 40 00 78.9000 11.8800 475.00 166809 ZEP 1999 04 09 08 10 00 1309-91 P co2 CCGG 376.340 -999.990 ... L3 1999 06 29 12 21 00 78.9000 11.8800 475.00 166810 ZEP 1999 04 09 08 10 00 1310-91 P co2 CCGG 376.260 -999.990 ... L3 1999 06 29 12 35 00 78.9000 11.8800 475.00 166811 ZEP 1999 04 15 08 35 00 1939-91 P co2 CCGG 375.870 -999.990 ... L3 1999 06 10 13 37 00 78.9000 11.8800 475.00 166812 ZEP 1999 04 15 08 35 00 1940-91 P co2 CCGG 375.870 -999.990 ... L3 1999 06 10 13 51 00 78.9000 11.8800 475.00 166813 ZEP 1999 04 22 08 45 00 1125-91 P co2 CCGG 374.540 -999.990 ... L3 1999 06 10 14 05 00 78.9000 11.8800 475.00 166814 ZEP 1999 04 22 08 45 00 1126-91 P co2 CCGG 374.480 -999.990 ... L3 1999 06 10 14 18 00 78.9000 11.8800 475.00 166815 ZEP 1999 05 01 08 53 00 4339-91 P co2 CCGG 374.760 -999.990 ... L3 1999 07 23 12 24 00 78.9000 11.8800 475.00 166816 ZEP 1999 05 01 08 53 00 4340-91 P co2 CCGG 374.790 -999.990 ... L3 1999 07 23 12 38 00 78.9000 11.8800 475.00 166817 ZEP 1999 05 06 08 32 00 287-91 P co2 CCGG 374.650 -999.990 ... L3 1999 07 23 11 57 00 78.9000 11.8800 475.00 166818 ZEP 1999 05 06 08 32 00 288-91 P co2 CCGG 374.530 -999.990 ... L3 1999 07 23 12 10 00 78.9000 11.8800 475.00 166819 ZEP 1999 05 14 09 00 00 4689-91 P co2 CCGG 373.080 -999.990 -.. L3 1999 08 11 12 51 00 78.9000 11.8800 475.00 166820 ZEP 1999 05 14 09 00 00 4690-91 P co2 CCGG 374.640 -999.990 +.. L3 1999 08 11 13 04 00 78.9000 11.8800 475.00 166821 ZEP 1999 05 21 08 58 00 563-91 P co2 CCGG 373.620 -999.990 ... L3 1999 08 11 13 45 00 78.9000 11.8800 475.00 166822 ZEP 1999 05 21 08 58 00 564-91 P co2 CCGG 373.570 -999.990 ... L3 1999 08 11 13 59 00 78.9000 11.8800 475.00 166823 ZEP 1999 05 27 08 50 00 4537-91 P co2 CCGG 369.810 -999.990 -.. L3 1999 08 12 09 34 00 78.9000 11.8800 475.00 166824 ZEP 1999 05 27 08 50 00 4538-91 P co2 CCGG 372.680 -999.990 +.. L3 1999 08 12 09 48 00 78.9000 11.8800 475.00 166825 ZEP 1999 06 07 08 40 00 1557-91 P co2 CCGG 372.940 -999.990 +.. L3 1999 08 12 12 20 00 78.9000 11.8800 475.00 166826 ZEP 1999 06 07 08 40 00 1558-91 P co2 CCGG 371.710 -999.990 -.. L3 1999 08 12 12 33 00 78.9000 11.8800 475.00 166827 ZEP 1999 06 11 09 30 00 427-91 P co2 CCGG 370.660 -999.990 +.. L3 1999 08 12 11 25 00 78.9000 11.8800 475.00 166828 ZEP 1999 06 11 09 30 00 428-91 P co2 CCGG 369.080 -999.990 -.. L3 1999 08 12 11 39 00 78.9000 11.8800 475.00 166829 ZEP 1999 06 17 08 30 00 4345-91 P co2 CCGG 370.030 -999.990 +.. L3 1999 08 12 11 52 00 78.9000 11.8800 475.00 166830 ZEP 1999 06 17 08 30 00 4346-91 P co2 CCGG 331.640 -999.990 -.. L3 1999 08 12 12 06 00 78.9000 11.8800 475.00 166831 ZEP 1999 07 15 09 45 00 2041-91 P co2 CCGG 430.920 -999.990 +.. L3 1999 09 07 15 21 00 78.9000 11.8800 475.00 166832 ZEP 1999 07 15 09 45 00 2042-91 P co2 CCGG 393.500 -999.990 -.. L3 1999 09 07 15 35 00 78.9000 11.8800 475.00 166833 ZEP 1999 07 22 09 15 00 2045-91 P co2 CCGG 363.430 -999.990 ... L3 1999 09 07 14 54 00 78.9000 11.8800 475.00 166834 ZEP 1999 07 22 09 15 00 2046-91 P co2 CCGG 363.010 -999.990 ... L3 1999 09 07 15 08 00 78.9000 11.8800 475.00 166835 ZEP 1999 07 26 09 30 00 789-91 P co2 CCGG 364.440 -999.990 -.. L3 1999 09 07 13 57 00 78.9000 11.8800 475.00 166836 ZEP 1999 07 26 09 30 00 790-91 P co2 CCGG 368.880 -999.990 +.. L3 1999 09 07 14 11 00 78.9000 11.8800 475.00 166837 ZEP 1999 07 29 09 00 00 1851-91 P co2 CCGG 362.190 -999.990 ... L3 1999 09 01 15 15 00 78.9000 11.8800 475.00 166838 ZEP 1999 07 29 09 00 00 1852-91 P co2 CCGG 361.920 -999.990 ... L3 1999 09 01 15 29 00 78.9000 11.8800 475.00 166839 ZEP 1999 08 02 08 55 00 785-91 P co2 CCGG 361.090 -999.990 ... L3 1999 09 07 12 35 00 78.9000 11.8800 475.00 166840 ZEP 1999 08 02 08 55 00 786-91 P co2 CCGG 361.270 -999.990 ... L3 1999 09 07 12 49 00 78.9000 11.8800 475.00 166841 ZEP 1999 08 05 12 34 56 1695-91 P co2 CCGG 360.850 -999.990 ... L3 1999 09 01 14 48 00 78.9000 11.8800 475.00 166842 ZEP 1999 08 05 12 34 56 1696-91 P co2 CCGG 360.860 -999.990 ... L3 1999 09 01 15 01 00 78.9000 11.8800 475.00 166843 ZEP 1999 08 09 13 40 00 795-91 P co2 CCGG 362.000 -999.990 ... L3 1999 10 22 12 36 00 78.9000 11.8800 475.00 166844 ZEP 1999 08 09 13 40 00 796-91 P co2 CCGG 361.810 -999.990 ... L3 1999 10 22 12 50 00 78.9000 11.8800 475.00 166845 ZEP 1999 08 12 09 00 00 1267-91 P co2 CCGG 364.350 -999.990 +.. L3 1999 10 21 12 44 00 78.9000 11.8800 475.00 166846 ZEP 1999 08 12 09 00 00 1268-91 P co2 CCGG 362.870 -999.990 -.. L3 1999 10 21 12 57 00 78.9000 11.8800 475.00 166847 ZEP 1999 08 20 08 55 00 809-91 P co2 CCGG 372.260 -999.990 -.. L3 1999 10 22 12 09 00 78.9000 11.8800 475.00 166848 ZEP 1999 08 20 08 55 00 810-91 P co2 CCGG 372.900 -999.990 +.. L3 1999 10 22 12 23 00 78.9000 11.8800 475.00 166849 ZEP 1999 08 23 13 18 00 739-91 P co2 CCGG 360.880 -999.990 ... L3 1999 11 03 14 51 00 78.9000 11.8800 475.00 166850 ZEP 1999 08 23 13 18 00 740-91 P co2 CCGG 360.940 -999.990 ... L3 1999 11 03 15 05 00 78.9000 11.8800 475.00 166851 ZEP 1999 08 26 06 50 00 679-91 P co2 CCGG 361.770 -999.990 ... L3 1999 10 21 12 16 00 78.9000 11.8800 475.00 166852 ZEP 1999 08 26 06 50 00 680-91 P co2 CCGG 361.550 -999.990 ... L3 1999 10 21 12 30 00 78.9000 11.8800 475.00 166853 ZEP 1999 08 30 08 10 00 811-91 P co2 CCGG 364.410 -999.990 .X. L3 1999 11 03 15 19 00 78.9000 11.8800 475.00 166854 ZEP 1999 08 30 08 10 00 812-91 P co2 CCGG 364.760 -999.990 .X. L3 1999 11 03 15 32 00 78.9000 11.8800 475.00 166855 ZEP 1999 09 02 08 30 00 4053-91 P co2 CCGG 357.690 -999.990 +.. L3 1999 10 21 10 51 00 78.9000 11.8800 475.00 166856 ZEP 1999 09 02 08 30 00 4054-91 P co2 CCGG 351.600 -999.990 -.. L3 1999 10 21 11 04 00 78.9000 11.8800 475.00 166857 ZEP 1999 09 06 08 15 00 791-91 P co2 CCGG 362.060 -999.990 ... L3 1999 10 22 11 37 00 78.9000 11.8800 475.00 166858 ZEP 1999 09 06 08 15 00 792-91 P co2 CCGG 362.240 -999.990 ... L3 1999 10 22 11 51 00 78.9000 11.8800 475.00 166859 ZEP 1999 09 09 09 00 00 157-98 P co2 CCGG 359.050 -999.990 ... L3 1999 10 21 11 45 00 78.9000 11.8800 475.00 166860 ZEP 1999 09 09 09 00 00 158-98 P co2 CCGG 358.950 -999.990 ... L3 1999 10 21 11 59 00 78.9000 11.8800 475.00 166861 ZEP 1999 09 13 07 15 00 747-91 P co2 CCGG 363.790 -999.990 -.. L3 1999 10 22 13 04 00 78.9000 11.8800 475.00 166862 ZEP 1999 09 13 07 15 00 748-91 P co2 CCGG 364.380 -999.990 +.. L3 1999 10 22 13 17 00 78.9000 11.8800 475.00 166863 ZEP 1999 09 16 08 47 00 1419-91 P co2 CCGG 359.230 -999.990 +.. L3 1999 11 30 14 28 00 78.9000 11.8800 475.00 166864 ZEP 1999 09 16 08 47 00 1420-91 P co2 CCGG 357.120 -999.990 -.. L3 1999 11 30 14 42 00 78.9000 11.8800 475.00 166865 ZEP 1999 09 20 09 00 00 4443-91 P co2 CCGG 359.130 -999.990 -.. L3 1999 12 01 11 51 00 78.9000 11.8800 475.00 166866 ZEP 1999 09 20 09 00 00 4444-91 P co2 CCGG 362.510 -999.990 +.. L3 1999 12 01 12 04 00 78.9000 11.8800 475.00 166867 ZEP 1999 09 23 11 20 00 4681-91 P co2 CCGG 361.580 -999.990 ... L3 1999 11 30 13 59 00 78.9000 11.8800 475.00 166868 ZEP 1999 09 23 11 20 00 4682-91 P co2 CCGG 361.720 -999.990 ... L3 1999 11 30 14 13 00 78.9000 11.8800 475.00 166869 ZEP 1999 09 27 08 45 00 693-91 P co2 CCGG 367.720 -999.990 +.. L3 1999 12 01 13 12 00 78.9000 11.8800 475.00 166870 ZEP 1999 09 27 08 45 00 694-91 P co2 CCGG 367.050 -999.990 -.. L3 1999 12 01 13 26 00 78.9000 11.8800 475.00 166871 ZEP 1999 09 30 09 03 00 4201-91 P co2 CCGG 361.960 -999.990 +.. L3 1999 12 01 12 18 00 78.9000 11.8800 475.00 166872 ZEP 1999 09 30 09 03 00 4202-91 P co2 CCGG 360.920 -999.990 -.. L3 1999 12 01 12 32 00 78.9000 11.8800 475.00 166873 ZEP 1999 10 04 09 20 00 813-91 P co2 CCGG 366.990 -999.990 ... L3 1999 11 18 11 46 00 78.9000 11.8800 475.00 166874 ZEP 1999 10 04 09 20 00 814-91 P co2 CCGG 366.870 -999.990 ... L3 1999 11 18 11 59 00 78.9000 11.8800 475.00 166875 ZEP 1999 10 07 08 45 00 1611-91 P co2 CCGG 365.950 -999.990 +.. L3 1999 12 01 12 45 00 78.9000 11.8800 475.00 166876 ZEP 1999 10 07 08 45 00 1612-91 P co2 CCGG 365.420 -999.990 -.. L3 1999 12 01 12 59 00 78.9000 11.8800 475.00 166877 ZEP 1999 10 11 09 00 00 733-91 P co2 CCGG 367.170 -999.990 -.. L3 1999 11 15 14 41 00 78.9000 11.8800 475.00 166878 ZEP 1999 10 11 09 00 00 734-91 P co2 CCGG 368.420 -999.990 +.. L3 1999 11 15 14 55 00 78.9000 11.8800 475.00 166879 ZEP 1999 10 14 09 20 00 535-91 P co2 CCGG 370.080 -999.990 .X. L3 1999 11 23 15 55 00 78.9000 11.8800 475.00 166880 ZEP 1999 10 14 09 20 00 536-91 P co2 CCGG 369.700 -999.990 .X. L3 1999 11 23 16 08 00 78.9000 11.8800 475.00 166881 ZEP 1999 10 18 08 55 00 11-91 P co2 CCGG 366.960 -999.990 ... L3 1999 11 30 13 32 00 78.9000 11.8800 475.00 166882 ZEP 1999 10 18 08 55 00 12-91 P co2 CCGG 366.720 -999.990 ... L3 1999 11 30 13 46 00 78.9000 11.8800 475.00 166883 ZEP 1999 10 21 08 45 00 1477-91 P co2 CCGG 366.080 -999.990 ... L3 1999 11 23 16 22 00 78.9000 11.8800 475.00 166884 ZEP 1999 10 21 08 45 00 1478-91 P co2 CCGG 365.750 -999.990 ... L3 1999 11 23 16 36 00 78.9000 11.8800 475.00 166885 ZEP 1999 10 25 09 15 00 1207-91 P co2 CCGG 369.480 -999.990 -.. L3 1999 11 30 13 05 00 78.9000 11.8800 475.00 166886 ZEP 1999 10 25 09 15 00 1208-91 P co2 CCGG 371.610 -999.990 +.. L3 1999 11 30 13 19 00 78.9000 11.8800 475.00 166887 ZEP 1999 10 28 08 55 00 1151-91 P co2 CCGG 368.280 -999.990 ... L3 1999 11 24 10 35 00 78.9000 11.8800 475.00 166888 ZEP 1999 10 28 08 55 00 1152-91 P co2 CCGG 367.970 -999.990 ... L3 1999 11 24 10 49 00 78.9000 11.8800 475.00 166889 ZEP 1999 11 04 09 55 00 5-98 P co2 CCGG 370.390 -999.990 ... L3 1999 11 24 10 06 00 78.9000 11.8800 475.00 166890 ZEP 1999 11 04 09 55 00 6-98 P co2 CCGG 370.310 -999.990 ... L3 1999 11 24 10 20 00 78.9000 11.8800 475.00 166891 ZEP 1999 11 08 09 25 00 4149-91 P co2 CCGG 368.870 -999.990 ... L3 1999 12 27 14 48 00 78.9000 11.8800 475.00 166892 ZEP 1999 11 08 09 25 00 4150-91 P co2 CCGG 368.910 -999.990 ... L3 1999 12 27 15 01 00 78.9000 11.8800 475.00 166893 ZEP 1999 11 11 10 28 00 4505-91 P co2 CCGG 369.990 -999.990 ... L3 1999 12 27 16 38 00 78.9000 11.8800 475.00 166894 ZEP 1999 11 11 10 28 00 4506-91 P co2 CCGG 369.970 -999.990 ... L3 1999 12 27 16 52 00 78.9000 11.8800 475.00 166895 ZEP 1999 11 15 09 15 00 805-91 P co2 CCGG 370.970 -999.990 +.. L3 1999 12 22 10 02 00 78.9000 11.8800 475.00 166896 ZEP 1999 11 15 09 15 00 806-91 P co2 CCGG 370.160 -999.990 -.. L3 1999 12 22 10 16 00 78.9000 11.8800 475.00 166897 ZEP 1999 11 18 09 01 00 1423-91 P co2 CCGG 371.040 -999.990 ... L3 1999 12 28 09 37 00 78.9000 11.8800 475.00 166898 ZEP 1999 11 18 09 01 00 1424-91 P co2 CCGG 370.850 -999.990 ... L3 1999 12 28 09 51 00 78.9000 11.8800 475.00 166899 ZEP 1999 11 25 10 50 00 1963-91 P co2 CCGG 376.480 -999.990 -.. L3 2000 01 21 10 04 00 78.9000 11.8800 475.00 166900 ZEP 1999 11 25 10 50 00 1964-91 P co2 CCGG 377.090 -999.990 +.. L3 2000 01 21 10 17 00 78.9000 11.8800 475.00 166901 ZEP 1999 11 29 09 30 00 783-91 P co2 CCGG 377.490 -999.990 .X. L3 1999 12 22 11 25 00 78.9000 11.8800 475.00 166902 ZEP 1999 11 29 09 30 00 784-91 P co2 CCGG 377.740 -999.990 .X. L3 1999 12 22 11 39 00 78.9000 11.8800 475.00 166903 ZEP 1999 12 02 09 20 00 4413-91 P co2 CCGG 373.760 -999.990 ... L3 2000 01 19 12 52 00 78.9000 11.8800 475.00 166904 ZEP 1999 12 02 09 20 00 4414-91 P co2 CCGG 373.960 -999.990 ... L3 2000 01 19 13 06 00 78.9000 11.8800 475.00 166905 ZEP 1999 12 06 09 33 00 735-91 P co2 CCGG 376.800 -999.990 ... L3 2000 01 28 11 50 00 78.9000 11.8800 475.00 166906 ZEP 1999 12 06 09 33 00 736-91 P co2 CCGG 377.040 -999.990 ... L3 2000 01 28 12 04 00 78.9000 11.8800 475.00 166907 ZEP 1999 12 09 09 05 00 1027-91 P co2 CCGG 375.830 -999.990 -.. L3 2000 01 19 12 25 00 78.9000 11.8800 475.00 166908 ZEP 1999 12 09 09 05 00 1028-91 P co2 CCGG 376.920 -999.990 +.. L3 2000 01 19 12 39 00 78.9000 11.8800 475.00 166909 ZEP 1999 12 13 09 05 00 737-91 P co2 CCGG 373.100 -999.990 ... L3 2000 01 28 14 08 00 78.9000 11.8800 475.00 166910 ZEP 1999 12 13 09 05 00 738-91 P co2 CCGG 373.190 -999.990 ... L3 2000 01 28 14 22 00 78.9000 11.8800 475.00 166911 ZEP 1999 12 16 09 43 00 235-91 P co2 CCGG 376.900 -999.990 ... L3 2000 01 20 15 22 00 78.9000 11.8800 475.00 166912 ZEP 1999 12 16 09 43 00 236-91 P co2 CCGG 377.240 -999.990 ... L3 2000 01 20 15 36 00 78.9000 11.8800 475.00 166913 ZEP 1999 12 20 09 55 00 815-91 P co2 CCGG 378.920 -999.990 ... L3 2000 01 28 14 35 00 78.9000 11.8800 475.00 166914 ZEP 1999 12 20 09 55 00 816-91 P co2 CCGG 379.020 -999.990 ... L3 2000 01 28 14 49 00 78.9000 11.8800 475.00 166915 ZEP 1999 12 23 10 20 00 1195-91 P co2 CCGG 382.560 -999.990 -.. L3 2000 01 26 11 52 00 78.9000 11.8800 475.00 166916 ZEP 1999 12 23 10 20 00 1196-91 P co2 CCGG 384.100 -999.990 +.. L3 2000 01 26 12 06 00 78.9000 11.8800 475.00 166917 ZEP 1999 12 27 10 10 00 787-91 P co2 CCGG 378.860 -999.990 +.. L3 2000 01 28 12 17 00 78.9000 11.8800 475.00 166918 ZEP 1999 12 27 10 10 00 788-91 P co2 CCGG 378.330 -999.990 -.. L3 2000 01 28 12 31 00 78.9000 11.8800 475.00 166919 ZEP 1999 12 30 09 20 00 4035-91 P co2 CCGG 377.860 -999.990 ... L3 2000 01 26 11 25 00 78.9000 11.8800 475.00 166920 ZEP 1999 12 30 09 20 00 4036-91 P co2 CCGG 377.670 -999.990 ... L3 2000 01 26 11 39 00 78.9000 11.8800 475.00 166921 ZEP 2000 01 03 09 00 00 799-91 P co2 CCGG 384.430 -999.990 -.. L3 2000 02 04 14 57 00 78.9000 11.8800 475.00 166922 ZEP 2000 01 03 09 00 00 800-91 P co2 CCGG 385.180 -999.990 +.. L3 2000 02 04 15 10 00 78.9000 11.8800 475.00 166923 ZEP 2000 01 06 09 20 00 253-91 P co2 CCGG 380.160 -999.990 -.. L3 2000 01 31 16 08 00 78.9000 11.8800 475.00 166924 ZEP 2000 01 06 09 20 00 254-91 P co2 CCGG 382.690 -999.990 +.. L3 2000 01 31 16 21 00 78.9000 11.8800 475.00 166925 ZEP 2000 01 10 09 20 00 781-91 P co2 CCGG 377.590 -999.990 ... L3 2000 02 04 14 28 00 78.9000 11.8800 475.00 166926 ZEP 2000 01 10 09 20 00 782-91 P co2 CCGG 377.720 -999.990 ... L3 2000 02 04 14 41 00 78.9000 11.8800 475.00 166927 ZEP 2000 01 14 09 47 00 1383-91 P co2 CCGG 377.220 -999.990 ... L3 2000 01 31 15 12 00 78.9000 11.8800 475.00 166928 ZEP 2000 01 14 09 47 00 1384-91 P co2 CCGG 376.870 -999.990 ... L3 2000 01 31 15 25 00 78.9000 11.8800 475.00 166929 ZEP 2000 01 17 10 35 00 745-91 P co2 CCGG 375.540 -999.990 ... L3 2000 02 16 12 30 00 78.9000 11.8800 475.00 166930 ZEP 2000 01 17 10 35 00 746-91 P co2 CCGG 375.390 -999.990 ... L3 2000 02 16 12 44 00 78.9000 11.8800 475.00 166931 ZEP 2000 01 20 09 00 00 1379-91 P co2 CCGG 375.630 -999.990 ... L3 2000 02 16 11 08 00 78.9000 11.8800 475.00 166932 ZEP 2000 01 20 09 00 00 1380-91 P co2 CCGG 375.540 -999.990 ... L3 2000 02 16 11 22 00 78.9000 11.8800 475.00 166933 ZEP 2000 01 24 09 00 00 793-91 P co2 CCGG 375.900 -999.990 -.. L3 2000 02 16 12 59 00 78.9000 11.8800 475.00 166934 ZEP 2000 01 24 09 00 00 794-91 P co2 CCGG 376.720 -999.990 +.. L3 2000 02 16 13 12 00 78.9000 11.8800 475.00 166935 ZEP 2000 01 27 09 25 00 1329-91 P co2 CCGG 376.640 -999.990 ... L3 2000 02 16 10 21 00 78.9000 11.8800 475.00 166936 ZEP 2000 01 27 09 25 00 1330-91 P co2 CCGG 376.600 -999.990 ... L3 2000 02 16 10 35 00 78.9000 11.8800 475.00 166937 ZEP 2000 01 31 09 40 00 785-91 P co2 CCGG 385.020 -999.990 +.. L3 2000 02 25 14 35 00 78.9000 11.8800 475.00 166938 ZEP 2000 01 31 09 40 00 786-91 P co2 CCGG 383.910 -999.990 -.. L3 2000 02 25 14 49 00 78.9000 11.8800 475.00 166939 ZEP 2000 02 03 09 25 00 4085-91 P co2 CCGG 377.640 -999.990 ... L3 2000 03 02 12 31 00 78.9000 11.8800 475.00 166940 ZEP 2000 02 07 15 30 00 789-91 P co2 CCGG 374.310 -999.990 ... L3 2000 02 25 15 57 00 78.9000 11.8800 475.00 166941 ZEP 2000 02 07 15 30 00 790-91 P co2 CCGG 374.770 -999.990 ... L3 2000 02 25 16 11 00 78.9000 11.8800 475.00 166942 ZEP 2000 02 10 08 45 00 69-98 P co2 CCGG 382.620 -999.990 +.. L3 2000 03 02 11 04 00 78.9000 11.8800 475.00 166943 ZEP 2000 02 10 08 45 00 70-98 P co2 CCGG 381.300 -999.990 -.. L3 2000 03 02 11 18 00 78.9000 11.8800 475.00 166944 ZEP 2000 02 14 10 30 00 813-91 P co2 CCGG 377.370 -999.990 ... L3 2000 03 31 10 48 00 78.9000 11.8800 475.00 166945 ZEP 2000 02 14 10 30 00 814-91 P co2 CCGG 377.380 -999.990 ... L3 2000 03 31 11 01 00 78.9000 11.8800 475.00 166946 ZEP 2000 02 18 09 34 00 795-91 P co2 CCGG 376.570 -999.990 ... L3 2000 03 31 12 06 00 78.9000 11.8800 475.00 166947 ZEP 2000 02 18 09 34 00 796-91 P co2 CCGG 376.130 -999.990 ... L3 2000 03 31 12 19 00 78.9000 11.8800 475.00 166948 ZEP 2000 02 21 09 30 00 733-91 P co2 CCGG 400.160 -999.990 +.. L3 2000 03 31 13 52 00 78.9000 11.8800 475.00 166949 ZEP 2000 02 21 09 30 00 734-91 P co2 CCGG 394.440 -999.990 -.. L3 2000 03 31 14 05 00 78.9000 11.8800 475.00 166950 ZEP 2000 02 24 09 45 00 77-98 P co2 CCGG 375.720 -999.990 ... L3 2000 03 31 14 46 00 78.9000 11.8800 475.00 166951 ZEP 2000 02 24 09 45 00 78-98 P co2 CCGG 375.910 -999.990 ... L3 2000 03 31 14 59 00 78.9000 11.8800 475.00 166952 ZEP 2000 02 28 10 55 00 739-91 P co2 CCGG 376.160 -999.990 ... L3 2000 03 31 12 34 00 78.9000 11.8800 475.00 166953 ZEP 2000 02 28 10 55 00 740-91 P co2 CCGG 375.910 -999.990 ... L3 2000 03 31 12 47 00 78.9000 11.8800 475.00 166954 ZEP 2000 03 02 09 30 00 1403-91 P co2 CCGG 379.180 -999.990 ... L3 2000 03 31 14 20 00 78.9000 11.8800 475.00 166955 ZEP 2000 03 02 09 30 00 1404-91 P co2 CCGG 379.310 -999.990 ... L3 2000 03 31 14 33 00 78.9000 11.8800 475.00 166956 ZEP 2000 03 06 10 20 00 747-91 P co2 CCGG 379.460 -999.990 ... L3 2000 04 07 12 21 00 78.9000 11.8800 475.00 166957 ZEP 2000 03 06 10 20 00 748-91 P co2 CCGG 379.310 -999.990 ... L3 2000 04 07 12 34 00 78.9000 11.8800 475.00 166958 ZEP 2000 03 10 13 50 00 1171-91 P co2 CCGG 386.440 -999.990 -.. L3 2000 04 10 12 32 00 78.9000 11.8800 475.00 166959 ZEP 2000 03 10 13 50 00 1172-91 P co2 CCGG 388.270 -999.990 +.. L3 2000 04 10 12 45 00 78.9000 11.8800 475.00 166960 ZEP 2000 03 15 18 00 00 811-91 P co2 CCGG 376.520 -999.990 ... L3 2000 04 07 11 55 00 78.9000 11.8800 475.00 166961 ZEP 2000 03 15 18 00 00 812-91 P co2 CCGG 376.470 -999.990 ... L3 2000 04 07 12 08 00 78.9000 11.8800 475.00 166962 ZEP 2000 03 16 10 30 00 4741-91 P co2 CCGG 375.650 -999.990 ... L3 2000 04 10 12 58 00 78.9000 11.8800 475.00 166963 ZEP 2000 03 16 10 30 00 4742-91 P co2 CCGG 375.680 -999.990 ... L3 2000 04 10 13 11 00 78.9000 11.8800 475.00 166964 ZEP 2000 03 20 10 15 00 149-91 P co2 CCGG 375.630 -999.990 +.. L3 2000 04 25 09 26 00 78.9000 11.8800 475.00 166965 ZEP 2000 03 20 10 15 00 150-91 P co2 CCGG 373.990 -999.990 -.. L3 2000 04 25 09 39 00 78.9000 11.8800 475.00 166966 ZEP 2000 03 23 10 20 00 591-91 P co2 CCGG 376.730 -999.990 ... L3 2000 04 25 11 41 00 78.9000 11.8800 475.00 166967 ZEP 2000 03 23 10 20 00 592-91 P co2 CCGG 376.730 -999.990 ... L3 2000 04 25 11 54 00 78.9000 11.8800 475.00 166968 ZEP 2000 03 27 09 40 00 2019-91 P co2 CCGG 375.380 -999.990 ... L3 2000 04 25 10 18 00 78.9000 11.8800 475.00 166969 ZEP 2000 03 27 09 40 00 2020-91 P co2 CCGG 375.270 -999.990 ... L3 2000 04 25 10 31 00 78.9000 11.8800 475.00 166970 ZEP 2000 03 30 08 55 00 137-98 P co2 CCGG 375.380 -999.990 ... L3 2000 04 25 12 07 00 78.9000 11.8800 475.00 166971 ZEP 2000 03 30 08 55 00 138-98 P co2 CCGG 375.280 -999.990 ... L3 2000 04 25 12 20 00 78.9000 11.8800 475.00 166972 ZEP 2000 04 03 09 10 00 805-91 P co2 CCGG 374.360 -999.990 ... L3 2000 05 11 10 46 00 78.9000 11.8800 475.00 166973 ZEP 2000 04 03 09 10 00 806-91 P co2 CCGG 374.360 -999.990 ... L3 2000 05 11 10 59 00 78.9000 11.8800 475.00 166974 ZEP 2000 04 06 10 30 00 807-91 P co2 CCGG 374.690 -999.990 ... L3 2000 05 11 11 12 00 78.9000 11.8800 475.00 166975 ZEP 2000 04 10 10 50 00 809-91 P co2 CCGG 375.600 -999.990 ... L3 2000 05 11 11 25 00 78.9000 11.8800 475.00 166976 ZEP 2000 04 13 09 05 00 743-91 P co2 CCGG 375.850 -999.990 ... L3 2000 05 10 15 04 00 78.9000 11.8800 475.00 166977 ZEP 2000 04 13 09 05 00 744-91 P co2 CCGG 375.740 -999.990 ... L3 2000 05 10 15 17 00 78.9000 11.8800 475.00 166978 ZEP 2000 04 21 09 10 00 131-98 P co2 CCGG 375.800 -999.990 ... L3 2000 06 07 10 33 00 78.9000 11.8800 475.00 166979 ZEP 2000 04 21 09 10 00 132-98 P co2 CCGG 375.850 -999.990 ... L3 2000 06 07 10 46 00 78.9000 11.8800 475.00 166980 ZEP 2000 04 24 09 00 00 799-91 P co2 CCGG 375.870 -999.990 ... L3 2000 06 01 16 08 00 78.9000 11.8800 475.00 166981 ZEP 2000 04 24 09 00 00 800-91 P co2 CCGG 375.960 -999.990 ... L3 2000 06 01 16 21 00 78.9000 11.8800 475.00 166982 ZEP 2000 04 27 09 15 00 1725-91 P co2 CCGG 375.810 -999.990 ... L3 2000 06 07 11 00 00 78.9000 11.8800 475.00 166983 ZEP 2000 04 27 09 15 00 1726-91 P co2 CCGG 375.620 -999.990 ... L3 2000 06 07 11 13 00 78.9000 11.8800 475.00 166984 ZEP 2000 05 01 11 00 00 787-91 P co2 CCGG 375.550 -999.990 ... L3 2000 06 01 15 15 00 78.9000 11.8800 475.00 166985 ZEP 2000 05 01 11 00 00 788-91 P co2 CCGG 375.520 -999.990 ... L3 2000 06 01 15 28 00 78.9000 11.8800 475.00 166986 ZEP 2000 05 04 09 00 00 801-91 P co2 CCGG 375.380 -999.990 ... L3 2000 06 14 13 37 00 78.9000 11.8800 475.00 166987 ZEP 2000 05 04 09 00 00 802-91 P co2 CCGG 375.420 -999.990 ... L3 2000 06 14 13 50 00 78.9000 11.8800 475.00 166988 ZEP 2000 05 09 08 30 00 783-91 P co2 CCGG 375.200 -999.990 ... L3 2000 06 15 10 31 00 78.9000 11.8800 475.00 166989 ZEP 2000 05 09 08 30 00 784-91 P co2 CCGG 375.170 -999.990 ... L3 2000 06 15 10 44 00 78.9000 11.8800 475.00 166990 ZEP 2000 05 11 09 06 00 815-91 P co2 CCGG 375.810 -999.990 ... L3 2000 06 15 10 04 00 78.9000 11.8800 475.00 166991 ZEP 2000 05 11 09 06 00 816-91 P co2 CCGG 375.820 -999.990 ... L3 2000 06 15 10 18 00 78.9000 11.8800 475.00 166992 ZEP 2000 05 11 09 50 00 803-91 P co2 CCGG 375.690 -999.990 ... L3 2000 06 14 14 55 00 78.9000 11.8800 475.00 166993 ZEP 2000 05 11 09 50 00 804-91 P co2 CCGG 375.690 -999.990 ... L3 2000 06 14 15 08 00 78.9000 11.8800 475.00 166994 ZEP 2000 05 15 09 00 00 737-91 P co2 CCGG 375.760 -999.990 ... L3 2000 06 14 14 03 00 78.9000 11.8800 475.00 166995 ZEP 2000 05 15 09 00 00 738-91 P co2 CCGG 375.640 -999.990 ... L3 2000 06 14 14 16 00 78.9000 11.8800 475.00 166996 ZEP 2000 05 18 09 45 00 1981-91 P co2 CCGG 375.210 -999.990 ... L3 2000 06 13 13 59 00 78.9000 11.8800 475.00 166997 ZEP 2000 05 18 09 45 00 1982-91 P co2 CCGG 375.180 -999.990 ... L3 2000 06 13 14 12 00 78.9000 11.8800 475.00 166998 ZEP 2000 05 22 09 20 00 735-91 P co2 CCGG 373.790 -999.990 ... L3 2000 06 14 14 29 00 78.9000 11.8800 475.00 166999 ZEP 2000 05 22 09 20 00 736-91 P co2 CCGG 373.740 -999.990 ... L3 2000 06 14 14 42 00 78.9000 11.8800 475.00 167000 ZEP 2000 05 25 09 00 00 1085-91 P co2 CCGG 374.270 -999.990 ... L3 2000 06 13 14 25 00 78.9000 11.8800 475.00 167001 ZEP 2000 05 25 09 00 00 1086-91 P co2 CCGG 374.250 -999.990 ... L3 2000 06 13 14 38 00 78.9000 11.8800 475.00 167002 ZEP 2000 05 29 08 55 00 791-91 P co2 CCGG 374.940 -999.990 ... L3 2000 08 02 13 46 00 78.9000 11.8800 475.00 167003 ZEP 2000 05 29 08 55 00 792-91 P co2 CCGG 375.010 -999.990 ... L3 2000 08 02 13 59 00 78.9000 11.8800 475.00 167004 ZEP 2000 06 02 09 27 00 325-91 P co2 CCGG 473.550 -999.990 -.. L3 2000 08 03 10 10 00 78.9000 11.8800 475.00 167005 ZEP 2000 06 02 09 27 00 326-91 P co2 CCGG 570.520 -999.990 +.. L3 2000 08 03 10 23 00 78.9000 11.8800 475.00 167006 ZEP 2000 06 05 09 30 00 733-91 P co2 CCGG 374.380 -999.990 ... L3 2000 08 02 14 13 00 78.9000 11.8800 475.00 167007 ZEP 2000 06 05 09 30 00 734-91 P co2 CCGG 374.350 -999.990 ... L3 2000 08 02 14 26 00 78.9000 11.8800 475.00 167008 ZEP 2000 06 08 09 25 00 4221-91 P co2 CCGG 375.160 -999.990 ... L3 2000 08 03 11 30 00 78.9000 11.8800 475.00 167009 ZEP 2000 06 08 09 25 00 4222-91 P co2 CCGG 374.780 -999.990 ... L3 2000 08 03 11 43 00 78.9000 11.8800 475.00 167010 ZEP 2000 06 12 09 30 00 739-91 P co2 CCGG 373.500 -999.990 ... L3 2000 08 02 12 52 00 78.9000 11.8800 475.00 167011 ZEP 2000 06 12 09 30 00 740-91 P co2 CCGG 373.460 -999.990 ... L3 2000 08 02 13 06 00 78.9000 11.8800 475.00 167012 ZEP 2000 06 15 09 00 00 811-91 P co2 CCGG 373.960 -999.990 ... L3 2000 08 02 11 32 00 78.9000 11.8800 475.00 167013 ZEP 2000 06 15 09 00 00 812-91 P co2 CCGG 374.010 -999.990 ... L3 2000 08 02 11 46 00 78.9000 11.8800 475.00 167014 ZEP 2000 06 19 09 15 00 813-91 P co2 CCGG 373.310 -999.990 ... L3 2000 08 04 11 14 00 78.9000 11.8800 475.00 167015 ZEP 2000 06 19 09 15 00 814-91 P co2 CCGG 373.280 -999.990 ... L3 2000 08 04 11 27 00 78.9000 11.8800 475.00 167016 ZEP 2000 06 22 09 05 00 4167-91 P co2 CCGG 372.030 -999.990 ... L3 2000 08 03 09 44 00 78.9000 11.8800 475.00 167017 ZEP 2000 06 22 09 05 00 4168-91 P co2 CCGG 372.070 -999.990 ... L3 2000 08 03 09 57 00 78.9000 11.8800 475.00 167018 ZEP 2000 06 26 09 19 00 785-91 P co2 CCGG 371.630 -999.990 ... L3 2000 08 04 11 40 00 78.9000 11.8800 475.00 167019 ZEP 2000 06 26 09 19 00 786-91 P co2 CCGG 371.590 -999.990 ... L3 2000 08 04 11 53 00 78.9000 11.8800 475.00 167020 ZEP 2000 06 29 09 05 00 223-91 P co2 CCGG 371.120 -999.990 ... L3 2000 08 02 15 05 00 78.9000 11.8800 475.00 167021 ZEP 2000 06 29 09 05 00 224-91 P co2 CCGG 371.120 -999.990 ... L3 2000 08 02 15 18 00 78.9000 11.8800 475.00 167022 ZEP 2000 07 03 09 02 00 789-91 P co2 CCGG 370.420 -999.990 ... L3 2000 08 02 14 39 00 78.9000 11.8800 475.00 167023 ZEP 2000 07 03 09 02 00 790-91 P co2 CCGG 370.430 -999.990 ... L3 2000 08 02 14 52 00 78.9000 11.8800 475.00 167024 ZEP 2000 07 06 08 50 00 4201-91 P co2 CCGG 369.390 -999.990 ... L3 2000 08 03 14 36 00 78.9000 11.8800 475.00 167025 ZEP 2000 07 06 08 50 00 4202-91 P co2 CCGG 369.360 -999.990 ... L3 2000 08 03 14 49 00 78.9000 11.8800 475.00 167026 ZEP 2000 07 11 08 05 00 445-91 P co2 CCGG 367.630 -999.990 ... L3 2000 08 03 14 10 00 78.9000 11.8800 475.00 167027 ZEP 2000 07 11 08 05 00 446-91 P co2 CCGG 367.670 -999.990 ... L3 2000 08 03 14 23 00 78.9000 11.8800 475.00 167028 ZEP 2000 07 13 08 57 00 4051-91 P co2 CCGG 367.560 -999.990 ... L3 2000 09 22 11 20 00 78.9000 11.8800 475.00 167029 ZEP 2000 07 13 08 57 00 4052-91 P co2 CCGG 367.510 -999.990 ... L3 2000 09 22 11 33 00 78.9000 11.8800 475.00 167030 ZEP 2000 07 17 09 16 00 781-91 P co2 CCGG 365.230 -999.990 ... L3 2000 08 02 13 19 00 78.9000 11.8800 475.00 167031 ZEP 2000 07 17 09 16 00 782-91 P co2 CCGG 365.260 -999.990 ... L3 2000 08 02 13 32 00 78.9000 11.8800 475.00 167032 ZEP 2000 07 20 08 55 00 677-91 P co2 CCGG 362.550 -999.990 ... L3 2000 09 22 13 32 00 78.9000 11.8800 475.00 167033 ZEP 2000 07 20 08 55 00 678-91 P co2 CCGG 362.610 -999.990 ... L3 2000 09 22 13 45 00 78.9000 11.8800 475.00 167034 ZEP 2000 07 24 09 30 00 745-91 P co2 CCGG 364.620 -999.990 ... L3 2000 09 27 15 03 00 78.9000 11.8800 475.00 167035 ZEP 2000 07 24 09 30 00 746-91 P co2 CCGG 364.690 -999.990 ... L3 2000 09 27 15 16 00 78.9000 11.8800 475.00 167036 ZEP 2000 07 27 08 52 00 1855-91 P co2 CCGG 363.270 -999.990 ... L3 2000 09 27 15 29 00 78.9000 11.8800 475.00 167037 ZEP 2000 07 27 08 52 00 1856-91 P co2 CCGG 363.270 -999.990 ... L3 2000 09 27 15 42 00 78.9000 11.8800 475.00 167038 ZEP 2000 08 01 12 34 56 793-91 P co2 CCGG 362.580 -999.990 ... L3 2000 09 27 14 37 00 78.9000 11.8800 475.00 167039 ZEP 2000 08 01 12 34 56 794-91 P co2 CCGG 362.600 -999.990 ... L3 2000 09 27 14 50 00 78.9000 11.8800 475.00 167040 ZEP 2000 08 03 08 59 00 181-91 P co2 CCGG 361.990 -999.990 ... L3 2000 09 28 09 50 00 78.9000 11.8800 475.00 167041 ZEP 2000 08 03 08 59 00 182-91 P co2 CCGG 362.050 -999.990 ... L3 2000 09 28 10 03 00 78.9000 11.8800 475.00 167042 ZEP 2000 08 07 08 59 00 4007-91 P co2 CCGG 360.380 -999.990 ... L3 2000 09 26 10 27 00 78.9000 11.8800 475.00 167043 ZEP 2000 08 07 08 59 00 4008-91 P co2 CCGG 360.350 -999.990 ... L3 2000 09 26 10 40 00 78.9000 11.8800 475.00 167044 ZEP 2000 08 10 09 05 00 645-91 P co2 CCGG 359.860 -999.990 ... L3 2000 09 18 11 02 00 78.9000 11.8800 475.00 167045 ZEP 2000 08 10 09 05 00 646-91 P co2 CCGG 359.870 -999.990 ... L3 2000 09 18 11 15 00 78.9000 11.8800 475.00 167046 ZEP 2000 08 14 09 36 00 755-91 P co2 CCGG 360.330 -999.990 ... L3 2000 09 26 09 33 00 78.9000 11.8800 475.00 167047 ZEP 2000 08 14 09 36 00 756-91 P co2 CCGG 360.170 -999.990 ... L3 2000 09 26 09 46 00 78.9000 11.8800 475.00 167048 ZEP 2000 08 18 10 12 00 73-98 P co2 CCGG 359.250 -999.990 ... L3 2000 09 18 12 20 00 78.9000 11.8800 475.00 167049 ZEP 2000 08 18 10 12 00 74-98 P co2 CCGG 359.250 -999.990 ... L3 2000 09 18 12 33 00 78.9000 11.8800 475.00 167050 ZEP 2000 08 22 08 30 00 737-91 P co2 CCGG 360.050 -999.990 ... L3 2000 09 22 11 46 00 78.9000 11.8800 475.00 167051 ZEP 2000 08 22 08 30 00 738-91 P co2 CCGG 360.050 -999.990 ... L3 2000 09 22 11 59 00 78.9000 11.8800 475.00 167052 ZEP 2000 08 29 08 54 00 803-91 P co2 CCGG 359.700 -999.990 ... L3 2000 09 22 12 12 00 78.9000 11.8800 475.00 167053 ZEP 2000 08 29 08 54 00 804-91 P co2 CCGG 359.730 -999.990 ... L3 2000 09 22 12 25 00 78.9000 11.8800 475.00 167054 ZEP 2000 09 01 10 10 00 41-91 P co2 CCGG 360.580 -999.990 ... L3 2000 11 01 09 02 00 78.9000 11.8800 475.00 167055 ZEP 2000 09 01 10 10 00 42-91 P co2 CCGG 360.510 -999.990 ... L3 2000 11 01 09 15 00 78.9000 11.8800 475.00 167056 ZEP 2000 09 07 09 35 00 1161-91 P co2 CCGG 360.020 -999.990 ... L3 2000 11 01 09 30 00 78.9000 11.8800 475.00 167057 ZEP 2000 09 07 09 35 00 1162-91 P co2 CCGG 360.030 -999.990 ... L3 2000 11 01 09 43 00 78.9000 11.8800 475.00 167058 ZEP 2000 09 12 09 48 00 795-91 P co2 CCGG 359.940 -999.990 ... L3 2000 10 31 13 03 00 78.9000 11.8800 475.00 167059 ZEP 2000 09 12 09 48 00 796-91 P co2 CCGG 359.900 -999.990 ... L3 2000 10 31 13 16 00 78.9000 11.8800 475.00 167060 ZEP 2000 09 18 08 55 00 747-91 P co2 CCGG 361.730 -999.990 ... L3 2000 10 31 13 29 00 78.9000 11.8800 475.00 167061 ZEP 2000 09 21 09 07 00 317-91 P co2 CCGG 360.960 -999.990 ... L3 2000 10 31 11 04 00 78.9000 11.8800 475.00 167062 ZEP 2000 09 21 09 07 00 318-91 P co2 CCGG 360.840 -999.990 ... L3 2000 10 31 11 17 00 78.9000 11.8800 475.00 167063 ZEP 2000 09 25 08 15 00 785-91 P co2 CCGG 362.640 -999.990 ... L3 2000 10 31 11 56 00 78.9000 11.8800 475.00 167064 ZEP 2000 09 25 08 15 00 786-91 P co2 CCGG 362.630 -999.990 ... L3 2000 10 31 12 09 00 78.9000 11.8800 475.00 167065 ZEP 2000 09 29 08 15 00 1693-91 P co2 CCGG 363.340 -999.990 ... L3 2000 10 31 11 30 00 78.9000 11.8800 475.00 167066 ZEP 2000 09 29 08 15 00 1694-91 P co2 CCGG 363.340 -999.990 ... L3 2000 10 31 11 43 00 78.9000 11.8800 475.00 167067 ZEP 2000 10 02 09 05 00 813-91 P co2 CCGG 362.060 -999.990 ... L3 2000 10 31 12 24 00 78.9000 11.8800 475.00 167068 ZEP 2000 10 02 09 05 00 814-91 P co2 CCGG 362.070 -999.990 ... L3 2000 10 31 12 37 00 78.9000 11.8800 475.00 167069 ZEP 2000 10 06 09 45 00 277-91 P co2 CCGG 364.450 -999.990 -.. L3 2000 11 01 12 10 00 78.9000 11.8800 475.00 167070 ZEP 2000 10 06 09 45 00 278-91 P co2 CCGG 367.240 -999.990 +.. L3 2000 11 01 12 23 00 78.9000 11.8800 475.00 167071 ZEP 2000 10 06 10 25 00 1759-91 P co2 CCGG 364.130 -999.990 ... L3 2000 11 01 12 36 00 78.9000 11.8800 475.00 167072 ZEP 2000 10 06 10 25 00 1760-91 P co2 CCGG 364.130 -999.990 ... L3 2000 11 01 12 49 00 78.9000 11.8800 475.00 167073 ZEP 2000 10 09 09 35 00 811-91 P co2 CCGG 367.430 -999.990 ... L3 2000 11 01 11 16 00 78.9000 11.8800 475.00 167074 ZEP 2000 10 09 09 35 00 812-91 P co2 CCGG 367.460 -999.990 ... L3 2000 11 01 11 29 00 78.9000 11.8800 475.00 167075 ZEP 2000 10 13 10 17 00 283-91 P co2 CCGG 370.670 -999.990 .X. L3 2000 12 07 13 53 00 78.9000 11.8800 475.00 167076 ZEP 2000 10 13 10 17 00 284-91 P co2 CCGG 370.730 -999.990 .X. L3 2000 12 07 14 06 00 78.9000 11.8800 475.00 167077 ZEP 2000 10 16 10 07 00 789-91 P co2 CCGG 367.720 -999.990 ... L3 2000 11 01 11 42 00 78.9000 11.8800 475.00 167078 ZEP 2000 10 16 10 07 00 790-91 P co2 CCGG 367.730 -999.990 ... L3 2000 11 01 11 55 00 78.9000 11.8800 475.00 167079 ZEP 2000 10 20 09 50 00 1671-91 P co2 CCGG 367.660 -999.990 ... L3 2000 12 11 08 00 00 78.9000 11.8800 475.00 167080 ZEP 2000 10 20 09 50 00 1672-91 P co2 CCGG 367.500 -999.990 ... L3 2000 12 11 08 13 00 78.9000 11.8800 475.00 167081 ZEP 2000 10 24 07 34 00 805-91 P co2 CCGG 367.760 -999.990 ... L3 2000 12 07 12 59 00 78.9000 11.8800 475.00 167082 ZEP 2000 10 24 07 34 00 806-91 P co2 CCGG 367.740 -999.990 ... L3 2000 12 07 13 12 00 78.9000 11.8800 475.00 167083 ZEP 2000 10 28 13 32 00 743-91 P co2 CCGG 367.330 -999.990 ... L3 2000 12 07 13 25 00 78.9000 11.8800 475.00 167084 ZEP 2000 10 28 13 32 00 744-91 P co2 CCGG 367.340 -999.990 ... L3 2000 12 07 13 38 00 78.9000 11.8800 475.00 167085 ZEP 2000 11 02 09 45 00 4373-91 P co2 CCGG 368.450 -999.990 ... L3 2000 12 07 12 33 00 78.9000 11.8800 475.00 167086 ZEP 2000 11 02 09 45 00 4374-91 P co2 CCGG 368.300 -999.990 ... L3 2000 12 07 12 46 00 78.9000 11.8800 475.00 167087 ZEP 2000 11 07 10 09 00 791-91 P co2 CCGG 371.940 -999.990 ... L3 2000 12 08 09 58 00 78.9000 11.8800 475.00 167088 ZEP 2000 11 07 10 09 00 792-91 P co2 CCGG 371.900 -999.990 ... L3 2000 12 08 10 12 00 78.9000 11.8800 475.00 167089 ZEP 2000 11 10 09 50 00 4946-91 P co2 CCGG 372.150 -999.990 ... L3 2000 12 07 12 07 00 78.9000 11.8800 475.00 167090 ZEP 2000 11 10 09 50 00 4947-91 P co2 CCGG 372.160 -999.990 ... L3 2000 12 07 12 20 00 78.9000 11.8800 475.00 167091 ZEP 2000 11 13 12 34 56 781-91 P co2 CCGG 371.940 -999.990 ... L3 2000 12 08 10 25 00 78.9000 11.8800 475.00 167092 ZEP 2000 11 13 12 34 56 782-91 P co2 CCGG 371.930 -999.990 ... L3 2000 12 08 10 38 00 78.9000 11.8800 475.00 167093 ZEP 2000 11 16 08 30 00 4955-91 P co2 CCGG 371.330 -999.990 ... L3 2000 12 19 12 07 00 78.9000 11.8800 475.00 167094 ZEP 2000 11 16 08 30 00 4956-91 P co2 CCGG 371.270 -999.990 ... L3 2000 12 19 12 20 00 78.9000 11.8800 475.00 167095 ZEP 2000 11 20 08 55 00 815-91 P co2 CCGG 372.030 -999.990 ... L3 2000 12 27 13 20 00 78.9000 11.8800 475.00 167096 ZEP 2000 11 20 08 55 00 816-91 P co2 CCGG 372.090 -999.990 ... L3 2000 12 27 13 33 00 78.9000 11.8800 475.00 167097 ZEP 2000 11 24 10 05 00 1397-91 P co2 CCGG 372.000 -999.990 ... L3 2000 12 19 11 41 00 78.9000 11.8800 475.00 167098 ZEP 2000 11 24 10 05 00 1398-91 P co2 CCGG 371.930 -999.990 ... L3 2000 12 19 11 54 00 78.9000 11.8800 475.00 167099 ZEP 2000 11 27 09 29 00 783-91 P co2 CCGG 372.310 -999.990 ... L3 2000 12 27 12 54 00 78.9000 11.8800 475.00 167100 ZEP 2000 11 27 09 29 00 784-91 P co2 CCGG 372.280 -999.990 ... L3 2000 12 27 13 07 00 78.9000 11.8800 475.00 167101 ZEP 2000 11 30 10 38 00 1769-91 P co2 CCGG 372.350 -999.990 ... L3 2001 01 17 15 00 00 78.9000 11.8800 475.00 167102 ZEP 2000 11 30 10 38 00 1770-91 P co2 CCGG 372.490 -999.990 ... L3 2001 01 17 15 13 00 78.9000 11.8800 475.00 167103 ZEP 2000 12 04 11 21 00 801-91 P co2 CCGG 373.590 -999.990 ... L3 2001 01 18 09 01 00 78.9000 11.8800 475.00 167104 ZEP 2000 12 04 11 21 00 802-91 P co2 CCGG 373.600 -999.990 ... L3 2001 01 18 09 14 00 78.9000 11.8800 475.00 167105 ZEP 2000 12 07 09 36 00 4525-91 P co2 CCGG 373.540 -999.990 ... L3 2001 01 17 14 32 00 78.9000 11.8800 475.00 167106 ZEP 2000 12 07 09 36 00 4526-91 P co2 CCGG 373.640 -999.990 ... L3 2001 01 17 14 45 00 78.9000 11.8800 475.00 167107 ZEP 2000 12 18 09 25 00 733-91 P co2 CCGG 373.100 -999.990 ... L3 2001 01 18 11 41 00 78.9000 11.8800 475.00 167108 ZEP 2000 12 18 09 25 00 734-91 P co2 CCGG 373.180 -999.990 ... L3 2001 01 18 11 54 00 78.9000 11.8800 475.00 167109 ZEP 2000 12 21 09 10 00 1055-91 P co2 CCGG 375.240 -999.990 ... L3 2001 01 17 13 14 00 78.9000 11.8800 475.00 167110 ZEP 2000 12 21 09 10 00 1056-91 P co2 CCGG 375.260 -999.990 ... L3 2001 01 17 13 27 00 78.9000 11.8800 475.00 167111 ZEP 2000 12 25 09 50 00 739-91 P co2 CCGG 376.360 -999.990 ... L3 2001 01 18 12 07 00 78.9000 11.8800 475.00 167112 ZEP 2000 12 25 09 50 00 740-91 P co2 CCGG 376.360 -999.990 ... L3 2001 01 18 12 20 00 78.9000 11.8800 475.00 167113 ZEP 2000 12 28 08 25 00 485-91 P co2 CCGG 375.160 -999.990 ... L3 2001 01 17 13 40 00 78.9000 11.8800 475.00 167114 ZEP 2000 12 28 08 25 00 486-91 P co2 CCGG 375.110 -999.990 ... L3 2001 01 17 13 53 00 78.9000 11.8800 475.00 167115 ZEP 2001 01 01 12 34 56 735-91 P co2 CCGG 374.530 -999.990 ... L3 2001 01 18 09 27 00 78.9000 11.8800 475.00 167116 ZEP 2001 01 01 12 34 56 736-91 P co2 CCGG 374.540 -999.990 ... L3 2001 01 18 09 40 00 78.9000 11.8800 475.00 167117 ZEP 2001 01 04 11 00 00 4503-91 P co2 CCGG 377.270 -999.990 ... L3 2001 02 01 13 07 00 78.9000 11.8800 475.00 167118 ZEP 2001 01 04 11 00 00 4504-91 P co2 CCGG 377.300 -999.990 ... L3 2001 02 01 13 20 00 78.9000 11.8800 475.00 167119 ZEP 2001 01 08 10 20 00 787-91 P co2 CCGG 375.750 -999.990 ... L3 2001 02 01 12 41 00 78.9000 11.8800 475.00 167120 ZEP 2001 01 08 10 20 00 788-91 P co2 CCGG 375.700 -999.990 ... L3 2001 02 01 12 54 00 78.9000 11.8800 475.00 167121 ZEP 2001 01 11 08 42 00 4033-91 P co2 CCGG 377.740 -999.990 ... L3 2001 02 01 12 15 00 78.9000 11.8800 475.00 167122 ZEP 2001 01 11 08 42 00 4034-91 P co2 CCGG 377.770 -999.990 ... L3 2001 02 01 12 28 00 78.9000 11.8800 475.00 167123 ZEP 2001 01 15 09 55 00 799-91 P co2 CCGG 377.490 -999.990 ... L3 2001 02 01 11 49 00 78.9000 11.8800 475.00 167124 ZEP 2001 01 15 09 55 00 800-91 P co2 CCGG 377.480 -999.990 ... L3 2001 02 01 12 02 00 78.9000 11.8800 475.00 167125 ZEP 2001 01 18 08 30 00 597-91 P co2 CCGG 377.380 -999.990 ... L3 2001 02 14 10 49 00 78.9000 11.8800 475.00 167126 ZEP 2001 01 18 08 30 00 598-91 P co2 CCGG 377.340 -999.990 ... L3 2001 02 14 11 02 00 78.9000 11.8800 475.00 167127 ZEP 2001 01 22 10 05 00 795-91 P co2 CCGG 374.880 -999.990 ... L3 2001 02 14 12 09 00 78.9000 11.8800 475.00 167128 ZEP 2001 01 22 10 05 00 796-91 P co2 CCGG 374.770 -999.990 ... L3 2001 02 14 12 22 00 78.9000 11.8800 475.00 167129 ZEP 2001 01 25 09 10 00 359-91 P co2 CCGG 375.390 -999.990 ... L3 2001 02 14 13 01 00 78.9000 11.8800 475.00 167130 ZEP 2001 01 25 09 10 00 360-91 P co2 CCGG 375.220 -999.990 ... L3 2001 02 14 13 14 00 78.9000 11.8800 475.00 167131 ZEP 2001 01 29 09 40 00 737-91 P co2 CCGG 377.000 -999.990 ... L3 2001 02 14 12 35 00 78.9000 11.8800 475.00 167132 ZEP 2001 01 29 09 40 00 738-91 P co2 CCGG 376.960 -999.990 ... L3 2001 02 14 12 48 00 78.9000 11.8800 475.00 167133 ZEP 2001 02 04 13 10 00 789-91 P co2 CCGG 375.370 -999.990 -.. L3 2001 03 12 09 47 00 78.9000 11.8800 475.00 167134 ZEP 2001 02 04 13 10 00 790-91 P co2 CCGG 376.120 -999.990 +.. L3 2001 03 12 10 00 00 78.9000 11.8800 475.00 167135 ZEP 2001 02 08 08 13 00 1579-91 P co2 CCGG 378.410 -999.990 ... L3 2001 03 12 16 25 00 78.9000 11.8800 475.00 167136 ZEP 2001 02 08 08 13 00 1580-91 P co2 CCGG 378.420 -999.990 ... L3 2001 03 12 16 38 00 78.9000 11.8800 475.00 167137 ZEP 2001 02 12 10 25 00 4007-91 P co2 CCGG 374.510 -999.990 ... L3 2001 03 08 13 17 00 78.9000 11.8800 475.00 167138 ZEP 2001 02 15 08 30 00 569-91 P co2 CCGG 374.870 -999.990 ... L3 2001 03 12 15 07 00 78.9000 11.8800 475.00 167139 ZEP 2001 02 15 08 30 00 570-91 P co2 CCGG 374.860 -999.990 ... L3 2001 03 12 15 20 00 78.9000 11.8800 475.00 167140 ZEP 2001 02 20 09 50 00 91-91 P co2 CCGG 375.050 -999.990 ... L3 2001 03 28 08 57 00 78.9000 11.8800 475.00 167141 ZEP 2001 02 20 09 50 00 92-91 P co2 CCGG 375.040 -999.990 ... L3 2001 03 28 09 10 00 78.9000 11.8800 475.00 167142 ZEP 2001 02 22 09 32 00 1113-91 P co2 CCGG 376.860 -999.990 ... L3 2001 03 23 10 02 00 78.9000 11.8800 475.00 167143 ZEP 2001 02 22 09 32 00 1114-91 P co2 CCGG 376.790 -999.990 ... L3 2001 03 23 10 15 00 78.9000 11.8800 475.00 167144 ZEP 2001 02 26 10 23 00 301-91 P co2 CCGG 375.810 -999.990 ... L3 2001 03 28 09 23 00 78.9000 11.8800 475.00 167145 ZEP 2001 02 26 10 23 00 302-91 P co2 CCGG 375.850 -999.990 ... L3 2001 03 28 09 36 00 78.9000 11.8800 475.00 167146 ZEP 2001 03 01 12 50 00 4263-91 P co2 CCGG 376.080 -999.990 ... L3 2001 03 23 10 54 00 78.9000 11.8800 475.00 167147 ZEP 2001 03 01 12 50 00 4264-91 P co2 CCGG 376.090 -999.990 ... L3 2001 03 23 11 07 00 78.9000 11.8800 475.00 167148 ZEP 2001 03 05 09 25 00 781-91 P co2 CCGG 375.000 -999.990 -.. L3 2001 04 13 12 15 00 78.9000 11.8800 475.00 167149 ZEP 2001 03 05 09 25 00 782-91 P co2 CCGG 376.460 -999.990 +.. L3 2001 04 13 12 28 00 78.9000 11.8800 475.00 167150 ZEP 2001 03 08 09 38 00 39-98 P co2 CCGG 377.120 -999.990 ... L3 2001 04 17 12 03 00 78.9000 11.8800 475.00 167151 ZEP 2001 03 08 09 38 00 40-98 P co2 CCGG 377.010 -999.990 ... L3 2001 04 17 12 16 00 78.9000 11.8800 475.00 167152 ZEP 2001 03 12 08 57 00 791-91 P co2 CCGG 376.060 -999.990 ... L3 2001 04 13 11 48 00 78.9000 11.8800 475.00 167153 ZEP 2001 03 12 08 57 00 792-91 P co2 CCGG 376.100 -999.990 ... L3 2001 04 13 12 01 00 78.9000 11.8800 475.00 167154 ZEP 2001 03 15 08 20 00 1429-91 P co2 CCGG 376.420 -999.990 ... L3 2001 04 17 11 37 00 78.9000 11.8800 475.00 167155 ZEP 2001 03 15 08 20 00 1430-91 P co2 CCGG 376.460 -999.990 ... L3 2001 04 17 11 50 00 78.9000 11.8800 475.00 167156 ZEP 2001 03 19 09 42 00 811-91 P co2 CCGG 376.950 -999.990 ... L3 2001 04 23 11 03 00 78.9000 11.8800 475.00 167157 ZEP 2001 03 19 09 42 00 812-91 P co2 CCGG 377.050 -999.990 ... L3 2001 04 23 11 16 00 78.9000 11.8800 475.00 167158 ZEP 2001 03 22 09 44 00 353-91 P co2 CCGG 376.180 -999.990 ... L3 2001 04 23 14 35 00 78.9000 11.8800 475.00 167159 ZEP 2001 03 22 09 44 00 354-91 P co2 CCGG 376.320 -999.990 ... L3 2001 04 23 14 49 00 78.9000 11.8800 475.00 167160 ZEP 2001 03 26 07 55 00 803-91 P co2 CCGG 376.770 -999.990 ... L3 2001 04 24 13 44 00 78.9000 11.8800 475.00 167161 ZEP 2001 03 26 07 55 00 804-91 P co2 CCGG 376.710 -999.990 ... L3 2001 04 24 13 57 00 78.9000 11.8800 475.00 167162 ZEP 2001 03 29 09 00 00 547-91 P co2 CCGG 374.570 -999.990 -.. L3 2001 04 23 15 54 00 78.9000 11.8800 475.00 167163 ZEP 2001 03 29 09 00 00 548-91 P co2 CCGG 376.070 -999.990 +.. L3 2001 04 23 16 07 00 78.9000 11.8800 475.00 167164 ZEP 2001 04 02 07 42 00 4627-91 P co2 CCGG 376.250 -999.990 ... L3 2001 05 04 12 11 00 78.9000 11.8800 475.00 167165 ZEP 2001 04 02 07 42 00 4628-91 P co2 CCGG 376.240 -999.990 ... L3 2001 05 04 12 24 00 78.9000 11.8800 475.00 167166 ZEP 2001 04 05 08 47 00 1379-91 P co2 CCGG 377.800 -999.990 ... L3 2001 05 07 10 50 00 78.9000 11.8800 475.00 167167 ZEP 2001 04 05 08 47 00 1380-91 P co2 CCGG 377.850 -999.990 ... L3 2001 05 07 11 03 00 78.9000 11.8800 475.00 167168 ZEP 2001 04 09 08 22 00 4637-91 P co2 CCGG 376.890 -999.990 ... L3 2001 05 04 13 03 00 78.9000 11.8800 475.00 167169 ZEP 2001 04 09 08 22 00 4638-91 P co2 CCGG 376.970 -999.990 ... L3 2001 05 04 13 16 00 78.9000 11.8800 475.00 167170 ZEP 2001 04 12 07 25 00 4455-91 P co2 CCGG 376.950 -999.990 ... L3 2001 05 07 11 16 00 78.9000 11.8800 475.00 167171 ZEP 2001 04 12 07 25 00 4456-91 P co2 CCGG 376.940 -999.990 ... L3 2001 05 07 11 29 00 78.9000 11.8800 475.00 167172 ZEP 2001 04 16 07 30 00 785-91 P co2 CCGG 377.070 -999.990 ... L3 2001 05 23 11 04 00 78.9000 11.8800 475.00 167173 ZEP 2001 04 16 07 30 00 786-91 P co2 CCGG 377.090 -999.990 ... L3 2001 05 23 11 17 00 78.9000 11.8800 475.00 167174 ZEP 2001 04 19 08 30 00 2007-91 P co2 CCGG 377.430 -999.990 ... L3 2001 05 23 10 36 00 78.9000 11.8800 475.00 167175 ZEP 2001 04 19 08 30 00 2008-91 P co2 CCGG 377.400 -999.990 ... L3 2001 05 23 10 50 00 78.9000 11.8800 475.00 167176 ZEP 2001 04 23 12 34 56 813-91 P co2 CCGG 377.600 -999.990 ... L3 2001 05 23 12 23 00 78.9000 11.8800 475.00 167177 ZEP 2001 04 23 12 34 56 814-91 P co2 CCGG 377.620 -999.990 ... L3 2001 05 23 12 36 00 78.9000 11.8800 475.00 167178 ZEP 2001 04 26 08 03 00 1323-91 P co2 CCGG 376.310 -999.990 ... L3 2001 05 23 11 57 00 78.9000 11.8800 475.00 167179 ZEP 2001 04 26 08 03 00 1324-91 P co2 CCGG 376.430 -999.990 ... L3 2001 05 23 12 10 00 78.9000 11.8800 475.00 167180 ZEP 2001 04 30 09 40 00 745-91 P co2 CCGG 376.300 -999.990 ... L3 2001 06 08 14 30 00 78.9000 11.8800 475.00 167181 ZEP 2001 04 30 09 40 00 746-91 P co2 CCGG 376.330 -999.990 ... L3 2001 06 08 14 43 00 78.9000 11.8800 475.00 167182 ZEP 2001 05 03 07 58 00 1465-91 P co2 CCGG 376.290 -999.990 ... L3 2001 06 06 11 50 00 78.9000 11.8800 475.00 167183 ZEP 2001 05 03 07 58 00 1466-91 P co2 CCGG 376.300 -999.990 ... L3 2001 06 06 12 03 00 78.9000 11.8800 475.00 167184 ZEP 2001 05 10 09 15 00 29-91 P co2 CCGG 378.050 -999.990 ... L3 2001 06 06 12 16 00 78.9000 11.8800 475.00 167185 ZEP 2001 05 10 09 15 00 30-91 P co2 CCGG 378.010 -999.990 ... L3 2001 06 06 12 29 00 78.9000 11.8800 475.00 167186 ZEP 2001 05 17 08 00 00 793-91 P co2 CCGG 377.880 -999.990 ... L3 2001 06 08 14 56 00 78.9000 11.8800 475.00 167187 ZEP 2001 05 17 08 00 00 794-91 P co2 CCGG 377.850 -999.990 ... L3 2001 06 08 15 09 00 78.9000 11.8800 475.00 167188 ZEP 2001 05 24 10 02 00 807-91 P co2 CCGG 376.500 -999.990 ... L3 2001 06 21 14 37 00 78.9000 11.8800 475.00 167189 ZEP 2001 05 24 10 02 00 808-91 P co2 CCGG 376.490 -999.990 ... L3 2001 06 21 14 51 00 78.9000 11.8800 475.00 167190 ZEP 2001 05 31 09 54 00 743-91 P co2 CCGG 377.240 -999.990 ... L3 2001 06 21 14 11 00 78.9000 11.8800 475.00 167191 ZEP 2001 05 31 09 54 00 744-91 P co2 CCGG 377.200 -999.990 ... L3 2001 06 21 14 24 00 78.9000 11.8800 475.00 167192 ZEP 2001 06 07 08 15 00 4001-91 P co2 CCGG 376.640 -999.990 ... L3 2001 07 05 13 57 00 78.9000 11.8800 475.00 167193 ZEP 2001 06 07 08 15 00 4002-91 P co2 CCGG 376.620 -999.990 ... L3 2001 07 05 14 10 00 78.9000 11.8800 475.00 167194 ZEP 2001 06 14 08 18 00 853-91 P co2 CCGG 370.810 -999.990 .X. L3 2001 07 05 12 37 00 78.9000 11.8800 475.00 167195 ZEP 2001 06 14 08 18 00 854-91 P co2 CCGG 370.900 -999.990 .X. L3 2001 07 05 12 50 00 78.9000 11.8800 475.00 167196 ZEP 2001 06 21 10 20 00 281-99 P co2 CCGG 368.310 -999.990 .X. L3 2001 07 20 15 06 00 78.9000 11.8800 475.00 167197 ZEP 2001 06 21 10 20 00 282-99 P co2 CCGG 368.320 -999.990 .X. L3 2001 07 20 15 19 00 78.9000 11.8800 475.00 167198 ZEP 2001 06 28 08 33 00 275-99 P co2 CCGG 373.110 -999.990 ... L3 2001 07 23 11 45 00 78.9000 11.8800 475.00 167199 ZEP 2001 06 28 08 33 00 276-99 P co2 CCGG 372.960 -999.990 ... L3 2001 07 23 11 58 00 78.9000 11.8800 475.00 167200 ZEP 2001 07 05 09 08 00 4955-91 P co2 CCGG 370.290 -999.990 ... L3 2001 08 01 15 24 00 78.9000 11.8800 475.00 167201 ZEP 2001 07 05 09 08 00 4956-91 P co2 CCGG 370.230 -999.990 ... L3 2001 08 01 15 37 00 78.9000 11.8800 475.00 167202 ZEP 2001 07 12 09 29 00 1475-91 P co2 CCGG 369.660 -999.990 ... L3 2001 08 01 14 58 00 78.9000 11.8800 475.00 167203 ZEP 2001 07 12 09 29 00 1476-91 P co2 CCGG 369.420 -999.990 ... L3 2001 08 01 15 11 00 78.9000 11.8800 475.00 167204 ZEP 2001 07 19 08 25 00 1603-91 P co2 CCGG 366.590 -999.990 ... L3 2001 08 15 14 36 00 78.9000 11.8800 475.00 167205 ZEP 2001 07 19 08 25 00 1604-91 P co2 CCGG 366.590 -999.990 ... L3 2001 08 15 14 49 00 78.9000 11.8800 475.00 167206 ZEP 2001 07 26 08 25 00 265-99 P co2 CCGG 364.690 -999.990 ... L3 2001 08 15 13 51 00 78.9000 11.8800 475.00 167207 ZEP 2001 07 26 08 25 00 266-99 P co2 CCGG 364.700 -999.990 ... L3 2001 08 15 14 04 00 78.9000 11.8800 475.00 167208 ZEP 2001 08 02 08 38 00 75-98 P co2 CCGG 364.530 -999.990 ... L3 2001 09 07 13 13 00 78.9000 11.8800 475.00 167209 ZEP 2001 08 02 08 38 00 76-98 P co2 CCGG 364.560 -999.990 ... L3 2001 09 07 13 26 00 78.9000 11.8800 475.00 167210 ZEP 2001 08 13 13 06 00 987-91 P co2 CCGG 360.040 -999.990 ... L3 2001 09 07 13 39 00 78.9000 11.8800 475.00 167211 ZEP 2001 08 13 13 06 00 988-91 P co2 CCGG 359.940 -999.990 ... L3 2001 09 07 13 53 00 78.9000 11.8800 475.00 167212 ZEP 2001 08 16 08 16 00 1845-91 P co2 CCGG 361.890 -999.990 ... L3 2001 10 18 14 46 00 78.9000 11.8800 475.00 167213 ZEP 2001 08 16 08 16 00 1846-91 P co2 CCGG 361.920 -999.990 ... L3 2001 10 18 14 59 00 78.9000 11.8800 475.00 167214 ZEP 2001 08 23 08 46 00 4279-91 P co2 CCGG 362.010 -999.990 ... L3 2001 10 18 15 12 00 78.9000 11.8800 475.00 167215 ZEP 2001 08 23 08 46 00 4280-91 P co2 CCGG 361.920 -999.990 ... L3 2001 10 18 15 25 00 78.9000 11.8800 475.00 167216 ZEP 2001 08 30 08 33 00 4475-91 P co2 CCGG 361.420 -999.990 ... L3 2001 10 18 15 38 00 78.9000 11.8800 475.00 167217 ZEP 2001 08 30 08 33 00 4476-91 P co2 CCGG 361.470 -999.990 ... L3 2001 10 18 15 51 00 78.9000 11.8800 475.00 167218 ZEP 2001 09 06 07 43 00 369-91 P co2 CCGG 362.250 -999.990 ... L3 2001 10 18 16 33 00 78.9000 11.8800 475.00 167219 ZEP 2001 09 06 07 43 00 370-91 P co2 CCGG 362.280 -999.990 ... L3 2001 10 18 16 46 00 78.9000 11.8800 475.00 167220 ZEP 2001 09 13 08 55 00 4990-91 P co2 CCGG 361.710 -999.990 ... L3 2001 10 18 16 04 00 78.9000 11.8800 475.00 167221 ZEP 2001 09 14 08 13 00 65-98 P co2 CCGG 366.160 -999.990 .X. L3 2001 10 18 14 08 00 78.9000 11.8800 475.00 167222 ZEP 2001 09 14 08 13 00 66-98 P co2 CCGG 366.170 -999.990 .X. L3 2001 10 18 14 22 00 78.9000 11.8800 475.00 167223 ZEP 2001 09 29 09 00 00 267-99 P co2 CCGG 365.770 -999.990 ... L3 2001 10 24 13 51 00 78.9000 11.8800 475.00 167224 ZEP 2001 09 29 09 00 00 268-99 P co2 CCGG 365.690 -999.990 ... L3 2001 10 24 14 04 00 78.9000 11.8800 475.00 167225 ZEP 2001 10 04 08 43 00 300-99 P co2 CCGG 366.130 -999.990 ... L3 2001 10 24 16 22 00 78.9000 11.8800 475.00 167226 ZEP 2001 10 11 08 40 00 4083-91 P co2 CCGG 367.640 -999.990 +.. L3 2001 11 27 12 37 00 78.9000 11.8800 475.00 167227 ZEP 2001 10 11 08 40 00 4084-91 P co2 CCGG 366.940 -999.990 -.. L3 2001 11 27 12 50 00 78.9000 11.8800 475.00 167228 ZEP 2001 10 18 08 35 00 4529-91 P co2 CCGG 368.160 -999.990 ... L3 2001 11 27 12 11 00 78.9000 11.8800 475.00 167229 ZEP 2001 10 18 08 35 00 4530-91 P co2 CCGG 368.170 -999.990 ... L3 2001 11 27 12 24 00 78.9000 11.8800 475.00 167230 ZEP 2001 10 26 14 40 00 157-99 P co2 CCGG 369.570 -999.990 ... L3 2001 11 27 15 18 00 78.9000 11.8800 475.00 167231 ZEP 2001 11 01 09 42 00 251-99 P co2 CCGG 370.980 -999.990 ... L3 2001 11 27 11 45 00 78.9000 11.8800 475.00 167232 ZEP 2001 11 01 09 42 00 252-99 P co2 CCGG 370.960 -999.990 ... L3 2001 11 27 11 58 00 78.9000 11.8800 475.00 167233 ZEP 2001 11 08 09 05 00 4181-91 P co2 CCGG 374.250 -999.990 ... L3 2001 12 10 11 08 00 78.9000 11.8800 475.00 167234 ZEP 2001 11 08 09 05 00 4182-91 P co2 CCGG 374.300 -999.990 ... L3 2001 12 10 11 21 00 78.9000 11.8800 475.00 167235 ZEP 2001 11 15 09 00 00 4187-91 P co2 CCGG 376.890 -999.990 ... L3 2001 12 10 12 00 00 78.9000 11.8800 475.00 167236 ZEP 2001 11 15 09 00 00 4188-91 P co2 CCGG 376.650 -999.990 ... L3 2001 12 10 12 13 00 78.9000 11.8800 475.00 167237 ZEP 2001 11 22 09 50 00 339-91 P co2 CCGG 375.370 -999.990 ... L3 2002 01 08 15 58 00 78.9000 11.8800 475.00 167238 ZEP 2001 11 22 09 50 00 340-91 P co2 CCGG 375.450 -999.990 ... L3 2002 01 08 16 11 00 78.9000 11.8800 475.00 167239 ZEP 2001 11 29 12 34 56 813-91 P co2 CCGG 376.150 -999.990 ... L3 2002 01 08 16 24 00 78.9000 11.8800 475.00 167240 ZEP 2001 11 29 12 34 56 814-91 P co2 CCGG 376.080 -999.990 ... L3 2002 01 08 16 37 00 78.9000 11.8800 475.00 167241 ZEP 2001 12 06 09 35 00 803-91 P co2 CCGG 373.940 -999.990 ... L3 2002 01 09 10 55 00 78.9000 11.8800 475.00 167242 ZEP 2001 12 06 09 35 00 804-91 P co2 CCGG 373.880 -999.990 ... L3 2002 01 09 11 08 00 78.9000 11.8800 475.00 167243 ZEP 2001 12 13 08 35 00 4595-91 P co2 CCGG 375.520 -999.990 ... L3 2002 01 30 14 01 00 78.9000 11.8800 475.00 167244 ZEP 2001 12 13 08 35 00 4596-91 P co2 CCGG 375.400 -999.990 ... L3 2002 01 30 14 14 00 78.9000 11.8800 475.00 167245 ZEP 2001 12 20 09 50 00 4103-91 P co2 CCGG 379.430 -999.990 .X. L3 2002 01 30 17 04 00 78.9000 11.8800 475.00 167246 ZEP 2001 12 20 09 50 00 4104-91 P co2 CCGG 379.570 -999.990 .X. L3 2002 01 30 17 17 00 78.9000 11.8800 475.00 167247 ZEP 2001 12 27 13 42 00 4703-91 P co2 CCGG 376.690 -999.990 ... L3 2002 01 24 16 20 00 78.9000 11.8800 475.00 167248 ZEP 2001 12 27 13 42 00 4704-91 P co2 CCGG 376.690 -999.990 ... L3 2002 01 24 16 33 00 78.9000 11.8800 475.00 167249 ZEP 2002 01 03 12 34 56 4095-91 P co2 CCGG 375.060 -999.990 ... L3 2002 01 24 15 00 00 78.9000 11.8800 475.00 167250 ZEP 2002 01 03 12 34 56 4096-91 P co2 CCGG 375.010 -999.990 ... L3 2002 01 24 15 13 00 78.9000 11.8800 475.00 167251 ZEP 2002 01 10 10 00 00 659-91 P co2 CCGG 375.690 -999.990 ... L3 2002 01 31 16 43 00 78.9000 11.8800 475.00 167252 ZEP 2002 01 10 10 00 00 660-91 P co2 CCGG 375.680 -999.990 ... L3 2002 01 31 16 56 00 78.9000 11.8800 475.00 167253 ZEP 2002 01 17 09 50 00 1471-91 P co2 CCGG 378.150 -999.990 ... L3 2002 02 20 15 44 00 78.9000 11.8800 475.00 167254 ZEP 2002 01 17 09 50 00 1472-91 P co2 CCGG 378.050 -999.990 ... L3 2002 02 20 15 57 00 78.9000 11.8800 475.00 167255 ZEP 2002 01 25 10 30 00 1093-91 P co2 CCGG 378.870 -999.990 ... L3 2002 02 20 15 18 00 78.9000 11.8800 475.00 167256 ZEP 2002 01 25 10 30 00 1094-91 P co2 CCGG 379.030 -999.990 ... L3 2002 02 20 15 31 00 78.9000 11.8800 475.00 167257 ZEP 2002 01 31 09 50 00 4025-91 P co2 CCGG 377.790 -999.990 ... L3 2002 03 13 14 35 00 78.9000 11.8800 475.00 167258 ZEP 2002 01 31 09 50 00 4026-91 P co2 CCGG 377.770 -999.990 ... L3 2002 03 13 14 48 00 78.9000 11.8800 475.00 167259 ZEP 2002 02 07 09 34 00 1789-91 P co2 CCGG 378.600 -999.990 ... L3 2002 03 13 15 01 00 78.9000 11.8800 475.00 167260 ZEP 2002 02 07 09 34 00 1790-91 P co2 CCGG 378.570 -999.990 ... L3 2002 03 13 15 14 00 78.9000 11.8800 475.00 167261 ZEP 2002 02 15 09 02 00 1841-91 P co2 CCGG 377.050 -999.990 ... L3 2002 03 14 11 08 00 78.9000 11.8800 475.00 167262 ZEP 2002 02 15 09 02 00 1842-91 P co2 CCGG 377.050 -999.990 ... L3 2002 03 14 11 21 00 78.9000 11.8800 475.00 167263 ZEP 2002 02 21 09 04 00 4084-91 P co2 CCGG 379.230 -999.990 ... L3 2002 03 18 16 01 00 78.9000 11.8800 475.00 167264 ZEP 2002 02 21 09 54 00 853-91 P co2 CCGG 379.030 -999.990 ... L3 2002 03 25 15 41 00 78.9000 11.8800 475.00 167265 ZEP 2002 02 21 09 54 00 854-91 P co2 CCGG 379.080 -999.990 ... L3 2002 03 25 15 54 00 78.9000 11.8800 475.00 167266 ZEP 2002 02 28 12 34 56 1405-91 P co2 CCGG 378.550 -999.990 ... L3 2002 03 25 16 07 00 78.9000 11.8800 475.00 167267 ZEP 2002 02 28 12 34 56 1406-91 P co2 CCGG 378.490 -999.990 ... L3 2002 03 25 16 20 00 78.9000 11.8800 475.00 167268 ZEP 2002 03 10 11 30 00 161-99 P co2 CCGG 378.380 -999.990 ... L3 2002 04 23 12 47 00 78.9000 11.8800 475.00 167269 ZEP 2002 03 10 11 30 00 162-99 P co2 CCGG 378.350 -999.990 ... L3 2002 04 23 13 00 00 78.9000 11.8800 475.00 167270 ZEP 2002 03 15 10 25 00 181-99 P co2 CCGG 378.300 -999.990 ... L3 2002 04 22 15 55 00 78.9000 11.8800 475.00 167271 ZEP 2002 03 15 10 25 00 182-99 P co2 CCGG 378.260 -999.990 ... L3 2002 04 22 16 08 00 78.9000 11.8800 475.00 167272 ZEP 2002 03 18 09 20 00 4709-91 P co2 CCGG 439.860 -999.990 +.. L3 2002 07 08 08 52 00 78.9000 11.8800 475.00 167273 ZEP 2002 03 18 09 20 00 4710-91 P co2 CCGG 377.700 -999.990 -.. L3 2002 07 08 09 05 00 78.9000 11.8800 475.00 167274 ZEP 2002 03 22 09 26 00 339-99 P co2 CCGG 377.760 -999.990 ... L3 2002 04 23 11 55 00 78.9000 11.8800 475.00 167275 ZEP 2002 03 22 09 26 00 340-99 P co2 CCGG 377.750 -999.990 ... L3 2002 04 23 12 08 00 78.9000 11.8800 475.00 167276 ZEP 2002 03 29 10 40 00 4835-98 P co2 CCGG 379.140 -999.990 ... L3 2002 04 23 12 21 00 78.9000 11.8800 475.00 167277 ZEP 2002 03 29 10 40 00 4836-98 P co2 CCGG 379.140 -999.990 ... L3 2002 04 23 12 34 00 78.9000 11.8800 475.00 167278 ZEP 2002 04 05 09 05 00 743-91 P co2 CCGG 377.970 -999.990 ... L3 2002 05 24 11 19 00 78.9000 11.8800 475.00 167279 ZEP 2002 04 05 09 05 00 744-91 P co2 CCGG 378.040 -999.990 ... L3 2002 05 24 11 32 00 78.9000 11.8800 475.00 167280 ZEP 2002 04 11 08 11 00 793-91 P co2 CCGG 378.700 -999.990 ... L3 2002 05 24 10 51 00 78.9000 11.8800 475.00 167281 ZEP 2002 04 11 08 11 00 794-91 P co2 CCGG 378.390 -999.990 ... L3 2002 05 24 11 05 00 78.9000 11.8800 475.00 167282 ZEP 2002 04 25 08 08 00 75-98 P co2 CCGG 378.410 -999.990 ... L3 2002 06 06 16 06 00 78.9000 11.8800 475.00 167283 ZEP 2002 04 25 08 08 00 76-98 P co2 CCGG 378.390 -999.990 ... L3 2002 06 06 16 19 00 78.9000 11.8800 475.00 167284 ZEP 2002 05 03 08 56 00 1123-91 P co2 CCGG 369.080 -999.990 N.. L3 2002 06 06 16 32 00 78.9000 11.8800 475.00 167285 ZEP 2002 05 03 08 56 00 1124-91 P co2 CCGG 774.060 -999.990 N.. L3 2002 06 06 16 45 00 78.9000 11.8800 475.00 167286 ZEP 2002 05 10 08 52 00 359-91 P co2 CCGG 379.260 -999.990 ... L3 2002 06 06 16 58 00 78.9000 11.8800 475.00 167287 ZEP 2002 05 10 08 52 00 360-91 P co2 CCGG 379.000 -999.990 ... L3 2002 06 06 17 11 00 78.9000 11.8800 475.00 167288 ZEP 2002 05 17 08 03 00 1055-91 P co2 CCGG 377.870 -999.990 ... L3 2002 06 06 15 40 00 78.9000 11.8800 475.00 167289 ZEP 2002 05 17 08 03 00 1056-91 P co2 CCGG 377.960 -999.990 ... L3 2002 06 06 15 53 00 78.9000 11.8800 475.00 167290 ZEP 2002 05 23 08 34 00 1967-91 P co2 CCGG 378.930 -999.990 ... L3 2002 07 08 09 18 00 78.9000 11.8800 475.00 167291 ZEP 2002 05 23 08 34 00 1968-91 P co2 CCGG 378.910 -999.990 ... L3 2002 07 08 09 31 00 78.9000 11.8800 475.00 167292 ZEP 2002 05 30 08 04 00 4893-91 P co2 CCGG 375.310 -999.990 ... L3 2002 10 28 14 54 00 78.9000 11.8800 475.00 167293 ZEP 2002 05 30 08 04 00 4894-91 P co2 CCGG 375.380 -999.990 ... L3 2002 10 28 15 07 00 78.9000 11.8800 475.00 167294 ZEP 2002 06 06 08 25 00 35-91 P co2 CCGG 375.260 -999.990 ... L3 2002 10 28 13 36 00 78.9000 11.8800 475.00 167295 ZEP 2002 06 06 08 25 00 36-91 P co2 CCGG 375.150 -999.990 ... L3 2002 10 28 13 49 00 78.9000 11.8800 475.00 167296 ZEP 2002 06 13 08 12 00 4887-91 P co2 CCGG 376.350 -999.990 ... L3 2002 07 22 11 06 00 78.9000 11.8800 475.00 167297 ZEP 2002 06 13 08 12 00 4888-91 P co2 CCGG 376.310 -999.990 ... L3 2002 07 22 11 19 00 78.9000 11.8800 475.00 167298 ZEP 2002 06 22 13 30 00 513-91 P co2 CCGG 375.160 -999.990 ... L3 2002 07 22 10 38 00 78.9000 11.8800 475.00 167299 ZEP 2002 06 22 13 30 00 514-91 P co2 CCGG 375.080 -999.990 ... L3 2002 07 22 10 51 00 78.9000 11.8800 475.00 167300 ZEP 2002 06 27 08 33 00 803-91 P co2 CCGG 373.390 -999.990 ... L3 2002 07 24 16 30 00 78.9000 11.8800 475.00 167301 ZEP 2002 06 27 08 33 00 804-91 P co2 CCGG 373.370 -999.990 ... L3 2002 07 24 16 44 00 78.9000 11.8800 475.00 167302 ZEP 2002 07 04 08 14 00 813-91 P co2 CCGG 371.520 -999.990 ... L3 2002 07 24 15 38 00 78.9000 11.8800 475.00 167303 ZEP 2002 07 04 08 14 00 814-91 P co2 CCGG 371.490 -999.990 ... L3 2002 07 24 15 51 00 78.9000 11.8800 475.00 167304 ZEP 2002 07 11 03 46 00 65-98 P co2 CCGG 370.310 -999.990 ... L3 2002 08 12 09 28 00 78.9000 11.8800 475.00 167305 ZEP 2002 07 11 03 46 00 66-98 P co2 CCGG 370.250 -999.990 ... L3 2002 08 12 09 41 00 78.9000 11.8800 475.00 167306 ZEP 2002 07 18 07 32 00 1215-91 P co2 CCGG 368.410 -999.990 ... L3 2002 08 12 10 20 00 78.9000 11.8800 475.00 167307 ZEP 2002 07 18 07 32 00 1216-91 P co2 CCGG 368.430 -999.990 ... L3 2002 08 12 10 33 00 78.9000 11.8800 475.00 167308 ZEP 2002 07 25 07 45 00 295-99 P co2 CCGG 366.400 -999.990 ... L3 2002 08 26 15 49 00 78.9000 11.8800 475.00 167309 ZEP 2002 07 25 07 45 00 296-99 P co2 CCGG 366.320 -999.990 ... L3 2002 08 26 16 02 00 78.9000 11.8800 475.00 167310 ZEP 2002 08 08 09 42 00 531-99 P co2 CCGG 364.550 -999.990 ... L3 2002 08 26 14 55 00 78.9000 11.8800 475.00 167311 ZEP 2002 08 08 09 42 00 532-99 P co2 CCGG 364.500 -999.990 ... L3 2002 08 26 15 08 00 78.9000 11.8800 475.00 167312 ZEP 2002 08 15 08 11 00 113-99 P co2 CCGG 362.660 -999.990 ... L3 2002 09 19 12 12 00 78.9000 11.8800 475.00 167313 ZEP 2002 08 15 08 11 00 114-99 P co2 CCGG 362.670 -999.990 ... L3 2002 09 19 12 25 00 78.9000 11.8800 475.00 167314 ZEP 2002 08 22 07 28 00 261-99 P co2 CCGG 364.530 -999.990 ... L3 2002 09 19 13 30 00 78.9000 11.8800 475.00 167315 ZEP 2002 08 22 07 28 00 262-99 P co2 CCGG 364.710 -999.990 ... L3 2002 09 19 13 43 00 78.9000 11.8800 475.00 167316 ZEP 2002 08 29 08 07 00 447-99 P co2 CCGG 351.000 -999.990 -.. L3 2002 10 03 16 16 00 78.9000 11.8800 475.00 167317 ZEP 2002 08 29 08 07 00 448-99 P co2 CCGG 363.070 -999.990 +.. L3 2002 10 03 16 29 00 78.9000 11.8800 475.00 167318 ZEP 2002 09 06 08 30 00 645-99 P co2 CCGG 363.360 -999.990 ... L3 2002 10 03 16 42 00 78.9000 11.8800 475.00 167319 ZEP 2002 09 06 08 30 00 646-99 P co2 CCGG 363.450 -999.990 ... L3 2002 10 03 16 55 00 78.9000 11.8800 475.00 167320 ZEP 2002 09 12 08 17 00 647-99 P co2 CCGG 363.330 -999.990 ... L3 2002 12 09 10 05 00 78.9000 11.8800 475.00 167321 ZEP 2002 09 12 08 17 00 648-99 P co2 CCGG 363.270 -999.990 ... L3 2002 12 09 10 18 00 78.9000 11.8800 475.00 167322 ZEP 2002 09 19 08 30 00 650-99 P co2 CCGG 366.300 -999.990 ... L3 2002 12 09 12 04 00 78.9000 11.8800 475.00 167323 ZEP 2002 09 26 07 32 00 4029-91 P co2 CCGG 366.330 -999.990 ... L3 2002 10 25 14 02 00 78.9000 11.8800 475.00 167324 ZEP 2002 09 26 07 32 00 4030-91 P co2 CCGG 366.250 -999.990 ... L3 2002 10 25 14 15 00 78.9000 11.8800 475.00 167325 ZEP 2002 10 03 08 30 00 4507-91 P co2 CCGG 367.470 -999.990 ... L3 2002 10 25 13 36 00 78.9000 11.8800 475.00 167326 ZEP 2002 10 03 08 30 00 4508-91 P co2 CCGG 367.430 -999.990 ... L3 2002 10 25 13 49 00 78.9000 11.8800 475.00 167327 ZEP 2002 10 10 08 44 00 1992-91 P co2 CCGG 366.220 -999.990 .X. L3 2002 10 29 16 27 00 78.9000 11.8800 475.00 167328 ZEP 2002 10 10 08 59 00 4657-91 P co2 CCGG 369.650 -999.990 ... L3 2002 10 30 10 57 00 78.9000 11.8800 475.00 167329 ZEP 2002 10 10 08 59 00 4658-91 P co2 CCGG 369.580 -999.990 ... L3 2002 10 30 11 10 00 78.9000 11.8800 475.00 167330 ZEP 2002 12 05 08 45 00 4071-91 P co2 CCGG 381.660 -999.990 ... L3 2003 01 29 16 24 00 78.9000 11.8800 475.00 167331 ZEP 2002 12 05 08 45 00 4072-91 P co2 CCGG 381.590 -999.990 ... L3 2003 01 29 16 37 00 78.9000 11.8800 475.00 167332 ZEP 2002 12 19 08 30 00 743-91 P co2 CCGG 381.950 -999.990 ... L3 2003 02 03 10 00 00 78.9000 11.8800 475.00 167333 ZEP 2002 12 19 08 30 00 744-91 P co2 CCGG 382.180 -999.990 ... L3 2003 02 03 10 13 00 78.9000 11.8800 475.00 167334 ZEP 2002 12 26 10 36 00 719-91 P co2 CCGG 376.900 -999.990 .X. L3 2003 02 07 10 58 00 78.9000 11.8800 475.00 167335 ZEP 2002 12 26 10 36 00 720-91 P co2 CCGG 376.870 -999.990 .X. L3 2003 02 07 11 11 00 78.9000 11.8800 475.00 167336 ZEP 2003 01 02 08 30 00 4845-91 P co2 CCGG 376.680 -999.990 .X. L3 2003 02 07 12 18 00 78.9000 11.8800 475.00 167337 ZEP 2003 01 02 08 30 00 4846-91 P co2 CCGG 376.690 -999.990 .X. L3 2003 02 07 12 31 00 78.9000 11.8800 475.00 167338 ZEP 2003 01 09 07 36 00 693-99 P co2 CCGG 378.980 -999.990 ... L3 2003 02 06 16 52 00 78.9000 11.8800 475.00 167339 ZEP 2003 01 09 07 36 00 694-99 P co2 CCGG 379.150 -999.990 ... L3 2003 02 06 17 05 00 78.9000 11.8800 475.00 167340 ZEP 2003 01 16 07 55 00 6217-66 P co2 CCGG 379.330 -999.990 ... L3 2003 03 21 10 42 00 78.9000 11.8800 475.00 167341 ZEP 2003 01 16 07 55 00 6218-66 P co2 CCGG 379.360 -999.990 ... L3 2003 03 21 10 55 00 78.9000 11.8800 475.00 167342 ZEP 2003 01 23 10 00 00 6261-66 P co2 CCGG 379.430 -999.990 ... L3 2003 03 21 14 03 00 78.9000 11.8800 475.00 167343 ZEP 2003 01 23 10 00 00 6262-66 P co2 CCGG 379.250 -999.990 ... L3 2003 03 21 14 16 00 78.9000 11.8800 475.00 167344 ZEP 2003 01 30 08 15 00 149-91 P co2 CCGG 381.870 -999.990 ... L3 2003 05 08 09 01 00 78.9000 11.8800 475.00 167345 ZEP 2003 01 30 08 15 00 150-91 P co2 CCGG 381.790 -999.990 ... L3 2003 05 08 09 14 00 78.9000 11.8800 475.00 167346 ZEP 2003 02 06 09 23 00 1997-91 P co2 CCGG 379.670 -999.990 ... L3 2003 05 08 09 27 00 78.9000 11.8800 475.00 167347 ZEP 2003 02 06 09 23 00 1998-91 P co2 CCGG 379.670 -999.990 ... L3 2003 05 08 09 40 00 78.9000 11.8800 475.00 167348 ZEP 2003 02 13 09 22 00 375-99 P co2 CCGG 379.840 -999.990 ... L3 2003 03 25 17 24 00 78.9000 11.8800 475.00 167349 ZEP 2003 02 27 07 58 00 485-91 P co2 CCGG 380.780 -999.990 ... L3 2003 04 03 11 08 00 78.9000 11.8800 475.00 167350 ZEP 2003 02 27 07 58 00 486-91 P co2 CCGG 380.690 -999.990 ... L3 2003 04 03 11 22 00 78.9000 11.8800 475.00 167351 ZEP 2003 03 13 13 55 00 219-99 P co2 CCGG 381.340 -999.990 ... L3 2003 04 03 10 42 00 78.9000 11.8800 475.00 167352 ZEP 2003 03 13 13 55 00 220-99 P co2 CCGG 381.330 -999.990 ... L3 2003 04 03 10 55 00 78.9000 11.8800 475.00 167353 ZEP 2003 03 20 08 27 00 1127-91 P co2 CCGG 382.210 -999.990 ... L3 2003 05 09 13 24 00 78.9000 11.8800 475.00 167354 ZEP 2003 03 20 08 27 00 1128-91 P co2 CCGG 382.050 -999.990 ... L3 2003 05 09 13 37 00 78.9000 11.8800 475.00 167355 ZEP 2003 03 27 09 36 00 1029-91 P co2 CCGG 380.910 -999.990 ... L3 2003 05 09 12 58 00 78.9000 11.8800 475.00 167356 ZEP 2003 03 27 09 36 00 1030-91 P co2 CCGG 380.870 -999.990 ... L3 2003 05 09 13 11 00 78.9000 11.8800 475.00 167357 ZEP 2003 04 03 08 30 00 1051-99 P co2 CCGG 382.140 -999.990 ... L3 2003 05 21 11 49 00 78.9000 11.8800 475.00 167358 ZEP 2003 04 03 08 30 00 1052-99 P co2 CCGG 382.110 -999.990 ... L3 2003 05 21 12 02 00 78.9000 11.8800 475.00 167359 ZEP 2003 04 07 17 21 00 4781-91 P co2 CCGG 379.280 -999.990 -.. L3 2003 05 21 11 23 00 78.9000 11.8800 475.00 167360 ZEP 2003 04 07 17 21 00 4782-91 P co2 CCGG 382.190 -999.990 +.. L3 2003 05 21 11 36 00 78.9000 11.8800 475.00 167361 ZEP 2003 04 08 07 00 00 105-91 P co2 CCGG 380.310 -999.990 ... L3 2003 05 14 10 53 00 78.9000 11.8800 475.00 167362 ZEP 2003 04 08 07 00 00 106-91 P co2 CCGG 380.330 -999.990 ... L3 2003 05 14 11 06 00 78.9000 11.8800 475.00 167363 ZEP 2003 04 09 11 24 00 6195-66 P co2 CCGG 381.000 -999.990 ... L3 2003 05 14 11 45 00 78.9000 11.8800 475.00 167364 ZEP 2003 04 09 11 24 00 6196-66 P co2 CCGG 380.930 -999.990 ... L3 2003 05 14 11 58 00 78.9000 11.8800 475.00 167365 ZEP 2003 04 10 07 08 00 435-99 P co2 CCGG 380.530 -999.990 ... L3 2003 05 09 14 29 00 78.9000 11.8800 475.00 167366 ZEP 2003 04 10 07 08 00 436-99 P co2 CCGG 380.600 -999.990 ... L3 2003 05 09 14 42 00 78.9000 11.8800 475.00 167367 ZEP 2003 04 11 08 01 00 1373-91 P co2 CCGG 380.390 -999.990 ... L3 2003 05 09 13 50 00 78.9000 11.8800 475.00 167368 ZEP 2003 04 11 08 01 00 1374-91 P co2 CCGG 380.410 -999.990 ... L3 2003 05 09 14 03 00 78.9000 11.8800 475.00 167369 ZEP 2003 04 12 12 02 00 487-99 P co2 CCGG 380.830 -999.990 ... L3 2003 05 21 12 43 00 78.9000 11.8800 475.00 167370 ZEP 2003 04 12 12 02 00 488-99 P co2 CCGG 380.830 -999.990 ... L3 2003 05 21 12 56 00 78.9000 11.8800 475.00 167371 ZEP 2003 04 13 09 43 00 1129-91 P co2 CCGG 384.180 -999.990 ... L3 2003 05 21 13 09 00 78.9000 11.8800 475.00 167372 ZEP 2003 04 13 09 43 00 1130-91 P co2 CCGG 384.180 -999.990 ... L3 2003 05 21 13 22 00 78.9000 11.8800 475.00 167373 ZEP 2003 04 14 13 01 00 257-91 P co2 CCGG 382.750 -999.990 ... L3 2003 05 14 13 05 00 78.9000 11.8800 475.00 167374 ZEP 2003 04 14 13 01 00 258-91 P co2 CCGG 382.670 -999.990 ... L3 2003 05 14 13 18 00 78.9000 11.8800 475.00 167375 ZEP 2003 04 15 06 41 00 4933-91 P co2 CCGG 380.370 -999.990 ... L3 2003 05 14 12 39 00 78.9000 11.8800 475.00 167376 ZEP 2003 04 15 06 41 00 4934-91 P co2 CCGG 380.240 -999.990 ... L3 2003 05 14 12 52 00 78.9000 11.8800 475.00 167377 ZEP 2003 04 17 06 58 00 4093-91 P co2 CCGG 380.910 -999.990 ... L3 2003 05 28 11 20 00 78.9000 11.8800 475.00 167378 ZEP 2003 04 17 06 58 00 4094-91 P co2 CCGG 380.880 -999.990 ... L3 2003 05 28 11 33 00 78.9000 11.8800 475.00 167379 ZEP 2003 04 24 07 40 00 1567-91 P co2 CCGG 381.650 -999.990 ... L3 2003 05 28 10 54 00 78.9000 11.8800 475.00 167380 ZEP 2003 04 24 07 40 00 1568-91 P co2 CCGG 381.630 -999.990 ... L3 2003 05 28 11 07 00 78.9000 11.8800 475.00 167381 ZEP 2003 05 01 10 00 00 2005-91 P co2 CCGG 382.590 -999.990 +.. L3 2003 06 11 10 08 00 78.9000 11.8800 475.00 167382 ZEP 2003 05 01 10 00 00 2006-91 P co2 CCGG 381.920 -999.990 -.. L3 2003 06 11 10 21 00 78.9000 11.8800 475.00 167383 ZEP 2003 05 08 07 40 00 911-99 P co2 CCGG 381.990 -999.990 ... L3 2003 06 11 10 37 00 78.9000 11.8800 475.00 167384 ZEP 2003 05 08 07 40 00 912-99 P co2 CCGG 382.000 -999.990 ... L3 2003 06 11 10 50 00 78.9000 11.8800 475.00 167385 ZEP 2003 05 15 08 55 00 4840-98 P co2 CCGG 381.410 -999.990 ... L3 2003 08 15 16 13 00 78.9000 11.8800 475.00 167386 ZEP 2003 05 22 07 00 00 987-91 P co2 CCGG 381.460 -999.990 ... L3 2003 08 15 16 26 00 78.9000 11.8800 475.00 167387 ZEP 2003 05 22 07 20 00 1002-99 P co2 CCGG 381.240 -999.990 ... L3 2003 06 11 09 29 00 78.9000 11.8800 475.00 167388 ZEP 2003 05 22 07 20 00 1495-91 P co2 CCGG 381.280 -999.990 ... L3 2003 06 11 09 16 00 78.9000 11.8800 475.00 167389 ZEP 2003 05 27 07 57 00 1747-91 P co2 CCGG 380.240 -999.990 ... L3 2003 06 25 14 30 00 78.9000 11.8800 475.00 167390 ZEP 2003 05 27 07 57 00 1748-91 P co2 CCGG 380.400 -999.990 ... L3 2003 06 25 14 43 00 78.9000 11.8800 475.00 167391 ZEP 2003 05 29 10 35 00 1093-91 P co2 CCGG 380.840 -999.990 ... L3 2003 06 25 14 56 00 78.9000 11.8800 475.00 167392 ZEP 2003 05 29 10 35 00 1094-91 P co2 CCGG 380.890 -999.990 ... L3 2003 06 25 15 09 00 78.9000 11.8800 475.00 167393 ZEP 2003 06 05 06 35 00 1925-91 P co2 CCGG 379.670 -999.990 ... L3 2003 07 08 10 54 00 78.9000 11.8800 475.00 167394 ZEP 2003 06 05 06 35 00 1926-91 P co2 CCGG 379.610 -999.990 ... L3 2003 07 08 11 07 00 78.9000 11.8800 475.00 167395 ZEP 2003 06 12 10 20 00 1435-91 P co2 CCGG 381.450 -999.990 ... L3 2003 07 08 10 28 00 78.9000 11.8800 475.00 167396 ZEP 2003 06 12 10 20 00 1436-91 P co2 CCGG 381.480 -999.990 ... L3 2003 07 08 10 41 00 78.9000 11.8800 475.00 167397 ZEP 2003 06 19 07 50 00 335-99 P co2 CCGG 378.200 -999.990 ... L3 2003 07 16 13 53 00 78.9000 11.8800 475.00 167398 ZEP 2003 06 19 07 50 00 336-99 P co2 CCGG 378.210 -999.990 ... L3 2003 07 16 14 06 00 78.9000 11.8800 475.00 167399 ZEP 2003 06 26 07 58 00 401-99 P co2 CCGG 376.110 -999.990 ... L3 2003 07 16 14 19 00 78.9000 11.8800 475.00 167400 ZEP 2003 06 26 07 58 00 402-99 P co2 CCGG 376.120 -999.990 ... L3 2003 07 16 14 32 00 78.9000 11.8800 475.00 167401 ZEP 2003 07 03 07 12 00 813-91 P co2 CCGG 377.510 -999.990 ... L3 2003 08 04 14 19 00 78.9000 11.8800 475.00 167402 ZEP 2003 07 11 07 59 00 803-91 P co2 CCGG 373.780 -999.990 ... L3 2003 08 01 14 27 00 78.9000 11.8800 475.00 167403 ZEP 2003 07 11 07 59 00 804-91 P co2 CCGG 373.800 -999.990 ... L3 2003 08 01 14 41 00 78.9000 11.8800 475.00 167404 ZEP 2003 07 17 07 30 00 4789-91 P co2 CCGG 371.670 -999.990 ... L3 2003 08 15 11 38 00 78.9000 11.8800 475.00 167405 ZEP 2003 07 17 07 30 00 4790-91 P co2 CCGG 371.730 -999.990 ... L3 2003 08 15 11 51 00 78.9000 11.8800 475.00 167406 ZEP 2003 07 24 08 06 00 97-91 P co2 CCGG 371.820 -999.990 ... L3 2003 08 15 12 04 00 78.9000 11.8800 475.00 167407 ZEP 2003 07 24 08 06 00 98-91 P co2 CCGG 371.790 -999.990 ... L3 2003 08 15 12 17 00 78.9000 11.8800 475.00 167408 ZEP 2003 07 31 07 58 00 45-98 P co2 CCGG 368.110 -999.990 ... L3 2003 10 06 10 11 00 78.9000 11.8800 475.00 167409 ZEP 2003 07 31 07 58 00 46-98 P co2 CCGG 368.110 -999.990 ... L3 2003 10 06 10 24 00 78.9000 11.8800 475.00 167410 ZEP 2003 08 07 07 16 00 189-99 P co2 CCGG 368.030 -999.990 ... L3 2003 10 06 12 25 00 78.9000 11.8800 475.00 167411 ZEP 2003 08 07 07 16 00 190-99 P co2 CCGG 368.010 -999.990 ... L3 2003 10 06 12 38 00 78.9000 11.8800 475.00 167412 ZEP 2003 08 14 08 25 00 2051-91 P co2 CCGG 367.380 -999.990 ... L3 2003 10 01 18 39 00 78.9000 11.8800 475.00 167413 ZEP 2003 08 14 08 25 00 2052-91 P co2 CCGG 367.430 -999.990 ... L3 2003 10 01 18 52 00 78.9000 11.8800 475.00 167414 ZEP 2003 08 21 07 55 00 4413-91 P co2 CCGG 366.330 -999.990 ... L3 2003 10 01 19 05 00 78.9000 11.8800 475.00 167415 ZEP 2003 08 21 07 55 00 4414-91 P co2 CCGG 366.290 -999.990 ... L3 2003 10 01 19 18 00 78.9000 11.8800 475.00 167416 ZEP 2003 08 28 13 36 00 987-99 P co2 CCGG 366.400 -999.990 ... L3 2003 10 01 11 59 00 78.9000 11.8800 475.00 167417 ZEP 2003 08 28 13 36 00 988-99 P co2 CCGG 366.340 -999.990 ... L3 2003 10 01 12 12 00 78.9000 11.8800 475.00 167418 ZEP 2003 09 04 07 36 00 651-99 P co2 CCGG 365.390 -999.990 ... L3 2003 10 01 13 19 00 78.9000 11.8800 475.00 167419 ZEP 2003 09 04 07 36 00 652-99 P co2 CCGG 365.260 -999.990 ... L3 2003 10 01 13 32 00 78.9000 11.8800 475.00 167420 ZEP 2003 09 11 07 39 00 6605-66 P co2 CCGG 366.950 -999.990 ... L3 2003 10 07 13 14 00 78.9000 11.8800 475.00 167421 ZEP 2003 09 11 07 39 00 6606-66 P co2 CCGG 366.860 -999.990 ... L3 2003 10 07 13 27 00 78.9000 11.8800 475.00 167422 ZEP 2003 09 18 07 24 00 6527-66 P co2 CCGG 368.760 -999.990 ... L3 2003 10 07 11 56 00 78.9000 11.8800 475.00 167423 ZEP 2003 09 18 07 24 00 6528-66 P co2 CCGG 368.640 -999.990 ... L3 2003 10 07 12 09 00 78.9000 11.8800 475.00 167424 ZEP 2003 09 25 07 57 00 1857-99 P co2 CCGG 370.960 -999.990 ... L3 2003 10 30 11 50 00 78.9000 11.8800 475.00 167425 ZEP 2003 09 25 07 57 00 1858-99 P co2 CCGG 370.960 -999.990 ... L3 2003 10 30 12 03 00 78.9000 11.8800 475.00 167426 ZEP 2003 09 26 11 47 00 1835-99 P co2 CCGG 370.690 -999.990 ... L3 2003 10 30 12 16 00 78.9000 11.8800 475.00 167427 ZEP 2003 09 26 11 47 00 1836-99 P co2 CCGG 370.710 -999.990 ... L3 2003 10 30 12 29 00 78.9000 11.8800 475.00 167428 ZEP 2003 09 27 11 58 00 743-91 P co2 CCGG 370.780 -999.990 ... L3 2003 11 11 10 21 00 78.9000 11.8800 475.00 167429 ZEP 2003 09 27 11 58 00 744-91 P co2 CCGG 370.870 -999.990 ... L3 2003 11 11 10 34 00 78.9000 11.8800 475.00 167430 ZEP 2003 09 28 15 06 00 4411-91 P co2 CCGG 370.330 -999.990 ... L3 2003 11 11 09 55 00 78.9000 11.8800 475.00 167431 ZEP 2003 09 28 15 06 00 4412-91 P co2 CCGG 370.400 -999.990 ... L3 2003 11 11 10 08 00 78.9000 11.8800 475.00 167432 ZEP 2003 09 29 12 38 00 1005-91 P co2 CCGG 370.320 -999.990 ... L3 2003 11 11 10 49 00 78.9000 11.8800 475.00 167433 ZEP 2003 09 29 12 38 00 1006-91 P co2 CCGG 370.310 -999.990 ... L3 2003 11 11 11 02 00 78.9000 11.8800 475.00 167434 ZEP 2003 09 30 07 05 00 603-91 P co2 CCGG 370.560 -999.990 ... L3 2003 11 11 09 29 00 78.9000 11.8800 475.00 167435 ZEP 2003 09 30 07 05 00 604-91 P co2 CCGG 370.580 -999.990 ... L3 2003 11 11 09 42 00 78.9000 11.8800 475.00 167436 ZEP 2003 10 01 08 53 00 1613-99 P co2 CCGG 370.190 -999.990 ... L3 2003 10 31 16 14 00 78.9000 11.8800 475.00 167437 ZEP 2003 10 01 08 53 00 1614-99 P co2 CCGG 370.210 -999.990 ... L3 2003 10 31 16 27 00 78.9000 11.8800 475.00 167438 ZEP 2003 10 02 07 14 00 1611-99 P co2 CCGG 370.250 -999.990 ... L3 2003 11 03 10 04 00 78.9000 11.8800 475.00 167439 ZEP 2003 10 02 07 14 00 1612-99 P co2 CCGG 370.260 -999.990 ... L3 2003 11 03 10 17 00 78.9000 11.8800 475.00 167440 ZEP 2003 10 09 07 59 00 451-91 P co2 CCGG 372.800 -999.990 ... L3 2003 11 06 13 07 00 78.9000 11.8800 475.00 167441 ZEP 2003 10 09 07 59 00 452-91 P co2 CCGG 372.730 -999.990 ... L3 2003 11 06 13 20 00 78.9000 11.8800 475.00 167442 ZEP 2003 10 16 07 02 00 4753-91 P co2 CCGG 372.600 -999.990 ... L3 2003 11 06 13 33 00 78.9000 11.8800 475.00 167443 ZEP 2003 10 16 07 02 00 4754-91 P co2 CCGG 372.620 -999.990 ... L3 2003 11 06 13 47 00 78.9000 11.8800 475.00 167444 ZEP 2003 10 23 08 11 00 495-91 P co2 CCGG 373.540 -999.990 ... L3 2003 11 26 11 00 00 78.9000 11.8800 475.00 167445 ZEP 2003 10 23 08 11 00 496-91 P co2 CCGG 373.440 -999.990 ... L3 2003 11 26 11 13 00 78.9000 11.8800 475.00 167446 ZEP 2003 10 30 09 50 00 65-98 P co2 CCGG 377.810 -999.990 ... L3 2003 11 26 11 27 00 78.9000 11.8800 475.00 167447 ZEP 2003 10 30 09 50 00 66-98 P co2 CCGG 377.810 -999.990 ... L3 2003 11 26 11 40 00 78.9000 11.8800 475.00 167448 ZEP 2003 11 06 08 10 00 793-91 P co2 CCGG 380.780 -999.990 .X. L3 2003 12 10 17 06 00 78.9000 11.8800 475.00 167449 ZEP 2003 11 06 08 10 00 794-91 P co2 CCGG 380.800 -999.990 .X. L3 2003 12 10 17 19 00 78.9000 11.8800 475.00 167450 ZEP 2003 11 13 09 11 00 803-91 P co2 CCGG 376.920 -999.990 ... L3 2003 12 10 17 34 00 78.9000 11.8800 475.00 167451 ZEP 2003 11 13 09 11 00 804-91 P co2 CCGG 376.890 -999.990 ... L3 2003 12 10 17 47 00 78.9000 11.8800 475.00 167452 ZEP 2003 11 20 13 31 00 6383-66 P co2 CCGG 379.440 -999.990 ... L3 2003 12 29 10 14 00 78.9000 11.8800 475.00 167453 ZEP 2003 11 20 13 31 00 6384-66 P co2 CCGG 379.550 -999.990 ... L3 2003 12 29 10 27 00 78.9000 11.8800 475.00 167454 ZEP 2003 11 27 09 00 00 2073-99 P co2 CCGG 379.820 -999.990 ... L3 2003 12 29 10 42 00 78.9000 11.8800 475.00 167455 ZEP 2003 11 27 09 00 00 2074-99 P co2 CCGG 379.840 -999.990 ... L3 2003 12 29 10 55 00 78.9000 11.8800 475.00 167456 ZEP 2003 12 04 08 25 00 159-98 P co2 CCGG 379.890 -999.990 ... L3 2004 01 15 17 40 00 78.9000 11.8800 475.00 167457 ZEP 2003 12 04 08 25 00 160-98 P co2 CCGG 379.830 -999.990 ... L3 2004 01 15 17 53 00 78.9000 11.8800 475.00 167458 ZEP 2003 12 11 10 33 00 2173-99 P co2 CCGG 381.360 -999.990 ... L3 2004 01 27 16 46 00 78.9000 11.8800 475.00 167459 ZEP 2003 12 11 10 33 00 2174-99 P co2 CCGG 381.310 -999.990 ... L3 2004 01 27 16 59 00 78.9000 11.8800 475.00 167460 ZEP 2003 12 18 08 41 00 631-99 P co2 CCGG 382.600 -999.990 ... L3 2004 01 15 18 06 00 78.9000 11.8800 475.00 167461 ZEP 2003 12 18 08 41 00 632-99 P co2 CCGG 382.600 -999.990 ... L3 2004 01 15 18 19 00 78.9000 11.8800 475.00 167462 ZEP 2004 01 01 12 05 00 2025-99 P co2 CCGG 379.990 -999.990 ... L3 2004 01 27 16 20 00 78.9000 11.8800 475.00 167463 ZEP 2004 01 01 12 05 00 2026-99 P co2 CCGG 380.050 -999.990 ... L3 2004 01 27 16 33 00 78.9000 11.8800 475.00 167464 ZEP 2004 01 08 08 22 00 2357-99 P co2 CCGG 380.750 -999.990 ... L3 2004 02 17 15 25 00 78.9000 11.8800 475.00 167465 ZEP 2004 01 08 08 22 00 2358-99 P co2 CCGG 380.730 -999.990 ... L3 2004 02 17 15 38 00 78.9000 11.8800 475.00 167466 ZEP 2004 01 15 09 44 00 2355-99 P co2 CCGG 380.610 -999.990 ... L3 2004 02 17 17 39 00 78.9000 11.8800 475.00 167467 ZEP 2004 01 15 09 44 00 2356-99 P co2 CCGG 380.720 -999.990 ... L3 2004 02 17 17 52 00 78.9000 11.8800 475.00 167468 ZEP 2004 01 22 11 20 00 1687-91 P co2 CCGG 384.220 -999.990 ... L3 2004 02 20 13 20 00 78.9000 11.8800 475.00 167469 ZEP 2004 01 29 08 10 00 1769-91 P co2 CCGG 382.770 -999.990 ... L3 2004 02 20 12 39 00 78.9000 11.8800 475.00 167470 ZEP 2004 01 29 08 10 00 1770-91 P co2 CCGG 382.790 -999.990 ... L3 2004 02 20 12 52 00 78.9000 11.8800 475.00 167471 ZEP 2004 02 05 09 13 00 2297-99 P co2 CCGG 385.960 -999.990 .X. L3 2004 03 01 18 28 00 78.9000 11.8800 475.00 167472 ZEP 2004 02 05 09 13 00 2298-99 P co2 CCGG 385.940 -999.990 .X. L3 2004 03 01 18 41 00 78.9000 11.8800 475.00 167473 ZEP 2004 02 12 13 20 00 2293-99 P co2 CCGG 382.900 -999.990 ... L3 2004 03 02 12 45 00 78.9000 11.8800 475.00 167474 ZEP 2004 02 12 13 20 00 2294-99 P co2 CCGG 382.850 -999.990 ... L3 2004 03 02 12 58 00 78.9000 11.8800 475.00 167475 ZEP 2004 02 19 07 48 00 1727-99 P co2 CCGG 382.210 -999.990 ... L3 2004 04 01 17 02 00 78.9000 11.8800 475.00 167476 ZEP 2004 02 19 07 48 00 1728-99 P co2 CCGG 382.200 -999.990 ... L3 2004 04 01 17 15 00 78.9000 11.8800 475.00 167477 ZEP 2004 02 26 13 37 00 1499-99 P co2 CCGG 382.080 -999.990 ... L3 2004 04 01 17 28 00 78.9000 11.8800 475.00 167478 ZEP 2004 02 26 13 37 00 1500-99 P co2 CCGG 382.110 -999.990 ... L3 2004 04 01 17 41 00 78.9000 11.8800 475.00 167479 ZEP 2004 03 04 09 17 00 2341-99 P co2 CCGG 383.710 -999.990 ... L3 2004 04 01 09 48 00 78.9000 11.8800 475.00 167480 ZEP 2004 03 04 09 17 00 2342-99 P co2 CCGG 383.790 -999.990 ... L3 2004 04 01 10 01 00 78.9000 11.8800 475.00 167481 ZEP 2004 03 12 09 15 00 743-91 P co2 CCGG 382.680 -999.990 ... L3 2004 04 01 10 14 00 78.9000 11.8800 475.00 167482 ZEP 2004 03 12 09 15 00 744-91 P co2 CCGG 382.650 -999.990 ... L3 2004 04 01 10 27 00 78.9000 11.8800 475.00 167483 ZEP 2004 03 18 08 30 00 4333-91 P co2 CCGG 384.540 -999.990 ... L3 2004 04 16 10 53 00 78.9000 11.8800 475.00 167484 ZEP 2004 03 18 08 30 00 4334-91 P co2 CCGG 384.490 -999.990 ... L3 2004 04 16 11 06 00 78.9000 11.8800 475.00 167485 ZEP 2004 03 25 08 55 00 6369-66 P co2 CCGG 383.350 -999.990 ... L3 2004 04 16 11 19 00 78.9000 11.8800 475.00 167486 ZEP 2004 03 25 08 55 00 6370-66 P co2 CCGG 383.330 -999.990 ... L3 2004 04 16 11 32 00 78.9000 11.8800 475.00 167487 ZEP 2004 04 01 13 32 00 1183-99 P co2 CCGG 383.390 -999.990 ... L3 2004 05 05 12 22 00 78.9000 11.8800 475.00 167488 ZEP 2004 04 01 13 32 00 1184-99 P co2 CCGG 383.500 -999.990 ... L3 2004 05 05 12 35 00 78.9000 11.8800 475.00 167489 ZEP 2004 04 11 09 41 00 1939-99 P co2 CCGG 384.270 -999.990 ... L3 2004 05 05 12 48 00 78.9000 11.8800 475.00 167490 ZEP 2004 04 11 09 41 00 1940-99 P co2 CCGG 384.260 -999.990 ... L3 2004 05 05 13 01 00 78.9000 11.8800 475.00 167491 ZEP 2004 04 15 08 30 00 3115-99 P co2 CCGG 385.390 -999.990 ... L3 2004 05 18 10 25 00 78.9000 11.8800 475.00 167492 ZEP 2004 04 15 08 30 00 3116-99 P co2 CCGG 385.400 -999.990 ... L3 2004 05 18 10 38 00 78.9000 11.8800 475.00 167493 ZEP 2004 04 22 07 13 00 3117-99 P co2 CCGG 383.250 -999.990 ... L3 2004 05 18 09 57 00 78.9000 11.8800 475.00 167494 ZEP 2004 04 22 07 13 00 3118-99 P co2 CCGG 383.210 -999.990 ... L3 2004 05 18 10 10 00 78.9000 11.8800 475.00 167495 ZEP 2004 04 29 08 00 00 6035-66 P co2 CCGG 382.820 -999.990 ... L3 2004 05 26 09 29 00 78.9000 11.8800 475.00 167496 ZEP 2004 04 29 08 00 00 6036-66 P co2 CCGG 382.690 -999.990 ... L3 2004 05 26 09 42 00 78.9000 11.8800 475.00 167497 ZEP 2004 05 06 07 44 00 2937-99 P co2 CCGG 382.850 -999.990 ... L3 2004 05 26 09 56 00 78.9000 11.8800 475.00 167498 ZEP 2004 05 06 07 44 00 2938-99 P co2 CCGG 382.800 -999.990 ... L3 2004 05 26 10 09 00 78.9000 11.8800 475.00 167499 ZEP 2004 05 13 08 05 00 955-99 P co2 CCGG 383.100 -999.990 ... L3 2004 07 08 12 35 00 78.9000 11.8800 475.00 167500 ZEP 2004 05 13 08 05 00 956-99 P co2 CCGG 383.000 -999.990 ... L3 2004 07 08 12 48 00 78.9000 11.8800 475.00 167501 ZEP 2004 05 20 17 36 00 1613-99 P co2 CCGG 382.930 -999.990 ... L3 2004 07 08 12 09 00 78.9000 11.8800 475.00 167502 ZEP 2004 05 20 17 36 00 1614-99 P co2 CCGG 382.980 -999.990 ... L3 2004 07 08 12 22 00 78.9000 11.8800 475.00 167503 ZEP 2004 05 24 09 37 00 3257-99 P co2 CCGG 380.460 -999.990 ... L3 2004 08 03 11 56 00 78.9000 11.8800 475.00 167504 ZEP 2004 05 24 09 37 00 3258-99 P co2 CCGG 380.340 -999.990 ... L3 2004 08 03 12 09 00 78.9000 11.8800 475.00 167505 ZEP 2004 05 27 11 15 00 2717-99 P co2 CCGG 382.440 -999.990 ... L3 2004 07 26 11 09 00 78.9000 11.8800 475.00 167506 ZEP 2004 05 27 11 15 00 2718-99 P co2 CCGG 382.520 -999.990 ... L3 2004 07 26 11 22 00 78.9000 11.8800 475.00 167507 ZEP 2004 06 03 06 35 00 2757-99 P co2 CCGG 382.750 -999.990 ... L3 2004 07 26 11 37 00 78.9000 11.8800 475.00 167508 ZEP 2004 06 03 06 35 00 2758-99 P co2 CCGG 382.630 -999.990 ... L3 2004 07 26 11 50 00 78.9000 11.8800 475.00 167509 ZEP 2004 06 10 08 37 00 633-99 P co2 CCGG 382.480 -999.990 ... L3 2004 07 07 10 25 00 78.9000 11.8800 475.00 167510 ZEP 2004 06 10 08 37 00 634-99 P co2 CCGG 382.500 -999.990 ... L3 2004 07 07 10 38 00 78.9000 11.8800 475.00 167511 ZEP 2004 06 17 06 50 00 6161-66 P co2 CCGG 382.090 -999.990 ... L3 2004 07 07 09 57 00 78.9000 11.8800 475.00 167512 ZEP 2004 06 17 06 50 00 6162-66 P co2 CCGG 382.020 -999.990 ... L3 2004 07 07 10 10 00 78.9000 11.8800 475.00 167513 ZEP 2004 07 01 08 30 00 3255-99 P co2 CCGG 376.540 -999.990 ... L3 2004 08 03 12 22 00 78.9000 11.8800 475.00 167514 ZEP 2004 07 01 08 30 00 3256-99 P co2 CCGG 376.510 -999.990 ... L3 2004 08 03 12 35 00 78.9000 11.8800 475.00 167515 ZEP 2004 07 08 06 59 00 743-91 P co2 CCGG 377.400 -999.990 ... L3 2004 08 12 14 55 00 78.9000 11.8800 475.00 167516 ZEP 2004 07 08 06 59 00 744-91 P co2 CCGG 377.460 -999.990 ... L3 2004 08 12 15 08 00 78.9000 11.8800 475.00 167517 ZEP 2004 07 15 08 35 00 1855-99 P co2 CCGG 373.540 -999.990 ... L3 2004 08 12 13 32 00 78.9000 11.8800 475.00 167518 ZEP 2004 07 15 08 35 00 1856-99 P co2 CCGG 373.600 -999.990 ... L3 2004 08 12 13 45 00 78.9000 11.8800 475.00 167519 ZEP 2004 07 22 12 50 00 1129-99 P co2 CCGG 371.160 -999.990 ... L3 2004 09 30 13 04 00 78.9000 11.8600 475.00 188784 ZEP 2004 07 22 12 50 00 1130-99 P co2 CCGG 371.350 -999.990 ... L3 2004 09 30 13 19 00 78.9000 11.8600 475.00 188785 ZEP 2004 07 27 10 34 00 1007-99 P co2 CCGG 366.010 -999.990 .X. L3 2004 09 30 12 36 00 78.9000 11.8600 475.00 188782 ZEP 2004 07 27 10 34 00 1008-99 P co2 CCGG 366.000 -999.990 .X. L3 2004 09 30 12 50 00 78.9000 11.8600 475.00 188783 ZEP 2004 07 30 10 21 00 2777-99 P co2 CCGG 370.370 -999.990 ... L3 2004 09 30 12 08 00 78.9000 11.8600 475.00 188786 ZEP 2004 07 30 10 21 00 2778-99 P co2 CCGG 370.300 -999.990 ... L3 2004 09 30 12 22 00 78.9000 11.8600 475.00 188787 ZEP 2004 08 05 07 38 00 709-99 P co2 CCGG 369.680 -999.990 ... L3 2004 09 30 13 33 00 78.9000 11.8600 475.00 188780 ZEP 2004 08 05 07 38 00 710-99 P co2 CCGG 369.550 -999.990 ... L3 2004 09 30 13 47 00 78.9000 11.8600 475.00 188781 ZEP 2004 08 12 07 12 00 803-91 P co2 CCGG 370.360 -999.990 ... L3 2004 10 04 17 34 00 78.9000 11.8600 475.00 188975 ZEP 2004 08 12 07 12 00 804-91 P co2 CCGG 370.290 -999.990 ... L3 2004 10 04 17 48 00 78.9000 11.8600 475.00 188976 ZEP 2004 08 18 07 15 00 793-91 P co2 CCGG 367.300 -999.990 ... L3 2004 10 04 18 03 00 78.9000 11.8600 475.00 188973 ZEP 2004 08 18 07 15 00 794-91 P co2 CCGG 367.400 -999.990 ... L3 2004 10 04 18 17 00 78.9000 11.8600 475.00 188974 ZEP 2004 08 26 07 35 00 3487-99 P co2 CCGG 368.410 -999.990 ... L3 2004 10 07 18 28 00 78.9000 11.8600 475.00 189645 ZEP 2004 08 26 07 35 00 3488-99 P co2 CCGG 368.480 -999.990 ... L3 2004 10 07 18 42 00 78.9000 11.8600 475.00 189646 ZEP 2004 09 09 07 25 00 1911-99 P co2 CCGG 367.590 -999.990 ... L3 2004 10 07 18 56 00 78.9000 11.8600 475.00 189643 ZEP 2004 09 09 07 25 00 1912-99 P co2 CCGG 367.590 -999.990 ... L3 2004 10 07 19 10 00 78.9000 11.8600 475.00 189644 ZEP 2004 09 16 10 14 00 3903-99 P co2 CCGG 369.900 -999.990 ... L3 2004 11 01 16 13 00 78.9000 11.8600 475.00 190677 ZEP 2004 09 16 10 14 00 3904-99 P co2 CCGG 370.000 -999.990 ... L3 2004 11 01 16 27 00 78.9000 11.8600 475.00 190678 ZEP 2004 09 23 07 30 00 3895-99 P co2 CCGG 370.420 -999.990 ... L3 2004 11 01 15 32 00 78.9000 11.8600 475.00 190675 ZEP 2004 09 23 07 30 00 3896-99 P co2 CCGG 370.430 -999.990 ... L3 2004 11 01 15 46 00 78.9000 11.8600 475.00 190676 ZEP 2004 09 30 07 30 00 3749-99 P co2 CCGG 370.320 -999.990 ... L3 2004 11 05 09 17 00 78.9000 11.8600 475.00 191179 ZEP 2004 09 30 07 30 00 3750-99 P co2 CCGG 370.340 -999.990 ... L3 2004 11 05 09 31 00 78.9000 11.8600 475.00 191178 ZEP 2004 10 08 13 32 00 285-99 P co2 CCGG 373.010 -999.990 ... L3 2004 11 05 09 45 00 78.9000 11.8600 475.00 191176 ZEP 2004 10 08 13 32 00 286-99 P co2 CCGG 373.090 -999.990 ... L3 2004 11 05 09 59 00 78.9000 11.8600 475.00 191177 ZEP 2004 10 14 07 50 00 2647-99 P co2 CCGG 374.520 -999.990 ... L3 2004 11 15 09 07 00 78.9000 11.8600 475.00 191598 ZEP 2004 10 14 07 50 00 2648-99 P co2 CCGG 374.280 -999.990 ... L3 2004 11 15 09 21 00 78.9000 11.8600 475.00 191599 ZEP 2004 10 21 08 40 00 1791-99 P co2 CCGG 373.990 -999.990 ... L3 2004 11 15 10 32 00 78.9000 11.8600 475.00 191596 ZEP 2004 10 21 08 40 00 1792-99 P co2 CCGG 374.010 -999.990 ... L3 2004 11 15 10 46 00 78.9000 11.8600 475.00 191597 ZEP 2004 10 29 08 33 00 2197-99 P co2 CCGG 376.100 -999.990 ... L3 2004 11 30 16 18 00 78.9000 11.8600 475.00 192177 ZEP 2004 10 29 08 33 00 2198-99 P co2 CCGG 376.140 -999.990 ... L3 2004 11 30 16 32 00 78.9000 11.8600 475.00 192178 ZEP 2004 11 04 08 20 00 1485-99 P co2 CCGG 377.750 -999.990 ... L3 2004 11 30 16 47 00 78.9000 11.8600 475.00 192175 ZEP 2004 11 04 08 20 00 1486-99 P co2 CCGG 377.670 -999.990 ... L3 2004 11 30 17 02 00 78.9000 11.8600 475.00 192176 ZEP 2004 11 11 08 55 00 803-91 P co2 CCGG 382.100 -999.990 .X. L3 2004 12 02 19 06 00 78.9000 11.8600 475.00 192477 ZEP 2004 11 11 08 55 00 804-91 P co2 CCGG 382.050 -999.990 .X. L3 2004 12 02 19 20 00 78.9000 11.8600 475.00 192478 ZEP 2004 11 18 09 52 00 793-91 P co2 CCGG 379.620 -999.990 ... L3 2004 12 02 18 38 00 78.9000 11.8600 475.00 192475 ZEP 2004 11 18 09 52 00 794-91 P co2 CCGG 379.560 -999.990 ... L3 2004 12 02 18 52 00 78.9000 11.8600 475.00 192476 ZEP 2004 11 25 08 50 00 1159-99 P co2 CCGG 381.190 -999.990 ... L3 2004 12 15 12 11 00 78.9000 11.8600 475.00 192968 ZEP 2004 11 25 08 50 00 1160-99 P co2 CCGG 381.080 -999.990 ... L3 2004 12 15 12 25 00 78.9000 11.8600 475.00 192969 ZEP 2004 12 02 08 15 00 2079-99 P co2 CCGG 380.430 -999.990 ... L3 2004 12 15 12 39 00 78.9000 11.8600 475.00 192970 ZEP 2004 12 02 08 15 00 2080-99 P co2 CCGG 380.420 -999.990 ... L3 2004 12 15 12 53 00 78.9000 11.8600 475.00 192971 ZEP 2004 12 10 09 48 00 3441-99 P co2 CCGG 380.330 -999.990 ... L3 2005 01 06 14 01 00 78.9000 11.8600 475.00 193567 ZEP 2004 12 10 09 48 00 3442-99 P co2 CCGG 380.200 -999.990 ... L3 2005 01 06 14 15 00 78.9000 11.8600 475.00 193568 ZEP 2004 12 16 08 00 00 3443-99 P co2 CCGG 383.380 -999.990 ... L3 2005 01 06 15 26 00 78.9000 11.8600 475.00 193569 ZEP 2004 12 16 08 00 00 3444-99 P co2 CCGG 383.510 -999.990 ... L3 2005 01 06 15 40 00 78.9000 11.8600 475.00 193570 ZEP 2004 12 28 10 40 00 743-91 P co2 CCGG 385.400 -999.990 ... L3 2005 01 18 10 36 00 78.9000 11.8600 475.00 193991 ZEP 2004 12 28 10 40 00 744-91 P co2 CCGG 385.280 -999.990 ... L3 2005 01 18 10 50 00 78.9000 11.8600 475.00 193992 ZEP 2004 12 30 12 47 00 3189-99 P co2 CCGG 382.010 -999.990 ... L3 2005 01 18 11 04 00 78.9000 11.8600 475.00 193959 ZEP 2004 12 30 12 47 00 3190-99 P co2 CCGG 382.050 -999.990 ... L3 2005 01 18 11 18 00 78.9000 11.8600 475.00 193960 ZEP 2005 01 06 08 35 00 89-99 P co2 CCGG 384.160 -999.990 ... L3 2005 02 10 11 12 00 78.9000 11.8600 475.00 194905 ZEP 2005 01 06 08 35 00 90-99 P co2 CCGG 384.020 -999.990 ... L3 2005 02 10 11 26 00 78.9000 11.8600 475.00 194906 ZEP 2005 01 13 08 35 00 2745-99 P co2 CCGG 386.380 -999.990 ... L3 2005 02 10 11 41 00 78.9000 11.8600 475.00 194907 ZEP 2005 01 13 08 35 00 2746-99 P co2 CCGG 386.360 -999.990 ... L3 2005 02 10 11 55 00 78.9000 11.8600 475.00 194908 ZEP 2005 01 20 07 52 00 6621-66 P co2 CCGG 387.850 -999.990 ... L3 2005 03 11 12 10 00 78.9000 11.8600 475.00 196322 ZEP 2005 01 20 07 52 00 6622-66 P co2 CCGG 387.730 -999.990 ... L3 2005 03 11 12 24 00 78.9000 11.8600 475.00 196323 ZEP 2005 01 27 08 33 00 3779-99 P co2 CCGG 383.520 -999.990 ... L3 2005 02 16 13 46 00 78.9000 11.8600 475.00 195125 ZEP 2005 01 27 08 33 00 3780-99 P co2 CCGG 383.260 -999.990 ... L3 2005 02 16 14 00 00 78.9000 11.8600 475.00 195126 ZEP 2005 02 03 09 10 00 3961-99 P co2 CCGG 385.350 -999.990 ... L3 2005 02 16 13 18 00 78.9000 11.8600 475.00 195127 ZEP 2005 02 03 09 10 00 3962-99 P co2 CCGG 385.390 -999.990 ... L3 2005 02 16 13 32 00 78.9000 11.8600 475.00 195128 ZEP 2005 02 10 10 12 00 10-99 P co2 CCGG 382.390 -999.990 ... L3 2005 03 11 12 52 00 78.9000 11.8600 475.00 196320 ZEP 2005 02 10 10 12 00 9-99 P co2 CCGG 382.370 -999.990 ... L3 2005 03 11 12 38 00 78.9000 11.8600 475.00 196321 ZEP 2005 02 17 08 24 00 675-99 P co2 CCGG 382.950 -999.990 ... L3 2005 03 11 14 59 00 78.9000 11.8600 475.00 196417 ZEP 2005 02 17 08 24 00 676-99 P co2 CCGG 382.910 -999.990 ... L3 2005 03 11 15 13 00 78.9000 11.8600 475.00 196418 ZEP 2005 02 24 07 52 00 769-99 P co2 CCGG 384.200 -999.990 ... L3 2005 03 11 15 27 00 78.9000 11.8600 475.00 196415 ZEP 2005 02 24 07 52 00 770-99 P co2 CCGG 384.220 -999.990 ... L3 2005 03 11 15 41 00 78.9000 11.8600 475.00 196416 ZEP 2005 03 03 07 50 00 1925-99 P co2 CCGG 384.750 -999.990 ... L3 2005 04 04 10 11 00 78.9000 11.8600 475.00 197269 ZEP 2005 03 03 07 50 00 1926-99 P co2 CCGG 384.760 -999.990 ... L3 2005 04 04 10 25 00 78.9000 11.8600 475.00 197270 ZEP 2005 03 10 09 40 00 3391-99 P co2 CCGG 383.760 -999.990 ... L3 2005 04 04 10 39 00 78.9000 11.8600 475.00 197267 ZEP 2005 03 10 09 40 00 3392-99 P co2 CCGG 383.750 -999.990 ... L3 2005 04 04 10 53 00 78.9000 11.8600 475.00 197268 ZEP 2005 03 17 08 10 00 793-91 P co2 CCGG 384.280 -999.990 ... L3 2005 04 11 10 49 00 78.9000 11.8600 475.00 197487 ZEP 2005 03 17 08 10 00 794-91 P co2 CCGG 384.230 -999.990 ... L3 2005 04 11 11 03 00 78.9000 11.8600 475.00 197488 ZEP 2005 03 24 09 59 00 803-91 P co2 CCGG 384.090 -999.990 ... L3 2005 04 11 12 54 00 78.9000 11.8600 475.00 197489 ZEP 2005 03 24 09 59 00 804-91 P co2 CCGG 384.020 -999.990 ... L3 2005 04 11 13 08 00 78.9000 11.8600 475.00 197490 ZEP 2005 03 31 07 10 00 2219-99 P co2 CCGG 384.050 -999.990 ... L3 2005 04 29 11 58 00 78.9000 11.8600 475.00 198177 ZEP 2005 03 31 07 10 00 2220-99 P co2 CCGG 384.020 -999.990 ... L3 2005 04 29 12 12 00 78.9000 11.8600 475.00 198178 ZEP 2005 04 07 07 38 00 6248-66 P co2 CCGG 388.300 -999.990 ... L3 2005 04 28 16 24 00 78.9000 11.8600 475.00 198176 ZEP 2005 04 14 07 18 00 3695-99 P co2 CCGG 386.910 -999.990 ... L3 2005 05 18 12 12 00 78.9000 11.8600 475.00 198609 ZEP 2005 04 14 07 18 00 3696-99 P co2 CCGG 386.900 -999.990 ... L3 2005 05 18 12 26 00 78.9000 11.8600 475.00 198610 ZEP 2005 04 21 07 28 00 3897-99 P co2 CCGG 384.540 -999.990 ... L3 2005 05 18 11 44 00 78.9000 11.8600 475.00 198611 ZEP 2005 04 21 07 28 00 3898-99 P co2 CCGG 384.550 -999.990 ... L3 2005 05 18 11 58 00 78.9000 11.8600 475.00 198612 ZEP 2005 04 28 07 24 00 3963-99 P co2 CCGG 386.100 -999.990 ... L3 2005 06 02 15 01 00 78.9000 11.8600 475.00 199353 ZEP 2005 04 28 07 24 00 3964-99 P co2 CCGG 385.910 -999.990 ... L3 2005 06 02 15 15 00 78.9000 11.8600 475.00 199354 ZEP 2005 05 05 15 13 00 3205-99 P co2 CCGG 385.200 -999.990 ... L3 2005 06 02 12 10 00 78.9000 11.8600 475.00 199351 ZEP 2005 05 05 15 13 00 3206-99 P co2 CCGG 385.120 -999.990 ... L3 2005 06 02 12 24 00 78.9000 11.8600 475.00 199352 ZEP 2005 05 12 08 40 00 313-99 P co2 CCGG 386.090 -999.990 ... L3 2005 06 16 14 18 00 78.9000 11.8600 475.00 200058 ZEP 2005 05 12 08 40 00 314-99 P co2 CCGG 386.080 -999.990 ... L3 2005 06 16 14 32 00 78.9000 11.8600 475.00 200059 ZEP 2005 05 19 07 27 00 319-99 P co2 CCGG 385.740 -999.990 ... L3 2005 06 16 13 49 00 78.9000 11.8600 475.00 200061 ZEP 2005 05 19 07 27 00 320-99 P co2 CCGG 385.780 -999.990 ... L3 2005 06 16 14 04 00 78.9000 11.8600 475.00 200062 ZEP 2005 05 26 13 02 00 2717-99 P co2 CCGG 384.940 -999.990 ... L3 2005 07 07 12 52 00 78.9000 11.8600 475.00 200991 ZEP 2005 05 26 13 02 00 2718-99 P co2 CCGG 384.990 -999.990 ... L3 2005 07 07 13 06 00 78.9000 11.8600 475.00 200992 ZEP 2005 06 02 12 35 00 803-91 P co2 CCGG 383.850 -999.990 ... L3 2005 07 07 12 17 00 78.9000 11.8600 475.00 200993 ZEP 2005 06 02 12 35 00 804-91 P co2 CCGG 383.770 -999.990 ... L3 2005 07 07 12 31 00 78.9000 11.8600 475.00 200994 ZEP 2005 06 08 09 10 00 791-91 P co2 CCGG 382.140 -999.990 ... L3 2005 07 18 12 41 00 78.9000 11.8600 475.00 201767 ZEP 2005 06 08 09 10 00 792-91 P co2 CCGG 382.240 -999.990 ... L3 2005 07 18 12 55 00 78.9000 11.8600 475.00 201768 ZEP 2005 06 16 07 19 00 733-91 P co2 CCGG 382.370 -999.990 ... L3 2005 07 18 13 09 00 78.9000 11.8600 475.00 201765 ZEP 2005 06 16 07 19 00 734-91 P co2 CCGG 382.390 -999.990 ... L3 2005 07 18 13 23 00 78.9000 11.8600 475.00 201766 ZEP 2005 06 23 07 47 00 783-91 P co2 CCGG 381.820 -999.990 ... L3 2005 08 22 10 15 00 78.9000 11.8600 475.00 203701 ZEP 2005 06 23 07 47 00 784-91 P co2 CCGG 381.700 -999.990 ... L3 2005 08 22 10 29 00 78.9000 11.8600 475.00 203702 ZEP 2005 06 30 12 50 00 811-91 P co2 CCGG 378.990 -999.990 ... L3 2005 08 22 09 46 00 78.9000 11.8600 475.00 203699 ZEP 2005 06 30 12 50 00 812-91 P co2 CCGG 378.980 -999.990 ... L3 2005 08 22 10 01 00 78.9000 11.8600 475.00 203700 ZEP 2005 07 07 14 20 00 3731-99 P co2 CCGG 373.880 -999.990 .X. L3 2005 08 22 13 06 00 78.9000 11.8600 475.00 203711 ZEP 2005 07 07 14 20 00 3732-99 P co2 CCGG 373.860 -999.990 .X. L3 2005 08 22 13 20 00 78.9000 11.8600 475.00 203712 ZEP 2005 07 14 13 15 00 1925-99 P co2 CCGG 375.930 -999.990 ... L3 2005 08 22 12 37 00 78.9000 11.8600 475.00 203713 ZEP 2005 07 14 13 15 00 1926-99 P co2 CCGG 376.000 -999.990 ... L3 2005 08 22 12 51 00 78.9000 11.8600 475.00 203714 ZEP 2005 07 21 08 39 00 4167-99 P co2 CCGG 375.590 -999.990 ... L3 2005 08 22 10 43 00 78.9000 11.8600 475.00 203703 ZEP 2005 07 21 08 39 00 4168-99 P co2 CCGG 375.550 -999.990 ... L3 2005 08 22 10 58 00 78.9000 11.8600 475.00 203704 ZEP 2005 07 28 07 46 00 2067-99 P co2 CCGG 373.470 -999.990 ... L3 2005 08 22 11 12 00 78.9000 11.8600 475.00 203705 ZEP 2005 07 28 07 46 00 2068-99 P co2 CCGG 373.420 -999.990 ... L3 2005 08 22 11 26 00 78.9000 11.8600 475.00 203706 ZEP 2005 08 04 07 09 00 385-99 P co2 CCGG 368.530 -999.990 .X. L3 2005 08 31 15 55 00 78.9000 11.8600 475.00 204427 ZEP 2005 08 04 07 09 00 386-99 P co2 CCGG 368.520 -999.990 .X. L3 2005 08 31 16 09 00 78.9000 11.8600 475.00 204428 ZEP 2005 08 06 05 53 00 2515-99 P co2 CCGG 371.900 -999.990 ... L3 2005 08 31 16 23 00 78.9000 11.8600 475.00 204429 ZEP 2005 08 06 05 53 00 2516-99 P co2 CCGG 371.670 -999.990 ... L3 2005 08 31 16 38 00 78.9000 11.8600 475.00 204430 ZEP 2005 08 11 07 33 00 743-91 P co2 CCGG 370.510 -999.990 ... L3 2005 09 06 13 03 00 78.9000 11.8600 475.00 205190 ZEP 2005 08 11 07 33 00 744-91 P co2 CCGG 370.530 -999.990 ... L3 2005 09 06 13 17 00 78.9000 11.8600 475.00 205191 ZEP 2005 08 18 07 19 00 2075-99 P co2 CCGG 370.090 -999.990 ... L3 2005 09 06 13 31 00 78.9000 11.8600 475.00 205193 ZEP 2005 08 18 07 19 00 2076-99 P co2 CCGG 370.020 -999.990 ... L3 2005 09 06 13 45 00 78.9000 11.8600 475.00 205194 ZEP 2005 08 25 08 59 00 39-99 P co2 CCGG 369.920 -999.990 ... L3 2005 09 23 16 25 00 78.9000 11.8600 475.00 205730 ZEP 2005 08 25 08 59 00 40-99 P co2 CCGG 369.970 -999.990 ... L3 2005 09 23 16 39 00 78.9000 11.8600 475.00 205731 ZEP 2005 09 01 07 45 00 1359-99 P co2 CCGG 369.310 -999.990 ... L3 2005 09 23 15 56 00 78.9000 11.8600 475.00 205732 ZEP 2005 09 01 07 45 00 1360-99 P co2 CCGG 369.370 -999.990 ... L3 2005 09 23 16 10 00 78.9000 11.8600 475.00 205733 ZEP 2005 09 08 06 59 00 343-99 P co2 CCGG 369.860 -999.990 ... L3 2005 10 20 10 36 00 78.9000 11.8600 475.00 206987 ZEP 2005 09 08 06 59 00 344-99 P co2 CCGG 369.870 -999.990 ... L3 2005 10 20 10 50 00 78.9000 11.8600 475.00 206988 ZEP 2005 09 15 07 25 00 1937-99 P co2 CCGG 370.230 -999.990 ... L3 2005 10 20 10 07 00 78.9000 11.8600 475.00 206989 ZEP 2005 09 15 07 25 00 1938-99 P co2 CCGG 370.240 -999.990 ... L3 2005 10 20 10 21 00 78.9000 11.8600 475.00 206990 ZEP 2005 09 22 07 04 00 733-91 P co2 CCGG 372.930 -999.990 ... L3 2005 10 27 08 55 00 78.9000 11.8600 475.00 207262 ZEP 2005 09 22 07 04 00 734-91 P co2 CCGG 372.910 -999.990 ... L3 2005 10 27 09 10 00 78.9000 11.8600 475.00 207263 ZEP 2005 09 29 07 32 00 3837-99 P co2 CCGG 373.190 -999.990 ... L3 2005 10 26 15 12 00 78.9000 11.8600 475.00 207260 ZEP 2005 09 29 07 32 00 3838-99 P co2 CCGG 373.120 -999.990 ... L3 2005 10 26 15 27 00 78.9000 11.8600 475.00 207261 ZEP 2005 10 06 00 00 00 803-91 P co2 CCGG 373.730 -999.990 ... L3 2005 11 09 09 22 00 78.9000 11.8600 475.00 207853 ZEP 2005 10 06 00 00 00 804-91 P co2 CCGG 373.690 -999.990 ... L3 2005 11 09 09 37 00 78.9000 11.8600 475.00 207854 ZEP 2005 10 13 07 24 00 791-91 P co2 CCGG 375.120 -999.990 ... L3 2005 11 09 09 51 00 78.9000 11.8600 475.00 207851 ZEP 2005 10 13 07 24 00 792-91 P co2 CCGG 375.170 -999.990 ... L3 2005 11 09 10 05 00 78.9000 11.8600 475.00 207852 ZEP 2005 10 20 07 31 00 139-99 P co2 CCGG 376.810 -999.990 ... L3 2006 01 23 15 29 00 78.9000 11.8600 475.00 211582 ZEP 2005 10 20 07 31 00 140-99 P co2 CCGG 376.840 -999.990 ... L3 2006 01 23 15 43 00 78.9000 11.8600 475.00 211583 ZEP 2005 10 27 08 15 00 2979-99 P co2 CCGG 377.860 -999.990 ... L3 2005 11 22 09 14 00 78.9000 11.8600 475.00 209067 ZEP 2005 10 27 08 15 00 2980-99 P co2 CCGG 377.820 -999.990 ... L3 2005 11 22 09 28 00 78.9000 11.8600 475.00 209068 ZEP 2005 11 03 07 55 00 2965-99 P co2 CCGG 379.920 -999.990 ... L3 2005 11 22 10 39 00 78.9000 11.8600 475.00 209065 ZEP 2005 11 03 07 55 00 2966-99 P co2 CCGG 379.900 -999.990 ... L3 2005 11 22 10 53 00 78.9000 11.8600 475.00 209066 ZEP 2005 11 10 08 30 00 6229-66 P co2 CCGG 381.040 -999.990 ... L3 2005 11 29 14 43 00 78.9000 11.8600 475.00 209601 ZEP 2005 11 10 08 30 00 6230-66 P co2 CCGG 381.040 -999.990 ... L3 2005 11 29 14 57 00 78.9000 11.8600 475.00 209602 ZEP 2005 11 17 09 46 00 909-99 P co2 CCGG 386.400 -999.990 .X. L3 2005 11 29 14 14 00 78.9000 11.8600 475.00 209599 ZEP 2005 11 17 09 46 00 910-99 P co2 CCGG 386.420 -999.990 .X. L3 2005 11 29 14 29 00 78.9000 11.8600 475.00 209600 ZEP 2005 11 24 08 23 00 4195-99 P co2 CCGG 388.760 -999.990 .X. L3 2005 12 19 16 37 00 78.9000 11.8600 475.00 210306 ZEP 2005 11 24 08 23 00 4196-99 P co2 CCGG 388.750 -999.990 .X. L3 2005 12 19 16 52 00 78.9000 11.8600 475.00 210307 ZEP 2005 12 01 08 35 00 743-91 P co2 CCGG 384.680 -999.990 ... L3 2005 12 19 17 06 00 78.9000 11.8600 475.00 210308 ZEP 2005 12 01 08 35 00 744-91 P co2 CCGG 384.570 -999.990 ... L3 2005 12 19 17 20 00 78.9000 11.8600 475.00 210309 ZEP 2005 12 08 08 05 00 305-99 P co2 CCGG 384.650 -999.990 ... L3 2006 02 06 18 02 00 78.9000 11.8600 475.00 212363 ZEP 2005 12 08 08 05 00 306-99 P co2 CCGG 384.630 -999.990 ... L3 2006 02 06 18 16 00 78.9000 11.8600 475.00 212364 ZEP 2005 12 15 07 55 00 1423-99 P co2 CCGG 388.730 -999.990 .X. L3 2006 01 23 15 58 00 78.9000 11.8600 475.00 211584 ZEP 2005 12 15 07 55 00 1424-99 P co2 CCGG 388.690 -999.990 .X. L3 2006 01 23 16 12 00 78.9000 11.8600 475.00 211585 ZEP 2005 12 22 14 12 00 599-99 P co2 CCGG 385.300 -999.990 ... L3 2006 01 23 14 32 00 78.9000 11.8600 475.00 211578 ZEP 2005 12 22 14 12 00 600-99 P co2 CCGG 385.300 -999.990 ... L3 2006 01 23 14 46 00 78.9000 11.8600 475.00 211579 ZEP 2005 12 29 07 15 00 1125-99 P co2 CCGG 384.110 -999.990 ... L3 2006 01 23 15 01 00 78.9000 11.8600 475.00 211580 ZEP 2005 12 29 07 15 00 1126-99 P co2 CCGG 384.080 -999.990 ... L3 2006 01 23 15 15 00 78.9000 11.8600 475.00 211581 ZEP 2006 01 05 09 19 00 3569-99 P co2 CCGG 383.260 -999.990 ... L3 2006 02 06 14 14 00 78.9000 11.8600 475.00 212041 ZEP 2006 01 05 09 19 00 3570-99 P co2 CCGG 383.270 -999.990 ... L3 2006 02 06 14 28 00 78.9000 11.8600 475.00 212042 ZEP 2006 01 12 07 55 00 733-91 P co2 CCGG 384.270 -999.990 ... L3 2006 02 06 13 46 00 78.9000 11.8600 475.00 212039 ZEP 2006 01 12 07 55 00 734-91 P co2 CCGG 384.320 -999.990 ... L3 2006 02 06 14 00 00 78.9000 11.8600 475.00 212040 ZEP 2006 01 19 09 35 00 4103-99 P co2 CCGG 389.510 -999.990 .X. L3 2006 02 06 17 33 00 78.9000 11.8600 475.00 212361 ZEP 2006 01 19 09 35 00 4104-99 P co2 CCGG 389.440 -999.990 .X. L3 2006 02 06 17 48 00 78.9000 11.8600 475.00 212362 ZEP 2006 01 26 08 01 00 2183-99 P co2 CCGG 384.990 -999.990 ... L3 2006 02 17 15 00 00 78.9000 11.8600 475.00 213046 ZEP 2006 01 26 08 01 00 2184-99 P co2 CCGG 384.950 -999.990 ... L3 2006 02 17 15 14 00 78.9000 11.8600 475.00 213047 ZEP 2006 02 02 08 04 00 175-99 P co2 CCGG 389.860 -999.990 .X. L3 2006 02 17 15 28 00 78.9000 11.8600 475.00 213044 ZEP 2006 02 02 08 04 00 176-99 P co2 CCGG 389.910 -999.990 .X. L3 2006 02 17 15 42 00 78.9000 11.8600 475.00 213045 ZEP 2006 02 09 08 10 00 773-99 P co2 CCGG 332.400 -999.990 N.. L3 2006 03 02 09 09 00 78.9000 11.8600 475.00 213476 ZEP 2006 02 09 08 10 00 793-91 P co2 CCGG 385.330 -999.990 +.. L3 2006 03 02 08 55 00 78.9000 11.8600 475.00 213475 ZEP 2006 02 16 09 07 00 774-99 P co2 CCGG 385.840 -999.990 ... L3 2006 03 02 10 20 00 78.9000 11.8600 475.00 213473 ZEP 2006 02 16 09 07 00 794-91 P co2 CCGG 385.790 -999.990 ... L3 2006 03 02 10 34 00 78.9000 11.8600 475.00 213474 ZEP 2006 02 23 07 59 00 765-99 P co2 CCGG 385.660 -999.990 ... L3 2006 03 28 16 07 00 78.9000 11.8600 475.00 214430 ZEP 2006 02 23 07 59 00 766-99 P co2 CCGG 385.710 -999.990 ... L3 2006 03 28 16 21 00 78.9000 11.8600 475.00 214431 ZEP 2006 03 02 08 27 00 2155-99 P co2 CCGG 386.710 -999.990 ... L3 2006 03 22 14 40 00 78.9000 11.8600 475.00 214186 ZEP 2006 03 02 08 27 00 2156-99 P co2 CCGG 386.690 -999.990 ... L3 2006 03 22 14 54 00 78.9000 11.8600 475.00 214187 ZEP 2006 03 09 08 12 00 3185-99 P co2 CCGG 386.540 -999.990 -.. L3 2006 03 22 15 08 00 78.9000 11.8600 475.00 214184 ZEP 2006 03 09 08 12 00 3186-99 P co2 CCGG 389.280 -999.990 +.. L3 2006 03 22 15 22 00 78.9000 11.8600 475.00 214185 ZEP 2006 03 16 09 55 00 473-99 P co2 CCGG 387.480 -999.990 ... L3 2006 03 28 16 35 00 78.9000 11.8600 475.00 214428 ZEP 2006 03 16 09 55 00 474-99 P co2 CCGG 387.490 -999.990 ... L3 2006 03 28 16 49 00 78.9000 11.8600 475.00 214429 ZEP 2006 03 23 08 55 00 3917-99 P co2 CCGG 387.380 -999.990 ... L3 2006 04 14 09 53 00 78.9000 11.8600 475.00 215338 ZEP 2006 03 23 08 55 00 3918-99 P co2 CCGG 387.370 -999.990 ... L3 2006 04 14 10 07 00 78.9000 11.8600 475.00 215339 ZEP 2006 03 30 07 55 00 693-99 P co2 CCGG 387.000 -999.990 ... L3 2006 04 14 09 25 00 78.9000 11.8600 475.00 215336 ZEP 2006 03 30 07 55 00 694-99 P co2 CCGG 387.040 -999.990 ... L3 2006 04 14 09 39 00 78.9000 11.8600 475.00 215337 ZEP 2006 04 07 09 20 00 4617-99 P co2 CCGG 387.730 -999.990 ... L3 2006 05 05 12 33 00 78.9000 11.8600 475.00 216127 ZEP 2006 04 07 09 20 00 4618-99 P co2 CCGG 387.750 -999.990 ... L3 2006 05 05 12 48 00 78.9000 11.8600 475.00 216128 ZEP 2006 04 13 09 15 00 6389-66 P co2 CCGG 389.460 -999.990 ... L3 2006 05 05 13 02 00 78.9000 11.8600 475.00 216125 ZEP 2006 04 13 09 15 00 6390-66 P co2 CCGG 389.530 -999.990 ... L3 2006 05 05 13 16 00 78.9000 11.8600 475.00 216126 ZEP 2006 04 20 06 45 00 291-99 P co2 CCGG 388.000 -999.990 ... L3 2006 06 01 09 53 00 78.9000 11.8600 475.00 217183 ZEP 2006 04 20 06 45 00 292-99 P co2 CCGG 388.000 -999.990 ... L3 2006 06 01 10 07 00 78.9000 11.8600 475.00 217184 ZEP 2006 04 27 09 04 00 1803-99 P co2 CCGG 387.600 -999.990 ... L3 2006 05 26 10 30 00 78.9000 11.8600 475.00 216999 ZEP 2006 04 27 09 04 00 1804-99 P co2 CCGG 387.610 -999.990 ... L3 2006 05 26 10 45 00 78.9000 11.8600 475.00 217000 ZEP 2006 05 04 07 18 00 733-91 P co2 CCGG 387.990 -999.990 ... L3 2006 05 26 10 59 00 78.9000 11.8600 475.00 217001 ZEP 2006 05 04 07 18 00 734-91 P co2 CCGG 387.970 -999.990 ... L3 2006 05 26 11 13 00 78.9000 11.8600 475.00 217002 ZEP 2006 05 11 06 52 00 743-91 P co2 CCGG 387.520 -999.990 ... L3 2006 06 01 09 24 00 78.9000 11.8600 475.00 217185 ZEP 2006 05 11 06 52 00 744-91 P co2 CCGG 387.580 -999.990 ... L3 2006 06 01 09 39 00 78.9000 11.8600 475.00 217186 ZEP 2006 05 18 09 07 00 1317-99 P co2 CCGG 387.920 -999.990 ... L3 2006 07 13 16 29 00 78.9000 11.8600 475.00 218841 ZEP 2006 05 24 06 59 00 2947-99 P co2 CCGG 387.530 -999.990 ... L3 2006 06 30 11 47 00 78.9000 11.8600 475.00 218545 ZEP 2006 05 24 06 59 00 2948-99 P co2 CCGG 387.470 -999.990 ... L3 2006 06 30 12 01 00 78.9000 11.8600 475.00 218546 ZEP 2006 06 01 08 27 00 407-99 P co2 CCGG 387.790 -999.990 ... L3 2006 06 30 12 16 00 78.9000 11.8600 475.00 218543 ZEP 2006 06 01 08 27 00 408-99 P co2 CCGG 387.800 -999.990 ... L3 2006 06 30 12 30 00 78.9000 11.8600 475.00 218544 ZEP 2006 06 08 12 34 56 245-99 P co2 CCGG 384.980 -999.990 ... L3 2006 07 13 16 43 00 78.9000 11.8600 475.00 218839 ZEP 2006 06 08 12 34 56 246-99 P co2 CCGG 385.110 -999.990 ... L3 2006 07 13 16 57 00 78.9000 11.8600 475.00 218840 ZEP 2006 06 15 06 58 00 3293-99 P co2 CCGG 386.750 -999.990 ... L3 2006 07 17 10 51 00 78.9000 11.8600 475.00 219010 ZEP 2006 06 15 06 58 00 3294-99 P co2 CCGG 386.800 -999.990 ... L3 2006 07 17 11 05 00 78.9000 11.8600 475.00 219011 ZEP 2006 06 20 13 00 00 3631-99 P co2 CCGG 384.510 -999.990 ... L3 2006 07 17 10 22 00 78.9000 11.8600 475.00 219008 ZEP 2006 06 20 13 00 00 3632-99 P co2 CCGG 384.450 -999.990 ... L3 2006 07 17 10 37 00 78.9000 11.8600 475.00 219009 ZEP 2006 06 22 08 29 00 3915-99 P co2 CCGG 384.840 -999.990 ... L3 2006 07 27 10 23 00 78.9000 11.8600 475.00 219685 ZEP 2006 06 22 08 29 00 3916-99 P co2 CCGG 384.790 -999.990 ... L3 2006 07 27 10 37 00 78.9000 11.8600 475.00 219686 ZEP 2006 07 02 12 26 00 1999-99 P co2 CCGG 382.440 -999.990 ... L3 2006 07 27 10 52 00 78.9000 11.8600 475.00 219687 ZEP 2006 07 02 12 26 00 2000-99 P co2 CCGG 382.280 -999.990 ... L3 2006 07 27 11 06 00 78.9000 11.8600 475.00 219688 ZEP 2006 07 07 09 18 00 783-91 P co2 CCGG 381.410 -999.990 ... L3 2006 08 11 14 59 00 78.9000 11.8600 475.00 220421 ZEP 2006 07 07 09 18 00 784-91 P co2 CCGG 381.430 -999.990 ... L3 2006 08 11 15 13 00 78.9000 11.8600 475.00 220422 ZEP 2006 07 13 07 22 00 112-99 P co2 CCGG 379.400 -999.990 ... L3 2006 08 23 12 01 00 78.9000 11.8600 475.00 220749 ZEP 2006 07 21 07 33 00 811-91 P co2 CCGG 378.600 -999.990 ... L3 2006 08 11 15 27 00 78.9000 11.8600 475.00 220423 ZEP 2006 07 21 07 33 00 812-91 P co2 CCGG 378.630 -999.990 ... L3 2006 08 11 15 42 00 78.9000 11.8600 475.00 220424 ZEP 2006 07 30 10 21 00 1763-99 P co2 CCGG 376.720 -999.990 ... L3 2006 08 22 11 26 00 78.9000 11.8600 475.00 220750 ZEP 2006 07 30 10 21 00 1764-99 P co2 CCGG 376.720 -999.990 ... L3 2006 08 22 11 41 00 78.9000 11.8600 475.00 220751 ZEP 2006 08 03 08 36 00 557-99 P co2 CCGG 375.410 -999.990 ... L3 2006 09 01 10 01 00 78.9000 11.8600 475.00 221363 ZEP 2006 08 03 08 36 00 558-99 P co2 CCGG 375.420 -999.990 ... L3 2006 09 01 10 15 00 78.9000 11.8600 475.00 221364 ZEP 2006 08 11 07 40 00 3443-99 P co2 CCGG 374.560 -999.990 ... L3 2006 09 01 09 32 00 78.9000 11.8600 475.00 221365 ZEP 2006 08 11 07 40 00 3444-99 P co2 CCGG 374.620 -999.990 ... L3 2006 09 01 09 46 00 78.9000 11.8600 475.00 221366 ZEP 2006 08 17 07 35 00 1105-99 P co2 CCGG 373.690 -999.990 ... L3 2006 09 13 10 01 00 78.9000 11.8600 475.00 222073 ZEP 2006 08 17 07 35 00 1106-99 P co2 CCGG 373.800 -999.990 ... L3 2006 09 13 10 15 00 78.9000 11.8600 475.00 222074 ZEP 2006 08 24 08 32 00 3907-99 P co2 CCGG 372.480 -999.990 ... L3 2006 09 13 09 32 00 78.9000 11.8600 475.00 222071 ZEP 2006 08 24 08 32 00 3908-99 P co2 CCGG 372.670 -999.990 ... L3 2006 09 13 09 46 00 78.9000 11.8600 475.00 222072 ZEP 2006 08 31 07 27 00 117-99 P co2 CCGG 372.620 -999.990 ... L3 2006 10 17 14 56 00 78.9000 11.8600 475.00 223450 ZEP 2006 08 31 07 27 00 118-99 P co2 CCGG 372.650 -999.990 ... L3 2006 10 17 15 10 00 78.9000 11.8600 475.00 223451 ZEP 2006 09 07 07 28 00 3155-99 P co2 CCGG 372.260 -999.990 ... L3 2006 10 17 13 38 00 78.9000 11.8600 475.00 223448 ZEP 2006 09 07 07 28 00 3156-99 P co2 CCGG 372.220 -999.990 ... L3 2006 10 17 13 52 00 78.9000 11.8600 475.00 223449 ZEP 2006 09 14 08 44 00 733-91 P co2 CCGG 372.490 -999.990 ... L3 2006 10 16 08 59 00 78.9000 11.8600 475.00 223434 ZEP 2006 09 14 08 44 00 734-91 P co2 CCGG 372.660 -999.990 ... L3 2006 10 16 09 14 00 78.9000 11.8600 475.00 223435 ZEP 2006 09 21 07 49 00 4301-99 P co2 CCGG 375.080 -999.990 ... L3 2006 10 16 09 28 00 78.9000 11.8600 475.00 223432 ZEP 2006 09 21 07 49 00 4302-99 P co2 CCGG 375.100 -999.990 ... L3 2006 10 16 09 42 00 78.9000 11.8600 475.00 223433 ZEP 2006 09 28 07 50 00 1459-99 P co2 CCGG 376.120 -999.990 ... L3 2006 10 30 12 10 00 78.9000 11.8600 475.00 224033 ZEP 2006 09 28 07 50 00 1460-99 P co2 CCGG 376.260 -999.990 ... L3 2006 10 30 12 24 00 78.9000 11.8600 475.00 224034 ZEP 2006 10 06 08 10 00 793-91 P co2 CCGG 377.850 -999.990 ... L3 2006 10 30 11 41 00 78.9000 11.8600 475.00 224031 ZEP 2006 10 06 08 10 00 794-91 P co2 CCGG 377.790 -999.990 ... L3 2006 10 30 11 56 00 78.9000 11.8600 475.00 224032 ZEP 2006 10 15 09 45 00 4023-99 P co2 CCGG 378.330 -999.990 ... L3 2006 11 09 09 50 00 78.9000 11.8600 475.00 224503 ZEP 2006 10 15 09 45 00 4024-99 P co2 CCGG 378.360 -999.990 ... L3 2006 11 09 10 04 00 78.9000 11.8600 475.00 224504 ZEP 2006 10 19 07 00 00 743-91 P co2 CCGG 380.280 -999.990 ... L3 2006 11 08 14 35 00 78.9000 11.8600 475.00 224501 ZEP 2006 10 19 07 00 00 744-91 P co2 CCGG 380.240 -999.990 ... L3 2006 11 08 14 49 00 78.9000 11.8600 475.00 224502 ZEP 2006 10 24 10 13 00 791-91 P co2 CCGG 386.060 -999.990 .X. L3 2007 01 03 12 12 00 78.9000 11.8600 475.00 226486 ZEP 2006 10 24 10 13 00 792-91 P co2 CCGG 386.130 -999.990 .X. L3 2007 01 03 12 26 00 78.9000 11.8600 475.00 226487 ZEP 2006 10 26 07 15 00 1155-99 P co2 CCGG 380.920 -999.990 ... L3 2006 11 28 13 58 00 78.9000 11.8600 475.00 225343 ZEP 2006 10 26 07 15 00 1156-99 P co2 CCGG 380.970 -999.990 ... L3 2006 11 28 14 12 00 78.9000 11.8600 475.00 225344 ZEP 2006 11 02 08 05 00 3327-99 P co2 CCGG 382.950 -999.990 ... L3 2006 11 28 14 26 00 78.9000 11.8600 475.00 225341 ZEP 2006 11 02 08 05 00 3328-99 P co2 CCGG 382.950 -999.990 ... L3 2006 11 28 14 40 00 78.9000 11.8600 475.00 225342 ZEP 2006 11 09 08 00 00 2841-99 P co2 CCGG 382.280 -999.990 ... L3 2006 12 06 10 51 00 78.9000 11.8600 475.00 225783 ZEP 2006 11 09 08 00 00 2842-99 P co2 CCGG 382.300 -999.990 ... L3 2006 12 06 11 05 00 78.9000 11.8600 475.00 225784 ZEP 2006 11 16 17 50 00 141-99 P co2 CCGG 387.640 -999.990 ... L3 2006 12 06 10 22 00 78.9000 11.8600 475.00 225781 ZEP 2006 11 16 17 50 00 142-99 P co2 CCGG 387.640 -999.990 ... L3 2006 12 06 10 36 00 78.9000 11.8600 475.00 225782 ZEP 2006 11 30 08 35 00 803-91 P co2 CCGG 391.060 -999.990 .X. L3 2007 01 03 12 40 00 78.9000 11.8600 475.00 226484 ZEP 2006 11 30 08 35 00 804-91 P co2 CCGG 391.020 -999.990 .X. L3 2007 01 03 12 54 00 78.9000 11.8600 475.00 226485 ZEP 2006 12 07 13 00 00 2777-99 P co2 CCGG 387.800 -999.990 ... L3 2007 01 30 17 59 00 78.9000 11.8600 475.00 227668 ZEP 2006 12 07 13 00 00 2778-99 P co2 CCGG 387.780 -999.990 ... L3 2007 01 30 18 13 00 78.9000 11.8600 475.00 227669 ZEP 2006 12 16 11 02 00 613-99 P co2 CCGG 392.640 -999.990 .X. L3 2007 01 30 18 27 00 78.9000 11.8600 475.00 227670 ZEP 2006 12 16 11 02 00 614-99 P co2 CCGG 392.620 -999.990 .X. L3 2007 01 30 18 41 00 78.9000 11.8600 475.00 227671 ZEP 2006 12 21 08 00 00 2317-99 P co2 CCGG 387.080 -999.990 ... L3 2007 02 23 12 33 00 78.9000 11.8600 475.00 229444 ZEP 2006 12 21 08 00 00 2318-99 P co2 CCGG 387.050 -999.990 ... L3 2007 02 23 12 47 00 78.9000 11.8600 475.00 229445 ZEP 2006 12 28 07 53 00 2815-99 P co2 CCGG 387.070 -999.990 ... L3 2007 02 23 12 05 00 78.9000 11.8600 475.00 229442 ZEP 2006 12 28 07 53 00 2816-99 P co2 CCGG 387.030 -999.990 ... L3 2007 02 23 12 19 00 78.9000 11.8600 475.00 229443 ZEP 2007 01 05 09 36 00 3563-99 P co2 CCGG 388.370 -999.990 ... L3 2007 02 26 09 37 00 78.9000 11.8600 475.00 229446 ZEP 2007 01 05 09 36 00 3564-99 P co2 CCGG 388.420 -999.990 ... L3 2007 02 26 09 51 00 78.9000 11.8600 475.00 229447 ZEP 2007 01 12 08 00 00 3193-99 P co2 CCGG 389.050 -999.990 ... L3 2007 02 26 11 02 00 78.9000 11.8600 475.00 229448 ZEP 2007 01 12 08 00 00 3194-99 P co2 CCGG 388.970 -999.990 ... L3 2007 02 26 11 16 00 78.9000 11.8600 475.00 229449 ZEP 2007 01 18 08 09 00 793-91 P co2 CCGG 388.310 -999.990 ... L3 2007 02 26 12 31 00 78.9000 11.8600 475.00 229452 ZEP 2007 01 18 08 09 00 794-91 P co2 CCGG 388.290 -999.990 ... L3 2007 02 26 12 45 00 78.9000 11.8600 475.00 229453 ZEP 2007 01 25 08 09 00 733-91 P co2 CCGG 387.330 -999.990 ... L3 2007 02 26 12 59 00 78.9000 11.8600 475.00 229450 ZEP 2007 01 25 08 09 00 734-91 P co2 CCGG 387.310 -999.990 ... L3 2007 02 26 13 14 00 78.9000 11.8600 475.00 229451 ZEP 2007 02 01 09 35 00 811-91 P co2 CCGG 389.280 -999.990 ... L3 2007 03 09 14 53 00 78.9000 11.8600 475.00 230249 ZEP 2007 02 01 09 35 00 812-91 P co2 CCGG 389.320 -999.990 ... L3 2007 03 09 15 07 00 78.9000 11.8600 475.00 230250 ZEP 2007 02 08 12 34 56 783-91 P co2 CCGG 389.410 -999.990 ... L3 2007 03 12 10 24 00 78.9000 11.8600 475.00 230247 ZEP 2007 02 08 12 34 56 784-91 P co2 CCGG 389.480 -999.990 ... L3 2007 03 12 10 39 00 78.9000 11.8600 475.00 230248 ZEP 2007 02 15 08 17 00 3135-99 P co2 CCGG 387.470 -999.990 ... L3 2007 03 21 16 00 00 78.9000 11.8600 475.00 230985 ZEP 2007 02 15 08 17 00 3136-99 P co2 CCGG 387.420 -999.990 ... L3 2007 03 21 16 14 00 78.9000 11.8600 475.00 230986 ZEP 2007 02 23 07 53 00 2585-99 P co2 CCGG 387.540 -999.990 ... L3 2007 03 21 15 31 00 78.9000 11.8600 475.00 230983 ZEP 2007 02 23 07 53 00 2586-99 P co2 CCGG 387.690 -999.990 ... L3 2007 03 21 15 46 00 78.9000 11.8600 475.00 230984 ZEP 2007 03 01 09 20 00 743-91 P co2 CCGG 388.610 -999.990 ... L3 2007 04 06 14 22 00 78.9000 11.8600 475.00 231728 ZEP 2007 03 01 09 20 00 744-91 P co2 CCGG 388.620 -999.990 ... L3 2007 04 06 14 36 00 78.9000 11.8600 475.00 231729 ZEP 2007 03 09 08 59 00 3581-99 P co2 CCGG 389.600 -999.990 ... L3 2007 04 06 14 51 00 78.9000 11.8600 475.00 231726 ZEP 2007 03 09 08 59 00 3582-99 P co2 CCGG 389.640 -999.990 ... L3 2007 04 06 15 05 00 78.9000 11.8600 475.00 231727 ZEP 2007 03 16 09 05 00 2395-99 P co2 CCGG 389.060 -999.990 ... L3 2007 04 23 12 12 00 78.9000 11.8600 475.00 232575 ZEP 2007 03 16 09 05 00 2396-99 P co2 CCGG 388.980 -999.990 ... L3 2007 04 23 12 27 00 78.9000 11.8600 475.00 232576 ZEP 2007 03 22 08 00 00 6571-66 P co2 CCGG 388.850 -999.990 ... L3 2007 04 23 11 44 00 78.9000 11.8600 475.00 232577 ZEP 2007 03 22 08 00 00 6572-66 P co2 CCGG 389.000 -999.990 ... L3 2007 04 23 11 58 00 78.9000 11.8600 475.00 232578 ZEP 2007 03 30 12 15 00 3271-99 P co2 CCGG 389.340 -999.990 ... L3 2007 04 30 16 43 00 78.9000 11.8600 475.00 233128 ZEP 2007 03 30 12 15 00 3272-99 P co2 CCGG 389.370 -999.990 ... L3 2007 04 30 16 57 00 78.9000 11.8600 475.00 233129 ZEP 2007 04 05 07 15 00 125-99 P co2 CCGG 390.250 -999.990 ... L3 2007 04 30 16 14 00 78.9000 11.8600 475.00 233126 ZEP 2007 04 05 07 15 00 126-99 P co2 CCGG 390.130 -999.990 ... L3 2007 04 30 16 28 00 78.9000 11.8600 475.00 233127 ZEP 2007 04 12 07 32 00 6061-66 P co2 CCGG 389.810 -999.990 ... L3 2007 05 16 14 27 00 78.9000 11.8600 475.00 233999 ZEP 2007 04 12 07 32 00 6062-66 P co2 CCGG 390.040 -999.990 ... L3 2007 05 16 14 42 00 78.9000 11.8600 475.00 234000 ZEP 2007 04 20 08 12 00 1138-99 P co2 CCGG 389.750 -999.990 ... L3 2007 05 17 11 08 00 78.9000 11.8600 475.00 233985 ZEP 2007 04 27 07 24 00 803-91 P co2 CCGG 389.710 -999.990 ... L3 2007 07 12 12 46 00 78.9000 11.8600 475.00 238177 ZEP 2007 04 27 07 24 00 804-91 P co2 CCGG 389.610 -999.990 ... L3 2007 07 12 13 01 00 78.9000 11.8600 475.00 238178 ZEP 2007 05 04 07 38 00 911-99 P co2 CCGG 389.370 -999.990 ... L3 2007 07 12 13 15 00 78.9000 11.8600 475.00 238179 ZEP 2007 05 04 07 38 00 912-99 P co2 CCGG 389.400 -999.990 ... L3 2007 07 12 13 29 00 78.9000 11.8600 475.00 238180 ZEP 2007 05 17 07 18 00 4675-99 P co2 CCGG 388.230 -999.990 ... L3 2007 07 17 14 43 00 78.9000 11.8600 475.00 238167 ZEP 2007 05 17 07 18 00 4676-99 P co2 CCGG 388.330 -999.990 ... L3 2007 07 17 14 57 00 78.9000 11.8600 475.00 238168 ZEP 2007 05 24 07 54 00 791-91 P co2 CCGG 387.490 -999.990 ... L3 2007 07 17 14 14 00 78.9000 11.8600 475.00 238165 ZEP 2007 05 24 07 54 00 792-91 P co2 CCGG 387.550 -999.990 ... L3 2007 07 17 14 28 00 78.9000 11.8600 475.00 238166 ZEP 2007 06 01 07 20 00 4077-99 P co2 CCGG 386.670 -999.990 ... L3 2007 07 12 11 49 00 78.9000 11.8600 475.00 238173 ZEP 2007 06 01 07 20 00 4077-99 P co2 CCGG 386.670 -999.990 ... L3 2007 07 12 13 47 00 78.9000 11.8600 475.00 238173 ZEP 2007 06 01 07 20 00 4078-99 P co2 CCGG 386.580 -999.990 ... L3 2007 07 12 12 04 00 78.9000 11.8600 475.00 238174 ZEP 2007 06 01 07 20 00 4078-99 P co2 CCGG 386.560 -999.990 ... L3 2007 07 12 14 01 00 78.9000 11.8600 475.00 238174 ZEP 2007 06 07 06 50 00 2019-99 P co2 CCGG 386.780 -999.990 ... L3 2007 07 12 12 18 00 78.9000 11.8600 475.00 238175 ZEP 2007 06 07 06 50 00 2019-99 P co2 CCGG 386.880 -999.990 ... L3 2007 07 12 14 15 00 78.9000 11.8600 475.00 238175 ZEP 2007 06 07 06 50 00 2020-99 P co2 CCGG 386.630 -999.990 ... L3 2007 07 12 12 32 00 78.9000 11.8600 475.00 238176 ZEP 2007 06 07 06 50 00 2020-99 P co2 CCGG 386.650 -999.990 ... L3 2007 07 12 14 29 00 78.9000 11.8600 475.00 238176 ZEP 2007 06 14 07 00 00 1757-99 P co2 CCGG 387.290 -999.990 ... L3 2007 07 17 15 39 00 78.9000 11.8600 475.00 238169 ZEP 2007 06 14 07 00 00 1758-99 P co2 CCGG 387.220 -999.990 ... L3 2007 07 17 15 54 00 78.9000 11.8600 475.00 238170 ZEP 2007 06 21 07 08 00 6413-66 P co2 CCGG 385.370 -999.990 ... L3 2007 07 17 15 11 00 78.9000 11.8600 475.00 238171 ZEP 2007 06 21 07 08 00 6414-66 P co2 CCGG 385.230 -999.990 ... L3 2007 07 17 15 25 00 78.9000 11.8600 475.00 238172 ZEP 2007 06 29 09 29 00 811-91 P co2 CCGG 383.320 -999.990 ... L3 2007 07 25 11 56 00 78.9000 11.8600 475.00 238667 ZEP 2007 06 29 09 29 00 812-91 P co2 CCGG 383.340 -999.990 ... L3 2007 07 25 12 10 00 78.9000 11.8600 475.00 238668 ZEP 2007 07 05 08 00 00 783-91 P co2 CCGG 382.300 -999.990 ... L3 2007 07 25 11 27 00 78.9000 11.8600 475.00 238665 ZEP 2007 07 05 08 00 00 784-91 P co2 CCGG 382.250 -999.990 ... L3 2007 07 25 11 41 00 78.9000 11.8600 475.00 238666 ZEP 2007 07 12 07 50 00 573-99 P co2 CCGG 380.120 -999.990 ... L3 2007 08 03 14 37 00 78.9000 11.8600 475.00 239424 ZEP 2007 07 12 07 50 00 574-99 P co2 CCGG 380.100 -999.990 ... L3 2007 08 03 14 52 00 78.9000 11.8600 475.00 239425 ZEP 2007 07 19 07 35 00 1293-99 P co2 CCGG 379.720 -999.990 ... L3 2007 08 03 14 09 00 78.9000 11.8600 475.00 239422 ZEP 2007 07 19 07 35 00 1294-99 P co2 CCGG 379.360 -999.990 ... L3 2007 08 03 14 23 00 78.9000 11.8600 475.00 239423 ZEP 2007 07 26 12 34 56 175-99 P co2 CCGG 375.250 -999.990 ... L3 2007 08 24 13 47 00 78.9000 11.8600 475.00 240462 ZEP 2007 07 26 12 34 56 176-99 P co2 CCGG 375.220 -999.990 ... L3 2007 08 24 14 02 00 78.9000 11.8600 475.00 240463 ZEP 2007 08 02 07 40 00 4653-99 P co2 CCGG 373.250 -999.990 ... L3 2007 08 24 14 16 00 78.9000 11.8600 475.00 240465 ZEP 2007 08 02 07 40 00 4654-99 P co2 CCGG 373.290 -999.990 ... L3 2007 08 24 14 30 00 78.9000 11.8600 475.00 240466 ZEP 2007 08 09 07 30 00 3243-99 P co2 CCGG 373.330 -999.990 ... L3 2007 09 06 11 25 00 78.9000 11.8600 475.00 240845 ZEP 2007 08 09 07 30 00 3244-99 P co2 CCGG 373.280 -999.990 ... L3 2007 09 06 11 40 00 78.9000 11.8600 475.00 240846 ZEP 2007 08 16 07 20 00 6035-66 P co2 CCGG 371.380 -999.990 ... L3 2007 09 06 10 57 00 78.9000 11.8600 475.00 240843 ZEP 2007 08 16 07 20 00 6036-66 P co2 CCGG 371.360 -999.990 ... L3 2007 09 06 11 11 00 78.9000 11.8600 475.00 240844 ZEP 2007 08 23 07 22 00 733-91 P co2 CCGG 371.800 -999.990 ... L3 2007 09 17 17 36 00 78.9000 11.8600 475.00 241503 ZEP 2007 08 23 07 22 00 734-91 P co2 CCGG 371.860 -999.990 ... L3 2007 09 17 17 51 00 78.9000 11.8600 475.00 241504 ZEP 2007 08 31 08 40 00 3631-99 P co2 CCGG 372.500 -999.990 ... L3 2007 09 18 11 03 00 78.9000 11.8600 475.00 241505 ZEP 2007 08 31 08 40 00 3632-99 P co2 CCGG 372.610 -999.990 ... L3 2007 09 18 10 49 00 78.9000 11.8600 475.00 241506 ZEP 2007 09 06 07 48 00 2689-99 P co2 CCGG 375.050 -999.990 ... L3 2007 10 10 13 05 00 78.9000 11.8600 475.00 242947 ZEP 2007 09 06 07 48 00 2690-99 P co2 CCGG 374.870 -999.990 ... L3 2007 10 10 13 20 00 78.9000 11.8600 475.00 242948 ZEP 2007 09 13 09 30 00 744-91 P co2 CCGG 373.710 -999.990 ... L3 2007 10 10 12 37 00 78.9000 11.8600 475.00 242945 ZEP 2007 09 13 09 30 00 794-91 P co2 CCGG 373.780 -999.990 ... L3 2007 10 10 12 51 00 78.9000 11.8600 475.00 242946 ZEP 2007 09 20 07 43 00 3909-99 P co2 CCGG 377.070 -999.990 ... L3 2007 10 15 12 02 00 78.9000 11.8600 475.00 243183 ZEP 2007 09 20 07 43 00 3910-99 P co2 CCGG 377.140 -999.990 ... L3 2007 10 15 12 16 00 78.9000 11.8600 475.00 243184 ZEP 2007 09 27 06 38 00 339-99 P co2 CCGG 376.930 -999.990 ... L3 2007 10 15 12 30 00 78.9000 11.8600 475.00 243181 ZEP 2007 09 27 06 38 00 340-99 P co2 CCGG 377.010 -999.990 ... L3 2007 10 15 12 45 00 78.9000 11.8600 475.00 243182 ZEP 2007 10 04 07 18 00 1379-99 P co2 CCGG 378.040 -999.990 ... L3 2007 10 26 09 39 00 78.9000 11.8600 475.00 243833 ZEP 2007 10 04 07 18 00 1380-99 P co2 CCGG 377.760 -999.990 ... L3 2007 10 26 09 53 00 78.9000 11.8600 475.00 243834 ZEP 2007 10 11 07 16 00 4173-99 P co2 CCGG 379.240 -999.990 ... L3 2007 10 26 09 11 00 78.9000 11.8600 475.00 243831 ZEP 2007 10 11 07 16 00 4174-99 P co2 CCGG 379.300 -999.990 ... L3 2007 10 26 09 25 00 78.9000 11.8600 475.00 243832 ZEP 2007 10 18 07 20 00 2633-99 P co2 CCGG 381.610 -999.990 ... L3 2007 11 09 12 00 00 78.9000 11.8600 475.00 244625 ZEP 2007 10 18 07 20 00 2634-99 P co2 CCGG 381.510 -999.990 ... L3 2007 11 09 12 14 00 78.9000 11.8600 475.00 244626 ZEP 2007 10 25 07 55 00 2719-99 P co2 CCGG 381.370 -999.990 ... L3 2007 11 09 11 32 00 78.9000 11.8600 475.00 244623 ZEP 2007 10 25 07 55 00 2720-99 P co2 CCGG 381.370 -999.990 ... L3 2007 11 09 11 46 00 78.9000 11.8600 475.00 244624 ZEP 2007 11 01 07 55 00 4698-99 P co2 CCGG 384.180 -999.990 ... L3 2007 11 30 15 54 00 78.9000 11.8600 475.00 245526 ZEP 2007 11 08 08 10 00 783-91 P co2 CCGG 384.320 -999.990 ... L3 2007 11 30 16 08 00 78.9000 11.8600 475.00 245524 ZEP 2007 11 08 08 10 00 784-91 P co2 CCGG 384.320 -999.990 ... L3 2007 11 30 16 22 00 78.9000 11.8600 475.00 245525 ZEP 2007 11 29 08 45 00 733-91 P co2 CCGG 389.080 -999.990 ... L3 2008 01 08 15 16 00 78.9000 11.8600 475.00 247235 ZEP 2007 11 29 08 45 00 734-91 P co2 CCGG 389.060 -999.990 ... L3 2008 01 08 15 30 00 78.9000 11.8600 475.00 247236 ZEP 2007 12 06 08 10 00 4283-99 P co2 CCGG 387.920 -999.990 ... L3 2008 01 08 15 44 00 78.9000 11.8600 475.00 247234 ZEP 2007 12 06 08 30 00 811-91 P co2 CCGG 391.920 -999.990 +.. L8 2008 01 28 13 17 00 78.9000 11.8700 475.00 248507 ZEP 2007 12 06 08 30 00 812-91 P co2 CCGG 388.630 -999.990 -.. L8 2008 01 28 13 32 00 78.9000 11.8700 475.00 248508 ZEP 2007 12 13 08 17 00 4639-99 P co2 CCGG 387.060 -999.990 ... L8 2008 01 28 14 50 00 78.9000 11.8700 475.00 248511 ZEP 2007 12 13 08 17 00 4640-99 P co2 CCGG 387.110 -999.990 ... L8 2008 01 28 15 05 00 78.9000 11.8700 475.00 248512 ZEP 2007 12 20 08 05 00 744-91 P co2 CCGG 389.110 -999.990 ... L8 2008 01 28 14 34 00 78.9000 11.8700 475.00 248510 ZEP 2007 12 20 08 05 00 794-91 P co2 CCGG 389.160 -999.990 ... L8 2008 01 28 14 19 00 78.9000 11.8700 475.00 248509 ZEP 2007 12 27 08 10 00 791-91 P co2 CCGG 390.830 -999.990 ... L8 2008 01 28 13 48 00 78.9000 11.8700 475.00 248505 ZEP 2007 12 27 08 10 00 792-91 P co2 CCGG 390.870 -999.990 ... L8 2008 01 28 14 03 00 78.9000 11.8700 475.00 248506 ZEP 2008 01 03 07 56 00 17-99 P co2 CCGG 387.910 -999.990 ... L3 2008 02 11 11 32 00 78.9000 11.8700 475.00 249151 ZEP 2008 01 03 07 56 00 18-99 P co2 CCGG 387.970 -999.990 ... L3 2008 02 11 11 46 00 78.9000 11.8700 475.00 249152 ZEP 2008 01 10 08 47 00 3749-99 P co2 CCGG 389.330 -999.990 ... L3 2008 02 11 12 00 00 78.9000 11.8700 475.00 249149 ZEP 2008 01 10 08 47 00 3750-99 P co2 CCGG 389.320 -999.990 ... L3 2008 02 11 12 15 00 78.9000 11.8700 475.00 249150 ZEP 2008 01 17 08 40 00 55-99 P co2 CCGG 396.990 -999.990 .Z. L8 2008 02 12 13 39 00 78.9000 11.8700 475.00 249224 ZEP 2008 01 17 08 40 00 56-99 P co2 CCGG 396.860 -999.990 .Z. L8 2008 02 12 13 54 00 78.9000 11.8700 475.00 249225 ZEP 2008 01 24 09 58 00 2973-99 P co2 CCGG 390.450 -999.990 ... L8 2008 02 12 13 08 00 78.9000 11.8700 475.00 249222 ZEP 2008 01 24 09 58 00 2974-99 P co2 CCGG 390.350 -999.990 ... L8 2008 02 12 13 23 00 78.9000 11.8700 475.00 249223 ZEP 2008 01 31 08 00 00 1223-99 P co2 CCGG 391.830 -999.990 ... L8 2008 03 13 15 47 00 78.9000 11.8700 475.00 251028 ZEP 2008 01 31 08 00 00 1224-99 P co2 CCGG 391.770 -999.990 ... L8 2008 03 13 16 03 00 78.9000 11.8700 475.00 251029 ZEP 2008 02 07 08 03 00 1677-99 P co2 CCGG 391.850 -999.990 ... L8 2008 03 13 16 18 00 78.9000 11.8700 475.00 251030 ZEP 2008 02 07 08 03 00 1678-99 P co2 CCGG 391.750 -999.990 ... L8 2008 03 13 16 33 00 78.9000 11.8700 475.00 251031 ZEP 2008 02 14 08 53 00 485-99 P co2 CCGG 390.720 -999.990 ... L8 2008 03 14 14 15 00 78.9000 11.8700 475.00 250894 ZEP 2008 02 14 08 53 00 486-99 P co2 CCGG 390.730 -999.990 ... L8 2008 03 14 14 30 00 78.9000 11.8700 475.00 250895 ZEP 2008 02 21 13 15 00 199-99 P co2 CCGG 389.940 -999.990 ... L8 2008 03 14 13 44 00 78.9000 11.8700 475.00 250892 ZEP 2008 02 21 13 15 00 200-99 P co2 CCGG 389.830 -999.990 ... L8 2008 03 14 14 00 00 78.9000 11.8700 475.00 250893 ZEP 2008 02 28 08 20 00 4983-99 P co2 CCGG 390.250 -999.990 ... L3 2008 03 27 12 13 00 78.9000 11.8700 475.00 251517 ZEP 2008 02 28 08 20 00 4984-99 P co2 CCGG 390.250 -999.990 ... L3 2008 03 27 12 27 00 78.9000 11.8700 475.00 251518 ZEP 2008 03 06 08 00 00 4987-99 P co2 CCGG 395.440 -999.990 .X. L3 2008 03 27 12 41 00 78.9000 11.8700 475.00 251515 ZEP 2008 03 06 08 00 00 4988-99 P co2 CCGG 395.470 -999.990 .X. L3 2008 03 27 12 55 00 78.9000 11.8700 475.00 251516 ZEP 2008 03 13 08 06 00 563-99 P co2 CCGG 393.720 -999.990 ... L8 2008 04 17 11 42 00 78.9000 11.8700 475.00 252622 ZEP 2008 03 13 08 06 00 564-99 P co2 CCGG 393.340 -999.990 ... L8 2008 04 17 11 58 00 78.9000 11.8700 475.00 252623 ZEP 2008 03 20 11 00 00 2067-99 P co2 CCGG 393.100 -999.990 ... L3 2008 04 17 11 39 00 78.9000 11.8700 475.00 252620 ZEP 2008 03 20 11 00 00 2068-99 P co2 CCGG 392.920 -999.990 ... L3 2008 04 17 11 53 00 78.9000 11.8700 475.00 252621 ZEP 2008 03 27 08 21 00 621-99 P co2 CCGG 394.040 -999.990 ... L8 2008 04 22 13 48 00 78.9000 11.8700 475.00 252952 ZEP 2008 03 27 08 21 00 622-99 P co2 CCGG 394.070 -999.990 ... L8 2008 04 22 14 03 00 78.9000 11.8700 475.00 252953 ZEP 2008 04 03 07 54 00 2035-99 P co2 CCGG 392.560 -999.990 ... L8 2008 04 23 10 10 00 78.9000 11.8700 475.00 252950 ZEP 2008 04 03 07 54 00 2036-99 P co2 CCGG 392.530 -999.990 ... L8 2008 04 23 10 25 00 78.9000 11.8700 475.00 252951 ZEP 2008 04 10 07 40 00 4491-99 P co2 CCGG 392.170 -999.990 ... L8 2008 05 16 12 18 00 78.9000 11.8800 475.00 254219 ZEP 2008 04 10 07 40 00 4492-99 P co2 CCGG 392.190 -999.990 ... L8 2008 05 16 12 34 00 78.9000 11.8800 475.00 254220 ZEP 2008 04 24 06 53 00 791-91 P co2 CCGG 393.060 -999.990 ... L8 2008 05 21 09 52 00 78.9000 11.8800 475.00 254417 ZEP 2008 04 24 06 53 00 792-91 P co2 CCGG 393.150 -999.990 ... L8 2008 05 21 10 08 00 78.9000 11.8800 475.00 254418 ZEP 2008 05 01 06 44 00 811-91 P co2 CCGG 392.430 -999.990 ... L8 2008 05 21 09 21 00 78.9000 11.8800 475.00 254415 ZEP 2008 05 01 06 44 00 812-91 P co2 CCGG 392.410 -999.990 ... L8 2008 05 21 09 37 00 78.9000 11.8800 475.00 254416 ZEP 2008 05 08 07 10 00 169-99 P co2 CCGG 392.430 -999.990 ... L8 2008 06 12 08 22 00 78.9000 11.8800 475.00 255522 ZEP 2008 05 15 07 25 00 4798-99 P co2 CCGG 392.560 -999.990 ... L8 2008 06 12 08 37 00 78.9000 11.8800 475.00 255521 ZEP 2008 05 22 07 17 00 2179-99 P co2 CCGG 391.630 -999.990 ... L8 2008 06 19 14 54 00 78.9000 11.8800 475.00 256037 ZEP 2008 05 22 07 17 00 2180-99 P co2 CCGG 391.620 -999.990 ... L8 2008 06 19 15 09 00 78.9000 11.8800 475.00 256038 ZEP 2008 05 29 06 50 00 4063-99 P co2 CCGG 391.430 -999.990 ... L8 2008 06 19 14 23 00 78.9000 11.8800 475.00 256035 ZEP 2008 05 29 06 50 00 4064-99 P co2 CCGG 391.190 -999.990 ... L8 2008 06 19 14 39 00 78.9000 11.8800 475.00 256036 ZEP 2008 06 05 07 14 00 1285-99 P co2 CCGG 390.630 -999.990 ... L8 2008 09 12 15 20 00 78.9000 11.8800 475.00 260562 ZEP 2008 06 05 07 14 00 1286-99 P co2 CCGG 390.600 -999.990 ... L8 2008 09 12 15 35 00 78.9000 11.8800 475.00 260563 ZEP 2008 06 12 06 55 00 1977-99 P co2 CCGG 390.480 -999.990 ... L8 2008 09 15 11 18 00 78.9000 11.8800 475.00 260564 ZEP 2008 06 12 06 55 00 1978-99 P co2 CCGG 390.500 -999.990 ... L8 2008 09 15 11 33 00 78.9000 11.8800 475.00 260565 ZEP 2008 06 19 07 50 00 6345-66 P co2 CCGG 389.960 -999.990 ... L8 2008 09 16 09 40 00 78.9000 11.8800 475.00 260542 ZEP 2008 06 19 07 50 00 6346-66 P co2 CCGG 390.090 -999.990 ... L8 2008 09 16 09 55 00 78.9000 11.8800 475.00 260543 ZEP 2008 06 26 12 40 00 3749-99 P co2 CCGG 385.820 -999.990 ... L8 2008 09 16 10 11 00 78.9000 11.8800 475.00 260540 ZEP 2008 06 26 12 40 00 3750-99 P co2 CCGG 385.770 -999.990 ... L8 2008 09 16 10 26 00 78.9000 11.8800 475.00 260541 ZEP 2008 07 03 07 35 00 487-99 P co2 CCGG 386.320 -999.990 ... L8 2008 09 15 15 55 00 78.9000 11.8800 475.00 260536 ZEP 2008 07 03 07 35 00 488-99 P co2 CCGG 386.390 -999.990 ... L8 2008 09 15 16 10 00 78.9000 11.8800 475.00 260537 ZEP 2008 07 17 07 30 00 3649-99 P co2 CCGG 381.290 -999.990 ... L8 2008 09 15 16 26 00 78.9000 11.8800 475.00 260538 ZEP 2008 07 17 07 30 00 3650-99 P co2 CCGG 381.290 -999.990 ... L8 2008 09 15 16 41 00 78.9000 11.8800 475.00 260539 ZEP 2008 07 27 10 28 00 947-99 P co2 CCGG 379.310 -999.990 ... L8 2008 09 12 14 18 00 78.9000 11.8800 475.00 260560 ZEP 2008 07 27 10 28 00 948-99 P co2 CCGG 379.100 -999.990 ... L8 2008 09 12 14 34 00 78.9000 11.8800 475.00 260561 ZEP 2008 07 31 08 28 00 4733-99 P co2 CCGG 380.390 -999.990 ... L8 2008 09 12 14 49 00 78.9000 11.8800 475.00 260558 ZEP 2008 07 31 08 28 00 4734-99 P co2 CCGG 380.410 -999.990 ... L8 2008 09 12 15 04 00 78.9000 11.8800 475.00 260559 ZEP 2008 08 07 07 40 00 733-91 P co2 CCGG 377.470 -999.990 ... L8 2008 09 15 13 52 00 78.9000 11.8800 475.00 260528 ZEP 2008 08 07 07 40 00 734-91 P co2 CCGG 377.440 -999.990 ... L8 2008 09 15 14 07 00 78.9000 11.8800 475.00 260529 ZEP 2008 08 14 08 35 00 744-91 P co2 CCGG 376.860 -999.990 ... L8 2008 09 15 14 23 00 78.9000 11.8800 475.00 260530 ZEP 2008 08 14 08 35 00 794-91 P co2 CCGG 376.900 -999.990 ... L8 2008 09 15 14 38 00 78.9000 11.8800 475.00 260531 ZEP 2008 08 21 07 25 00 783-91 P co2 CCGG 376.840 -999.990 ... L8 2008 11 12 11 48 00 78.9000 11.8800 475.00 263737 ZEP 2008 08 21 07 25 00 784-91 P co2 CCGG 376.840 -999.990 ... L8 2008 11 12 12 04 00 78.9000 11.8800 475.00 263738 ZEP 2008 08 31 11 35 00 4985-99 P co2 CCGG 375.820 -999.990 ... L8 2008 11 12 12 19 00 78.9000 11.8800 475.00 263735 ZEP 2008 08 31 11 35 00 4986-99 P co2 CCGG 375.910 -999.990 ... L8 2008 11 12 12 34 00 78.9000 11.8800 475.00 263736 ZEP 2008 09 11 14 25 00 2397-99 P co2 CCGG 376.450 -999.990 ... L8 2008 11 19 15 51 00 78.9000 11.8800 475.00 263991 ZEP 2008 09 11 14 25 00 2398-99 P co2 CCGG 376.340 -999.990 ... L8 2008 11 19 16 06 00 78.9000 11.8800 475.00 263992 ZEP 2008 09 18 07 10 00 1087-99 P co2 CCGG 376.680 -999.990 ... L8 2008 11 19 16 21 00 78.9000 11.8800 475.00 263989 ZEP 2008 09 18 07 10 00 1088-99 P co2 CCGG 376.680 -999.990 ... L8 2008 11 19 16 37 00 78.9000 11.8800 475.00 263990 ZEP 2008 10 31 09 35 00 3261-99 P co2 CCGG 384.490 -999.990 ... L8 2009 03 05 11 07 00 78.9000 11.8800 475.00 270602 ZEP 2008 10 31 09 35 00 3262-99 P co2 CCGG 384.460 -999.990 ... L8 2009 03 05 11 23 00 78.9000 11.8800 475.00 270603 ZEP 2008 11 06 08 55 00 3407-99 P co2 CCGG 385.790 -999.990 ... L8 2009 01 13 10 58 00 78.9000 11.8800 475.00 267194 ZEP 2008 11 06 08 55 00 3408-99 P co2 CCGG 385.820 -999.990 ... L8 2009 01 13 11 14 00 78.9000 11.8800 475.00 267195 ZEP 2008 11 13 08 30 00 2313-99 P co2 CCGG 387.420 -999.990 ... L8 2009 01 13 10 28 00 78.9000 11.8800 475.00 267192 ZEP 2008 11 13 08 30 00 2314-99 P co2 CCGG 387.240 -999.990 ... L8 2009 01 13 10 43 00 78.9000 11.8800 475.00 267193 ZEP 2008 11 20 09 28 00 1273-99 P co2 CCGG 388.230 -999.990 ... L3 2009 01 30 13 19 00 78.9000 11.8800 475.00 268379 ZEP 2008 11 20 09 28 00 1274-99 P co2 CCGG 388.070 -999.990 ... L3 2009 01 30 13 33 00 78.9000 11.8800 475.00 268380 ZEP 2008 11 27 08 20 00 3191-99 P co2 CCGG 388.880 -999.990 ... L3 2009 01 30 13 48 00 78.9000 11.8800 475.00 268377 ZEP 2008 11 27 08 20 00 3192-99 P co2 CCGG 388.830 -999.990 ... L3 2009 01 30 14 02 00 78.9000 11.8800 475.00 268378 ZEP 2008 12 04 08 22 00 3159-99 P co2 CCGG 388.050 -999.990 ... L8 2009 03 04 16 28 00 78.9000 11.8800 475.00 270600 ZEP 2008 12 04 08 22 00 3160-99 P co2 CCGG 387.750 -999.990 ... L8 2009 03 04 16 44 00 78.9000 11.8800 475.00 270601 ZEP 2008 12 11 09 47 00 1617-99 P co2 CCGG 389.180 -999.990 ... L8 2009 03 05 10 36 00 78.9000 11.8800 475.00 270598 ZEP 2008 12 11 09 47 00 1618-99 P co2 CCGG 389.190 -999.990 ... L8 2009 03 05 10 52 00 78.9000 11.8800 475.00 270599 ZEP 2008 12 18 08 15 00 4843-99 P co2 CCGG 388.930 -999.990 ... L3 2009 01 30 12 50 00 78.9000 11.8800 475.00 268375 ZEP 2008 12 18 08 15 00 4844-99 P co2 CCGG 389.120 -999.990 ... L3 2009 01 30 13 05 00 78.9000 11.8800 475.00 268376 ZEP 2009 01 01 16 10 00 2121-99 P co2 CCGG 393.550 -999.990 ... L3 2009 01 30 12 22 00 78.9000 11.8800 475.00 268373 ZEP 2009 01 01 16 10 00 2122-99 P co2 CCGG 393.510 -999.990 ... L3 2009 01 30 12 36 00 78.9000 11.8800 475.00 268374 ZEP 2009 01 09 08 55 00 4273-99 P co2 CCGG 391.650 -999.990 ... L8 2009 05 19 14 04 00 78.9000 11.8800 475.00 275541 ZEP 2009 01 09 08 55 00 4274-99 P co2 CCGG 391.680 -999.990 ... L8 2009 05 19 14 20 00 78.9000 11.8800 475.00 275542 ZEP 2009 01 15 08 25 00 3011-99 P co2 CCGG 391.770 -999.990 ... L8 2009 05 19 14 35 00 78.9000 11.8800 475.00 275543 ZEP 2009 01 15 08 25 00 3012-99 P co2 CCGG 391.710 -999.990 ... L8 2009 05 19 14 50 00 78.9000 11.8800 475.00 275544 ZEP 2009 01 22 08 32 00 701-99 P co2 CCGG 392.610 -999.990 ... L8 2009 03 05 10 06 00 78.9000 11.8800 475.00 270604 ZEP 2009 01 22 08 32 00 702-99 P co2 CCGG 392.640 -999.990 ... L8 2009 03 05 10 21 00 78.9000 11.8800 475.00 270605 ZEP 2009 01 29 08 38 00 2205-99 P co2 CCGG 394.170 -999.990 ... L8 2009 05 19 15 37 00 78.9000 11.8800 475.00 275547 ZEP 2009 01 29 08 38 00 2206-99 P co2 CCGG 394.150 -999.990 ... L8 2009 05 19 15 52 00 78.9000 11.8800 475.00 275548 ZEP 2009 02 05 09 04 00 3961-99 P co2 CCGG 392.710 -999.990 ... L8 2009 05 19 15 06 00 78.9000 11.8800 475.00 275545 ZEP 2009 02 05 09 04 00 3962-99 P co2 CCGG 392.650 -999.990 ... L8 2009 05 19 15 21 00 78.9000 11.8800 475.00 275546 ZEP 2009 02 12 09 47 00 803-91 P co2 CCGG 395.120 -999.990 ... L3 2009 06 18 13 55 00 78.9000 11.8800 475.00 276528 ZEP 2009 02 12 09 47 00 804-91 P co2 CCGG 394.760 -999.990 ... L3 2009 06 18 14 09 00 78.9000 11.8800 475.00 276529 ZEP 2009 02 23 09 35 00 743-91 P co2 CCGG 392.320 -999.990 ... L3 2009 06 18 13 27 00 78.9000 11.8800 475.00 276526 ZEP 2009 02 23 09 35 00 793-91 P co2 CCGG 392.290 -999.990 ... L3 2009 06 18 13 41 00 78.9000 11.8800 475.00 276527 ZEP 2009 03 05 08 25 00 3233-99 P co2 CCGG 394.220 -999.990 ... L8 2009 05 19 16 07 00 78.9000 11.8800 475.00 275509 ZEP 2009 03 05 08 25 00 3234-99 P co2 CCGG 394.340 -999.990 ... L8 2009 05 19 16 23 00 78.9000 11.8800 475.00 275510 ZEP 2009 03 13 08 40 00 531-99 P co2 CCGG 393.840 -999.990 ... L3 2009 05 19 16 12 00 78.9000 11.8800 475.00 275511 ZEP 2009 03 13 08 40 00 532-99 P co2 CCGG 393.890 -999.990 ... L3 2009 05 19 16 26 00 78.9000 11.8800 475.00 275512 ZEP 2009 03 19 09 53 00 3983-99 P co2 CCGG 393.100 -999.990 ... L8 2009 05 20 10 34 00 78.9000 11.8800 475.00 275513 ZEP 2009 03 19 09 53 00 3984-99 P co2 CCGG 393.110 -999.990 ... L8 2009 05 20 10 49 00 78.9000 11.8800 475.00 275514 ZEP 2009 03 26 09 03 00 744-91 P co2 CCGG 394.170 -999.990 ... L8 2009 05 20 11 04 00 78.9000 11.8800 475.00 275515 ZEP 2009 03 26 09 03 00 794-91 P co2 CCGG 394.280 -999.990 ... L8 2009 05 20 11 20 00 78.9000 11.8800 475.00 275516 ZEP 2009 04 03 08 10 00 811-91 P co2 CCGG 392.980 -999.990 ... L8 2009 05 22 13 04 00 78.9000 11.8800 475.00 275656 ZEP 2009 04 03 08 10 00 812-91 P co2 CCGG 393.070 -999.990 ... L8 2009 05 22 13 20 00 78.9000 11.8800 475.00 275657 ZEP 2009 04 11 13 10 00 791-91 P co2 CCGG 393.210 -999.990 ... L8 2009 05 22 13 35 00 78.9000 11.8800 475.00 275654 ZEP 2009 04 11 13 10 00 792-91 P co2 CCGG 393.260 -999.990 ... L8 2009 05 22 13 51 00 78.9000 11.8800 475.00 275655 ZEP 2009 04 16 07 45 00 2025-99 P co2 CCGG 394.070 -999.990 ... L10 2009 06 18 14 23 00 78.9000 11.8800 475.00 276532 ZEP 2009 04 16 07 45 00 2026-99 P co2 CCGG 394.080 -999.990 ... L10 2009 06 18 14 38 00 78.9000 11.8800 475.00 276533 ZEP 2009 04 23 08 50 00 4647-99 P co2 CCGG 394.290 -999.990 ... L10 2009 06 18 14 53 00 78.9000 11.8800 475.00 276530 ZEP 2009 04 23 08 50 00 4648-99 P co2 CCGG 394.260 -999.990 ... L10 2009 06 18 15 09 00 78.9000 11.8800 475.00 276531 ZEP 2009 05 04 08 55 00 369-99 P co2 CCGG 393.130 -999.990 ... L3 2009 08 05 13 32 00 78.9000 11.8800 475.00 280638 ZEP 2009 05 04 08 55 00 370-99 P co2 CCGG 393.160 -999.990 ... L3 2009 08 05 13 47 00 78.9000 11.8800 475.00 280639 ZEP 2009 05 04 09 28 00 2615-99 P co2 CCGG 392.360 -999.990 ... L10 2009 07 29 17 02 00 78.9000 11.8800 475.00 280219 ZEP 2009 05 04 09 28 00 2616-99 P co2 CCGG 392.410 -999.990 ... L10 2009 07 29 17 17 00 78.9000 11.8800 475.00 280220 ZEP 2009 05 07 08 45 00 855-99 P co2 CCGG 393.710 -999.990 ... L3 2009 08 05 13 04 00 78.9000 11.8800 475.00 280640 ZEP 2009 05 07 08 45 00 856-99 P co2 CCGG 393.730 -999.990 ... L3 2009 08 05 13 18 00 78.9000 11.8800 475.00 280641 ZEP 2009 05 21 09 02 00 3737-99 P co2 CCGG 391.720 -999.990 ... L10 2009 07 21 15 59 00 78.9000 11.8800 475.00 279377 ZEP 2009 05 21 09 02 00 3738-99 P co2 CCGG 391.750 -999.990 ... L10 2009 07 21 16 15 00 78.9000 11.8800 475.00 279378 ZEP 2009 05 28 07 53 00 2131-99 P co2 CCGG 393.310 -999.990 ... L3 2009 07 29 16 58 00 78.9000 11.8800 475.00 280221 ZEP 2009 05 28 07 53 00 2132-99 P co2 CCGG 392.930 -999.990 ... L3 2009 07 29 17 13 00 78.9000 11.8800 475.00 280222 ZEP 2009 06 11 07 22 00 389-99 P co2 CCGG 392.380 -999.990 ... L3 2009 07 21 13 53 00 78.9000 11.8800 475.00 279278 ZEP 2009 06 11 07 22 00 390-99 P co2 CCGG 392.420 -999.990 ... L3 2009 07 21 14 07 00 78.9000 11.8800 475.00 279279 ZEP 2009 06 18 07 55 00 3839-99 P co2 CCGG 391.490 -999.990 ... L3 2009 07 21 13 24 00 78.9000 11.8800 475.00 279280 ZEP 2009 06 18 07 55 00 3840-99 P co2 CCGG 391.390 -999.990 ... L3 2009 07 21 13 39 00 78.9000 11.8800 475.00 279281 ZEP 2009 06 25 07 32 00 1229-99 P co2 CCGG 388.540 -999.990 ... L3 2009 08 25 09 54 00 78.9000 11.8800 475.00 281682 ZEP 2009 06 25 07 32 00 1230-99 P co2 CCGG 388.350 -999.990 ... L3 2009 08 25 10 08 00 78.9000 11.8800 475.00 281683 ZEP 2009 07 03 07 55 00 583-99 P co2 CCGG 387.960 -999.990 ... L3 2009 08 25 10 51 00 78.9000 11.8800 475.00 281680 ZEP 2009 07 03 07 55 00 584-99 P co2 CCGG 387.990 -999.990 ... L3 2009 08 25 11 05 00 78.9000 11.8800 475.00 281681 ZEP 2009 07 12 10 05 00 3417-99 P co2 CCGG 384.720 -999.990 ... L10 2009 08 20 11 41 00 78.9000 11.8800 475.00 281649 ZEP 2009 07 12 10 05 00 3418-99 P co2 CCGG 384.760 -999.990 ... L10 2009 08 20 11 57 00 78.9000 11.8800 475.00 281650 ZEP 2009 07 17 10 05 00 4757-99 P co2 CCGG 380.880 -999.990 ... L10 2009 08 20 12 12 00 78.9000 11.8800 475.00 281651 ZEP 2009 07 17 10 05 00 4758-99 P co2 CCGG 380.830 -999.990 ... L10 2009 08 20 12 27 00 78.9000 11.8800 475.00 281652 ZEP 2009 07 23 07 25 00 4575-99 P co2 CCGG 380.280 -999.990 ... L3 2009 08 25 11 48 00 78.9000 11.8800 475.00 281686 ZEP 2009 07 23 07 25 00 4576-99 P co2 CCGG 380.250 -999.990 ... L3 2009 08 25 12 02 00 78.9000 11.8800 475.00 281687 ZEP 2009 07 30 07 39 00 3591-99 P co2 CCGG 373.730 -999.990 .X. L3 2009 08 25 11 19 00 78.9000 11.8800 475.00 281684 ZEP 2009 07 30 07 39 00 3592-99 P co2 CCGG 373.810 -999.990 .X. L3 2009 08 25 11 34 00 78.9000 11.8800 475.00 281685 ZEP 2009 08 10 07 50 00 833-99 P co2 CCGG 377.630 -999.990 ... L10 2009 09 08 13 28 00 78.9000 11.8800 475.00 282944 ZEP 2009 08 10 07 50 00 834-99 P co2 CCGG 377.570 -999.990 ... L10 2009 09 08 13 43 00 78.9000 11.8800 475.00 282945 ZEP 2009 08 17 08 45 00 3689-99 P co2 CCGG 378.040 -999.990 ... L10 2009 09 08 12 57 00 78.9000 11.8800 475.00 282946 ZEP 2009 08 17 08 45 00 3690-99 P co2 CCGG 377.960 -999.990 ... L10 2009 09 08 13 12 00 78.9000 11.8800 475.00 282947 ZEP 2009 08 22 10 12 00 2329-99 P co2 CCGG 376.340 -999.990 ... L10 2009 12 14 12 38 00 78.9000 11.8800 475.00 287560 ZEP 2009 08 22 10 12 00 2330-99 P co2 CCGG 376.410 -999.990 ... L10 2009 12 14 12 53 00 78.9000 11.8800 475.00 287561 ZEP 2009 09 03 09 18 00 733-91 P co2 CCGG 375.970 -999.990 ... L10 2009 12 14 12 07 00 78.9000 11.8800 475.00 287562 ZEP 2009 09 03 09 18 00 734-91 P co2 CCGG 375.840 -999.990 ... L10 2009 12 14 12 23 00 78.9000 11.8800 475.00 287563 ZEP 2009 09 10 08 16 00 4918-99 P co2 CCGG 376.810 -999.990 ... L10 2010 03 11 15 40 00 78.9000 11.8800 475.00 291580 ZEP 2009 09 11 09 30 00 3889-99 P co2 CCGG 377.180 -999.990 ... L10 2010 03 11 15 09 00 78.9000 11.8800 475.00 291578 ZEP 2009 09 11 09 30 00 3890-99 P co2 CCGG 377.100 -999.990 ... L10 2010 03 11 15 25 00 78.9000 11.8800 475.00 291579 ZEP 2009 09 17 08 05 00 2739-99 P co2 CCGG 377.220 -999.990 ... L10 2009 12 10 17 28 00 78.9000 11.8800 475.00 287542 ZEP 2009 09 17 08 05 00 2740-99 P co2 CCGG 377.280 -999.990 ... L10 2009 12 10 17 44 00 78.9000 11.8800 475.00 287543 ZEP 2009 09 24 08 10 00 1149-99 P co2 CCGG 378.960 -999.990 ... L10 2009 12 10 17 59 00 78.9000 11.8800 475.00 287540 ZEP 2009 09 24 08 10 00 1150-99 P co2 CCGG 378.840 -999.990 ... L10 2009 12 10 18 14 00 78.9000 11.8800 475.00 287541 ZEP 2009 10 01 08 55 00 2511-99 P co2 CCGG 382.170 -999.990 ... L10 2009 12 14 11 36 00 78.9000 11.8800 475.00 287558 ZEP 2009 10 01 08 55 00 2512-99 P co2 CCGG 382.120 -999.990 ... L10 2009 12 14 11 52 00 78.9000 11.8800 475.00 287559 ZEP 2009 10 08 09 02 00 2929-99 P co2 CCGG 381.710 -999.990 ... L10 2009 12 14 10 35 00 78.9000 11.8800 475.00 287556 ZEP 2009 10 08 09 02 00 2930-99 P co2 CCGG 381.640 -999.990 ... L10 2009 12 14 10 50 00 78.9000 11.8800 475.00 287557 ZEP 2009 10 15 10 46 00 3199-99 P co2 CCGG 383.360 -999.990 ... L10 2009 12 11 10 48 00 78.9000 11.8800 475.00 287546 ZEP 2009 10 15 10 46 00 3200-99 P co2 CCGG 383.240 -999.990 ... L10 2009 12 11 11 03 00 78.9000 11.8800 475.00 287547 ZEP 2009 10 26 15 03 00 2683-99 P co2 CCGG 384.800 -999.990 ... L10 2009 12 10 18 30 00 78.9000 11.8800 475.00 287544 ZEP 2009 10 26 15 03 00 2684-99 P co2 CCGG 384.660 -999.990 ... L10 2009 12 10 18 45 00 78.9000 11.8800 475.00 287545 ZEP 2009 10 30 15 07 00 3921-99 P co2 CCGG 508.160 -999.990 N.. L10 2011 06 24 12 05 00 78.9000 11.8800 475.00 319594 ZEP 2009 10 30 15 07 00 3922-99 P co2 CCGG 498.400 -999.990 N.. L10 2011 06 24 12 21 00 78.9000 11.8800 475.00 319595 ZEP 2009 12 04 09 45 00 4849-99 P co2 CCGG 391.510 -999.990 ... L10 2011 06 24 12 38 00 78.9000 11.8800 475.00 319596 ZEP 2009 12 04 09 45 00 4850-99 P co2 CCGG 390.720 -999.990 ... L10 2011 06 24 12 54 00 78.9000 11.8800 475.00 319597 ZEP 2009 12 10 09 42 00 4927-99 P co2 CCGG 393.710 -999.990 ... L10 2010 03 10 10 17 00 78.9000 11.8800 475.00 291460 ZEP 2009 12 10 09 42 00 4928-99 P co2 CCGG 393.730 -999.990 ... L10 2010 03 10 10 32 00 78.9000 11.8800 475.00 291461 ZEP 2009 12 24 10 15 00 1413-99 P co2 CCGG 392.510 -999.990 ... L10 2010 03 11 15 55 00 78.9000 11.8800 475.00 291462 ZEP 2009 12 31 08 17 00 2301-99 P co2 CCGG 397.550 -999.990 .X. L10 2010 03 11 10 34 00 78.9000 11.8800 475.00 291569 ZEP 2009 12 31 08 17 00 2302-99 P co2 CCGG 397.570 -999.990 .X. L10 2010 03 11 10 49 00 78.9000 11.8800 475.00 291568 ZEP 2010 01 07 08 35 00 781-99 P co2 CCGG 391.900 -999.990 ... L10 2010 03 10 16 26 00 78.9000 11.8800 475.00 291566 ZEP 2010 01 07 08 35 00 782-99 P co2 CCGG 391.930 -999.990 ... L10 2010 03 10 16 41 00 78.9000 11.8800 475.00 291567 ZEP 2010 01 14 08 40 00 803-91 P co2 CCGG 391.260 -999.990 ... L10 2010 03 11 14 08 00 78.9000 11.8800 475.00 291574 ZEP 2010 01 14 08 40 00 804-91 P co2 CCGG 391.320 -999.990 ... L10 2010 03 11 14 24 00 78.9000 11.8800 475.00 291575 ZEP 2010 01 21 09 20 00 1583-99 P co2 CCGG 392.410 -999.990 ... L10 2010 03 11 14 39 00 78.9000 11.8800 475.00 291576 ZEP 2010 01 21 09 20 00 1584-99 P co2 CCGG 392.400 -999.990 ... L10 2010 03 11 14 54 00 78.9000 11.8800 475.00 291577 ZEP 2010 01 28 08 30 00 2189-99 P co2 CCGG 395.670 -999.990 ... L8 2011 07 11 12 07 00 78.9000 11.8800 475.00 320179 ZEP 2010 01 28 08 30 00 2190-99 P co2 CCGG 395.480 -999.990 ... L8 2011 07 11 12 22 00 78.9000 11.8800 475.00 320180 ZEP 2010 02 04 08 25 00 4025-99 P co2 CCGG 396.400 -999.990 ... L8 2011 07 08 14 22 00 78.9000 11.8800 475.00 320181 ZEP 2010 02 04 08 25 00 4025-99 P co2 CCGG 387.800 -999.990 ... L8 2011 09 16 12 35 00 78.9000 11.8800 475.00 320181 ZEP 2010 02 04 08 25 00 4026-99 P co2 CCGG 396.310 -999.990 ... L8 2011 07 08 14 37 00 78.9000 11.8800 475.00 320182 ZEP 2010 02 04 08 25 00 4026-99 P co2 CCGG 387.940 -999.990 ... L8 2011 09 16 12 50 00 78.9000 11.8800 475.00 320182 ZEP 2010 02 11 08 40 00 4441-99 P co2 CCGG 396.740 -999.990 ... L10 2010 04 09 14 27 00 78.9000 11.8800 475.00 293445 ZEP 2010 02 11 08 40 00 4442-99 P co2 CCGG 396.790 -999.990 ... L10 2010 04 09 14 43 00 78.9000 11.8800 475.00 293446 ZEP 2010 02 18 08 30 00 2989-99 P co2 CCGG 394.510 -999.990 ... L10 2010 04 09 14 58 00 78.9000 11.8800 475.00 293443 ZEP 2010 02 18 08 30 00 2990-99 P co2 CCGG 394.570 -999.990 ... L10 2010 04 09 15 13 00 78.9000 11.8800 475.00 293444 ZEP 2010 02 25 09 09 00 1999-99 P co2 CCGG 393.630 -999.990 ... L10 2010 04 09 13 57 00 78.9000 11.8800 475.00 293439 ZEP 2010 02 25 09 09 00 2000-99 P co2 CCGG 393.270 -999.990 ... L10 2010 04 09 14 12 00 78.9000 11.8800 475.00 293440 ZEP 2010 03 04 10 32 00 345-99 P co2 CCGG 393.120 -999.990 ... L10 2010 04 09 13 26 00 78.9000 11.8800 475.00 293441 ZEP 2010 03 04 10 32 00 346-99 P co2 CCGG 393.010 -999.990 ... L10 2010 04 09 13 42 00 78.9000 11.8800 475.00 293442 ZEP 2010 03 11 10 13 00 291-99 P co2 CCGG 396.010 -999.990 ... L10 2010 04 15 12 57 00 78.9000 11.8800 475.00 293835 ZEP 2010 03 11 10 13 00 292-99 P co2 CCGG 395.970 -999.990 ... L10 2010 04 15 13 13 00 78.9000 11.8800 475.00 293836 ZEP 2010 03 18 09 50 00 4137-99 P co2 CCGG 396.670 -999.990 ... L10 2010 04 15 12 27 00 78.9000 11.8800 475.00 293833 ZEP 2010 03 18 09 50 00 4138-99 P co2 CCGG 396.820 -999.990 ... L10 2010 04 15 12 42 00 78.9000 11.8800 475.00 293834 ZEP 2010 03 25 09 26 00 1549-99 P co2 CCGG 395.260 -999.990 ... L8 2010 04 23 13 50 00 78.9000 11.8800 475.00 295189 ZEP 2010 03 25 09 26 00 1550-99 P co2 CCGG 394.880 -999.990 ... L8 2010 04 23 14 05 00 78.9000 11.8800 475.00 295190 ZEP 2010 04 01 07 07 00 427-99 P co2 CCGG 397.550 -999.990 ... L8 2010 04 23 14 20 00 78.9000 11.8800 475.00 295187 ZEP 2010 04 01 07 07 00 428-99 P co2 CCGG 397.560 -999.990 ... L8 2010 04 23 14 34 00 78.9000 11.8800 475.00 295188 ZEP 2010 04 08 08 40 00 791-91 P co2 CCGG 395.650 -999.990 ... L10 2010 05 28 16 14 00 78.9000 11.8800 475.00 297191 ZEP 2010 04 08 08 40 00 792-91 P co2 CCGG 395.700 -999.990 ... L10 2010 05 28 16 30 00 78.9000 11.8800 475.00 297192 ZEP 2010 04 15 07 38 00 733-91 P co2 CCGG 394.750 -999.990 ... L10 2010 05 28 15 44 00 78.9000 11.8800 475.00 297193 ZEP 2010 04 15 07 38 00 734-91 P co2 CCGG 394.740 -999.990 ... L10 2010 05 28 15 59 00 78.9000 11.8800 475.00 297194 ZEP 2010 04 22 07 35 00 2095-99 P co2 CCGG 395.610 -999.990 ... L10 2010 05 28 14 43 00 78.9000 11.8800 475.00 297189 ZEP 2010 04 22 07 35 00 2096-99 P co2 CCGG 395.760 -999.990 ... L10 2010 05 28 14 58 00 78.9000 11.8800 475.00 297190 ZEP 2010 04 29 08 23 00 3169-99 P co2 CCGG 395.420 -999.990 ... L10 2010 05 28 15 13 00 78.9000 11.8800 475.00 297187 ZEP 2010 04 29 08 23 00 3170-99 P co2 CCGG 395.200 -999.990 ... L10 2010 05 28 15 29 00 78.9000 11.8800 475.00 297188 ZEP 2010 05 06 13 05 00 3687-99 P co2 CCGG 394.780 -999.990 ... L8 2010 06 11 15 30 00 78.9000 11.8800 475.00 298276 ZEP 2010 05 06 13 05 00 3688-99 P co2 CCGG 394.620 -999.990 ... L8 2010 06 11 15 45 00 78.9000 11.8800 475.00 298277 ZEP 2010 05 13 06 58 00 4887-99 P co2 CCGG 393.990 -999.990 ... L8 2010 06 11 15 59 00 78.9000 11.8800 475.00 298274 ZEP 2010 05 13 06 58 00 4888-99 P co2 CCGG 393.980 -999.990 ... L8 2010 06 11 16 14 00 78.9000 11.8800 475.00 298275 ZEP 2010 05 20 08 22 00 1481-99 P co2 CCGG 391.720 -999.990 ... L8 2010 06 11 16 29 00 78.9000 11.8800 475.00 298278 ZEP 2010 05 20 08 22 00 1482-99 P co2 CCGG 391.690 -999.990 ... L8 2010 06 11 16 43 00 78.9000 11.8800 475.00 298279 ZEP 2010 05 27 07 30 00 2365-99 P co2 CCGG 395.120 -999.990 ... L8 2010 06 14 14 15 00 78.9000 11.8800 475.00 298280 ZEP 2010 05 27 07 30 00 2366-99 P co2 CCGG 395.570 -999.990 ... L8 2010 06 14 14 30 00 78.9000 11.8800 475.00 298281 ZEP 2010 06 03 08 15 00 1507-99 P co2 CCGG 394.220 -999.990 ... L10 2010 07 27 14 21 00 78.9000 11.8800 475.00 300563 ZEP 2010 06 10 07 35 00 1357-99 P co2 CCGG 393.320 -999.990 ... L10 2010 07 23 13 49 00 78.9000 11.8800 475.00 300561 ZEP 2010 06 10 07 35 00 1358-99 P co2 CCGG 393.270 -999.990 ... L10 2010 07 23 14 04 00 78.9000 11.8800 475.00 300562 ZEP 2010 06 17 07 45 00 3411-99 P co2 CCGG 393.440 -999.990 +.. L8 2010 07 22 11 27 00 78.9000 11.8800 475.00 300504 ZEP 2010 06 17 07 45 00 3412-99 P co2 CCGG 392.830 -999.990 -.. L8 2010 07 22 11 42 00 78.9000 11.8800 475.00 300505 ZEP 2010 06 24 07 45 00 4419-99 P co2 CCGG 390.210 -999.990 ... L8 2010 07 22 11 57 00 78.9000 11.8800 475.00 300502 ZEP 2010 06 24 07 45 00 4420-99 P co2 CCGG 390.180 -999.990 ... L8 2010 07 22 12 11 00 78.9000 11.8800 475.00 300503 ZEP 2010 07 01 14 05 00 6017-66 P co2 CCGG 388.800 -999.990 ... L8 2010 07 22 13 55 00 78.9000 11.8800 475.00 300520 ZEP 2010 07 01 14 05 00 6018-66 P co2 CCGG 388.560 -999.990 ... L8 2010 07 22 14 10 00 78.9000 11.8800 475.00 300521 ZEP 2010 07 08 14 45 00 1893-99 P co2 CCGG 386.940 -999.990 ... L8 2010 07 22 14 24 00 78.9000 11.8800 475.00 300518 ZEP 2010 07 08 14 45 00 2704-99 P co2 CCGG 387.120 -999.990 ... L8 2010 07 22 14 39 00 78.9000 11.8800 475.00 300519 ZEP 2010 07 15 08 07 00 783-91 P co2 CCGG 385.070 -999.990 ... L8 2010 08 02 15 26 00 78.9000 11.8800 475.00 301151 ZEP 2010 07 15 08 07 00 784-91 P co2 CCGG 385.130 -999.990 ... L8 2010 08 02 15 40 00 78.9000 11.8800 475.00 301152 ZEP 2010 07 22 08 17 00 2689-99 P co2 CCGG 385.760 -999.990 ... L8 2010 08 03 11 18 00 78.9000 11.8800 475.00 301149 ZEP 2010 07 22 08 17 00 2690-99 P co2 CCGG 385.550 -999.990 ... L8 2010 08 03 11 33 00 78.9000 11.8800 475.00 301150 ZEP 2010 07 29 07 38 00 81-99 P co2 CCGG 382.930 -999.990 ... L8 2010 08 18 14 52 00 78.9000 11.8800 475.00 302052 ZEP 2010 07 29 07 38 00 82-99 P co2 CCGG 382.980 -999.990 ... L8 2010 08 18 15 06 00 78.9000 11.8800 475.00 302053 ZEP 2010 08 05 07 49 00 4639-99 P co2 CCGG 381.670 -999.990 ... L8 2010 08 18 15 21 00 78.9000 11.8800 475.00 302050 ZEP 2010 08 05 07 49 00 4640-99 P co2 CCGG 381.610 -999.990 ... L8 2010 08 18 15 36 00 78.9000 11.8800 475.00 302051 ZEP 2010 08 12 08 45 00 2809-99 P co2 CCGG 380.930 -999.990 ... L10 2010 09 22 13 39 00 78.9000 11.8800 475.00 304079 ZEP 2010 08 12 08 45 00 2810-99 P co2 CCGG 380.940 -999.990 ... L10 2010 09 22 13 54 00 78.9000 11.8800 475.00 304080 ZEP 2010 08 19 07 57 00 5017-99 P co2 CCGG 380.160 -999.990 ... L10 2010 09 22 13 08 00 78.9000 11.8800 475.00 304077 ZEP 2010 08 19 07 57 00 5018-99 P co2 CCGG 380.000 -999.990 ... L10 2010 09 22 13 23 00 78.9000 11.8800 475.00 304078 ZEP 2010 08 26 08 15 00 13-99 P co2 CCGG 379.840 -999.990 ... L10 2010 10 01 13 51 00 78.9000 11.8800 475.00 304754 ZEP 2010 08 26 08 15 00 14-99 P co2 CCGG 379.940 -999.990 ... L10 2010 10 01 14 06 00 78.9000 11.8800 475.00 304755 ZEP 2010 09 02 08 15 00 4879-99 P co2 CCGG 380.700 -999.990 ... L10 2010 10 01 14 21 00 78.9000 11.8800 475.00 304757 ZEP 2010 09 02 08 15 00 4880-99 P co2 CCGG 380.630 -999.990 ... L10 2010 10 01 14 37 00 78.9000 11.8800 475.00 304756 ZEP 2010 09 09 09 08 00 5135-99 P co2 CCGG 381.540 -999.990 +.. L10 2010 10 13 11 44 00 78.9000 11.8800 475.00 305449 ZEP 2010 09 09 09 08 00 5136-99 P co2 CCGG 380.860 -999.990 -.. L10 2010 10 13 11 59 00 78.9000 11.8800 475.00 305450 ZEP 2010 09 17 07 21 00 743-91 P co2 CCGG 381.940 -999.990 ... L10 2010 10 13 12 29 00 78.9000 11.8800 475.00 305448 ZEP 2010 09 17 07 21 00 793-91 P co2 CCGG 382.010 -999.990 ... L10 2010 10 13 12 14 00 78.9000 11.8800 475.00 305447 ZEP 2010 09 23 07 10 00 2097-99 P co2 CCGG 387.070 -999.990 ... L10 2010 10 27 14 28 00 78.9000 11.8800 475.00 306395 ZEP 2010 09 23 07 10 00 2098-99 P co2 CCGG 387.080 -999.990 ... L10 2010 10 27 14 43 00 78.9000 11.8800 475.00 306396 ZEP 2010 09 30 08 16 00 525-99 P co2 CCGG 449.270 -999.990 N.. L10 2010 10 27 13 57 00 78.9000 11.8800 475.00 306393 ZEP 2010 09 30 08 16 00 526-99 P co2 CCGG 449.900 -999.990 N.. L10 2010 10 27 14 12 00 78.9000 11.8800 475.00 306394 ZEP 2010 10 07 07 57 00 5191-99 P co2 CCGG 496.620 -999.990 N.. L8 2010 10 27 15 01 00 78.9000 11.8800 475.00 306383 ZEP 2010 10 07 07 57 00 5192-99 P co2 CCGG 497.280 -999.990 N.. L8 2010 10 27 15 16 00 78.9000 11.8800 475.00 306384 ZEP 2010 10 14 08 22 00 5077-99 P co2 CCGG 448.420 -999.990 N.. L8 2010 10 27 15 31 00 78.9000 11.8800 475.00 306385 ZEP 2010 10 14 08 22 00 5078-99 P co2 CCGG 459.100 -999.990 N.. L8 2010 10 27 15 45 00 78.9000 11.8800 475.00 306386 ZEP 2010 10 22 08 28 00 1955-99 P co2 CCGG 465.850 -999.990 N.. L8 2010 11 22 11 53 00 78.9000 11.8800 475.00 308031 ZEP 2010 10 22 08 28 00 1956-99 P co2 CCGG 472.480 -999.990 N.. L8 2010 11 22 12 08 00 78.9000 11.8800 475.00 308032 ZEP 2010 10 28 08 26 00 4297-99 P co2 CCGG 482.350 -999.990 N.. L8 2010 11 22 11 24 00 78.9000 11.8800 475.00 308029 ZEP 2010 10 28 08 26 00 4298-99 P co2 CCGG 483.240 -999.990 N.. L8 2010 11 22 11 39 00 78.9000 11.8800 475.00 308030 ZEP 2010 11 25 10 13 00 4871-99 P co2 CCGG 394.540 -999.990 ... L10 2010 12 30 13 07 00 78.9000 11.8800 475.00 310106 ZEP 2010 11 25 10 13 00 4872-99 P co2 CCGG 394.570 -999.990 ... L10 2010 12 30 13 24 00 78.9000 11.8800 475.00 310107 ZEP 2010 12 02 11 54 00 2627-99 P co2 CCGG 393.080 -999.990 ... L8 2011 01 03 11 40 00 78.9000 11.8800 475.00 310108 ZEP 2010 12 02 11 54 00 2628-99 P co2 CCGG 393.000 -999.990 ... L8 2011 01 03 11 55 00 78.9000 11.8800 475.00 310109 ZEP 2010 12 10 10 15 00 1055-99 P co2 CCGG 395.040 -999.990 ... L10 2011 01 04 12 03 00 78.9000 11.8800 475.00 310275 ZEP 2010 12 10 10 15 00 1056-99 P co2 CCGG 395.020 -999.990 ... L10 2011 01 04 12 19 00 78.9000 11.8800 475.00 310276 ZEP 2010 12 16 13 27 00 2715-99 P co2 CCGG 393.740 -999.990 ... L10 2011 01 04 11 31 00 78.9000 11.8800 475.00 310273 ZEP 2010 12 16 13 27 00 2716-99 P co2 CCGG 393.760 -999.990 ... L10 2011 01 04 11 47 00 78.9000 11.8800 475.00 310274 ZEP 2010 12 23 09 25 00 295-99 P co2 CCGG 393.910 -999.990 ... L8 2011 01 18 12 19 00 78.9000 11.8800 475.00 311038 ZEP 2010 12 23 09 25 00 296-99 P co2 CCGG 393.970 -999.990 ... L8 2011 01 18 12 33 00 78.9000 11.8800 475.00 311039 ZEP 2010 12 30 10 55 00 3013-99 P co2 CCGG 394.360 -999.990 ... L8 2011 01 18 12 48 00 78.9000 11.8800 475.00 311040 ZEP 2010 12 30 10 55 00 3014-99 P co2 CCGG 394.290 -999.990 ... L8 2011 01 18 13 03 00 78.9000 11.8800 475.00 311041