# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-21 15:18:41 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO2 (Individual Flasks) # Thomas J Conway # tel: (303) 497-6681 # email: Thomas.J.Conway@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Direccion Meteorologica de Chile [DMC]" without # whom these measurements would not be possible. # # URL: www.meteochile.cl # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # site yr mo dy hr mn id me formula value unc flag inst ayr amo ady ahr amn lat lon masl evn EIC 1994 01 04 16 30 663-91 P co2 355.490 -999.990 ... S1 1994 05 18 08 44 -27.1500 -109.4500 50.00 48078 EIC 1994 01 04 16 30 664-91 P co2 355.080 -999.990 ... S1 1994 05 18 08 46 -27.1500 -109.4500 50.00 48079 EIC 1994 01 11 16 30 661-91 P co2 354.720 -999.990 ... S1 1994 05 18 08 56 -27.1500 -109.4500 50.00 48080 EIC 1994 01 18 17 00 341-91 P co2 354.390 -999.990 +.. S1 1994 06 07 08 40 -27.1500 -109.4500 50.00 48081 EIC 1994 01 18 17 00 342-91 P co2 353.720 -999.990 -.. S1 1994 06 07 08 42 -27.1500 -109.4500 50.00 48082 EIC 1994 01 25 16 45 445-91 P co2 353.340 -999.990 ... S1 1994 06 07 08 28 -27.1500 -109.4500 50.00 48083 EIC 1994 01 25 16 45 446-91 P co2 353.470 -999.990 ... S1 1994 06 07 08 30 -27.1500 -109.4500 50.00 48084 EIC 1994 02 01 17 30 305-91 P co2 354.800 -999.990 ... S1 1994 05 18 08 48 -27.1500 -109.4500 50.00 48085 EIC 1994 02 01 17 30 306-91 P co2 354.390 -999.990 ... S1 1994 05 18 08 50 -27.1500 -109.4500 50.00 48086 EIC 1994 02 08 16 25 83-91 P co2 354.890 -999.990 ... S1 1994 05 18 08 52 -27.1500 -109.4500 50.00 48087 EIC 1994 02 08 16 25 84-91 P co2 354.640 -999.990 ... S1 1994 05 18 08 54 -27.1500 -109.4500 50.00 48088 EIC 1994 02 15 17 30 653-91 P co2 355.450 -999.990 ... S1 1994 06 07 08 24 -27.1500 -109.4500 50.00 48089 EIC 1994 02 15 17 30 654-91 P co2 355.340 -999.990 ... S1 1994 06 07 08 26 -27.1500 -109.4500 50.00 48090 EIC 1994 02 22 17 30 659-91 P co2 355.710 -999.990 ... S1 1994 06 07 08 12 -27.1500 -109.4500 50.00 48091 EIC 1994 02 22 17 30 660-91 P co2 355.880 -999.990 ... S1 1994 06 07 08 14 -27.1500 -109.4500 50.00 48092 EIC 1994 03 01 20 30 321-91 P co2 356.210 -999.990 ... S1 1994 06 02 08 24 -27.1500 -109.4500 50.00 48093 EIC 1994 03 01 20 30 322-91 P co2 356.390 -999.990 ... S1 1994 06 02 08 26 -27.1500 -109.4500 50.00 48094 EIC 1994 03 08 18 00 101-91 P co2 354.930 -999.990 ... S1 1994 06 02 08 20 -27.1500 -109.4500 50.00 48095 EIC 1994 03 08 18 00 102-91 P co2 354.880 -999.990 ... S1 1994 06 02 08 22 -27.1500 -109.4500 50.00 48096 EIC 1994 03 15 18 00 317-91 P co2 354.720 -999.990 ... S1 1994 06 07 08 20 -27.1500 -109.4500 50.00 48097 EIC 1994 03 15 18 00 318-91 P co2 354.680 -999.990 ... S1 1994 06 07 08 22 -27.1500 -109.4500 50.00 48098 EIC 1994 03 30 21 00 351-91 P co2 355.300 -999.990 ... S1 1994 06 07 08 16 -27.1500 -109.4500 50.00 48099 EIC 1994 03 30 21 00 352-91 P co2 355.270 -999.990 ... S1 1994 06 07 08 18 -27.1500 -109.4500 50.00 48100 EIC 1994 06 07 21 00 717-91 P co2 354.330 -999.990 ... S1 1994 08 23 08 48 -27.1500 -109.4500 50.00 48101 EIC 1994 06 07 21 00 718-91 P co2 354.490 -999.990 ... S1 1994 08 23 08 50 -27.1500 -109.4500 50.00 48102 EIC 1994 06 14 17 00 715-91 P co2 354.800 -999.990 ... S1 1994 08 23 08 44 -27.1500 -109.4500 50.00 48103 EIC 1994 06 14 17 00 716-91 P co2 354.950 -999.990 ... S1 1994 08 23 08 46 -27.1500 -109.4500 50.00 48104 EIC 1994 06 21 23 30 725-91 P co2 355.880 -999.990 ... S1 1994 08 18 10 00 -27.1500 -109.4500 50.00 48105 EIC 1994 06 21 23 30 726-91 P co2 355.880 -999.990 ... S1 1994 08 18 10 02 -27.1500 -109.4500 50.00 48106 EIC 1994 06 30 18 30 727-91 P co2 354.840 -999.990 ... S1 1994 08 18 08 40 -27.1500 -109.4500 50.00 48107 EIC 1994 06 30 18 30 728-91 P co2 355.080 -999.990 ... S1 1994 08 18 08 42 -27.1500 -109.4500 50.00 48108 EIC 1994 07 12 18 00 347-91 P co2 355.400 -999.990 ... S1 1994 09 09 08 24 -27.1500 -109.4500 50.00 48109 EIC 1994 07 12 18 00 348-91 P co2 355.490 -999.990 ... S1 1994 09 09 08 26 -27.1500 -109.4500 50.00 48110 EIC 1994 07 26 23 30 681-91 P co2 356.800 -999.990 ... S1 1994 09 09 09 28 -27.1500 -109.4500 50.00 48111 EIC 1994 07 26 23 30 682-91 P co2 356.890 -999.990 ... S1 1994 09 09 09 30 -27.1500 -109.4500 50.00 48112 EIC 1994 08 01 16 00 729-91 P co2 356.810 -999.990 ... S1 1994 10 04 09 52 -27.1500 -109.4500 50.00 48113 EIC 1994 08 01 16 00 730-91 P co2 356.850 -999.990 ... S1 1994 10 04 09 54 -27.1500 -109.4500 50.00 48114 EIC 1994 08 06 19 00 443-91 P co2 356.330 -999.990 +.. S1 1994 10 20 08 16 -27.1500 -109.4500 50.00 48115 EIC 1994 08 06 19 00 444-91 P co2 -999.990 -999.990 *.. S1 1994 10 20 08 18 -27.1500 -109.4500 50.00 48116 EIC 1994 08 09 18 40 731-91 P co2 356.710 -999.990 ... S1 1994 10 04 09 48 -27.1500 -109.4500 50.00 48117 EIC 1994 08 09 18 40 732-91 P co2 356.750 -999.990 ... S1 1994 10 04 09 50 -27.1500 -109.4500 50.00 48118 EIC 1994 08 23 18 00 829-91 P co2 356.540 -999.990 ... S1 1994 10 20 08 20 -27.1500 -109.4500 50.00 48119 EIC 1994 08 23 18 00 830-91 P co2 356.720 -999.990 ... S1 1994 10 20 08 22 -27.1500 -109.4500 50.00 48120 EIC 1994 09 08 22 55 825-91 P co2 356.200 -999.990 ... S1 1994 10 21 08 16 -27.1500 -109.4500 50.00 48121 EIC 1994 09 08 23 05 827-91 P co2 356.210 -999.990 ... S1 1994 10 21 08 48 -27.1500 -109.4500 50.00 48122 EIC 1994 09 08 23 05 828-91 P co2 356.460 -999.990 ... S1 1994 10 21 08 50 -27.1500 -109.4500 50.00 48123 EIC 1994 09 20 22 00 817-91 P co2 357.000 -999.990 ... S1 1994 12 09 10 20 -27.1500 -109.4500 50.00 48124 EIC 1994 09 20 22 00 818-91 P co2 357.140 -999.990 ... S1 1994 12 09 10 22 -27.1500 -109.4500 50.00 48125 EIC 1994 09 27 16 00 819-91 P co2 356.690 -999.990 ... S1 1994 12 09 10 16 -27.1500 -109.4500 50.00 48126 EIC 1994 09 27 16 00 820-91 P co2 356.620 -999.990 ... S1 1994 12 09 10 18 -27.1500 -109.4500 50.00 48127 EIC 1994 10 20 22 15 191-91 P co2 356.390 -999.990 ... S1 1995 02 22 10 16 -27.1500 -109.4500 50.00 48128 EIC 1994 10 20 22 15 192-91 P co2 356.310 -999.990 ... S1 1995 02 22 10 18 -27.1500 -109.4500 50.00 48129 EIC 1994 11 05 15 00 81-91 P co2 356.090 -999.990 ... S1 1995 02 22 10 20 -27.1500 -109.4500 50.00 48130 EIC 1994 11 05 15 00 82-91 P co2 355.980 -999.990 ... S1 1995 02 22 10 22 -27.1500 -109.4500 50.00 48131 EIC 1994 11 17 23 00 143-91 P co2 363.530 -999.990 .X. S1 1995 02 22 08 16 -27.1500 -109.4500 50.00 48132 EIC 1994 11 17 23 00 144-91 P co2 363.140 -999.990 .X. S1 1995 02 22 08 18 -27.1500 -109.4500 50.00 48133 EIC 1994 11 22 20 00 175-91 P co2 356.710 -999.990 ... S1 1995 02 22 09 44 -27.1500 -109.4500 50.00 48134 EIC 1994 11 22 20 00 176-91 P co2 356.540 -999.990 ... S1 1995 02 22 09 46 -27.1500 -109.4500 50.00 48135 EIC 1994 12 03 15 00 161-91 P co2 357.370 -999.990 ... S1 1995 02 22 09 16 -27.1500 -109.4500 50.00 48136 EIC 1994 12 03 15 00 162-91 P co2 357.350 -999.990 ... S1 1995 02 22 09 18 -27.1500 -109.4500 50.00 48137 EIC 1994 12 10 15 00 57-91 P co2 356.780 -999.990 ... S1 1995 02 22 09 28 -27.1500 -109.4500 50.00 48138 EIC 1994 12 10 15 00 58-91 P co2 356.550 -999.990 ... S1 1995 02 22 09 30 -27.1500 -109.4500 50.00 48139 EIC 1994 12 24 15 00 137-91 P co2 357.440 -999.990 ... S1 1995 02 24 11 00 -27.1500 -109.4500 50.00 48140 EIC 1994 12 24 15 00 138-91 P co2 357.400 -999.990 ... S1 1995 02 24 11 02 -27.1500 -109.4500 50.00 48141 EIC 1994 12 31 15 15 331-91 P co2 356.850 -999.990 ... S1 1995 02 28 10 00 -27.1500 -109.4500 50.00 48142 EIC 1994 12 31 15 15 332-91 P co2 356.650 -999.990 ... S1 1995 02 28 10 02 -27.1500 -109.4500 50.00 48143 EIC 1995 01 03 15 00 823-91 P co2 359.180 -999.990 ... S1 1995 04 05 09 00 -27.1500 -109.4500 50.00 48144 EIC 1995 01 03 15 00 824-91 P co2 359.290 -999.990 ... S1 1995 04 05 09 02 -27.1500 -109.4500 50.00 48145 EIC 1995 01 16 00 00 821-91 P co2 357.970 -999.990 ... S1 1995 04 05 08 48 -27.1500 -109.4500 50.00 48146 EIC 1995 01 16 00 00 822-91 P co2 358.160 -999.990 ... S1 1995 04 05 08 50 -27.1500 -109.4500 50.00 48147 EIC 1995 01 31 18 00 131-91 P co2 357.650 -999.990 ... S1 1995 04 05 10 28 -27.1500 -109.4500 50.00 48148 EIC 1995 01 31 18 00 132-91 P co2 357.710 -999.990 ... S1 1995 04 05 10 30 -27.1500 -109.4500 50.00 48149 EIC 1995 02 06 23 00 847-91 P co2 356.930 -999.990 +.. S1 1995 04 05 10 24 -27.1500 -109.4500 50.00 48150 EIC 1995 02 06 23 00 848-91 P co2 356.180 -999.990 -.. S1 1995 04 05 10 26 -27.1500 -109.4500 50.00 48151 EIC 1995 02 10 21 00 91-91 P co2 357.460 -999.990 ... S1 1995 06 13 08 28 -27.1500 -109.4500 50.00 48152 EIC 1995 02 10 21 00 92-91 P co2 357.590 -999.990 ... S1 1995 06 13 08 30 -27.1500 -109.4500 50.00 48153 EIC 1995 02 16 21 00 71-91 P co2 356.630 -999.990 ... S1 1995 06 13 08 24 -27.1500 -109.4500 50.00 48154 EIC 1995 02 16 21 00 72-91 P co2 356.430 -999.990 ... S1 1995 06 13 08 26 -27.1500 -109.4500 50.00 48155 EIC 1995 02 27 19 00 51-91 P co2 357.050 -999.990 ... S1 1995 06 15 09 28 -27.1500 -109.4500 50.00 48156 EIC 1995 02 27 19 00 52-91 P co2 357.130 -999.990 ... S1 1995 06 15 09 30 -27.1500 -109.4500 50.00 48157 EIC 1995 03 03 22 30 325-91 P co2 357.910 -999.990 ... S1 1995 06 15 09 16 -27.1500 -109.4500 50.00 48158 EIC 1995 03 03 22 30 326-91 P co2 357.540 -999.990 ... S1 1995 06 15 09 18 -27.1500 -109.4500 50.00 48159 EIC 1995 03 10 00 00 675-91 P co2 358.740 -999.990 ... S1 1995 06 12 08 44 -27.1500 -109.4500 50.00 48160 EIC 1995 03 10 00 00 676-91 P co2 358.900 -999.990 ... S1 1995 06 12 08 46 -27.1500 -109.4500 50.00 48161 EIC 1995 03 21 17 00 283-91 P co2 356.680 -999.990 ... S1 1995 06 13 08 48 -27.1500 -109.4500 50.00 48162 EIC 1995 03 21 17 00 284-91 P co2 357.100 -999.990 ... S1 1995 06 13 08 50 -27.1500 -109.4500 50.00 48163 EIC 1995 03 24 23 00 125-91 P co2 357.970 -999.990 ... S1 1995 06 13 08 44 -27.1500 -109.4500 50.00 48164 EIC 1995 03 24 23 00 126-91 P co2 357.740 -999.990 ... S1 1995 06 13 08 46 -27.1500 -109.4500 50.00 48165 EIC 1995 07 04 15 00 343-91 P co2 357.010 -999.990 ... S1 1995 09 05 09 44 -27.1500 -109.4500 50.00 48166 EIC 1995 07 04 15 00 344-91 P co2 356.850 -999.990 ... S1 1995 09 05 09 46 -27.1500 -109.4500 50.00 48167 EIC 1995 07 11 16 00 377-91 P co2 357.900 -999.990 ... S1 1995 09 07 12 28 -27.1500 -109.4500 50.00 48168 EIC 1995 07 11 16 00 378-91 P co2 357.940 -999.990 ... S1 1995 09 07 12 30 -27.1500 -109.4500 50.00 48169 EIC 1995 07 18 18 00 647-91 P co2 358.070 -999.990 ... S1 1995 10 03 09 32 -27.1500 -109.4500 50.00 48170 EIC 1995 07 18 18 00 648-91 P co2 358.290 -999.990 ... S1 1995 10 03 09 34 -27.1500 -109.4500 50.00 48171 EIC 1995 07 26 21 00 1241-91 P co2 357.990 -999.990 ... S1 1995 10 03 09 28 -27.1500 -109.4500 50.00 48172 EIC 1995 07 26 21 00 1242-91 P co2 357.990 -999.990 ... S1 1995 10 03 09 30 -27.1500 -109.4500 50.00 48173 EIC 1995 08 01 17 00 1371-91 P co2 356.970 -999.990 ... S1 1995 10 17 08 52 -27.1500 -109.4500 50.00 48174 EIC 1995 08 01 17 00 1372-91 P co2 356.820 -999.990 ... S1 1995 10 17 08 54 -27.1500 -109.4500 50.00 48175 EIC 1995 08 08 19 00 753-91 P co2 357.200 -999.990 ... S1 1995 10 13 14 40 -27.1500 -109.4500 50.00 48176 EIC 1995 08 08 19 00 754-91 P co2 357.210 -999.990 ... S1 1995 10 13 14 42 -27.1500 -109.4500 50.00 48177 EIC 1995 08 15 15 00 1373-91 P co2 357.850 -999.990 ... S1 1995 10 17 08 48 -27.1500 -109.4500 50.00 48178 EIC 1995 08 15 15 00 1374-91 P co2 357.860 -999.990 ... S1 1995 10 17 08 50 -27.1500 -109.4500 50.00 48179 EIC 1995 08 22 18 00 1375-91 P co2 358.150 -999.990 ... S1 1995 10 13 15 12 -27.1500 -109.4500 50.00 48180 EIC 1995 08 22 18 00 1376-91 P co2 358.180 -999.990 ... S1 1995 10 13 15 14 -27.1500 -109.4500 50.00 48181 EIC 1995 08 29 18 00 483-91 P co2 357.760 -999.990 ... S1 1995 10 19 09 32 -27.1500 -109.4500 50.00 48182 EIC 1995 08 29 18 00 484-91 P co2 357.660 -999.990 ... S1 1995 10 19 09 34 -27.1500 -109.4500 50.00 48183 EIC 1995 09 05 16 00 481-91 P co2 358.730 -999.990 ... S1 1995 10 19 09 44 -27.1500 -109.4500 50.00 48184 EIC 1995 09 05 16 00 482-91 P co2 358.410 -999.990 ... S1 1995 10 19 09 46 -27.1500 -109.4500 50.00 48185 EIC 1995 09 12 21 00 531-91 P co2 358.150 -999.990 ... S1 1995 10 19 09 24 -27.1500 -109.4500 50.00 48186 EIC 1995 09 12 21 00 532-91 P co2 358.130 -999.990 ... S1 1995 10 19 09 26 -27.1500 -109.4500 50.00 48187 EIC 1995 09 19 18 00 705-91 P co2 358.690 -999.990 ... S1 1995 10 19 10 48 -27.1500 -109.4500 50.00 48188 EIC 1995 09 19 18 00 706-91 P co2 358.410 -999.990 ... S1 1995 10 19 10 50 -27.1500 -109.4500 50.00 48189 EIC 1995 09 26 15 00 175-91 P co2 358.520 -999.990 -.. S1 1995 12 14 10 52 -27.1500 -109.4500 50.00 48190 EIC 1995 09 26 15 00 176-91 P co2 378.870 -999.990 +.. S1 1995 12 14 10 54 -27.1500 -109.4500 50.00 48191 EIC 1995 10 07 17 00 751-91 P co2 358.820 -999.990 ... S1 1995 12 14 10 56 -27.1500 -109.4500 50.00 48192 EIC 1995 10 07 17 00 752-91 P co2 358.790 -999.990 ... S1 1995 12 14 10 58 -27.1500 -109.4500 50.00 48193 EIC 1995 10 14 21 00 1271-91 P co2 357.530 -999.990 ... S1 1995 12 06 10 32 -27.1500 -109.4500 50.00 48194 EIC 1995 10 14 21 00 1272-91 P co2 357.960 -999.990 ... S1 1995 12 06 10 34 -27.1500 -109.4500 50.00 48195 EIC 1995 10 19 21 00 525-91 P co2 358.430 -999.990 ... S1 1995 12 06 11 36 -27.1500 -109.4500 50.00 48196 EIC 1995 10 19 21 00 526-91 P co2 358.310 -999.990 ... S1 1995 12 06 11 38 -27.1500 -109.4500 50.00 48197 EIC 1995 10 27 21 00 1253-91 P co2 358.730 -999.990 ... S1 1995 12 12 09 24 -27.1500 -109.4500 50.00 48198 EIC 1995 10 27 21 00 1254-91 P co2 358.460 -999.990 ... S1 1995 12 12 09 26 -27.1500 -109.4500 50.00 48199 EIC 1995 11 03 22 30 233-91 P co2 358.500 -999.990 ... S1 1995 12 12 09 12 -27.1500 -109.4500 50.00 48200 EIC 1995 11 03 22 30 234-91 P co2 358.480 -999.990 ... S1 1995 12 12 09 14 -27.1500 -109.4500 50.00 48201 EIC 1995 11 11 16 00 527-91 P co2 358.730 -999.990 ... S1 1995 12 12 09 52 -27.1500 -109.4500 50.00 48202 EIC 1995 11 11 16 00 528-91 P co2 358.360 -999.990 ... S1 1995 12 12 09 54 -27.1500 -109.4500 50.00 48203 EIC 1995 11 17 21 30 357-91 P co2 359.490 -999.990 ... S1 1996 02 13 08 12 -27.1500 -109.4500 50.00 48204 EIC 1995 11 17 21 30 358-91 P co2 359.470 -999.990 ... S1 1996 02 13 08 14 -27.1500 -109.4500 50.00 48205 EIC 1995 11 28 16 00 1267-91 P co2 357.310 -999.990 ... S1 1996 02 07 10 32 -27.1500 -109.4500 50.00 48206 EIC 1995 11 28 16 00 1268-91 P co2 357.690 -999.990 ... S1 1996 02 07 10 34 -27.1500 -109.4500 50.00 48207 EIC 1995 12 09 16 00 133-91 P co2 359.380 -999.990 ... S1 1996 02 05 08 52 -27.1500 -109.4500 50.00 48208 EIC 1995 12 17 00 00 113-91 P co2 359.140 -999.990 ... S1 1996 01 26 09 56 -27.1500 -109.4500 50.00 48209 EIC 1995 12 17 00 00 114-91 P co2 358.990 -999.990 ... S1 1996 01 26 09 58 -27.1500 -109.4500 50.00 48210 EIC 1995 12 29 21 00 91-91 P co2 359.740 -999.990 ... S1 1996 02 01 09 16 -27.1500 -109.4500 50.00 48211 EIC 1995 12 29 21 00 92-91 P co2 359.560 -999.990 ... S1 1996 02 01 09 18 -27.1500 -109.4500 50.00 48212 EIC 1996 01 16 21 00 843-91 P co2 359.050 -999.990 -.. S1 1996 03 12 08 12 -27.1500 -109.4500 50.00 48213 EIC 1996 01 16 21 00 844-91 P co2 -999.990 -999.990 *.. S1 1996 03 12 08 14 -27.1500 -109.4500 50.00 48214 EIC 1996 01 23 22 00 111-91 P co2 358.790 -999.990 ... S1 1996 03 08 13 04 -27.1500 -109.4500 50.00 48215 EIC 1996 01 23 22 00 112-91 P co2 358.370 -999.990 ... S1 1996 03 08 13 06 -27.1500 -109.4500 50.00 48216 EIC 1996 01 30 21 00 1301-91 P co2 360.450 -999.990 ... S1 1996 06 18 16 24 -27.1500 -109.4500 50.00 48217 EIC 1996 01 30 21 00 1302-91 P co2 360.460 -999.990 ... S1 1996 06 18 16 26 -27.1500 -109.4500 50.00 48218 EIC 1996 02 07 00 00 75-91 P co2 360.550 -999.990 ... S1 1996 06 18 16 20 -27.1500 -109.4500 50.00 48219 EIC 1996 02 07 00 00 76-91 P co2 360.670 -999.990 ... S1 1996 06 18 16 22 -27.1500 -109.4500 50.00 48220 EIC 1996 02 15 15 00 11-91 P co2 -999.990 -999.990 *.. S1 1996 03 28 11 04 -27.1500 -109.4500 50.00 48221 EIC 1996 02 15 15 00 12-91 P co2 -999.990 -999.990 *.. S1 1996 03 28 11 06 -27.1500 -109.4500 50.00 48222 EIC 1996 02 20 20 00 1245-91 P co2 358.750 -999.990 ... S1 1996 03 28 11 40 -27.1500 -109.4500 50.00 48223 EIC 1996 02 20 20 00 1246-91 P co2 358.810 -999.990 ... S1 1996 03 28 11 42 -27.1500 -109.4500 50.00 48224 EIC 1996 03 05 21 00 305-91 P co2 359.230 -999.990 +.. S1 1996 04 08 10 16 -27.1500 -109.4500 50.00 48225 EIC 1996 03 05 21 00 306-91 P co2 358.120 -999.990 -.. S1 1996 04 08 10 18 -27.1500 -109.4500 50.00 48226 EIC 1996 03 12 00 00 467-91 P co2 359.090 -999.990 ... S1 1996 05 08 13 40 -27.1500 -109.4500 50.00 48227 EIC 1996 03 12 00 00 468-91 P co2 359.060 -999.990 ... S1 1996 05 08 13 42 -27.1500 -109.4500 50.00 48228 EIC 1996 03 19 21 00 987-91 P co2 359.260 -999.990 ... S1 1996 05 08 13 04 -27.1500 -109.4500 50.00 48229 EIC 1996 03 19 21 00 988-91 P co2 359.660 -999.990 ... S1 1996 05 08 13 06 -27.1500 -109.4500 50.00 48230 EIC 1996 04 02 21 00 345-91 P co2 359.180 -999.990 ... S1 1996 06 04 08 28 -27.1500 -109.4500 50.00 48231 EIC 1996 04 02 21 00 346-91 P co2 358.960 -999.990 ... S1 1996 06 04 08 30 -27.1500 -109.4500 50.00 48232 EIC 1996 04 16 21 00 15-91 P co2 358.250 -999.990 ... S1 1996 06 04 08 40 -27.1500 -109.4500 50.00 48233 EIC 1996 04 16 21 00 16-91 P co2 358.510 -999.990 ... S1 1996 06 04 08 42 -27.1500 -109.4500 50.00 48234 EIC 1996 04 23 22 00 105-91 P co2 358.760 -999.990 ... S1 1996 06 14 09 56 -27.1500 -109.4500 50.00 48235 EIC 1996 04 23 22 00 106-91 P co2 358.310 -999.990 ... S1 1996 06 14 09 58 -27.1500 -109.4500 50.00 48236 EIC 1996 05 06 21 00 1255-91 P co2 358.600 -999.990 ... S1 1996 06 14 09 48 -27.1500 -109.4500 50.00 48237 EIC 1996 05 06 21 00 1256-91 P co2 358.620 -999.990 ... S1 1996 06 14 09 50 -27.1500 -109.4500 50.00 48238 EIC 1996 05 17 21 00 252-91 P co2 -999.990 -999.990 *.. S1 1996 07 18 08 42 -27.1500 -109.4500 50.00 48239 EIC 1996 05 17 21 00 384-91 P co2 358.620 -999.990 -.. S1 1996 07 18 08 40 -27.1500 -109.4500 50.00 48240 EIC 1996 05 24 21 00 131-91 P co2 358.060 -999.990 ... S1 1996 07 18 10 32 -27.1500 -109.4500 50.00 48241 EIC 1996 05 24 21 00 132-91 P co2 358.060 -999.990 ... S1 1996 07 18 10 34 -27.1500 -109.4500 50.00 48242 EIC 1996 05 31 21 00 1513-91 P co2 358.310 -999.990 ... S1 1996 07 12 09 12 -27.1500 -109.4500 50.00 48243 EIC 1996 05 31 21 00 1514-91 P co2 358.410 -999.990 ... S1 1996 07 12 09 14 -27.1500 -109.4500 50.00 48244 EIC 1996 06 04 21 00 233-91 P co2 358.960 -999.990 ... S1 1996 07 12 09 16 -27.1500 -109.4500 50.00 48245 EIC 1996 06 04 21 00 234-91 P co2 358.850 -999.990 ... S1 1996 07 12 09 18 -27.1500 -109.4500 50.00 48246 EIC 1996 06 15 00 00 581-91 P co2 361.140 -999.990 .X. S1 1996 08 21 08 24 -27.1500 -109.4500 50.00 48247 EIC 1996 06 15 00 00 582-91 P co2 361.310 -999.990 .X. S1 1996 08 21 08 26 -27.1500 -109.4500 50.00 48248 EIC 1996 06 21 21 00 251-91 P co2 359.190 -999.990 ... S1 1996 08 21 08 28 -27.1500 -109.4500 50.00 48249 EIC 1996 06 21 21 00 252-91 P co2 359.200 -999.990 ... S1 1996 08 21 08 30 -27.1500 -109.4500 50.00 48250 EIC 1996 06 29 18 00 695-91 P co2 359.140 -999.990 ... S1 1996 09 06 09 32 -27.1500 -109.4500 50.00 48251 EIC 1996 06 29 18 00 696-91 P co2 359.080 -999.990 ... S1 1996 09 06 09 34 -27.1500 -109.4500 50.00 48252 EIC 1996 07 07 17 00 323-91 P co2 357.950 -999.990 -.. S1 1996 09 06 09 28 -27.1500 -109.4500 50.00 48253 EIC 1996 07 07 17 00 324-91 P co2 358.480 -999.990 +.. S1 1996 09 06 09 30 -27.1500 -109.4500 50.00 48254 EIC 1996 07 08 00 00 333-91 P co2 359.200 -999.990 ... S1 1996 09 24 10 04 -27.1500 -109.4500 50.00 48255 EIC 1996 07 08 00 00 334-91 P co2 359.260 -999.990 ... S1 1996 09 24 10 06 -27.1500 -109.4500 50.00 48256 EIC 1996 07 17 19 00 69-91 P co2 358.730 -999.990 ... S1 1996 09 24 09 12 -27.1500 -109.4500 50.00 48257 EIC 1996 07 17 19 00 70-91 P co2 359.070 -999.990 ... S1 1996 09 24 09 14 -27.1500 -109.4500 50.00 48258 EIC 1996 08 02 03 00 515-91 P co2 359.040 -999.990 ... S1 1996 09 24 09 20 -27.1500 -109.4500 50.00 48259 EIC 1996 08 02 03 00 516-91 P co2 358.900 -999.990 ... S1 1996 09 24 09 22 -27.1500 -109.4500 50.00 48260 EIC 1996 08 09 01 00 1415-91 P co2 359.210 -999.990 ... S1 1996 09 24 09 16 -27.1500 -109.4500 50.00 48261 EIC 1996 08 09 01 00 1416-91 P co2 358.880 -999.990 ... S1 1996 09 24 09 18 -27.1500 -109.4500 50.00 48262 EIC 1996 08 16 22 30 1249-91 P co2 359.570 -999.990 ... S1 1996 10 18 14 56 -27.1500 -109.4500 50.00 48263 EIC 1996 08 16 22 30 1250-91 P co2 359.490 -999.990 ... S1 1996 10 18 14 57 -27.1500 -109.4500 50.00 48264 EIC 1996 08 20 19 00 607-91 P co2 360.060 -999.990 ... S1 1996 10 18 12 26 -27.1500 -109.4500 50.00 48265 EIC 1996 08 20 19 00 608-91 P co2 360.060 -999.990 ... S1 1996 10 18 12 27 -27.1500 -109.4500 50.00 48266 EIC 1996 08 24 23 00 1177-91 P co2 360.160 -999.990 ... S1 1996 10 18 14 58 -27.1500 -109.4500 50.00 48267 EIC 1996 08 24 23 00 1178-91 P co2 359.950 -999.990 ... S1 1996 10 18 14 59 -27.1500 -109.4500 50.00 48268 EIC 1996 09 03 22 00 335-91 P co2 360.130 -999.990 ... S1 1996 10 16 14 56 -27.1500 -109.4500 50.00 48269 EIC 1996 09 03 22 00 336-91 P co2 359.860 -999.990 ... S1 1996 10 16 14 58 -27.1500 -109.4500 50.00 48270 EIC 1996 09 13 21 00 1239-91 P co2 359.380 -999.990 ... S1 1996 11 25 16 59 -27.1500 -109.4500 50.00 48271 EIC 1996 09 13 21 00 1240-91 P co2 359.650 -999.990 ... S1 1996 11 25 17 00 -27.1500 -109.4500 50.00 48272 EIC 1996 09 17 23 00 1059-91 P co2 359.870 -999.990 ... S1 1996 11 25 16 54 -27.1500 -109.4500 50.00 48273 EIC 1996 09 17 23 00 1060-91 P co2 359.610 -999.990 ... S1 1996 11 25 16 56 -27.1500 -109.4500 50.00 48274 EIC 1996 09 24 23 00 639-91 P co2 359.730 -999.990 ... S1 1996 11 25 15 20 -27.1500 -109.4500 50.00 48275 EIC 1996 09 24 23 00 640-91 P co2 359.620 -999.990 ... S1 1996 11 25 15 22 -27.1500 -109.4500 50.00 48276 EIC 1996 10 06 18 00 1447-91 P co2 359.550 -999.990 ... S1 1996 11 25 15 18 -27.1500 -109.4500 50.00 48277 EIC 1996 10 06 18 00 1448-91 P co2 359.250 -999.990 ... S1 1996 11 25 15 19 -27.1500 -109.4500 50.00 48278 EIC 1996 10 08 22 00 1559-91 P co2 358.930 -999.990 ... S1 1996 11 25 15 16 -27.1500 -109.4500 50.00 48279 EIC 1996 10 08 22 00 1560-91 P co2 359.000 -999.990 ... S1 1996 11 25 15 17 -27.1500 -109.4500 50.00 48280 EIC 1996 10 15 22 45 1769-91 P co2 360.260 -999.990 ... S1 1996 11 25 15 14 -27.1500 -109.4500 50.00 48281 EIC 1996 10 15 22 45 1770-91 P co2 360.260 -999.990 ... S1 1996 11 25 15 15 -27.1500 -109.4500 50.00 48282 EIC 1996 10 22 21 00 1009-91 P co2 352.060 -999.990 -.. S1 1997 03 17 15 35 -27.1500 -109.4500 50.00 48283 EIC 1996 10 22 21 00 1010-91 P co2 358.910 -999.990 +.. S1 1997 03 17 15 36 -27.1500 -109.4500 50.00 48284 EIC 1996 10 29 15 00 97-91 P co2 358.740 -999.990 ... S1 1997 03 17 15 37 -27.1500 -109.4500 50.00 48285 EIC 1996 10 29 15 00 98-91 P co2 358.530 -999.990 ... S1 1997 03 17 15 38 -27.1500 -109.4500 50.00 48286 EIC 1996 11 06 00 16 161-91 P co2 359.800 -999.990 ... S1 1997 02 03 15 12 -27.1500 -109.4500 50.00 48287 EIC 1996 11 06 00 16 162-91 P co2 359.660 -999.990 ... S1 1997 02 03 15 13 -27.1500 -109.4500 50.00 48288 EIC 1996 11 12 20 28 701-91 P co2 358.520 -999.990 ... S1 1997 02 03 15 14 -27.1500 -109.4500 50.00 48289 EIC 1996 11 12 20 28 702-91 P co2 358.800 -999.990 ... S1 1997 02 03 15 15 -27.1500 -109.4500 50.00 48290 EIC 1996 11 19 20 00 1355-91 P co2 360.620 -999.990 ... S1 1996 12 31 12 48 -27.1500 -109.4500 50.00 48291 EIC 1996 11 19 20 00 1356-91 P co2 360.790 -999.990 ... S1 1996 12 31 12 49 -27.1500 -109.4500 50.00 48292 EIC 1996 11 26 23 00 301-91 P co2 360.000 -999.990 ... S1 1996 12 31 12 46 -27.1500 -109.4500 50.00 48293 EIC 1996 11 26 23 00 302-91 P co2 360.030 -999.990 ... S1 1996 12 31 12 47 -27.1500 -109.4500 50.00 48294 EIC 1996 12 03 19 00 1315-91 P co2 360.190 -999.990 ... S1 1997 02 11 16 06 -27.1500 -109.4500 50.00 48295 EIC 1996 12 03 19 00 1316-91 P co2 360.180 -999.990 ... S1 1997 02 11 16 07 -27.1500 -109.4500 50.00 48296 EIC 1996 12 10 21 00 2055-91 P co2 360.530 -999.990 ... S1 1997 02 11 16 08 -27.1500 -109.4500 50.00 48297 EIC 1996 12 10 21 00 2056-91 P co2 360.630 -999.990 ... S1 1997 02 11 16 09 -27.1500 -109.4500 50.00 48298 EIC 1996 12 17 15 00 1047-91 P co2 360.490 -999.990 -.. S1 1997 02 07 14 28 -27.1500 -109.4500 50.00 48299 EIC 1996 12 17 15 00 1048-91 P co2 366.800 -999.990 +.. S1 1997 02 07 14 29 -27.1500 -109.4500 50.00 48300 EIC 1996 12 24 22 00 231-91 P co2 361.160 -999.990 ... S1 1997 02 07 16 14 -27.1500 -109.4500 50.00 48301 EIC 1996 12 24 22 00 232-91 P co2 360.930 -999.990 ... S1 1997 02 07 16 16 -27.1500 -109.4500 50.00 48302 EIC 1996 12 31 21 00 1475-91 P co2 361.170 -999.990 ... S1 1997 03 17 14 01 -27.1500 -109.4500 50.00 48303 EIC 1996 12 31 21 00 1476-91 P co2 360.860 -999.990 ... S1 1997 03 17 14 02 -27.1500 -109.4500 50.00 48304 EIC 1997 01 07 23 00 139-91 P co2 361.120 -999.990 +.. S1 1997 03 17 13 24 -27.1500 -109.4500 50.00 48305 EIC 1997 01 07 23 00 140-91 P co2 360.460 -999.990 -.. S1 1997 03 17 13 26 -27.1500 -109.4500 50.00 48306 EIC 1997 01 21 23 00 47-91 P co2 361.500 -999.990 ... S1 1997 03 17 15 41 -27.1500 -109.4500 50.00 48307 EIC 1997 01 21 23 00 48-91 P co2 361.550 -999.990 ... S1 1997 03 17 15 42 -27.1500 -109.4500 50.00 48308 EIC 1997 01 28 21 00 2033-91 P co2 360.440 -999.990 ... S1 1997 03 20 14 45 -27.1500 -109.4500 50.00 48309 EIC 1997 01 28 21 00 2034-91 P co2 360.580 -999.990 ... S1 1997 03 20 14 46 -27.1500 -109.4500 50.00 48310 EIC 1997 02 04 18 00 1471-91 P co2 360.880 -999.990 ... S1 1997 04 14 16 27 -27.1500 -109.4500 50.00 48311 EIC 1997 02 04 18 00 1472-91 P co2 361.010 -999.990 ... S1 1997 04 14 16 28 -27.1500 -109.4500 50.00 48312 EIC 1997 02 15 19 00 1353-91 P co2 360.080 -999.990 ... S1 1997 04 14 16 29 -27.1500 -109.4500 50.00 48313 EIC 1997 02 15 19 00 1354-91 P co2 360.240 -999.990 ... S1 1997 04 14 16 30 -27.1500 -109.4500 50.00 48314 EIC 1997 02 21 21 00 1709-91 P co2 361.340 -999.990 ... S1 1997 04 14 13 47 -27.1500 -109.4500 50.00 48315 EIC 1997 02 21 21 00 1710-91 P co2 361.260 -999.990 ... S1 1997 04 14 13 48 -27.1500 -109.4500 50.00 48316 EIC 1997 02 26 00 00 1861-91 P co2 362.530 -999.990 .X. S1 1997 04 14 13 49 -27.1500 -109.4500 50.00 48317 EIC 1997 02 26 00 00 1862-91 P co2 362.420 -999.990 .X. S1 1997 04 14 13 50 -27.1500 -109.4500 50.00 48318 EIC 1997 03 07 21 00 847-91 P co2 358.630 -999.990 ... S1 1997 05 05 14 37 -27.1500 -109.4500 50.00 48319 EIC 1997 03 07 21 00 848-91 P co2 358.480 -999.990 ... S1 1997 05 05 14 38 -27.1500 -109.4500 50.00 48320 EIC 1997 03 11 21 00 1165-91 P co2 359.870 -999.990 ... S1 1997 05 12 13 41 -27.1500 -109.4500 50.00 48321 EIC 1997 03 11 21 00 1166-91 P co2 360.010 -999.990 ... S1 1997 05 12 13 42 -27.1500 -109.4500 50.00 48322 EIC 1997 03 15 15 00 849-91 P co2 359.890 -999.990 +.. S1 1997 05 19 13 39 -27.1500 -109.4500 50.00 48323 EIC 1997 03 15 15 00 850-91 P co2 358.250 -999.990 -.. S1 1997 05 19 13 40 -27.1500 -109.4500 50.00 48324 EIC 1997 03 22 15 00 695-91 P co2 358.030 -999.990 ... S1 1997 05 05 14 39 -27.1500 -109.4500 50.00 48325 EIC 1997 03 22 15 00 696-91 P co2 358.040 -999.990 ... S1 1997 05 05 14 40 -27.1500 -109.4500 50.00 48326 EIC 1997 04 04 21 00 1715-91 P co2 360.500 -999.990 ... S1 1997 05 28 14 50 -27.1500 -109.4500 50.00 48327 EIC 1997 04 04 21 00 1716-91 P co2 360.440 -999.990 ... S1 1997 05 28 14 51 -27.1500 -109.4500 50.00 48328 EIC 1997 04 12 18 00 1521-91 P co2 359.350 -999.990 +.. S1 1997 05 28 14 52 -27.1500 -109.4500 50.00 48329 EIC 1997 04 12 18 00 1522-91 P co2 358.780 -999.990 -.. S1 1997 05 28 14 53 -27.1500 -109.4500 50.00 48330 EIC 1997 04 18 21 00 1309-91 P co2 359.670 -999.990 ... S1 1997 05 27 13 44 -27.1500 -109.4500 50.00 48331 EIC 1997 04 18 21 00 1310-91 P co2 359.550 -999.990 ... S1 1997 05 27 13 45 -27.1500 -109.4500 50.00 48332 EIC 1997 04 25 22 00 723-91 P co2 360.310 -999.990 ... S1 1997 05 27 13 59 -27.1500 -109.4500 50.00 48333 EIC 1997 04 25 22 00 724-91 P co2 360.100 -999.990 ... S1 1997 05 27 14 00 -27.1500 -109.4500 50.00 48334 EIC 1997 05 06 22 30 1769-91 P co2 359.000 -999.990 ... S1 1997 07 14 14 43 -27.1500 -109.4500 50.00 48335 EIC 1997 05 06 22 30 1770-91 P co2 358.990 -999.990 ... S1 1997 07 14 14 44 -27.1500 -109.4500 50.00 48336 EIC 1997 05 13 21 00 639-91 P co2 360.650 -999.990 ... S1 1997 07 14 14 41 -27.1500 -109.4500 50.00 48337 EIC 1997 05 13 21 00 640-91 P co2 360.570 -999.990 ... S1 1997 07 14 14 42 -27.1500 -109.4500 50.00 48338 EIC 1997 06 05 15 00 597-91 P co2 358.520 -999.990 ... S1 1997 08 01 15 06 -27.1500 -109.4500 50.00 48339 EIC 1997 06 05 15 00 598-91 P co2 358.790 -999.990 ... S1 1997 08 01 15 07 -27.1500 -109.4500 50.00 48340 EIC 1997 06 10 15 00 1657-91 P co2 364.950 -999.990 .X. S1 1997 08 01 15 04 -27.1500 -109.4500 50.00 48341 EIC 1997 06 10 15 00 1658-91 P co2 364.490 -999.990 .X. S1 1997 08 01 15 05 -27.1500 -109.4500 50.00 48342 EIC 1997 06 17 23 00 4041-91 P co2 359.900 -999.990 ... S1 1997 08 01 15 08 -27.1500 -109.4500 50.00 48343 EIC 1997 06 17 23 00 4042-91 P co2 359.840 -999.990 ... S1 1997 08 01 15 09 -27.1500 -109.4500 50.00 48344 EIC 1997 06 27 18 00 1575-91 P co2 360.030 -999.990 ... S1 1997 08 01 15 11 -27.1500 -109.4500 50.00 48345 EIC 1997 06 27 18 00 1576-91 P co2 360.040 -999.990 ... S1 1997 08 01 15 12 -27.1500 -109.4500 50.00 48346 EIC 1997 07 09 23 00 707-91 P co2 360.680 -999.990 ... L3 1997 08 29 11 16 -27.1500 -109.4500 50.00 48347 EIC 1997 07 09 23 00 708-91 P co2 360.760 -999.990 ... L3 1997 08 29 11 30 -27.1500 -109.4500 50.00 48348 EIC 1997 07 12 12 34 155-91 P co2 361.470 -999.990 ... L3 1997 08 29 09 53 -27.1500 -109.4500 50.00 48349 EIC 1997 07 12 12 34 156-91 P co2 361.610 -999.990 ... L3 1997 08 29 10 07 -27.1500 -109.4500 50.00 48350 EIC 1997 07 18 15 00 493-91 P co2 361.140 -999.990 ... L3 1997 08 29 13 07 -27.1500 -109.4500 50.00 48351 EIC 1997 07 18 15 00 494-91 P co2 361.110 -999.990 ... L3 1997 08 29 13 21 -27.1500 -109.4500 50.00 48352 EIC 1997 07 26 21 00 731-91 P co2 361.000 -999.990 ... L3 1997 08 29 12 40 -27.1500 -109.4500 50.00 48353 EIC 1997 07 26 21 00 732-91 P co2 360.810 -999.990 ... L3 1997 08 29 12 53 -27.1500 -109.4500 50.00 48354 EIC 1997 08 01 21 00 377-91 P co2 321.720 -999.990 N.. L3 1997 10 08 14 18 -27.1500 -109.4500 50.00 48355 EIC 1997 08 01 21 00 378-91 P co2 321.430 -999.990 N.. L3 1997 10 08 14 31 -27.1500 -109.4500 50.00 48356 EIC 1997 08 08 21 00 473-91 P co2 361.010 -999.990 ... L3 1997 10 08 12 57 -27.1500 -109.4500 50.00 48357 EIC 1997 08 08 21 00 474-91 P co2 361.120 -999.990 ... L3 1997 10 08 13 11 -27.1500 -109.4500 50.00 48358 EIC 1997 08 19 22 00 827-91 P co2 360.420 -999.990 ... L3 1997 10 06 10 47 -27.1500 -109.4500 50.00 48359 EIC 1997 08 19 22 00 828-91 P co2 360.460 -999.990 ... L3 1997 10 06 11 00 -27.1500 -109.4500 50.00 48360 EIC 1997 08 26 15 00 1373-91 P co2 361.260 -999.990 ... L3 1997 10 06 11 13 -27.1500 -109.4500 50.00 48361 EIC 1997 08 26 15 00 1374-91 P co2 361.310 -999.990 ... L3 1997 10 06 11 27 -27.1500 -109.4500 50.00 48362 EIC 1997 09 02 22 00 1679-91 P co2 360.610 -999.990 ... L3 1997 11 11 12 52 -27.1500 -109.4500 50.00 48363 EIC 1997 09 02 22 00 1680-91 P co2 360.680 -999.990 ... L3 1997 11 11 13 05 -27.1500 -109.4500 50.00 48364 EIC 1997 09 16 21 00 1283-91 P co2 360.810 -999.990 ... L3 1997 11 11 14 23 -27.1500 -109.4500 50.00 48365 EIC 1997 09 16 21 00 1284-91 P co2 360.860 -999.990 ... L3 1997 11 11 14 36 -27.1500 -109.4500 50.00 48366 EIC 1997 09 23 22 00 41-91 P co2 360.550 -999.990 ... L3 1997 11 11 13 19 -27.1500 -109.4500 50.00 48367 EIC 1997 09 23 22 00 42-91 P co2 360.730 -999.990 ... L3 1997 11 11 13 32 -27.1500 -109.4500 50.00 48368 EIC 1997 09 30 18 00 4307-91 P co2 361.000 -999.990 ... L3 1997 11 11 13 45 -27.1500 -109.4500 50.00 48369 EIC 1997 09 30 18 00 4308-91 P co2 360.640 -999.990 ... L3 1997 11 11 13 59 -27.1500 -109.4500 50.00 48370 EIC 1997 10 07 21 00 1703-91 P co2 361.270 -999.990 ... L3 1997 12 10 13 44 -27.1500 -109.4500 50.00 48371 EIC 1997 10 07 21 00 1704-91 P co2 361.030 -999.990 ... L3 1997 12 10 13 58 -27.1500 -109.4500 50.00 48372 EIC 1997 10 16 15 00 100-91 P co2 361.000 -999.990 ... L3 1997 12 10 13 31 -27.1500 -109.4500 50.00 48373 EIC 1997 10 16 15 00 99-91 P co2 360.780 -999.990 ... L3 1997 12 10 13 17 -27.1500 -109.4500 50.00 48374 EIC 1997 10 21 15 00 21-91 P co2 361.570 -999.990 -.. L3 1997 12 09 13 03 -27.1500 -109.4500 50.00 48375 EIC 1997 10 21 15 00 22-91 P co2 362.300 -999.990 +.. L3 1997 12 09 13 16 -27.1500 -109.4500 50.00 48376 EIC 1997 10 28 21 00 1455-91 P co2 361.530 -999.990 ... L3 1997 12 09 13 57 -27.1500 -109.4500 50.00 48377 EIC 1997 10 28 21 00 1456-91 P co2 361.110 -999.990 ... L3 1997 12 09 14 10 -27.1500 -109.4500 50.00 48378 EIC 1997 11 07 15 00 375-91 P co2 362.100 -999.990 ... L3 1998 01 12 13 45 -27.1500 -109.4500 50.00 48379 EIC 1997 11 07 15 00 376-91 P co2 362.090 -999.990 ... L3 1998 01 12 13 58 -27.1500 -109.4500 50.00 48380 EIC 1997 11 22 21 00 141-91 P co2 361.490 -999.990 ... L3 1998 01 12 13 17 -27.1500 -109.4500 50.00 48381 EIC 1997 11 22 21 00 142-91 P co2 361.260 -999.990 ... L3 1998 01 12 13 31 -27.1500 -109.4500 50.00 48382 EIC 1997 12 01 22 30 4151-91 P co2 362.550 -999.990 ... L3 1998 01 08 16 29 -27.1500 -109.4500 50.00 48383 EIC 1997 12 01 22 30 4152-91 P co2 362.180 -999.990 ... L3 1998 01 08 16 42 -27.1500 -109.4500 50.00 48384 EIC 1997 12 06 21 00 1451-91 P co2 362.620 -999.990 ... L3 1998 01 09 13 14 -27.1500 -109.4500 50.00 48385 EIC 1997 12 06 21 00 1452-91 P co2 362.510 -999.990 ... L3 1998 01 09 13 28 -27.1500 -109.4500 50.00 48386 EIC 1997 12 09 21 00 1615-91 P co2 362.100 -999.990 ... L3 1998 02 12 10 20 -27.1500 -109.4500 50.00 48387 EIC 1997 12 09 21 00 1616-91 P co2 362.170 -999.990 ... L3 1998 02 12 10 34 -27.1500 -109.4500 50.00 48388 EIC 1997 12 14 20 00 1159-91 P co2 361.470 -999.990 ... L3 1998 02 12 09 53 -27.1500 -109.4500 50.00 48389 EIC 1997 12 14 20 00 1160-91 P co2 361.410 -999.990 ... L3 1998 02 12 10 07 -27.1500 -109.4500 50.00 48390 EIC 1997 12 23 21 00 532-91 P co2 362.100 -999.990 ... L3 1998 02 17 11 23 -27.1500 -109.4500 50.00 48391 EIC 1997 12 30 15 00 4295-91 P co2 362.100 -999.990 ... L3 1998 02 17 10 56 -27.1500 -109.4500 50.00 48392 EIC 1997 12 30 15 00 4296-91 P co2 361.940 -999.990 ... L3 1998 02 17 11 10 -27.1500 -109.4500 50.00 48393 EIC 1998 01 06 18 00 1293-91 P co2 361.680 -999.990 ... L3 1998 02 16 13 37 -27.1500 -109.4500 50.00 48394 EIC 1998 01 06 18 00 1294-91 P co2 361.710 -999.990 ... L3 1998 02 16 13 51 -27.1500 -109.4500 50.00 48395 EIC 1998 01 13 23 00 1753-91 P co2 362.190 -999.990 ... L3 1998 02 16 13 10 -27.1500 -109.4500 50.00 48396 EIC 1998 01 13 23 00 1754-91 P co2 362.260 -999.990 ... L3 1998 02 16 13 23 -27.1500 -109.4500 50.00 48397 EIC 1998 01 20 21 00 1841-91 P co2 362.120 -999.990 ... L3 1998 03 09 10 35 -27.1500 -109.4500 50.00 48398 EIC 1998 01 20 21 00 1842-91 P co2 362.080 -999.990 ... L3 1998 03 09 10 49 -27.1500 -109.4500 50.00 48399 EIC 1998 01 27 21 00 851-91 P co2 362.750 -999.990 ... L3 1998 03 09 11 02 -27.1500 -109.4500 50.00 48400 EIC 1998 01 27 21 00 852-91 P co2 362.610 -999.990 ... L3 1998 03 09 11 16 -27.1500 -109.4500 50.00 48401 EIC 1998 02 03 21 00 1011-91 P co2 362.780 -999.990 ... L3 1998 03 09 09 25 -27.1500 -109.4500 50.00 48402 EIC 1998 02 03 21 00 1012-91 P co2 362.780 -999.990 ... L3 1998 03 09 09 39 -27.1500 -109.4500 50.00 48403 EIC 1998 02 10 21 00 1024-91 P co2 363.790 -999.990 ... L3 1998 03 09 10 20 -27.1500 -109.4500 50.00 48404 EIC 1998 02 17 21 00 4217-91 P co2 328.330 -999.990 +.. L3 1998 04 08 11 16 -27.1500 -109.4500 50.00 48405 EIC 1998 02 17 21 00 4218-91 P co2 327.560 -999.990 -.. L3 1998 04 08 11 29 -27.1500 -109.4500 50.00 48406 EIC 1998 02 24 20 00 4307-91 P co2 362.740 -999.990 ... L3 1998 04 08 10 19 -27.1500 -109.4500 50.00 48407 EIC 1998 02 24 20 00 4308-91 P co2 362.820 -999.990 ... L3 1998 04 08 10 33 -27.1500 -109.4500 50.00 48408 EIC 1998 03 03 21 00 927-91 P co2 363.040 -999.990 ... L3 1998 04 08 09 52 -27.1500 -109.4500 50.00 48409 EIC 1998 03 03 21 00 928-91 P co2 362.840 -999.990 ... L3 1998 04 08 10 06 -27.1500 -109.4500 50.00 48410 EIC 1998 03 10 21 00 57-91 P co2 370.160 -999.990 -.. L3 1998 04 08 09 25 -27.1500 -109.4500 50.00 48411 EIC 1998 03 10 21 00 58-91 P co2 371.540 -999.990 +.. L3 1998 04 08 09 39 -27.1500 -109.4500 50.00 48412 EIC 1998 03 22 18 00 1711-91 P co2 362.320 -999.990 ... L3 1998 05 04 14 58 -27.1500 -109.4500 50.00 48413 EIC 1998 03 22 18 00 1712-91 P co2 362.270 -999.990 ... L3 1998 05 04 15 11 -27.1500 -109.4500 50.00 48414 EIC 1998 03 25 21 00 29-91 P co2 360.970 -999.990 ... L3 1998 05 04 15 27 -27.1500 -109.4500 50.00 48415 EIC 1998 03 25 21 00 30-91 P co2 361.000 -999.990 ... L3 1998 05 04 15 40 -27.1500 -109.4500 50.00 48416 EIC 1998 04 01 21 00 4097-91 P co2 363.480 -999.990 .X. L3 1998 05 04 16 21 -27.1500 -109.4500 50.00 48417 EIC 1998 04 01 21 00 4098-91 P co2 381.290 -999.990 A.. L3 1998 05 04 16 35 -27.1500 -109.4500 50.00 48418 EIC 1998 04 01 21 00 4098-91 P co2 363.600 -999.990 .X. L3 1998 05 04 16 50 -27.1500 -109.4500 50.00 48418 EIC 1998 04 08 18 00 647-91 P co2 360.520 -999.990 ... L3 1998 05 04 15 54 -27.1500 -109.4500 50.00 48419 EIC 1998 04 08 18 00 648-91 P co2 360.370 -999.990 ... L3 1998 05 04 16 08 -27.1500 -109.4500 50.00 48420 EIC 1998 04 22 21 00 171-91 P co2 360.660 -999.990 ... L3 1998 06 17 15 54 -27.1500 -109.4500 50.00 48421 EIC 1998 04 22 21 00 172-91 P co2 360.760 -999.990 ... L3 1998 06 17 16 08 -27.1500 -109.4500 50.00 48422 EIC 1998 04 29 21 00 1845-91 P co2 361.950 -999.990 ... L3 1998 06 17 16 23 -27.1500 -109.4500 50.00 48423 EIC 1998 04 29 21 00 1846-91 P co2 361.960 -999.990 ... L3 1998 06 17 16 37 -27.1500 -109.4500 50.00 48424 EIC 1998 05 10 21 00 1119-91 P co2 361.700 -999.990 ... L3 1998 06 18 10 18 -27.1500 -109.4500 50.00 48425 EIC 1998 05 10 21 00 1120-91 P co2 361.940 -999.990 ... L3 1998 06 18 10 31 -27.1500 -109.4500 50.00 48426 EIC 1998 05 13 21 00 1801-91 P co2 361.310 -999.990 ... L3 1998 06 18 09 50 -27.1500 -109.4500 50.00 48427 EIC 1998 05 13 21 00 1802-91 P co2 361.690 -999.990 ... L3 1998 06 18 10 04 -27.1500 -109.4500 50.00 48428 EIC 1998 05 20 21 00 1435-91 P co2 361.440 -999.990 ... L3 1998 07 06 16 23 -27.1500 -109.4500 50.00 48429 EIC 1998 05 20 21 00 1436-91 P co2 361.420 -999.990 ... L3 1998 07 06 16 37 -27.1500 -109.4500 50.00 48430 EIC 1998 05 27 21 00 4747-91 P co2 364.280 -999.990 .X. L3 1998 07 06 15 54 -27.1500 -109.4500 50.00 48431 EIC 1998 05 27 21 00 4748-91 P co2 364.370 -999.990 .X. L3 1998 07 06 16 08 -27.1500 -109.4500 50.00 48432 EIC 1998 06 03 21 00 4031-91 P co2 362.620 -999.990 ... L3 1998 07 06 15 27 -27.1500 -109.4500 50.00 48433 EIC 1998 06 03 21 00 4032-91 P co2 362.980 -999.990 ... L3 1998 07 06 15 41 -27.1500 -109.4500 50.00 48434 EIC 1998 06 11 21 00 1915-91 P co2 362.830 -999.990 ... L3 1998 06 29 16 03 -27.1500 -109.4500 50.00 48435 EIC 1998 06 11 21 00 1916-91 P co2 362.620 -999.990 ... L3 1998 06 29 16 17 -27.1500 -109.4500 50.00 48436 EIC 1998 06 17 21 00 4071-91 P co2 366.430 -999.990 .X. L3 1998 07 23 12 49 -27.1500 -109.4500 50.00 48437 EIC 1998 06 17 21 00 4072-91 P co2 366.290 -999.990 .X. L3 1998 07 23 13 02 -27.1500 -109.4500 50.00 48438 EIC 1998 06 21 23 00 4089-91 P co2 362.750 -999.990 +.. L3 1998 07 23 12 20 -27.1500 -109.4500 50.00 48439 EIC 1998 06 21 23 00 4090-91 P co2 361.990 -999.990 -.. L3 1998 07 23 12 33 -27.1500 -109.4500 50.00 48440 EIC 1998 06 26 15 00 4023-91 P co2 363.330 -999.990 -.. L3 1998 07 22 11 25 -27.1500 -109.4500 50.00 48441 EIC 1998 06 26 15 00 4024-91 P co2 364.810 -999.990 +.. L3 1998 07 22 11 38 -27.1500 -109.4500 50.00 48442 EIC 1998 07 01 21 00 1571-91 P co2 362.190 -999.990 ... L3 1998 08 24 11 44 -27.1500 -109.4500 50.00 48443 EIC 1998 07 01 21 00 1572-91 P co2 362.610 -999.990 ... L3 1998 08 24 11 57 -27.1500 -109.4500 50.00 48444 EIC 1998 07 08 21 00 1391-91 P co2 362.380 -999.990 ... L3 1998 08 21 15 58 -27.1500 -109.4500 50.00 48445 EIC 1998 07 08 21 00 1392-91 P co2 362.370 -999.990 ... L3 1998 08 21 16 12 -27.1500 -109.4500 50.00 48446 EIC 1998 07 15 21 00 4225-91 P co2 363.210 -999.990 ... L3 1998 08 21 14 36 -27.1500 -109.4500 50.00 48447 EIC 1998 07 15 21 00 4226-91 P co2 363.210 -999.990 ... L3 1998 08 21 14 50 -27.1500 -109.4500 50.00 48448 EIC 1998 07 22 21 00 4487-91 P co2 365.290 -999.990 ... L3 1998 08 21 15 04 -27.1500 -109.4500 50.00 48449 EIC 1998 07 22 21 00 4488-91 P co2 365.040 -999.990 ... L3 1998 08 21 15 17 -27.1500 -109.4500 50.00 48450 EIC 1998 08 05 21 00 4029-91 P co2 364.250 -999.990 ... L3 1998 10 01 12 11 -27.1500 -109.4500 50.00 48451 EIC 1998 08 05 21 00 4030-91 P co2 364.230 -999.990 ... L3 1998 10 01 12 25 -27.1500 -109.4500 50.00 48452 EIC 1998 08 12 23 00 563-91 P co2 363.930 -999.990 ... L3 1998 10 02 09 46 -27.1500 -109.4500 50.00 48453 EIC 1998 08 12 23 00 564-91 P co2 363.790 -999.990 ... L3 1998 10 02 09 59 -27.1500 -109.4500 50.00 48454 EIC 1998 08 19 15 00 4389-91 P co2 364.630 -999.990 ... L3 1998 10 02 12 08 -27.1500 -109.4500 50.00 48455 EIC 1998 08 19 15 00 4390-91 P co2 364.610 -999.990 ... L3 1998 10 02 12 21 -27.1500 -109.4500 50.00 48456 EIC 1998 08 26 22 00 4707-91 P co2 364.610 -999.990 ... L3 1998 10 02 12 35 -27.1500 -109.4500 50.00 48457 EIC 1998 08 26 22 00 4708-91 P co2 364.600 -999.990 ... L3 1998 10 02 12 49 -27.1500 -109.4500 50.00 48458 EIC 1998 09 06 21 00 377-91 P co2 364.510 -999.990 ... L3 1998 11 13 13 14 -27.1500 -109.4500 50.00 48459 EIC 1998 09 06 21 00 378-91 P co2 364.510 -999.990 ... L3 1998 11 13 13 28 -27.1500 -109.4500 50.00 48460 EIC 1998 09 16 21 00 1773-91 P co2 363.850 -999.990 ... L3 1998 11 13 13 41 -27.1500 -109.4500 50.00 48461 EIC 1998 09 16 21 00 1774-91 P co2 363.840 -999.990 ... L3 1998 11 13 13 55 -27.1500 -109.4500 50.00 48462 EIC 1998 09 23 21 00 307-91 P co2 365.000 -999.990 ... L3 1998 11 16 15 41 -27.1500 -109.4500 50.00 48463 EIC 1998 09 23 21 00 308-91 P co2 365.030 -999.990 ... L3 1998 11 16 15 54 -27.1500 -109.4500 50.00 48464 EIC 1998 09 30 21 00 1763-91 P co2 363.700 -999.990 ... L3 1998 11 17 09 52 -27.1500 -109.4500 50.00 48465 EIC 1998 09 30 21 00 1764-91 P co2 363.740 -999.990 ... L3 1998 11 17 10 06 -27.1500 -109.4500 50.00 48466 EIC 1998 10 07 21 00 1667-91 P co2 364.880 -999.990 ... L3 1998 12 09 13 16 -27.1500 -109.4500 50.00 48467 EIC 1998 10 07 21 00 1668-91 P co2 364.830 -999.990 ... L3 1998 12 09 13 29 -27.1500 -109.4500 50.00 48468 EIC 1998 10 28 22 00 487-91 P co2 364.110 -999.990 ... L3 1999 01 11 13 48 -27.1500 -109.4500 50.00 48469 EIC 1998 10 28 22 00 488-91 P co2 364.310 -999.990 ... L3 1999 01 11 14 01 -27.1500 -109.4500 50.00 48470 EIC 1998 11 04 21 00 4441-91 P co2 420.450 -999.990 +.. L3 1998 12 30 10 02 -27.1500 -109.4500 50.00 48471 EIC 1998 11 04 21 00 4442-91 P co2 363.500 -999.990 -.. L3 1998 12 30 10 16 -27.1500 -109.4500 50.00 48472 EIC 1998 11 11 21 00 915-91 P co2 364.810 -999.990 ... L3 1999 01 11 12 53 -27.1500 -109.4500 50.00 48473 EIC 1998 11 11 21 00 916-91 P co2 364.800 -999.990 ... L3 1999 01 11 13 07 -27.1500 -109.4500 50.00 48474 EIC 1998 11 18 21 00 49-98 P co2 365.020 -999.990 ... L3 1999 01 11 13 20 -27.1500 -109.4500 50.00 48475 EIC 1998 11 18 21 00 50-98 P co2 365.200 -999.990 ... L3 1999 01 11 13 34 -27.1500 -109.4500 50.00 48476 EIC 1998 11 25 21 00 1302-91 P co2 364.720 -999.990 ... L3 1999 02 04 14 29 -27.1500 -109.4500 50.00 48477 EIC 1998 12 03 21 00 425-91 P co2 366.860 -999.990 .X. L3 1999 02 04 14 01 -27.1500 -109.4500 50.00 48478 EIC 1998 12 03 21 00 426-91 P co2 366.750 -999.990 .X. L3 1999 02 04 14 15 -27.1500 -109.4500 50.00 48479 EIC 1998 12 09 21 00 1653-91 P co2 364.150 -999.990 ... L3 1999 02 09 09 53 -27.1500 -109.4500 50.00 48480 EIC 1998 12 09 21 00 1654-91 P co2 364.290 -999.990 ... L3 1999 02 09 10 07 -27.1500 -109.4500 50.00 48481 EIC 1998 12 16 21 00 4541-91 P co2 364.470 -999.990 ... L3 1999 02 09 10 20 -27.1500 -109.4500 50.00 48482 EIC 1998 12 16 21 00 4542-91 P co2 364.690 -999.990 ... L3 1999 02 09 10 34 -27.1500 -109.4500 50.00 48483 EIC 1998 12 30 21 00 1719-91 P co2 365.280 -999.990 ... L3 1999 02 09 09 26 -27.1500 -109.4500 50.00 48484 EIC 1998 12 30 21 00 1720-91 P co2 365.470 -999.990 ... L3 1999 02 09 09 39 -27.1500 -109.4500 50.00 48485 EIC 1999 01 06 21 00 1989-91 P co2 366.040 -999.990 ... L3 1999 02 09 12 41 -27.1500 -109.4500 50.00 48486 EIC 1999 01 06 21 00 1990-91 P co2 366.020 -999.990 ... L3 1999 02 09 12 54 -27.1500 -109.4500 50.00 48487 EIC 1999 01 20 21 00 549-91 P co2 365.050 -999.990 ... L3 1999 03 17 13 10 -27.1500 -109.4500 50.00 48488 EIC 1999 01 20 21 00 550-91 P co2 365.020 -999.990 ... L3 1999 03 17 13 24 -27.1500 -109.4500 50.00 48489 EIC 1999 01 27 21 00 41-98 P co2 364.920 -999.990 ... L3 1999 03 17 12 41 -27.1500 -109.4500 50.00 48490 EIC 1999 01 27 21 00 42-98 P co2 364.850 -999.990 ... L3 1999 03 17 12 55 -27.1500 -109.4500 50.00 48491 EIC 1999 02 03 18 00 287-91 P co2 363.000 -999.990 ... L3 1999 03 17 14 05 -27.1500 -109.4500 50.00 48492 EIC 1999 02 03 18 00 288-91 P co2 363.140 -999.990 ... L3 1999 03 17 14 18 -27.1500 -109.4500 50.00 48493 EIC 1999 02 10 21 00 4339-91 P co2 362.910 -999.990 ... L3 1999 03 17 13 37 -27.1500 -109.4500 50.00 48494 EIC 1999 02 10 21 00 4340-91 P co2 363.200 -999.990 ... L3 1999 03 17 13 51 -27.1500 -109.4500 50.00 48495 EIC 1999 02 24 18 00 429-91 P co2 364.350 -999.990 ... L3 1999 05 04 13 31 -27.1500 -109.4500 50.00 48496 EIC 1999 02 24 18 00 430-91 P co2 364.060 -999.990 ... L3 1999 05 04 13 45 -27.1500 -109.4500 50.00 48497 EIC 1999 03 03 21 00 715-91 P co2 364.610 -999.990 ... L3 1999 05 04 13 58 -27.1500 -109.4500 50.00 48498 EIC 1999 03 03 21 00 716-91 P co2 364.660 -999.990 ... L3 1999 05 04 14 12 -27.1500 -109.4500 50.00 48499 EIC 1999 03 10 18 00 1671-91 P co2 364.700 -999.990 ... L3 1999 05 03 14 52 -27.1500 -109.4500 50.00 48500 EIC 1999 03 10 18 00 1672-91 P co2 364.850 -999.990 ... L3 1999 05 03 15 05 -27.1500 -109.4500 50.00 48501 EIC 1999 03 17 12 34 763-91 P co2 365.580 -999.990 ... L3 1999 05 03 15 19 -27.1500 -109.4500 50.00 48502 EIC 1999 03 17 12 34 764-91 P co2 365.240 -999.990 ... L3 1999 05 03 15 33 -27.1500 -109.4500 50.00 48503 EIC 1999 03 24 21 00 4229-91 P co2 364.260 -999.990 ... L3 1999 06 04 13 17 -27.1500 -109.4500 50.00 48504 EIC 1999 03 24 21 00 4230-91 P co2 364.390 -999.990 ... L3 1999 06 04 13 31 -27.1500 -109.4500 50.00 48505 EIC 1999 03 31 15 00 4771-91 P co2 362.870 -999.990 ... L3 1999 06 04 13 44 -27.1500 -109.4500 50.00 48506 EIC 1999 03 31 15 00 4772-91 P co2 363.100 -999.990 ... L3 1999 06 04 13 58 -27.1500 -109.4500 50.00 48507 EIC 1999 04 08 23 00 177-98 P co2 364.860 -999.990 ... L3 1999 06 02 10 07 -27.1500 -109.4500 50.00 48508 EIC 1999 04 08 23 00 178-98 P co2 364.780 -999.990 ... L3 1999 06 02 10 20 -27.1500 -109.4500 50.00 48509 EIC 1999 04 14 21 00 169-98 P co2 364.190 -999.990 ... L3 1999 06 02 10 36 -27.1500 -109.4500 50.00 48510 EIC 1999 04 14 21 00 170-98 P co2 364.290 -999.990 ... L3 1999 06 02 10 49 -27.1500 -109.4500 50.00 48511 EIC 1999 04 21 21 00 261-91 P co2 363.390 -999.990 ... L3 1999 06 02 09 39 -27.1500 -109.4500 50.00 48512 EIC 1999 04 21 21 00 262-91 P co2 363.410 -999.990 ... L3 1999 06 02 09 53 -27.1500 -109.4500 50.00 48513 EIC 1999 04 28 17 00 1065-91 P co2 365.050 -999.990 ... L3 1999 06 02 09 12 -27.1500 -109.4500 50.00 48514 EIC 1999 04 28 17 00 1066-91 P co2 365.040 -999.990 ... L3 1999 06 02 09 26 -27.1500 -109.4500 50.00 48515 EIC 1999 05 05 21 00 1681-91 P co2 363.720 -999.990 ... L3 1999 07 08 13 48 -27.1500 -109.4500 50.00 48516 EIC 1999 05 05 21 00 1682-91 P co2 363.820 -999.990 ... L3 1999 07 08 14 02 -27.1500 -109.4500 50.00 48517 EIC 1999 05 12 15 00 1293-91 P co2 363.640 -999.990 ... L3 1999 07 08 13 21 -27.1500 -109.4500 50.00 48518 EIC 1999 05 12 15 00 1294-91 P co2 363.580 -999.990 ... L3 1999 07 08 13 35 -27.1500 -109.4500 50.00 48519 EIC 1999 05 19 21 00 4709-91 P co2 372.510 -999.990 +.. L3 1999 07 08 10 34 -27.1500 -109.4500 50.00 48520 EIC 1999 05 19 21 00 4710-91 P co2 365.400 -999.990 -.. L3 1999 07 08 10 48 -27.1500 -109.4500 50.00 48521 EIC 1999 05 26 21 00 171-91 P co2 365.000 -999.990 ... L3 1999 07 08 10 07 -27.1500 -109.4500 50.00 48522 EIC 1999 05 26 21 00 172-91 P co2 365.070 -999.990 ... L3 1999 07 08 10 20 -27.1500 -109.4500 50.00 48523 EIC 1999 06 02 15 00 397-91 P co2 365.350 -999.990 ... L3 1999 08 19 12 04 -27.1500 -109.4500 50.00 48524 EIC 1999 06 02 15 00 398-91 P co2 365.350 -999.990 ... L3 1999 08 19 12 18 -27.1500 -109.4500 50.00 48525 EIC 1999 06 09 21 00 4333-91 P co2 364.920 -999.990 ... L3 1999 08 19 12 32 -27.1500 -109.4500 50.00 48526 EIC 1999 06 09 21 00 4334-91 P co2 364.770 -999.990 ... L3 1999 08 19 12 45 -27.1500 -109.4500 50.00 48527 EIC 1999 06 17 18 00 79-98 P co2 364.730 -999.990 ... L3 1999 08 17 13 24 -27.1500 -109.4500 50.00 48528 EIC 1999 06 17 18 00 80-98 P co2 364.570 -999.990 ... L3 1999 08 17 13 38 -27.1500 -109.4500 50.00 48529 EIC 1999 06 23 15 00 1509-91 P co2 365.930 -999.990 ... L3 1999 08 17 14 52 -27.1500 -109.4500 50.00 48530 EIC 1999 06 23 15 00 1510-91 P co2 365.730 -999.990 ... L3 1999 08 17 15 06 -27.1500 -109.4500 50.00 48531 EIC 1999 06 30 19 00 1597-91 P co2 364.760 -999.990 +.. L3 1999 08 20 13 16 -27.1500 -109.4500 50.00 48532 EIC 1999 06 30 19 00 1598-91 P co2 363.560 -999.990 -.. L3 1999 08 20 13 29 -27.1500 -109.4500 50.00 48533 EIC 1999 07 07 21 00 1161-91 P co2 365.350 -999.990 ... L3 1999 08 20 14 38 -27.1500 -109.4500 50.00 48534 EIC 1999 07 07 21 00 1162-91 P co2 365.400 -999.990 ... L3 1999 08 20 14 51 -27.1500 -109.4500 50.00 48535 EIC 1999 07 15 15 00 29-91 P co2 366.110 -999.990 -.. L3 1999 08 25 12 52 -27.1500 -109.4500 50.00 48536 EIC 1999 07 15 15 00 30-91 P co2 372.810 -999.990 +.. L3 1999 08 25 13 06 -27.1500 -109.4500 50.00 48537 EIC 1999 07 21 21 00 1693-91 P co2 366.450 -999.990 ... L3 1999 08 25 13 20 -27.1500 -109.4500 50.00 48538 EIC 1999 07 21 21 00 1694-91 P co2 366.320 -999.990 ... L3 1999 08 25 13 33 -27.1500 -109.4500 50.00 48539 EIC 1999 07 28 21 00 333-91 P co2 366.360 -999.990 ... L3 1999 08 25 14 46 -27.1500 -109.4500 50.00 48540 EIC 1999 07 28 21 00 334-91 P co2 366.380 -999.990 ... L3 1999 08 25 15 00 -27.1500 -109.4500 50.00 48541 EIC 1999 08 04 21 00 4819-91 P co2 366.300 -999.990 ... L3 1999 08 25 15 14 -27.1500 -109.4500 50.00 48542 EIC 1999 08 04 21 00 4820-91 P co2 366.200 -999.990 ... L3 1999 08 25 15 27 -27.1500 -109.4500 50.00 48543 EIC 1999 08 11 16 00 4653-91 P co2 364.200 -999.990 ... L3 1999 09 20 12 31 -27.1500 -109.4500 50.00 48544 EIC 1999 08 11 16 00 4654-91 P co2 364.280 -999.990 ... L3 1999 09 20 12 45 -27.1500 -109.4500 50.00 48545 EIC 1999 08 18 21 30 1145-91 P co2 365.050 -999.990 ... L3 1999 09 20 12 02 -27.1500 -109.4500 50.00 48546 EIC 1999 08 18 21 30 1146-91 P co2 365.080 -999.990 ... L3 1999 09 20 12 16 -27.1500 -109.4500 50.00 48547 EIC 1999 08 25 21 00 471-91 P co2 364.720 -999.990 ... L3 1999 09 20 12 59 -27.1500 -109.4500 50.00 48548 EIC 1999 08 25 21 00 472-91 P co2 364.650 -999.990 ... L3 1999 09 20 13 12 -27.1500 -109.4500 50.00 48549 EIC 1999 09 01 21 00 45-91 P co2 330.640 -999.990 N.. L3 1999 09 22 15 36 -27.1500 -109.4500 50.00 48550 EIC 1999 09 09 21 00 511-91 P co2 364.460 -999.990 ... L3 1999 11 12 14 42 -27.1500 -109.4500 50.00 48551 EIC 1999 09 09 21 00 512-91 P co2 364.670 -999.990 ... L3 1999 11 12 14 56 -27.1500 -109.4500 50.00 48552 EIC 1999 09 15 21 00 4121-91 P co2 364.910 -999.990 ... L3 1999 11 09 15 51 -27.1500 -109.4500 50.00 48553 EIC 1999 09 15 21 00 4122-91 P co2 365.070 -999.990 ... L3 1999 11 09 16 05 -27.1500 -109.4500 50.00 48554 EIC 1999 09 22 22 00 1561-91 P co2 365.060 -999.990 ... L3 1999 11 04 15 07 -27.1500 -109.4500 50.00 48555 EIC 1999 09 22 22 00 1562-91 P co2 364.870 -999.990 ... L3 1999 11 04 15 21 -27.1500 -109.4500 50.00 48556 EIC 1999 09 29 21 00 153-98 P co2 365.100 -999.990 ... L3 1999 11 04 14 40 -27.1500 -109.4500 50.00 48557 EIC 1999 09 29 21 00 154-98 P co2 365.180 -999.990 ... L3 1999 11 04 14 53 -27.1500 -109.4500 50.00 48558 EIC 1999 10 06 21 00 4073-91 P co2 365.610 -999.990 ... L3 1999 12 09 15 34 -27.1500 -109.4500 50.00 48559 EIC 1999 10 06 21 00 4074-91 P co2 365.140 -999.990 ... L3 1999 12 09 15 47 -27.1500 -109.4500 50.00 48560 EIC 1999 10 13 18 00 45-98 P co2 365.410 -999.990 ... L3 1999 12 09 15 06 -27.1500 -109.4500 50.00 48561 EIC 1999 10 13 18 00 46-98 P co2 365.410 -999.990 ... L3 1999 12 09 15 20 -27.1500 -109.4500 50.00 48562 EIC 1999 10 21 12 34 4197-91 P co2 366.670 -999.990 ... L3 1999 12 09 09 01 -27.1500 -109.4500 50.00 48563 EIC 1999 10 21 12 34 4198-91 P co2 366.540 -999.990 ... L3 1999 12 09 09 14 -27.1500 -109.4500 50.00 48564 EIC 1999 10 27 21 00 1905-91 P co2 365.800 -999.990 ... L3 1999 12 09 09 28 -27.1500 -109.4500 50.00 48565 EIC 1999 10 27 21 00 1906-91 P co2 365.970 -999.990 ... L3 1999 12 09 09 41 -27.1500 -109.4500 50.00 48566 EIC 1999 11 03 14 30 121-98 P co2 366.810 -999.990 ... L3 1999 12 22 09 07 -27.1500 -109.4500 50.00 48567 EIC 1999 11 03 14 30 122-98 P co2 366.800 -999.990 ... L3 1999 12 22 09 21 -27.1500 -109.4500 50.00 48568 EIC 1999 11 10 21 00 79-98 P co2 366.220 -999.990 ... L3 1999 12 22 09 35 -27.1500 -109.4500 50.00 48569 EIC 1999 11 10 21 00 80-98 P co2 366.300 -999.990 ... L3 1999 12 22 09 48 -27.1500 -109.4500 50.00 48570 EIC 1999 11 17 21 00 1271-91 P co2 366.610 -999.990 ... L3 1999 12 27 11 22 -27.1500 -109.4500 50.00 48571 EIC 1999 11 17 21 00 1272-91 P co2 366.760 -999.990 ... L3 1999 12 27 11 35 -27.1500 -109.4500 50.00 48572 EIC 1999 11 24 21 00 1391-91 P co2 366.580 -999.990 ... L3 1999 12 27 10 54 -27.1500 -109.4500 50.00 48573 EIC 1999 11 24 21 00 1392-91 P co2 366.610 -999.990 ... L3 1999 12 27 11 08 -27.1500 -109.4500 50.00 48574 EIC 1999 12 01 21 00 197-91 P co2 364.920 -999.990 +.. L3 2000 01 21 12 50 -27.1500 -109.4500 50.00 48575 EIC 1999 12 01 21 00 198-91 P co2 363.580 -999.990 -.. L3 2000 01 21 13 04 -27.1500 -109.4500 50.00 48576 EIC 1999 12 15 21 00 4291-91 P co2 366.600 -999.990 ... L3 2000 01 24 10 58 -27.1500 -109.4500 50.00 48577 EIC 1999 12 15 21 00 4292-91 P co2 366.560 -999.990 ... L3 2000 01 24 11 12 -27.1500 -109.4500 50.00 48578 EIC 1999 12 22 21 00 1613-91 P co2 365.420 -999.990 ... L3 2000 01 24 11 25 -27.1500 -109.4500 50.00 48579 EIC 1999 12 22 21 00 1614-91 P co2 365.110 -999.990 ... L3 2000 01 24 11 39 -27.1500 -109.4500 50.00 48580 EIC 1999 12 29 15 30 4247-91 P co2 368.000 -999.990 ... L3 2000 01 21 13 18 -27.1500 -109.4500 50.00 48581 EIC 1999 12 29 15 30 4248-91 P co2 367.970 -999.990 ... L3 2000 01 21 13 31 -27.1500 -109.4500 50.00 48582 EIC 2000 01 05 21 00 4531-91 P co2 367.690 -999.990 ... L3 2000 03 06 11 00 -27.1500 -109.4500 50.00 48583 EIC 2000 01 05 21 00 4532-91 P co2 367.710 -999.990 ... L3 2000 03 06 11 14 -27.1500 -109.4500 50.00 48584 EIC 2000 01 12 21 00 4461-91 P co2 367.900 -999.990 +.. L3 2000 03 06 11 28 -27.1500 -109.4500 50.00 48585 EIC 2000 01 12 21 00 4462-91 P co2 366.190 -999.990 -.. L3 2000 03 06 11 41 -27.1500 -109.4500 50.00 48586 EIC 2000 01 19 21 00 4581-91 P co2 367.270 -999.990 ... L3 2000 02 29 16 26 -27.1500 -109.4500 50.00 48587 EIC 2000 01 19 21 00 4582-91 P co2 367.070 -999.990 ... L3 2000 02 29 16 40 -27.1500 -109.4500 50.00 48588 EIC 2000 01 26 21 00 82-98 P co2 364.870 -999.990 .X. L3 2000 03 02 10 20 -27.1500 -109.4500 50.00 48589 EIC 2000 02 02 21 00 515-91 P co2 366.780 -999.990 ... L3 2000 04 04 14 50 -27.1500 -109.4500 50.00 48590 EIC 2000 02 02 21 00 516-91 P co2 366.690 -999.990 ... L3 2000 04 04 15 03 -27.1500 -109.4500 50.00 48591 EIC 2000 02 09 21 00 1729-91 P co2 367.970 -999.990 ... L3 2000 04 04 15 16 -27.1500 -109.4500 50.00 48592 EIC 2000 02 09 21 00 1730-91 P co2 367.910 -999.990 ... L3 2000 04 04 15 29 -27.1500 -109.4500 50.00 48593 EIC 2000 02 16 21 00 4611-91 P co2 364.620 -999.990 .X. L3 2000 04 14 10 23 -27.1500 -109.4500 50.00 48594 EIC 2000 02 16 21 00 4612-91 P co2 364.450 -999.990 .X. L3 2000 04 14 10 36 -27.1500 -109.4500 50.00 48595 EIC 2000 02 23 21 00 4359-91 P co2 369.470 -999.990 .X. L3 2000 04 14 09 57 -27.1500 -109.4500 50.00 48596 EIC 2000 02 23 21 00 4360-91 P co2 369.800 -999.990 .X. L3 2000 04 14 10 10 -27.1500 -109.4500 50.00 48597 EIC 2000 03 01 22 00 229-91 P co2 365.150 -999.990 ... L3 2000 04 27 12 03 -27.1500 -109.4500 50.00 48598 EIC 2000 03 01 22 00 230-91 P co2 365.300 -999.990 ... L3 2000 04 27 12 16 -27.1500 -109.4500 50.00 48599 EIC 2000 03 08 15 00 1367-91 P co2 368.290 -999.990 .X. L3 2000 04 27 10 43 -27.1500 -109.4500 50.00 48600 EIC 2000 03 08 15 00 1368-91 P co2 368.200 -999.990 .X. L3 2000 04 27 10 56 -27.1500 -109.4500 50.00 48601 EIC 2000 03 15 21 00 1473-91 P co2 365.650 -999.990 -.. L3 2000 04 27 10 15 -27.1500 -109.4500 50.00 48602 EIC 2000 03 15 21 00 1474-91 P co2 366.250 -999.990 +.. L3 2000 04 27 10 28 -27.1500 -109.4500 50.00 48603 EIC 2000 03 22 21 00 855-91 P co2 363.970 -999.990 ... L3 2000 04 27 09 49 -27.1500 -109.4500 50.00 48604 EIC 2000 03 22 21 00 856-91 P co2 364.220 -999.990 ... L3 2000 04 27 10 02 -27.1500 -109.4500 50.00 48605 EIC 2000 03 29 21 00 501-91 P co2 363.070 -999.990 .X. L3 2000 06 27 15 23 -27.1500 -109.4500 50.00 48606 EIC 2000 03 29 21 00 502-91 P co2 363.460 -999.990 .X. L3 2000 06 27 15 36 -27.1500 -109.4500 50.00 48607 EIC 2000 04 05 21 00 1429-91 P co2 366.210 -999.990 ... L3 2000 06 27 15 51 -27.1500 -109.4500 50.00 48608 EIC 2000 04 05 21 00 1430-91 P co2 366.250 -999.990 ... L3 2000 06 27 16 04 -27.1500 -109.4500 50.00 48609 EIC 2000 04 12 21 00 4453-91 P co2 365.780 -999.990 ... L3 2000 06 27 16 17 -27.1500 -109.4500 50.00 48610 EIC 2000 04 12 21 00 4454-91 P co2 365.920 -999.990 ... L3 2000 06 27 16 30 -27.1500 -109.4500 50.00 48611 EIC 2000 05 03 21 00 4245-91 P co2 365.020 -999.990 ... L3 2000 06 26 11 55 -27.1500 -109.4500 50.00 48612 EIC 2000 05 03 21 00 4246-91 P co2 364.930 -999.990 ... L3 2000 06 26 12 09 -27.1500 -109.4500 50.00 48613 EIC 2000 05 10 21 00 153-98 P co2 365.630 -999.990 ... L3 2000 06 26 11 29 -27.1500 -109.4500 50.00 48614 EIC 2000 05 10 21 00 154-98 P co2 365.770 -999.990 ... L3 2000 06 26 11 42 -27.1500 -109.4500 50.00 48615 EIC 2000 05 18 15 00 4001-91 P co2 369.490 -999.990 +.. L3 2000 06 28 13 26 -27.1500 -109.4500 50.00 48616 EIC 2000 05 18 15 00 4002-91 P co2 368.270 -999.990 -.. L3 2000 06 28 13 39 -27.1500 -109.4500 50.00 48617 EIC 2000 05 23 21 00 4505-91 P co2 364.370 -999.990 ... L3 2000 06 28 13 00 -27.1500 -109.4500 50.00 48618 EIC 2000 05 23 21 00 4506-91 P co2 364.650 -999.990 ... L3 2000 06 28 13 13 -27.1500 -109.4500 50.00 48619 EIC 2000 06 07 21 00 1745-91 P co2 365.710 -999.990 ... L3 2000 07 26 09 25 -27.1500 -109.4500 50.00 48620 EIC 2000 06 07 21 00 1746-91 P co2 365.580 -999.990 ... L3 2000 07 26 09 38 -27.1500 -109.4500 50.00 48621 EIC 2000 06 14 21 00 4065-91 P co2 365.250 -999.990 ... L3 2000 07 26 09 51 -27.1500 -109.4500 50.00 48622 EIC 2000 06 14 21 00 4066-91 P co2 365.360 -999.990 ... L3 2000 07 26 10 04 -27.1500 -109.4500 50.00 48623 EIC 2000 06 21 21 00 191-98 P co2 367.300 -999.990 +.. L3 2000 07 26 08 59 -27.1500 -109.4500 50.00 48624 EIC 2000 06 21 21 00 192-98 P co2 366.730 -999.990 -.. L3 2000 07 26 09 12 -27.1500 -109.4500 50.00 48625 EIC 2000 07 12 21 00 1729-91 P co2 365.500 -999.990 ... L3 2000 09 06 11 23 -27.1500 -109.4500 50.00 48626 EIC 2000 07 12 21 00 1730-91 P co2 365.680 -999.990 ... L3 2000 09 06 11 36 -27.1500 -109.4500 50.00 48627 EIC 2000 07 19 21 00 1811-91 P co2 433.790 -999.990 +.. L3 2000 09 06 12 19 -27.1500 -109.4500 50.00 48628 EIC 2000 07 19 21 00 1812-91 P co2 366.210 -999.990 -.. L3 2000 09 06 12 32 -27.1500 -109.4500 50.00 48629 EIC 2000 07 26 21 00 1655-91 P co2 365.610 -999.990 ... L3 2000 09 19 10 51 -27.1500 -109.4500 50.00 48630 EIC 2000 07 26 21 00 1656-91 P co2 365.610 -999.990 ... L3 2000 09 19 11 04 -27.1500 -109.4500 50.00 48631 EIC 2000 08 02 21 00 1619-91 P co2 366.560 -999.990 ... L3 2000 09 19 08 39 -27.1500 -109.4500 50.00 48632 EIC 2000 08 02 21 00 1620-91 P co2 366.700 -999.990 ... L3 2000 09 19 08 52 -27.1500 -109.4500 50.00 48633 EIC 2000 08 09 21 00 4949-91 P co2 367.760 -999.990 ... L3 2000 10 02 09 34 -27.1500 -109.4500 50.00 48634 EIC 2000 08 09 21 00 4950-91 P co2 367.370 -999.990 ... L3 2000 10 02 09 48 -27.1500 -109.4500 50.00 48635 EIC 2000 08 16 21 00 497-91 P co2 365.750 -999.990 +.. L3 2000 10 02 09 08 -27.1500 -109.4500 50.00 48636 EIC 2000 08 16 21 00 498-91 P co2 362.720 -999.990 -.. L3 2000 10 02 09 21 -27.1500 -109.4500 50.00 48637 EIC 2000 08 23 21 00 4811-91 P co2 366.790 -999.990 ... L3 2000 10 02 10 02 -27.1500 -109.4500 50.00 48638 EIC 2000 08 23 21 00 4812-91 P co2 366.870 -999.990 ... L3 2000 10 02 10 15 -27.1500 -109.4500 50.00 48639 EIC 2000 08 30 21 00 4815-91 P co2 366.110 -999.990 ... L3 2000 10 02 08 42 -27.1500 -109.4500 50.00 48640 EIC 2000 08 30 21 00 4816-91 P co2 365.830 -999.990 ... L3 2000 10 02 08 55 -27.1500 -109.4500 50.00 48641 EIC 2000 09 06 21 00 4809-91 P co2 366.180 -999.990 ... L3 2000 10 31 12 50 -27.1500 -109.4500 50.00 48642 EIC 2000 09 13 21 00 4977-91 P co2 366.120 -999.990 ... L3 2000 10 31 13 42 -27.1500 -109.4500 50.00 48643 EIC 2000 09 13 21 00 4978-91 P co2 365.820 -999.990 ... L3 2000 10 31 13 55 -27.1500 -109.4500 50.00 48644 EIC 2000 09 20 21 00 265-91 P co2 366.240 -999.990 ... L3 2000 11 01 08 36 -27.1500 -109.4500 50.00 48645 EIC 2000 09 20 21 00 266-91 P co2 366.140 -999.990 ... L3 2000 11 01 08 49 -27.1500 -109.4500 50.00 48646 EIC 2000 09 27 21 00 4985-91 P co2 366.900 -999.990 ... L3 2000 11 01 08 10 -27.1500 -109.4500 50.00 48647 EIC 2000 09 27 21 00 4986-91 P co2 366.440 -999.990 ... L3 2000 11 01 08 23 -27.1500 -109.4500 50.00 48648 EIC 2000 10 04 21 00 605-91 P co2 366.360 -999.990 ... L3 2001 04 03 10 05 -27.1500 -109.4500 50.00 48649 EIC 2000 10 04 21 00 606-91 P co2 366.040 -999.990 ... L3 2001 04 03 10 18 -27.1500 -109.4500 50.00 48650 EIC 2000 10 12 18 00 1935-91 P co2 365.650 -999.990 ... L3 2001 04 03 10 33 -27.1500 -109.4500 50.00 48651 EIC 2000 10 12 18 00 1936-91 P co2 365.290 -999.990 ... L3 2001 04 03 10 46 -27.1500 -109.4500 50.00 48652 EIC 2000 10 18 21 00 1193-91 P co2 366.520 -999.990 ... L3 2001 04 03 09 13 -27.1500 -109.4500 50.00 48653 EIC 2000 10 18 21 00 1194-91 P co2 366.530 -999.990 ... L3 2001 04 03 09 26 -27.1500 -109.4500 50.00 48654 EIC 2000 10 25 18 00 1453-91 P co2 367.330 -999.990 ... L3 2001 04 03 09 39 -27.1500 -109.4500 50.00 48655 EIC 2000 10 25 18 00 1454-91 P co2 367.260 -999.990 ... L3 2001 04 03 09 52 -27.1500 -109.4500 50.00 48656 EIC 2000 11 01 21 00 2047-91 P co2 371.190 -999.990 +.. L3 2001 04 03 15 25 -27.1500 -109.4500 50.00 48657 EIC 2000 11 01 21 00 2048-91 P co2 370.570 -999.990 -.. L3 2001 04 03 15 38 -27.1500 -109.4500 50.00 48658 EIC 2000 11 08 21 00 1993-91 P co2 370.710 -999.990 .X. L3 2001 04 03 14 59 -27.1500 -109.4500 50.00 48659 EIC 2000 11 08 21 00 1994-91 P co2 370.400 -999.990 .X. L3 2001 04 03 15 12 -27.1500 -109.4500 50.00 48660 EIC 2000 11 15 21 00 4819-91 P co2 366.730 -999.990 ... L3 2001 01 24 13 16 -27.1500 -109.4500 50.00 48661 EIC 2000 11 15 21 00 4820-91 P co2 367.190 -999.990 ... L3 2001 01 24 13 29 -27.1500 -109.4500 50.00 48662 EIC 2000 11 22 21 00 12-91 P co2 366.930 -999.990 ... L3 2001 01 23 16 17 -27.1500 -109.4500 50.00 48663 EIC 2000 11 29 21 00 4559-91 P co2 368.180 -999.990 ... L3 2001 01 25 14 20 -27.1500 -109.4500 50.00 48664 EIC 2000 11 29 21 00 4560-91 P co2 368.170 -999.990 ... L3 2001 01 25 14 33 -27.1500 -109.4500 50.00 48665 EIC 2000 12 06 21 00 93-98 P co2 366.480 -999.990 ... L3 2001 01 24 12 50 -27.1500 -109.4500 50.00 48666 EIC 2000 12 06 21 00 94-98 P co2 366.550 -999.990 ... L3 2001 01 24 13 03 -27.1500 -109.4500 50.00 48667 EIC 2000 12 24 15 00 1521-91 P co2 366.370 -999.990 ... L3 2001 03 09 15 17 -27.1500 -109.4500 50.00 48668 EIC 2000 12 24 15 00 1522-91 P co2 366.150 -999.990 ... L3 2001 03 09 15 04 -27.1500 -109.4500 50.00 48669 EIC 2000 12 27 17 00 4051-91 P co2 368.310 -999.990 ... L3 2001 03 09 13 46 -27.1500 -109.4500 50.00 48670 EIC 2000 12 27 17 00 4052-91 P co2 368.090 -999.990 ... L3 2001 03 09 13 59 -27.1500 -109.4500 50.00 48671 EIC 2001 01 03 21 00 1729-91 P co2 369.430 -999.990 .X. L3 2001 03 08 10 52 -27.1500 -109.4500 50.00 48672 EIC 2001 01 03 21 00 1730-91 P co2 369.100 -999.990 .X. L3 2001 03 08 11 05 -27.1500 -109.4500 50.00 48673 EIC 2001 01 10 21 00 1291-91 P co2 367.170 -999.990 ... L3 2001 03 08 11 18 -27.1500 -109.4500 50.00 48674 EIC 2001 01 10 21 00 1292-91 P co2 366.910 -999.990 ... L3 2001 03 08 11 31 -27.1500 -109.4500 50.00 48675 EIC 2001 01 17 21 30 1735-91 P co2 367.290 -999.990 ... L3 2001 03 12 12 27 -27.1500 -109.4500 50.00 48676 EIC 2001 01 17 21 30 1736-91 P co2 367.400 -999.990 ... L3 2001 03 12 12 40 -27.1500 -109.4500 50.00 48677 EIC 2001 01 31 21 00 4429-91 P co2 368.250 -999.990 ... L3 2001 03 12 10 41 -27.1500 -109.4500 50.00 48678 EIC 2001 01 31 21 00 4430-91 P co2 368.250 -999.990 ... L3 2001 03 12 10 54 -27.1500 -109.4500 50.00 48679 EIC 2001 02 07 21 00 761-91 P co2 367.310 -999.990 +.. L3 2001 03 12 13 21 -27.1500 -109.4500 50.00 48680 EIC 2001 02 07 21 00 762-91 P co2 366.290 -999.990 -.. L3 2001 03 12 13 34 -27.1500 -109.4500 50.00 48681 EIC 2001 02 14 21 00 4747-91 P co2 367.230 -999.990 +.. L3 2001 03 12 13 47 -27.1500 -109.4500 50.00 48682 EIC 2001 02 14 21 00 4748-91 P co2 366.260 -999.990 -.. L3 2001 03 12 14 00 -27.1500 -109.4500 50.00 48683 EIC 2001 02 23 21 00 1343-91 P co2 370.530 -999.990 +.. L3 2001 04 04 10 46 -27.1500 -109.4500 50.00 48684 EIC 2001 02 23 21 00 1344-91 P co2 369.840 -999.990 -.. L3 2001 04 04 10 59 -27.1500 -109.4500 50.00 48685 EIC 2001 03 01 21 00 4621-91 P co2 367.270 -999.990 ... L3 2001 04 04 10 20 -27.1500 -109.4500 50.00 48686 EIC 2001 03 01 21 00 4622-91 P co2 367.180 -999.990 ... L3 2001 04 04 10 33 -27.1500 -109.4500 50.00 48687 EIC 2001 03 25 21 00 17-91 P co2 367.810 -999.990 ... L3 2001 06 20 13 32 -27.1500 -109.4500 50.00 48688 EIC 2001 03 25 21 00 18-91 P co2 367.670 -999.990 ... L3 2001 06 20 13 45 -27.1500 -109.4500 50.00 48689 EIC 2001 04 05 22 00 447-91 P co2 367.740 -999.990 ... L3 2001 06 20 14 25 -27.1500 -109.4500 50.00 48690 EIC 2001 04 05 22 00 448-91 P co2 367.690 -999.990 ... L3 2001 06 20 14 38 -27.1500 -109.4500 50.00 48691 EIC 2001 04 25 16 00 181-91 P co2 366.550 -999.990 ... L3 2001 06 22 11 16 -27.1500 -109.4500 50.00 48692 EIC 2001 04 25 16 00 182-91 P co2 366.740 -999.990 ... L3 2001 06 22 11 29 -27.1500 -109.4500 50.00 48693 EIC 2001 05 02 21 00 97-91 P co2 366.590 -999.990 +.. L3 2001 06 22 13 02 -27.1500 -109.4500 50.00 48694 EIC 2001 05 02 21 00 98-91 P co2 358.330 -999.990 N.. L3 2001 06 22 13 16 -27.1500 -109.4500 50.00 48695 EIC 2001 05 02 21 00 98-91 P co2 365.610 -999.990 -.. L3 2001 06 22 16 09 -27.1500 -109.4500 50.00 48695 EIC 2001 05 09 21 00 497-91 P co2 366.310 -999.990 ... L3 2001 06 21 11 18 -27.1500 -109.4500 50.00 48696 EIC 2001 05 09 21 00 498-91 P co2 366.330 -999.990 ... L3 2001 06 21 11 31 -27.1500 -109.4500 50.00 48697 EIC 2001 05 16 21 00 4265-91 P co2 367.690 -999.990 ... L3 2001 06 21 12 51 -27.1500 -109.4500 50.00 48698 EIC 2001 05 16 21 00 4266-91 P co2 367.610 -999.990 ... L3 2001 06 21 13 04 -27.1500 -109.4500 50.00 48699 EIC 2001 05 23 21 00 641-91 P co2 368.100 -999.990 ... L3 2001 08 01 11 49 -27.1500 -109.4500 50.00 48700 EIC 2001 05 23 21 00 642-91 P co2 368.140 -999.990 ... L3 2001 08 01 12 02 -27.1500 -109.4500 50.00 48701 EIC 2001 05 30 22 00 1703-91 P co2 368.970 -999.990 ... L3 2001 08 01 12 15 -27.1500 -109.4500 50.00 48702 EIC 2001 05 30 22 00 1704-91 P co2 368.860 -999.990 ... L3 2001 08 01 12 28 -27.1500 -109.4500 50.00 48703 EIC 2001 06 07 21 00 4431-91 P co2 368.120 -999.990 ... L3 2001 07 20 10 25 -27.1500 -109.4500 50.00 48704 EIC 2001 06 07 21 00 4432-91 P co2 368.030 -999.990 ... L3 2001 07 20 10 38 -27.1500 -109.4500 50.00 48705 EIC 2001 06 15 18 00 59-91 P co2 458.980 -999.990 N.. L3 2001 07 20 09 58 -27.1500 -109.4500 50.00 48706 EIC 2001 06 15 18 00 60-91 P co2 504.100 -999.990 N.. L3 2001 07 20 10 12 -27.1500 -109.4500 50.00 48707 EIC 2001 06 15 21 00 149-99 P co2 367.460 -999.990 ... L3 2001 07 20 10 52 -27.1500 -109.4500 50.00 48708 EIC 2001 06 15 21 00 150-99 P co2 367.780 -999.990 ... L3 2001 07 20 11 05 -27.1500 -109.4500 50.00 48709 EIC 2001 06 21 15 00 163-99 P co2 368.860 -999.990 ... L3 2001 07 20 09 32 -27.1500 -109.4500 50.00 48710 EIC 2001 06 21 15 00 164-99 P co2 369.010 -999.990 ... L3 2001 07 20 09 45 -27.1500 -109.4500 50.00 48711 EIC 2001 06 27 21 00 302-91 P co2 367.740 -999.990 ... L3 2001 07 20 12 11 -27.1500 -109.4500 50.00 48712 EIC 2001 07 04 23 40 4331-91 P co2 368.510 -999.990 ... L3 2001 07 20 11 45 -27.1500 -109.4500 50.00 48713 EIC 2001 07 04 23 40 4332-91 P co2 368.360 -999.990 ... L3 2001 07 20 11 58 -27.1500 -109.4500 50.00 48714 EIC 2001 07 18 21 40 283-99 P co2 368.040 -999.990 ... L3 2002 01 09 13 07 -27.1500 -109.4500 50.00 48715 EIC 2001 07 18 21 40 284-99 P co2 367.920 -999.990 ... L3 2002 01 09 13 20 -27.1500 -109.4500 50.00 48716 EIC 2001 07 25 17 00 1113-91 P co2 368.390 -999.990 ... L3 2002 01 09 11 49 -27.1500 -109.4500 50.00 48717 EIC 2001 07 25 17 00 1114-91 P co2 368.570 -999.990 ... L3 2002 01 09 12 02 -27.1500 -109.4500 50.00 48718 EIC 2001 08 01 21 00 1155-91 P co2 367.920 -999.990 ... L3 2002 01 03 10 33 -27.1500 -109.4500 50.00 48719 EIC 2001 08 01 21 00 1156-91 P co2 367.530 -999.990 ... L3 2002 01 03 10 46 -27.1500 -109.4500 50.00 48720 EIC 2001 08 08 21 00 1161-91 P co2 368.230 -999.990 ... L3 2002 01 03 11 25 -27.1500 -109.4500 50.00 48721 EIC 2001 08 08 21 00 1162-91 P co2 368.210 -999.990 ... L3 2002 01 03 11 38 -27.1500 -109.4500 50.00 48722 EIC 2001 08 22 17 00 1039-91 P co2 367.810 -999.990 ... L3 2002 01 03 14 05 -27.1500 -109.4500 50.00 48723 EIC 2001 08 22 17 00 1040-91 P co2 367.890 -999.990 ... L3 2002 01 03 14 18 -27.1500 -109.4500 50.00 48724 EIC 2001 08 29 21 00 4193-91 P co2 370.140 -999.990 +.. L3 2002 01 03 14 31 -27.1500 -109.4500 50.00 48725 EIC 2001 08 29 21 00 4194-91 P co2 368.980 -999.990 -.. L3 2002 01 03 14 44 -27.1500 -109.4500 50.00 48726 EIC 2001 09 20 15 00 189-91 P co2 367.370 -999.990 ... L3 2002 04 01 12 48 -27.1500 -109.4500 50.00 48727 EIC 2001 09 20 15 00 190-91 P co2 367.300 -999.990 ... L3 2002 04 01 13 01 -27.1500 -109.4500 50.00 48728 EIC 2001 09 26 21 00 4793-91 P co2 368.030 -999.990 ... L3 2002 04 01 13 14 -27.1500 -109.4500 50.00 48729 EIC 2001 09 26 21 00 4794-91 P co2 367.840 -999.990 ... L3 2002 04 01 13 27 -27.1500 -109.4500 50.00 48730 EIC 2001 10 03 23 00 1345-91 P co2 369.590 -999.990 ... L3 2002 01 30 11 01 -27.1500 -109.4500 50.00 48731 EIC 2001 10 03 23 00 1346-91 P co2 369.300 -999.990 ... L3 2002 01 30 11 14 -27.1500 -109.4500 50.00 48732 EIC 2001 10 11 15 00 1623-91 P co2 370.220 -999.990 -.. L3 2001 11 29 13 28 -27.1500 -109.4500 50.00 48733 EIC 2001 10 11 15 00 1624-91 P co2 489.350 -999.990 +.. L3 2001 11 29 13 41 -27.1500 -109.4500 50.00 48734 EIC 2001 10 17 21 00 1661-91 P co2 368.300 -999.990 ... L3 2001 11 29 14 20 -27.1500 -109.4500 50.00 48735 EIC 2001 10 17 21 00 1662-91 P co2 368.610 -999.990 ... L3 2001 11 29 14 33 -27.1500 -109.4500 50.00 48736 EIC 2001 10 24 16 00 1657-91 P co2 367.940 -999.990 ... L3 2001 11 29 11 16 -27.1500 -109.4500 50.00 48737 EIC 2001 10 24 16 00 1658-91 P co2 367.970 -999.990 ... L3 2001 11 29 11 29 -27.1500 -109.4500 50.00 48738 EIC 2001 11 01 17 00 4115-91 P co2 368.380 -999.990 ... L3 2001 11 29 12 34 -27.1500 -109.4500 50.00 48739 EIC 2001 11 01 17 00 4116-91 P co2 368.390 -999.990 ... L3 2001 11 29 12 47 -27.1500 -109.4500 50.00 48740 EIC 2001 11 07 21 00 4769-91 P co2 367.460 -999.990 ... L3 2002 01 28 09 06 -27.1500 -109.4500 50.00 48741 EIC 2001 11 07 21 00 4770-91 P co2 367.740 -999.990 ... L3 2002 01 28 09 19 -27.1500 -109.4500 50.00 48742 EIC 2001 11 14 16 00 1431-91 P co2 369.620 -999.990 ... L3 2002 01 28 11 18 -27.1500 -109.4500 50.00 48743 EIC 2001 11 14 16 00 1432-91 P co2 369.540 -999.990 ... L3 2002 01 28 11 31 -27.1500 -109.4500 50.00 48744 EIC 2001 11 21 21 00 273-91 P co2 367.820 -999.990 ... L3 2002 01 30 11 27 -27.1500 -109.4500 50.00 48745 EIC 2001 11 21 21 00 274-91 P co2 367.430 -999.990 ... L3 2002 01 30 11 40 -27.1500 -109.4500 50.00 48746 EIC 2001 11 28 21 00 151-91 P co2 368.330 -999.990 ... L3 2002 01 29 13 34 -27.1500 -109.4500 50.00 48747 EIC 2001 11 28 21 00 152-91 P co2 368.340 -999.990 ... L3 2002 01 29 13 47 -27.1500 -109.4500 50.00 48748 EIC 2001 12 05 23 00 1913-91 P co2 369.960 -999.990 ... L3 2002 01 30 16 12 -27.1500 -109.4500 50.00 48749 EIC 2001 12 05 23 00 1914-91 P co2 370.110 -999.990 ... L3 2002 01 30 16 25 -27.1500 -109.4500 50.00 48750 EIC 2001 12 12 21 00 1-91 P co2 369.030 -999.990 N.. L3 2002 01 29 13 08 -27.1500 -109.4500 50.00 48751 EIC 2001 12 12 21 00 2-91 P co2 362.770 -999.990 N.. L3 2002 01 29 13 21 -27.1500 -109.4500 50.00 48752 EIC 2001 12 19 21 00 569-91 P co2 370.140 -999.990 ... L3 2002 01 31 10 59 -27.1500 -109.4500 50.00 48753 EIC 2001 12 19 21 00 570-91 P co2 370.240 -999.990 ... L3 2002 01 31 11 12 -27.1500 -109.4500 50.00 48754 EIC 2002 02 06 21 00 371-99 P co2 369.430 -999.990 ... L3 2002 05 30 13 11 -27.1500 -109.4500 50.00 48755 EIC 2002 02 06 21 00 372-99 P co2 369.490 -999.990 ... L3 2002 05 30 13 24 -27.1500 -109.4500 50.00 48756 EIC 2002 02 13 21 00 1595-91 P co2 368.220 -999.990 ... L3 2002 06 10 10 37 -27.1500 -109.4500 50.00 48757 EIC 2002 02 21 15 00 11-99 P co2 368.770 -999.990 ... L3 2002 05 30 12 45 -27.1500 -109.4500 50.00 48758 EIC 2002 02 21 15 00 12-99 P co2 368.800 -999.990 ... L3 2002 05 30 12 58 -27.1500 -109.4500 50.00 48759 EIC 2002 02 27 21 00 481-99 P co2 366.930 -999.990 -.. L3 2002 05 30 13 37 -27.1500 -109.4500 50.00 48760 EIC 2002 02 27 21 00 482-99 P co2 367.790 -999.990 +.. L3 2002 05 30 13 50 -27.1500 -109.4500 50.00 48761 EIC 2002 04 10 23 00 4755-91 P co2 369.310 -999.990 ... L3 2002 05 31 15 50 -27.1500 -109.4500 50.00 48762 EIC 2002 04 10 23 00 4756-91 P co2 369.320 -999.990 ... L3 2002 05 31 16 03 -27.1500 -109.4500 50.00 48763 EIC 2002 04 24 21 00 4045-91 P co2 368.390 -999.990 +.. L3 2002 07 05 14 40 -27.1500 -109.4500 50.00 48764 EIC 2002 04 24 21 00 4046-91 P co2 365.710 -999.990 -.. L3 2002 07 05 14 53 -27.1500 -109.4500 50.00 48765 EIC 2002 05 01 23 00 711-91 P co2 367.630 -999.990 ... L3 2002 05 31 16 16 -27.1500 -109.4500 50.00 48766 EIC 2002 05 01 23 00 712-91 P co2 367.370 -999.990 ... L3 2002 05 31 16 29 -27.1500 -109.4500 50.00 48767 EIC 2002 05 15 21 00 229-99 P co2 370.700 -999.990 -.. L3 2002 07 09 11 17 -27.1500 -109.4500 50.00 48768 EIC 2002 05 15 21 00 230-99 P co2 372.900 -999.990 +.. L3 2002 07 09 11 30 -27.1500 -109.4500 50.00 48769 EIC 2002 05 16 21 00 1031-91 P co2 368.020 -999.990 ... L3 2002 08 15 14 59 -27.1500 -109.4500 50.00 48770 EIC 2002 05 16 21 00 1032-91 P co2 368.250 -999.990 ... L3 2002 08 15 15 12 -27.1500 -109.4500 50.00 48771 EIC 2002 05 23 21 00 475-99 P co2 368.860 -999.990 +.. L3 2002 07 08 09 44 -27.1500 -109.4500 50.00 48772 EIC 2002 05 23 21 00 476-99 P co2 366.280 -999.990 -.. L3 2002 07 08 09 57 -27.1500 -109.4500 50.00 48773 EIC 2002 05 30 23 40 135-91 P co2 371.550 -999.990 .X. L3 2002 07 09 11 43 -27.1500 -109.4500 50.00 48774 EIC 2002 05 30 23 40 136-91 P co2 371.670 -999.990 .X. L3 2002 07 09 11 56 -27.1500 -109.4500 50.00 48775 EIC 2002 06 06 21 00 177-99 P co2 369.830 -999.990 +.. L3 2002 08 15 16 19 -27.1500 -109.4500 50.00 48776 EIC 2002 06 06 21 00 178-99 P co2 368.660 -999.990 -.. L3 2002 08 15 16 32 -27.1500 -109.4500 50.00 48777 EIC 2002 06 13 21 00 291-99 P co2 371.070 -999.990 ... L3 2002 08 08 16 51 -27.1500 -109.4500 50.00 48778 EIC 2002 06 13 21 00 292-99 P co2 370.680 -999.990 ... L3 2002 08 08 17 04 -27.1500 -109.4500 50.00 48779 EIC 2002 06 21 16 00 4873-91 P co2 369.810 -999.990 ... L3 2002 08 08 16 38 -27.1500 -109.4500 50.00 48780 EIC 2002 06 21 16 00 4874-91 P co2 369.740 -999.990 ... L3 2002 08 08 16 25 -27.1500 -109.4500 50.00 48781 EIC 2002 07 04 19 00 575-91 P co2 369.970 -999.990 ... L3 2002 09 11 14 53 -27.1500 -109.4500 50.00 48782 EIC 2002 07 04 19 00 576-91 P co2 369.800 -999.990 ... L3 2002 09 11 15 07 -27.1500 -109.4500 50.00 48783 EIC 2002 07 11 21 00 729-91 P co2 370.520 -999.990 ... L3 2002 12 09 11 38 -27.1500 -109.4500 50.00 48784 EIC 2002 07 11 21 00 730-91 P co2 370.430 -999.990 ... L3 2002 12 09 11 51 -27.1500 -109.4500 50.00 48785 EIC 2002 07 18 18 00 455-99 P co2 370.420 -999.990 ... L3 2002 12 09 13 11 -27.1500 -109.4500 50.00 48786 EIC 2002 07 18 18 00 456-99 P co2 370.510 -999.990 ... L3 2002 12 09 13 24 -27.1500 -109.4500 50.00 48787 EIC 2002 07 25 21 00 309-91 P co2 372.760 -999.990 +.. L3 2002 09 11 13 33 -27.1500 -109.4500 50.00 48788 EIC 2002 07 25 21 00 310-91 P co2 371.930 -999.990 -.. L3 2002 09 11 13 46 -27.1500 -109.4500 50.00 48789 EIC 2002 08 26 18 00 1495-91 P co2 370.030 -999.990 ... L3 2002 11 21 12 36 -27.1500 -109.4500 50.00 48790 EIC 2002 08 26 18 00 1496-91 P co2 370.110 -999.990 ... L3 2002 11 21 12 49 -27.1500 -109.4500 50.00 48791 EIC 2002 09 05 21 00 4629-91 P co2 370.570 -999.990 ... L3 2002 11 21 13 02 -27.1500 -109.4500 50.00 48792 EIC 2002 09 05 21 00 4630-91 P co2 370.420 -999.990 ... L3 2002 11 21 13 15 -27.1500 -109.4500 50.00 48793 EIC 2002 09 12 21 00 111-99 P co2 371.080 -999.990 +.. L3 2002 11 20 14 12 -27.1500 -109.4500 50.00 48794 EIC 2002 09 12 21 00 112-99 P co2 370.570 -999.990 -.. L3 2002 11 20 14 25 -27.1500 -109.4500 50.00 48795 EIC 2002 09 26 23 00 299-99 P co2 371.940 -999.990 ... L3 2002 11 20 13 46 -27.1500 -109.4500 50.00 48796 EIC 2002 09 26 23 00 300-99 P co2 372.070 -999.990 ... L3 2002 11 20 13 59 -27.1500 -109.4500 50.00 48797 EIC 2002 10 03 21 00 617-91 P co2 372.970 -999.990 ... L3 2002 12 09 13 37 -27.1500 -109.4500 50.00 48798 EIC 2002 10 03 21 00 618-91 P co2 373.090 -999.990 ... L3 2002 12 09 13 50 -27.1500 -109.4500 50.00 48799 EIC 2002 10 17 21 00 1463-91 P co2 374.270 -999.990 ... L3 2002 12 05 15 43 -27.1500 -109.4500 50.00 48800 EIC 2002 10 17 21 00 1464-91 P co2 374.530 -999.990 ... L3 2002 12 05 15 30 -27.1500 -109.4500 50.00 48801 EIC 2002 10 20 21 00 1745-91 P co2 371.240 -999.990 .X. L3 2002 12 09 12 19 -27.1500 -109.4500 50.00 48802 EIC 2002 10 20 21 00 1746-91 P co2 371.440 -999.990 .X. L3 2002 12 09 12 32 -27.1500 -109.4500 50.00 48803 EIC 2002 10 24 00 00 1161-91 P co2 372.690 -999.990 ... L3 2002 12 05 15 56 -27.1500 -109.4500 50.00 48804 EIC 2002 10 24 00 00 1162-91 P co2 372.830 -999.990 ... L3 2002 12 05 16 09 -27.1500 -109.4500 50.00 48805 EIC 2002 11 07 21 00 4167-91 P co2 371.020 -999.990 +.. L3 2003 02 26 12 56 -27.1500 -109.4500 50.00 48806 EIC 2002 11 07 21 00 4168-91 P co2 368.160 -999.990 -.. L3 2003 02 26 13 09 -27.1500 -109.4500 50.00 48807 EIC 2002 11 14 21 00 4151-91 P co2 372.860 -999.990 ... L3 2003 02 26 12 30 -27.1500 -109.4500 50.00 48808 EIC 2002 11 14 21 00 4152-91 P co2 372.810 -999.990 ... L3 2003 02 26 12 43 -27.1500 -109.4500 50.00 48809 EIC 2002 11 21 17 00 1139-91 P co2 370.230 -999.990 .X. L3 2003 03 05 14 36 -27.1500 -109.4500 50.00 48810 EIC 2002 11 21 17 00 1140-91 P co2 370.430 -999.990 .X. L3 2003 03 05 14 49 -27.1500 -109.4500 50.00 48811 EIC 2002 11 28 21 00 1743-91 P co2 385.530 -999.990 +.. L3 2003 03 05 13 16 -27.1500 -109.4500 50.00 48812 EIC 2002 11 28 21 00 1744-91 P co2 384.770 -999.990 -.. L3 2003 03 05 13 29 -27.1500 -109.4500 50.00 48813 EIC 2002 12 06 00 00 555-99 P co2 373.420 -999.990 ... L3 2003 03 05 13 44 -27.1500 -109.4500 50.00 48814 EIC 2002 12 06 00 00 556-99 P co2 373.200 -999.990 ... L3 2003 03 05 13 57 -27.1500 -109.4500 50.00 48815 EIC 2002 12 12 21 00 4511-91 P co2 371.620 -999.990 +.. L3 2003 03 05 14 10 -27.1500 -109.4500 50.00 48816 EIC 2002 12 12 21 00 4512-91 P co2 371.100 -999.990 -.. L3 2003 03 05 14 23 -27.1500 -109.4500 50.00 48817 EIC 2002 12 19 15 00 688-99 P co2 371.260 -999.990 ... L3 2003 02 26 13 22 -27.1500 -109.4500 50.00 48818 EIC 2002 12 19 15 00 689-99 P co2 371.330 -999.990 ... L3 2003 02 26 13 35 -27.1500 -109.4500 50.00 48819 EIC 2003 01 16 21 00 1167-91 P co2 371.240 -999.990 ... L3 2003 03 14 15 01 -27.1500 -109.4500 50.00 48820 EIC 2003 01 16 21 00 1168-91 P co2 370.840 -999.990 ... L3 2003 03 14 15 14 -27.1500 -109.4500 50.00 48821 EIC 2003 01 23 21 00 175-98 P co2 373.790 -999.990 .X. L3 2003 03 17 10 31 -27.1500 -109.4500 50.00 48822 EIC 2003 02 06 21 00 4497-91 P co2 370.640 -999.990 ... L3 2003 03 17 10 44 -27.1500 -109.4500 50.00 48823 EIC 2003 02 06 21 00 4498-91 P co2 370.870 -999.990 ... L3 2003 03 17 10 57 -27.1500 -109.4500 50.00 48824 EIC 2003 02 13 21 00 251-91 P co2 374.250 -999.990 +.. L3 2003 04 08 14 20 -27.1500 -109.4500 50.00 48825 EIC 2003 02 13 21 00 252-91 P co2 372.540 -999.990 -.. L3 2003 04 08 14 33 -27.1500 -109.4500 50.00 48826 EIC 2003 02 20 18 00 4883-91 P co2 374.180 -999.990 .X. L3 2003 04 08 14 46 -27.1500 -109.4500 50.00 48827 EIC 2003 02 20 18 00 4884-91 P co2 374.270 -999.990 .X. L3 2003 04 08 14 59 -27.1500 -109.4500 50.00 48828 EIC 2003 02 20 21 00 205-91 P co2 372.110 -999.990 ... L3 2003 03 17 09 52 -27.1500 -109.4500 50.00 48829 EIC 2003 02 20 21 00 206-91 P co2 372.210 -999.990 ... L3 2003 03 17 10 05 -27.1500 -109.4500 50.00 48830 EIC 2003 02 27 21 00 619-99 P co2 372.200 -999.990 ... L3 2003 06 09 12 01 -27.1500 -109.4500 50.00 48831 EIC 2003 02 27 21 00 620-99 P co2 372.360 -999.990 ... L3 2003 06 09 12 14 -27.1500 -109.4500 50.00 48832 EIC 2003 03 06 21 00 4107-91 P co2 370.130 -999.990 ... L3 2003 06 09 11 28 -27.1500 -109.4500 50.00 48833 EIC 2003 03 06 21 00 4108-91 P co2 370.350 -999.990 ... L3 2003 06 09 11 42 -27.1500 -109.4500 50.00 48834 EIC 2003 04 03 21 00 501-99 P co2 371.690 -999.990 ... L3 2003 06 02 09 30 -27.1500 -109.4500 50.00 48835 EIC 2003 04 03 21 00 502-99 P co2 371.440 -999.990 ... L3 2003 06 02 09 43 -27.1500 -109.4500 50.00 48836 EIC 2003 04 10 21 00 1133-91 P co2 370.750 -999.990 ... L3 2003 06 02 09 04 -27.1500 -109.4500 50.00 48837 EIC 2003 04 10 21 00 1134-91 P co2 370.810 -999.990 ... L3 2003 06 02 09 17 -27.1500 -109.4500 50.00 48838 EIC 2003 04 17 21 00 711-91 P co2 373.230 -999.990 ... L3 2003 06 09 10 36 -27.1500 -109.4500 50.00 48839 EIC 2003 04 17 21 00 712-91 P co2 373.220 -999.990 ... L3 2003 06 09 10 49 -27.1500 -109.4500 50.00 48840 EIC 2003 04 24 21 00 389-99 P co2 371.820 -999.990 ... L3 2003 06 09 11 02 -27.1500 -109.4500 50.00 48841 EIC 2003 04 24 21 00 390-99 P co2 372.010 -999.990 ... L3 2003 06 09 11 15 -27.1500 -109.4500 50.00 48842 EIC 2003 05 01 21 00 461-99 P co2 402.000 -999.990 +.. L3 2003 06 02 10 24 -27.1500 -109.4500 50.00 48843 EIC 2003 05 01 21 00 462-99 P co2 395.110 -999.990 -.. L3 2003 06 02 10 37 -27.1500 -109.4500 50.00 48844 EIC 2003 05 01 21 00 465-99 P co2 334.160 -999.990 N.. L3 2003 07 02 16 24 -27.1500 -109.4500 50.00 48845 EIC 2003 05 01 21 00 466-99 P co2 334.220 -999.990 N.. L3 2003 07 02 16 37 -27.1500 -109.4500 50.00 48846 EIC 2003 05 08 21 00 4109-91 P co2 372.220 -999.990 ... L3 2003 06 02 09 56 -27.1500 -109.4500 50.00 48847 EIC 2003 05 08 21 00 4110-91 P co2 372.170 -999.990 ... L3 2003 06 02 10 09 -27.1500 -109.4500 50.00 48848 EIC 2003 05 15 23 00 1615-91 P co2 373.200 -999.990 ... L3 2003 07 02 15 32 -27.1500 -109.4500 50.00 48849 EIC 2003 05 15 23 00 1616-91 P co2 373.050 -999.990 ... L3 2003 07 02 15 45 -27.1500 -109.4500 50.00 48850 EIC 2003 05 22 17 00 523-99 P co2 371.240 -999.990 ... L3 2003 07 02 15 58 -27.1500 -109.4500 50.00 48851 EIC 2003 05 22 17 00 524-99 P co2 371.410 -999.990 ... L3 2003 07 02 16 11 -27.1500 -109.4500 50.00 48852 EIC 2003 05 29 15 00 1261-99 P co2 371.870 -999.990 ... L3 2003 07 02 15 04 -27.1500 -109.4500 50.00 48853 EIC 2003 05 29 15 00 1262-99 P co2 371.780 -999.990 ... L3 2003 07 02 15 17 -27.1500 -109.4500 50.00 48854 EIC 2004 05 24 20 40 6547-66 D co2 371.490 -999.990 ... L3 2004 07 29 11 57 -27.1500 -109.4500 50.00 48855 EIC 2004 05 24 20 40 6548-66 D co2 371.760 -999.990 ... L3 2004 07 29 12 10 -27.1500 -109.4500 50.00 48856 EIC 2004 05 27 18 00 6871-66 D co2 373.580 -999.990 ... L3 2004 07 29 12 23 -27.1500 -109.4500 50.00 48857 EIC 2004 05 27 18 00 6872-66 D co2 373.620 -999.990 ... L3 2004 07 29 12 36 -27.1500 -109.4500 50.00 48858 EIC 2005 02 17 22 34 305-99 G co2 375.460 -999.990 ... L3 2005 05 03 14 28 -27.1300 -109.4500 50.00 198272 EIC 2005 02 17 22 34 306-99 G co2 375.450 -999.990 ... L3 2005 05 03 14 42 -27.1300 -109.4500 50.00 198273 EIC 2005 02 20 14 28 777-99 G co2 376.190 -999.990 ... L3 2005 05 03 13 03 -27.1300 -109.4500 50.00 198274 EIC 2005 02 20 14 28 778-99 G co2 376.300 -999.990 ... L3 2005 05 03 13 17 -27.1300 -109.4500 50.00 198275 EIC 2005 03 09 15 00 517-91 G co2 372.790 -999.990 +.. L3 2005 05 03 14 00 -27.1300 -109.4500 50.00 198270 EIC 2005 03 09 15 00 518-91 G co2 371.570 -999.990 -.. L3 2005 05 03 14 14 -27.1300 -109.4500 50.00 198271 EIC 2005 03 25 23 40 1081-91 G co2 375.860 -999.990 ... L3 2005 05 03 13 32 -27.1300 -109.4500 50.00 198268 EIC 2005 03 25 23 40 1082-91 G co2 375.830 -999.990 ... L3 2005 05 03 13 46 -27.1300 -109.4500 50.00 198269 EIC 2005 04 09 16 00 229-99 G co2 375.240 -999.990 ... L3 2005 07 11 14 38 -27.1300 -109.4500 50.00 201595 EIC 2005 04 09 16 00 230-99 G co2 374.910 -999.990 ... L3 2005 07 11 14 52 -27.1300 -109.4500 50.00 201594 EIC 2005 04 24 22 00 1119-99 G co2 375.420 -999.990 ... L3 2005 07 11 16 04 -27.1300 -109.4500 50.00 201596 EIC 2005 04 24 22 00 1120-99 G co2 375.300 -999.990 ... L3 2005 07 11 16 18 -27.1300 -109.4500 50.00 201597 EIC 2005 05 03 20 00 6271-66 G co2 374.990 -999.990 ... L3 2005 07 06 09 10 -27.1300 -109.4500 50.00 201582 EIC 2005 05 03 20 00 6272-66 G co2 375.150 -999.990 ... L3 2005 07 06 09 24 -27.1300 -109.4500 50.00 201583 EIC 2005 05 11 17 00 4151-91 G co2 375.640 -999.990 ... L3 2005 07 06 09 38 -27.1300 -109.4500 50.00 201584 EIC 2005 05 11 17 00 4152-91 G co2 375.770 -999.990 ... L3 2005 07 06 09 53 -27.1300 -109.4500 50.00 201585 EIC 2005 05 18 15 45 1449-99 G co2 378.140 -999.990 +.. L3 2005 08 12 09 20 -27.1300 -109.4500 50.00 202989 EIC 2005 05 18 15 45 1450-99 G co2 376.970 -999.990 -.. L3 2005 08 12 09 34 -27.1300 -109.4500 50.00 202990 EIC 2005 05 24 21 00 2719-99 G co2 376.980 -999.990 ... L3 2005 08 12 09 49 -27.1300 -109.4500 50.00 202987 EIC 2005 05 24 21 00 2720-99 G co2 376.950 -999.990 ... L3 2005 08 12 10 03 -27.1300 -109.4500 50.00 202988 EIC 2005 06 01 16 00 1730-99 G co2 376.380 -999.990 ... L3 2005 08 12 13 51 -27.1300 -109.4500 50.00 202978 EIC 2005 06 14 15 00 1731-99 G co2 376.710 -999.990 +.. L3 2005 08 11 11 10 -27.1300 -109.4500 50.00 202979 EIC 2005 06 14 15 00 1732-99 G co2 376.160 -999.990 -.. L3 2005 08 11 11 24 -27.1300 -109.4500 50.00 202980 EIC 2005 06 24 22 00 813-99 G co2 376.990 -999.990 ... L3 2005 10 21 14 23 -27.1300 -109.4500 50.00 207061 EIC 2005 06 24 22 00 814-99 G co2 376.940 -999.990 ... L3 2005 10 21 14 37 -27.1300 -109.4500 50.00 207062 EIC 2005 06 28 21 40 2163-99 G co2 377.700 -999.990 ... L3 2005 10 17 14 30 -27.1300 -109.4500 50.00 207059 EIC 2005 06 28 21 40 2164-99 G co2 377.580 -999.990 ... L3 2005 10 17 14 44 -27.1300 -109.4500 50.00 207060 EIC 2005 07 15 21 00 187-99 G co2 376.580 -999.990 ... L3 2005 10 17 14 58 -27.1300 -109.4500 50.00 207057 EIC 2005 07 15 21 00 188-99 G co2 376.420 -999.990 ... L3 2005 10 17 15 13 -27.1300 -109.4500 50.00 207058 EIC 2005 07 19 18 00 533-99 G co2 376.690 -999.990 ... L3 2005 10 21 15 20 -27.1300 -109.4500 50.00 207065 EIC 2005 07 19 18 00 534-99 G co2 376.760 -999.990 ... L3 2005 10 21 15 34 -27.1300 -109.4500 50.00 207066 EIC 2005 07 26 18 00 1947-99 G co2 376.730 -999.990 ... L3 2005 10 21 14 51 -27.1300 -109.4500 50.00 207063 EIC 2005 07 26 18 00 1948-99 G co2 376.580 -999.990 ... L3 2005 10 21 15 05 -27.1300 -109.4500 50.00 207064 EIC 2005 08 16 17 00 2779-99 G co2 376.650 -999.990 ... L3 2006 01 06 13 37 -27.1300 -109.4500 50.00 210946 EIC 2005 08 16 17 00 2780-99 G co2 376.730 -999.990 ... L3 2006 01 06 13 51 -27.1300 -109.4500 50.00 210947 EIC 2005 09 10 16 00 79-99 G co2 375.490 -999.990 ... L3 2006 01 06 13 08 -27.1300 -109.4500 50.00 210948 EIC 2005 09 10 16 00 80-99 G co2 375.490 -999.990 ... L3 2006 01 06 13 22 -27.1300 -109.4500 50.00 210949 EIC 2005 09 27 21 00 951-99 G co2 376.370 -999.990 ... L3 2006 01 26 10 17 -27.1300 -109.4500 50.00 211700 EIC 2005 09 27 21 00 952-99 G co2 376.420 -999.990 ... L3 2006 01 26 10 31 -27.1300 -109.4500 50.00 211701 EIC 2005 10 07 20 00 1671-99 G co2 377.110 -999.990 ... L3 2006 01 26 09 49 -27.1300 -109.4500 50.00 211698 EIC 2005 10 07 20 00 1672-99 G co2 377.030 -999.990 ... L3 2006 01 26 10 03 -27.1300 -109.4500 50.00 211699 EIC 2005 10 11 17 20 137-99 G co2 376.670 -999.990 ... L3 2006 01 25 15 05 -27.1300 -109.4500 50.00 211714 EIC 2005 10 11 17 20 138-99 G co2 376.570 -999.990 ... L3 2006 01 25 15 19 -27.1300 -109.4500 50.00 211715 EIC 2005 10 18 21 00 3073-99 G co2 376.590 -999.990 ... L3 2006 01 25 16 02 -27.1300 -109.4500 50.00 211720 EIC 2005 10 18 21 00 3074-99 G co2 376.540 -999.990 ... L3 2006 01 25 16 16 -27.1300 -109.4500 50.00 211721 EIC 2005 10 25 22 00 1805-99 G co2 376.290 -999.990 ... L3 2006 01 25 14 37 -27.1300 -109.4500 50.00 211716 EIC 2005 10 25 22 00 1806-99 G co2 376.380 -999.990 ... L3 2006 01 25 14 51 -27.1300 -109.4500 50.00 211717 EIC 2005 11 01 17 20 3537-99 G co2 376.570 -999.990 ... L3 2006 01 25 15 34 -27.1300 -109.4500 50.00 211718 EIC 2005 11 01 17 20 3538-99 G co2 376.710 -999.990 ... L3 2006 01 25 15 48 -27.1300 -109.4500 50.00 211719 EIC 2005 11 07 17 00 6479-66 G co2 376.640 -999.990 ... L3 2006 04 11 09 32 -27.1300 -109.4500 50.00 215116 EIC 2005 11 07 17 00 6480-66 G co2 376.580 -999.990 ... L3 2006 04 11 09 46 -27.1300 -109.4500 50.00 215117 EIC 2005 11 09 15 00 3691-99 G co2 377.430 -999.990 ... L3 2006 04 07 16 16 -27.1300 -109.4500 50.00 215066 EIC 2005 11 09 15 00 3692-99 G co2 377.440 -999.990 ... L3 2006 04 07 16 30 -27.1300 -109.4500 50.00 215067 EIC 2005 11 16 16 00 2613-99 G co2 379.220 -999.990 ... L3 2006 04 07 15 47 -27.1300 -109.4500 50.00 215064 EIC 2005 11 16 16 00 2614-99 G co2 378.920 -999.990 ... L3 2006 04 07 16 01 -27.1300 -109.4500 50.00 215065 EIC 2005 12 13 21 00 6017-66 G co2 378.120 -999.990 ... L3 2006 04 11 10 00 -27.1300 -109.4500 50.00 215118 EIC 2005 12 13 21 00 6018-66 G co2 378.280 -999.990 ... L3 2006 04 11 10 15 -27.1300 -109.4500 50.00 215119 EIC 2005 12 20 22 30 1477-99 G co2 378.950 -999.990 ... L3 2006 05 25 11 05 -27.1300 -109.4500 50.00 216913 EIC 2005 12 20 22 30 1478-99 G co2 378.860 -999.990 ... L3 2006 05 25 11 20 -27.1300 -109.4500 50.00 216914 EIC 2006 01 04 15 00 6055-66 G co2 378.870 -999.990 ... L3 2006 05 25 11 34 -27.1300 -109.4500 50.00 216911 EIC 2006 01 04 15 00 6056-66 G co2 378.800 -999.990 ... L3 2006 05 25 11 48 -27.1300 -109.4500 50.00 216912 EIC 2006 01 11 15 00 727-99 G co2 378.210 -999.990 ... L3 2006 05 24 14 46 -27.1300 -109.4500 50.00 216920 EIC 2006 01 11 15 00 728-99 G co2 377.830 -999.990 ... L3 2006 05 24 15 00 -27.1300 -109.4500 50.00 216921 EIC 2006 01 24 23 00 2529-99 G co2 377.780 -999.990 ... L3 2006 05 24 15 15 -27.1300 -109.4500 50.00 216918 EIC 2006 01 24 23 00 2530-99 G co2 377.520 -999.990 ... L3 2006 05 24 15 29 -27.1300 -109.4500 50.00 216919 EIC 2006 02 01 15 00 2203-99 G co2 378.180 -999.990 ... L3 2006 05 25 09 40 -27.1300 -109.4500 50.00 216924 EIC 2006 02 01 15 00 2204-99 G co2 377.920 -999.990 ... L3 2006 05 25 09 54 -27.1300 -109.4500 50.00 216925 EIC 2006 02 07 20 00 3483-99 G co2 378.230 -999.990 +.. L3 2006 05 25 10 08 -27.1300 -109.4500 50.00 216922 EIC 2006 02 07 20 00 3484-99 G co2 377.610 -999.990 -.. L3 2006 05 25 10 23 -27.1300 -109.4500 50.00 216923 EIC 2006 02 14 21 00 3687-99 G co2 378.720 -999.990 ... L3 2006 04 07 12 56 -27.1300 -109.4500 50.00 215062 EIC 2006 02 14 21 00 3688-99 G co2 378.570 -999.990 ... L3 2006 04 07 13 10 -27.1300 -109.4500 50.00 215063 EIC 2006 02 21 21 00 3799-99 G co2 378.310 -999.990 ... L3 2006 04 07 13 25 -27.1300 -109.4500 50.00 215061 EIC 2006 03 03 22 00 4963-91 G co2 378.500 -999.990 ... L3 2006 04 07 11 59 -27.1300 -109.4500 50.00 215059 EIC 2006 03 03 22 00 4964-91 G co2 378.350 -999.990 ... L3 2006 04 07 12 14 -27.1300 -109.4500 50.00 215060 EIC 2006 03 08 15 00 4253-91 G co2 398.010 -999.990 .X. L3 2006 04 07 12 28 -27.1300 -109.4500 50.00 215057 EIC 2006 03 08 15 00 4254-91 G co2 398.070 -999.990 .X. L3 2006 04 07 12 42 -27.1300 -109.4500 50.00 215058 EIC 2006 03 14 23 00 1133-91 G co2 355.360 -999.990 .X. L3 2006 06 07 12 31 -27.1300 -109.4500 50.00 217447 EIC 2006 03 14 23 00 1134-91 G co2 355.400 -999.990 .X. L3 2006 06 07 12 45 -27.1300 -109.4500 50.00 217448 EIC 2006 03 22 16 00 4109-91 G co2 378.010 -999.990 ... L3 2006 06 07 12 02 -27.1300 -109.4500 50.00 217445 EIC 2006 03 22 16 00 4110-91 G co2 377.660 -999.990 ... L3 2006 06 07 12 16 -27.1300 -109.4500 50.00 217446 EIC 2006 03 29 15 00 4485-99 G co2 376.800 -999.990 ... L3 2006 06 07 13 28 -27.1300 -109.4500 50.00 217459 EIC 2006 03 29 15 00 4486-99 G co2 377.060 -999.990 ... L3 2006 06 07 13 42 -27.1300 -109.4500 50.00 217460 EIC 2006 04 04 21 00 1969-99 G co2 324.480 -999.990 N.. L3 2006 06 07 14 24 -27.1300 -109.4500 50.00 217463 EIC 2006 04 04 21 00 1970-99 G co2 324.510 -999.990 N.. L3 2006 06 07 14 39 -27.1300 -109.4500 50.00 217464 EIC 2006 04 12 16 00 6097-66 G co2 377.450 -999.990 ... L3 2006 06 07 12 59 -27.1300 -109.4500 50.00 217461 EIC 2006 04 12 16 00 6098-66 G co2 377.400 -999.990 ... L3 2006 06 07 13 13 -27.1300 -109.4500 50.00 217462 EIC 2006 04 18 22 00 2737-99 G co2 378.620 -999.990 ... L3 2006 06 07 13 56 -27.1300 -109.4500 50.00 217465 EIC 2006 04 18 22 00 2738-99 G co2 378.380 -999.990 ... L3 2006 06 07 14 10 -27.1300 -109.4500 50.00 217466 EIC 2006 04 25 22 00 595-99 G co2 378.380 -999.990 ... L3 2006 08 10 10 53 -27.1300 -109.4500 50.00 220216 EIC 2006 04 25 22 00 596-99 G co2 362.720 -999.990 A.. L3 2006 08 10 11 07 -27.1300 -109.4500 50.00 220217 EIC 2006 04 25 22 00 596-99 G co2 378.170 -999.990 ... L3 2006 08 10 13 01 -27.1300 -109.4500 50.00 220217 EIC 2006 05 03 18 00 4443-99 G co2 377.810 -999.990 A.. L3 2006 08 10 11 49 -27.1300 -109.4500 50.00 220214 EIC 2006 05 03 18 00 4443-99 G co2 377.860 -999.990 ... L3 2006 08 10 13 43 -27.1300 -109.4500 50.00 220214 EIC 2006 05 03 18 00 4444-99 G co2 378.090 -999.990 ... L3 2006 08 10 12 04 -27.1300 -109.4500 50.00 220215 EIC 2006 05 16 21 00 4445-99 G co2 378.010 -999.990 ... L3 2006 08 10 12 18 -27.1300 -109.4500 50.00 220202 EIC 2006 05 16 21 00 4446-99 G co2 377.810 -999.990 ... L3 2006 08 10 12 32 -27.1300 -109.4500 50.00 220203 EIC 2006 05 23 23 00 6183-66 G co2 380.950 -999.990 A.. L3 2006 08 10 11 21 -27.1300 -109.4500 50.00 220204 EIC 2006 05 23 23 00 6183-66 G co2 377.170 -999.990 ... L3 2006 08 10 13 15 -27.1300 -109.4500 50.00 220204 EIC 2006 05 23 23 00 6184-66 G co2 397.220 -999.990 A.. L3 2006 08 10 11 35 -27.1300 -109.4500 50.00 220205 EIC 2006 05 23 23 00 6184-66 G co2 377.020 -999.990 ... L3 2006 08 10 13 29 -27.1300 -109.4500 50.00 220205 EIC 2006 05 30 15 00 2281-99 G co2 380.030 -999.990 .X. L3 2006 08 10 09 22 -27.1300 -109.4500 50.00 220210 EIC 2006 05 30 15 00 2282-99 G co2 379.940 -999.990 .X. L3 2006 08 10 09 36 -27.1300 -109.4500 50.00 220211 EIC 2006 06 07 15 00 4053-99 G co2 377.570 -999.990 ... L3 2006 08 10 10 18 -27.1300 -109.4500 50.00 220212 EIC 2006 06 07 15 00 4054-99 G co2 377.580 -999.990 ... L3 2006 08 10 10 33 -27.1300 -109.4500 50.00 220213 EIC 2006 06 13 21 00 127-99 G co2 322.620 -999.990 N.. L3 2006 08 10 14 55 -27.1300 -109.4500 50.00 220206 EIC 2006 06 13 21 00 128-99 G co2 322.730 -999.990 N.. L3 2006 08 10 15 09 -27.1300 -109.4500 50.00 220207 EIC 2006 06 20 21 00 1193-99 G co2 377.940 -999.990 ... L3 2006 08 10 15 23 -27.1300 -109.4500 50.00 220208 EIC 2006 06 20 21 00 1194-99 G co2 378.050 -999.990 ... L3 2006 08 10 15 37 -27.1300 -109.4500 50.00 220209 EIC 2006 07 18 23 00 2521-99 G co2 380.250 -999.990 ... L3 2007 02 12 10 29 -27.1300 -109.4500 50.00 228708 EIC 2006 07 18 23 00 2522-99 G co2 379.940 -999.990 ... L3 2007 02 12 10 44 -27.1300 -109.4500 50.00 228709 EIC 2006 07 25 23 00 3351-99 G co2 322.220 -999.990 N.. L3 2007 02 12 09 04 -27.1300 -109.4500 50.00 228706 EIC 2006 07 25 23 00 3352-99 G co2 322.040 -999.990 N.. L3 2007 02 12 09 18 -27.1300 -109.4500 50.00 228707 EIC 2006 08 02 16 00 1039-99 G co2 378.120 -999.990 ... L3 2007 02 08 16 18 -27.1300 -109.4500 50.00 228726 EIC 2006 08 02 16 00 1040-99 G co2 378.210 -999.990 ... L3 2007 02 08 16 32 -27.1300 -109.4500 50.00 228727 EIC 2006 08 08 23 00 1173-99 G co2 379.670 -999.990 ... L3 2007 02 13 10 51 -27.1300 -109.4500 50.00 228740 EIC 2006 08 08 23 00 1174-99 G co2 379.570 -999.990 ... L3 2007 02 13 11 06 -27.1300 -109.4500 50.00 228741 EIC 2006 08 22 23 00 4401-99 G co2 322.410 -999.990 N.. L3 2007 02 13 11 20 -27.1300 -109.4500 50.00 228738 EIC 2006 08 22 23 00 4402-99 G co2 322.610 -999.990 N.. L3 2007 02 13 11 34 -27.1300 -109.4500 50.00 228739 EIC 2006 08 30 15 00 3341-99 G co2 379.770 -999.990 ... L3 2007 02 13 10 23 -27.1300 -109.4500 50.00 228734 EIC 2006 08 30 15 00 3342-99 G co2 379.660 -999.990 ... L3 2007 02 13 10 37 -27.1300 -109.4500 50.00 228735 EIC 2006 09 06 17 00 4161-99 G co2 378.510 -999.990 ... L3 2007 02 10 13 09 -27.1300 -109.4500 50.00 228722 EIC 2006 09 06 17 00 4162-99 G co2 378.830 -999.990 ... L3 2007 02 10 13 23 -27.1300 -109.4500 50.00 228723 EIC 2006 09 12 23 30 2667-99 G co2 370.320 -999.990 +.. L3 2007 02 10 13 37 -27.1300 -109.4500 50.00 228724 EIC 2006 09 12 23 30 2668-99 G co2 349.640 -999.990 -.. L3 2007 02 10 13 52 -27.1300 -109.4500 50.00 228725 EIC 2006 09 20 16 30 3507-99 G co2 377.640 -999.990 ... L3 2007 02 12 10 58 -27.1300 -109.4500 50.00 228712 EIC 2006 09 20 16 30 3508-99 G co2 378.050 -999.990 ... L3 2007 02 12 11 12 -27.1300 -109.4500 50.00 228713 EIC 2006 09 22 15 00 589-99 G co2 378.200 -999.990 ... L3 2007 02 12 11 26 -27.1300 -109.4500 50.00 228710 EIC 2006 09 22 15 00 590-99 G co2 378.350 -999.990 ... L3 2007 02 12 11 40 -27.1300 -109.4500 50.00 228711 EIC 2006 10 14 15 30 495-99 G co2 378.510 -999.990 ... L3 2007 02 09 08 48 -27.1300 -109.4500 50.00 228728 EIC 2006 10 14 15 30 496-99 G co2 378.370 -999.990 ... L3 2007 02 09 09 02 -27.1300 -109.4500 50.00 228729 EIC 2006 10 17 21 00 591-99 G co2 377.410 -999.990 ... L3 2007 02 12 12 23 -27.1300 -109.4500 50.00 228714 EIC 2006 10 17 21 00 592-99 G co2 377.550 -999.990 ... L3 2007 02 12 12 37 -27.1300 -109.4500 50.00 228715 EIC 2006 10 24 23 30 1243-99 G co2 322.110 -999.990 N.. L3 2007 02 12 11 55 -27.1300 -109.4500 50.00 228716 EIC 2006 10 24 23 30 1244-99 G co2 321.920 -999.990 N.. L3 2007 02 12 12 09 -27.1300 -109.4500 50.00 228717 EIC 2006 11 01 15 30 4569-99 G co2 377.660 -999.990 ... L3 2007 02 09 09 45 -27.1300 -109.4500 50.00 228730 EIC 2006 11 01 15 30 4570-99 G co2 378.090 -999.990 ... L3 2007 02 09 09 59 -27.1300 -109.4500 50.00 228731 EIC 2006 11 08 15 00 637-99 G co2 379.420 -999.990 ... L3 2007 02 09 09 17 -27.1300 -109.4500 50.00 228732 EIC 2006 11 08 15 00 638-99 G co2 379.380 -999.990 ... L3 2007 02 09 09 31 -27.1300 -109.4500 50.00 228733 EIC 2006 11 22 18 00 1949-99 G co2 379.500 -999.990 +.. L3 2007 02 12 16 11 -27.1300 -109.4500 50.00 228736 EIC 2006 11 22 18 00 1950-99 G co2 378.880 -999.990 -.. L3 2007 02 12 16 25 -27.1300 -109.4500 50.00 228737 EIC 2006 11 28 21 00 1503-99 G co2 379.040 -999.990 ... L3 2007 02 10 12 12 -27.1300 -109.4500 50.00 228718 EIC 2006 11 28 21 00 1504-99 G co2 379.420 -999.990 ... L3 2007 02 10 12 26 -27.1300 -109.4500 50.00 228719 EIC 2006 12 05 20 00 2217-99 G co2 379.120 -999.990 ... L3 2007 02 10 12 40 -27.1300 -109.4500 50.00 228720 EIC 2006 12 05 20 00 2218-99 G co2 379.340 -999.990 ... L3 2007 02 10 12 55 -27.1300 -109.4500 50.00 228721 EIC 2006 12 16 17 00 2615-99 G co2 377.570 -999.990 ... L3 2007 03 06 12 01 -27.1300 -109.4500 50.00 230134 EIC 2006 12 16 17 00 2616-99 G co2 377.430 -999.990 ... L3 2007 03 06 12 15 -27.1300 -109.4500 50.00 230135 EIC 2006 12 19 22 00 1097-99 G co2 378.910 -999.990 ... L3 2007 03 06 12 30 -27.1300 -109.4500 50.00 230132 EIC 2006 12 19 22 00 1098-99 G co2 379.100 -999.990 ... L3 2007 03 06 12 44 -27.1300 -109.4500 50.00 230133 EIC 2006 12 26 23 30 1493-99 G co2 330.790 -999.990 N.. L3 2007 03 06 12 58 -27.1300 -109.4500 50.00 230136 EIC 2006 12 26 23 30 1494-99 G co2 330.870 -999.990 N.. L3 2007 03 06 13 12 -27.1300 -109.4500 50.00 230137 EIC 2007 01 02 22 00 41-99 G co2 378.680 -999.990 ... L3 2007 03 06 13 27 -27.1300 -109.4500 50.00 230138 EIC 2007 01 02 22 00 42-99 G co2 378.390 -999.990 ... L3 2007 03 06 13 41 -27.1300 -109.4500 50.00 230139 EIC 2007 01 09 22 00 3215-99 G co2 378.820 -999.990 ... L3 2007 04 13 13 58 -27.1300 -109.4500 50.00 232256 EIC 2007 01 09 22 00 3216-99 G co2 378.620 -999.990 ... L3 2007 04 13 14 12 -27.1300 -109.4500 50.00 232257 EIC 2007 01 24 16 00 2001-99 G co2 379.140 -999.990 ... L3 2007 04 13 13 29 -27.1300 -109.4500 50.00 232254 EIC 2007 01 24 16 00 2002-99 G co2 378.840 -999.990 ... L3 2007 04 13 13 43 -27.1300 -109.4500 50.00 232255 EIC 2007 03 02 02 00 4231-99 G co2 382.410 -999.990 .X. L3 2007 05 25 11 59 -27.1300 -109.4500 50.00 234647 EIC 2007 03 06 21 00 3317-99 G co2 378.350 -999.990 ... L3 2007 05 25 11 16 -27.1300 -109.4500 50.00 234645 EIC 2007 03 06 21 00 3318-99 G co2 378.300 -999.990 ... L3 2007 05 25 11 31 -27.1300 -109.4500 50.00 234646 EIC 2007 03 14 02 00 4043-99 G co2 382.680 -999.990 .X. L3 2007 05 25 09 23 -27.1300 -109.4500 50.00 234650 EIC 2007 03 14 02 00 4044-99 G co2 382.810 -999.990 .X. L3 2007 05 25 09 37 -27.1300 -109.4500 50.00 234651 EIC 2007 03 20 23 00 3141-99 G co2 378.250 -999.990 ... L3 2007 05 25 09 51 -27.1300 -109.4500 50.00 234652 EIC 2007 03 20 23 00 3142-99 G co2 378.350 -999.990 ... L3 2007 05 25 10 05 -27.1300 -109.4500 50.00 234653 EIC 2007 04 08 17 00 3249-99 G co2 379.000 -999.990 ... L3 2007 05 25 08 54 -27.1300 -109.4500 50.00 234648 EIC 2007 04 08 17 00 3250-99 G co2 379.070 -999.990 ... L3 2007 05 25 09 08 -27.1300 -109.4500 50.00 234649 EIC 2007 04 20 21 00 4623-99 G co2 377.120 -999.990 .X. L3 2007 07 20 14 28 -27.1300 -109.4500 50.00 238502 EIC 2007 04 20 21 00 4624-99 G co2 377.160 -999.990 .X. L3 2007 07 20 14 42 -27.1300 -109.4500 50.00 238503 EIC 2007 04 24 23 00 1925-99 G co2 381.160 -999.990 ... L3 2007 07 20 13 03 -27.1300 -109.4500 50.00 238500 EIC 2007 04 24 23 00 1926-99 G co2 381.190 -999.990 ... L3 2007 07 20 13 17 -27.1300 -109.4500 50.00 238501 EIC 2007 05 08 21 00 4136-99 G co2 367.190 -999.990 N.. L3 2007 07 20 14 14 -27.1300 -109.4500 50.00 238506 EIC 2007 05 23 00 00 4075-99 G co2 382.750 -999.990 ... L3 2007 07 23 10 28 -27.1300 -109.4500 50.00 238504 EIC 2007 05 23 00 00 4076-99 G co2 382.580 -999.990 ... L3 2007 07 23 10 42 -27.1300 -109.4500 50.00 238505 EIC 2007 06 05 20 00 1641-99 G co2 378.580 -999.990 .X. L8 2007 09 28 11 40 -27.1300 -109.4500 50.00 242425 EIC 2007 06 05 20 00 1642-99 G co2 378.710 -999.990 .X. L8 2007 09 28 11 55 -27.1300 -109.4500 50.00 242426 EIC 2007 06 12 23 00 1101-99 G co2 380.130 -999.990 ... L8 2007 09 28 12 09 -27.1300 -109.4500 50.00 242423 EIC 2007 06 12 23 00 1102-99 G co2 379.930 -999.990 ... L8 2007 09 28 12 24 -27.1300 -109.4500 50.00 242424 EIC 2007 06 20 23 00 1888-99 G co2 379.260 -999.990 -.. L3 2007 09 27 15 39 -27.1300 -109.4500 50.00 242434 EIC 2007 06 20 23 00 4393-99 G co2 384.750 -999.990 +.. L3 2007 09 27 15 25 -27.1300 -109.4500 50.00 242433 EIC 2007 06 26 19 30 1197-99 G co2 380.880 -999.990 ... L3 2007 09 28 10 42 -27.1300 -109.4500 50.00 242431 EIC 2007 06 26 19 30 1198-99 G co2 380.440 -999.990 ... L3 2007 09 28 10 57 -27.1300 -109.4500 50.00 242432 EIC 2007 07 03 21 00 1629-99 G co2 378.920 -999.990 ... L3 2007 09 27 15 54 -27.1300 -109.4500 50.00 242429 EIC 2007 07 03 21 00 1630-99 G co2 379.220 -999.990 ... L3 2007 09 27 16 08 -27.1300 -109.4500 50.00 242430 EIC 2007 07 14 18 00 3939-99 G co2 380.550 -999.990 ... L3 2007 09 27 14 00 -27.1300 -109.4500 50.00 242447 EIC 2007 07 14 18 00 3940-99 G co2 381.020 -999.990 ... L3 2007 09 27 14 14 -27.1300 -109.4500 50.00 242448 EIC 2007 07 17 22 45 2169-99 G co2 381.910 -999.990 ... L3 2007 09 27 14 28 -27.1300 -109.4500 50.00 242445 EIC 2007 07 17 22 45 2170-99 G co2 382.090 -999.990 ... L3 2007 09 27 14 42 -27.1300 -109.4500 50.00 242446 EIC 2007 07 25 23 00 2525-99 G co2 381.840 -999.990 ... L3 2007 12 04 12 11 -27.1300 -109.4500 50.00 245567 EIC 2007 07 25 23 00 2526-99 G co2 381.670 -999.990 ... L3 2007 12 04 12 25 -27.1300 -109.4500 50.00 245568 EIC 2007 07 31 21 00 6197-66 G co2 379.660 -999.990 +.. L3 2007 12 04 11 43 -27.1300 -109.4500 50.00 245569 EIC 2007 07 31 21 00 6198-66 G co2 378.220 -999.990 -.. L3 2007 12 04 11 57 -27.1300 -109.4500 50.00 245570 EIC 2007 08 08 18 00 859-99 G co2 378.560 -999.990 ... L3 2007 09 27 14 57 -27.1300 -109.4500 50.00 242449 EIC 2007 08 08 18 00 860-99 G co2 379.030 -999.990 ... L3 2007 09 27 15 11 -27.1300 -109.4500 50.00 242450 EIC 2007 08 21 22 00 3925-99 G co2 380.440 -999.990 ... L3 2007 12 03 15 42 -27.1300 -109.4500 50.00 245573 EIC 2007 08 21 22 00 3926-99 G co2 380.070 -999.990 ... L3 2007 12 03 15 57 -27.1300 -109.4500 50.00 245574 EIC 2007 09 05 18 00 1889-99 G co2 380.350 -999.990 ... L3 2007 12 03 16 11 -27.1300 -109.4500 50.00 245571 EIC 2007 09 05 18 00 1890-99 G co2 379.850 -999.990 ... L3 2007 12 03 16 25 -27.1300 -109.4500 50.00 245572 EIC 2007 09 22 16 00 3963-99 G co2 379.790 -999.990 ... L8 2008 01 28 15 51 -27.1300 -109.4500 50.00 248558 EIC 2007 09 22 16 00 3964-99 G co2 379.640 -999.990 ... L8 2008 01 28 16 07 -27.1300 -109.4500 50.00 248559 EIC 2007 09 25 23 00 1481-99 G co2 381.070 -999.990 ... L8 2008 01 28 16 22 -27.1300 -109.4500 50.00 248562 EIC 2007 09 25 23 00 1482-99 G co2 381.020 -999.990 ... L8 2008 01 28 16 37 -27.1300 -109.4500 50.00 248563 EIC 2007 10 03 16 30 219-99 G co2 380.960 -999.990 ... L8 2008 01 28 15 21 -27.1300 -109.4500 50.00 248556 EIC 2007 10 03 16 30 220-99 G co2 380.690 -999.990 ... L8 2008 01 28 15 36 -27.1300 -109.4500 50.00 248557 EIC 2007 10 27 15 45 2245-99 G co2 380.920 -999.990 ... L8 2008 01 28 16 53 -27.1300 -109.4500 50.00 248560 EIC 2007 10 27 15 45 2246-99 G co2 381.100 -999.990 ... L8 2008 01 28 17 08 -27.1300 -109.4500 50.00 248561 EIC 2007 12 11 23 00 4371-99 G co2 381.980 -999.990 ... L8 2008 02 26 11 24 -27.1300 -109.4500 50.00 249967 EIC 2007 12 11 23 00 4372-99 G co2 381.960 -999.990 ... L8 2008 02 26 11 40 -27.1300 -109.4500 50.00 249968 EIC 2007 12 20 20 00 2863-99 G co2 381.790 -999.990 ... L8 2008 02 26 10 22 -27.1300 -109.4500 50.00 249965 EIC 2007 12 20 20 00 2864-99 G co2 381.680 -999.990 ... L8 2008 02 26 10 37 -27.1300 -109.4500 50.00 249966 EIC 2008 01 04 16 07 2041-99 G co2 383.610 -999.990 ... L8 2008 02 26 09 51 -27.1300 -109.4500 50.00 249961 EIC 2008 01 04 16 07 2042-99 G co2 383.540 -999.990 ... L8 2008 02 26 10 06 -27.1300 -109.4500 50.00 249962 EIC 2008 01 08 21 00 347-99 G co2 383.490 -999.990 ... L8 2008 02 26 10 52 -27.1300 -109.4500 50.00 249963 EIC 2008 01 08 21 00 348-99 G co2 383.590 -999.990 ... L8 2008 02 26 11 08 -27.1300 -109.4500 50.00 249964 EIC 2008 01 15 21 15 4181-99 G co2 381.480 -999.990 ... L3 2008 03 31 15 56 -27.1300 -109.4500 50.00 251688 EIC 2008 01 15 21 15 4182-99 G co2 381.510 -999.990 ... L3 2008 03 31 16 10 -27.1300 -109.4500 50.00 251689 EIC 2008 01 22 00 00 4647-99 G co2 383.100 -999.990 ... L3 2008 03 31 16 25 -27.1300 -109.4500 50.00 251690 EIC 2008 01 22 00 00 4648-99 G co2 383.150 -999.990 ... L3 2008 03 31 16 39 -27.1300 -109.4500 50.00 251691 EIC 2008 01 29 21 00 3243-99 G co2 390.940 -999.990 .Z. L3 2008 03 31 16 53 -27.1300 -109.4500 50.00 251694 EIC 2008 01 29 21 00 3244-99 G co2 390.510 -999.990 .Z. L3 2008 03 31 17 07 -27.1300 -109.4500 50.00 251695 EIC 2008 02 09 17 30 1395-99 G co2 383.150 -999.990 ... L3 2008 04 01 10 16 -27.1300 -109.4500 50.00 251692 EIC 2008 02 09 17 30 1396-99 G co2 383.010 -999.990 ... L3 2008 04 01 10 31 -27.1300 -109.4500 50.00 251693 EIC 2008 02 12 21 45 2925-99 G co2 382.610 -999.990 ... L8 2008 06 05 12 29 -27.1500 -109.4500 50.00 255129 EIC 2008 02 12 21 45 2926-99 G co2 382.530 -999.990 ... L8 2008 06 05 12 44 -27.1500 -109.4500 50.00 255130 EIC 2008 02 19 23 00 4441-99 G co2 382.870 -999.990 ... L8 2008 06 05 13 00 -27.1500 -109.4500 50.00 255131 EIC 2008 02 19 23 00 4442-99 G co2 382.760 -999.990 ... L8 2008 06 05 13 15 -27.1500 -109.4500 50.00 255132 EIC 2008 02 26 23 00 4167-99 G co2 382.880 -999.990 ... L8 2008 06 05 13 30 -27.1500 -109.4500 50.00 255135 EIC 2008 02 26 23 00 4168-99 G co2 382.800 -999.990 ... L8 2008 06 05 13 46 -27.1500 -109.4500 50.00 255136 EIC 2008 03 04 19 15 2723-99 G co2 382.520 -999.990 ... L8 2008 06 05 14 01 -27.1500 -109.4500 50.00 255133 EIC 2008 03 04 19 15 2724-99 G co2 382.470 -999.990 ... L8 2008 06 05 14 17 -27.1500 -109.4500 50.00 255134 EIC 2008 03 11 21 00 2205-99 G co2 382.100 -999.990 ... L8 2008 06 06 10 43 -27.1500 -109.4500 50.00 255139 EIC 2008 03 11 21 00 2206-99 G co2 382.160 -999.990 ... L8 2008 06 06 10 59 -27.1500 -109.4500 50.00 255140 EIC 2008 03 18 15 15 3011-99 G co2 381.180 -999.990 ... L8 2008 06 05 14 32 -27.1500 -109.4500 50.00 255137 EIC 2008 03 18 15 15 3012-99 G co2 381.390 -999.990 ... L8 2008 06 05 14 47 -27.1500 -109.4500 50.00 255138 EIC 2008 04 01 01 05 2329-99 G co2 383.000 -999.990 ... L8 2008 06 05 11 27 -27.1500 -109.4500 50.00 255127 EIC 2008 04 01 01 05 2330-99 G co2 383.080 -999.990 ... L8 2008 06 05 11 43 -27.1500 -109.4500 50.00 255128 EIC 2008 04 08 23 40 2793-99 G co2 382.460 -999.990 ... L8 2008 06 05 11 58 -27.1500 -109.4500 50.00 255125 EIC 2008 04 08 23 40 2794-99 G co2 382.430 -999.990 ... L8 2008 06 05 12 14 -27.1500 -109.4500 50.00 255126 EIC 2008 04 22 20 30 1111-99 G co2 380.030 -999.990 +.. L3 2008 07 16 11 14 -27.1500 -109.4500 50.00 257351 EIC 2008 04 22 20 30 1112-99 G co2 379.500 -999.990 -.. L3 2008 07 16 11 28 -27.1500 -109.4500 50.00 257352 EIC 2008 04 29 22 50 3519-99 G co2 381.760 -999.990 ... L3 2008 07 15 16 34 -27.1500 -109.4500 50.00 257349 EIC 2008 04 29 22 50 3520-99 G co2 381.920 -999.990 ... L3 2008 07 15 16 48 -27.1500 -109.4500 50.00 257350 EIC 2008 05 07 18 04 595-99 G co2 379.610 -999.990 -.. L8 2008 07 15 16 30 -27.1500 -109.4500 50.00 257347 EIC 2008 05 07 18 04 596-99 G co2 380.340 -999.990 +.. L8 2008 07 15 16 45 -27.1500 -109.4500 50.00 257348 EIC 2008 05 14 18 00 1712-99 G co2 381.400 -999.990 ... L8 2008 07 22 14 30 -27.1500 -109.4500 50.00 257683 EIC 2008 05 20 19 00 3135-99 G co2 381.210 -999.990 ... L8 2008 07 22 13 44 -27.1500 -109.4500 50.00 257677 EIC 2008 05 20 19 00 3136-99 G co2 381.060 -999.990 ... L8 2008 07 22 14 00 -27.1500 -109.4500 50.00 257678 EIC 2008 05 20 21 40 1691-99 G co2 382.490 -999.990 ... L8 2008 07 22 12 43 -27.1500 -109.4500 50.00 257681 EIC 2008 05 20 21 40 1692-99 G co2 382.320 -999.990 ... L8 2008 07 22 12 58 -27.1500 -109.4500 50.00 257682 EIC 2008 06 05 16 00 625-99 G co2 382.350 -999.990 ... L8 2008 07 22 13 14 -27.1500 -109.4500 50.00 257679 EIC 2008 06 05 16 00 626-99 G co2 382.310 -999.990 ... L8 2008 07 22 13 29 -27.1500 -109.4500 50.00 257680 EIC 2008 06 17 15 00 1043-99 G co2 384.390 -999.990 ... L8 2008 09 09 16 15 -27.1500 -109.4500 50.00 260369 EIC 2008 06 17 15 00 1044-99 G co2 384.490 -999.990 ... L8 2008 09 09 16 30 -27.1500 -109.4500 50.00 260370 EIC 2008 06 25 17 10 673-99 G co2 382.120 -999.990 ... L8 2008 09 09 16 46 -27.1500 -109.4500 50.00 260371 EIC 2008 06 25 17 10 674-99 G co2 382.040 -999.990 ... L8 2008 09 09 17 01 -27.1500 -109.4500 50.00 260372 EIC 2008 07 08 20 00 2239-99 G co2 382.050 -999.990 ... L8 2008 09 09 17 16 -27.1500 -109.4500 50.00 260375 EIC 2008 07 08 20 00 2240-99 G co2 381.980 -999.990 ... L8 2008 09 09 17 32 -27.1500 -109.4500 50.00 260376 EIC 2008 07 15 21 20 2213-99 G co2 381.600 -999.990 ... L8 2008 09 09 17 47 -27.1500 -109.4500 50.00 260373 EIC 2008 07 15 21 20 2214-99 G co2 381.290 -999.990 ... L8 2008 09 09 18 03 -27.1500 -109.4500 50.00 260374 EIC 2008 07 25 21 00 2973-99 G co2 381.480 -999.990 -.. L8 2008 10 29 16 42 -27.1500 -109.4500 50.00 263133 EIC 2008 07 25 21 00 2974-99 G co2 382.040 -999.990 +.. L8 2008 10 29 16 57 -27.1500 -109.4500 50.00 263134 EIC 2008 07 29 23 00 1465-99 G co2 383.240 -999.990 ... L8 2008 10 29 16 11 -27.1500 -109.4500 50.00 263131 EIC 2008 07 29 23 00 1466-99 G co2 383.180 -999.990 ... L8 2008 10 29 16 26 -27.1500 -109.4500 50.00 263132 EIC 2008 08 05 22 47 1271-99 G co2 382.590 -999.990 ... L8 2008 10 29 14 38 -27.1500 -109.4500 50.00 263123 EIC 2008 08 05 22 47 1272-99 G co2 382.230 -999.990 ... L8 2008 10 29 14 54 -27.1500 -109.4500 50.00 263124 EIC 2008 08 10 15 00 4811-99 G co2 381.610 -999.990 ... L8 2008 10 29 14 08 -27.1500 -109.4500 50.00 263125 EIC 2008 08 10 15 00 4812-99 G co2 382.080 -999.990 ... L8 2008 10 29 14 23 -27.1500 -109.4500 50.00 263126 EIC 2008 08 13 18 00 4055-99 G co2 382.250 -999.990 ... L3 2008 10 29 16 22 -27.1500 -109.4500 50.00 263135 EIC 2008 08 13 18 00 4056-99 G co2 381.930 -999.990 ... L3 2008 10 29 16 36 -27.1500 -109.4500 50.00 263136 EIC 2008 08 20 16 00 3231-99 G co2 382.720 -999.990 ... L3 2008 10 29 15 53 -27.1500 -109.4500 50.00 263137 EIC 2008 08 20 16 00 3232-99 G co2 382.670 -999.990 ... L3 2008 10 29 16 07 -27.1500 -109.4500 50.00 263138 EIC 2008 08 26 23 45 3869-99 G co2 383.460 -999.990 ... L8 2008 10 22 14 15 -27.1500 -109.4500 50.00 262560 EIC 2008 08 26 23 45 3870-99 G co2 383.590 -999.990 ... L8 2008 10 22 14 30 -27.1500 -109.4500 50.00 262561 EIC 2008 09 02 21 00 4519-99 G co2 381.630 -999.990 -.. L8 2008 10 22 14 46 -27.1500 -109.4500 50.00 262558 EIC 2008 09 02 21 00 4520-99 G co2 382.130 -999.990 +.. L8 2008 10 22 15 01 -27.1500 -109.4500 50.00 262559 EIC 2008 09 09 22 20 403-99 G co2 382.900 -999.990 ... L3 2008 11 12 15 34 -27.1500 -109.4500 50.00 263775 EIC 2008 09 09 22 20 404-99 G co2 382.750 -999.990 ... L3 2008 11 12 15 48 -27.1500 -109.4500 50.00 263776 EIC 2008 09 16 21 15 1381-99 G co2 381.830 -999.990 ... L3 2008 11 12 15 05 -27.1500 -109.4500 50.00 263777 EIC 2008 09 16 21 15 1382-99 G co2 381.700 -999.990 ... L3 2008 11 12 15 19 -27.1500 -109.4500 50.00 263778 EIC 2008 09 23 21 00 3201-99 G co2 383.760 -999.990 ... L8 2008 11 12 15 24 -27.1500 -109.4500 50.00 263771 EIC 2008 09 23 21 00 3202-99 G co2 383.990 -999.990 ... L8 2008 11 12 15 39 -27.1500 -109.4500 50.00 263772 EIC 2008 09 30 21 30 3611-99 G co2 382.620 -999.990 ... L8 2008 11 12 14 53 -27.1500 -109.4500 50.00 263773 EIC 2008 09 30 21 30 3612-99 G co2 382.510 -999.990 ... L8 2008 11 12 15 08 -27.1500 -109.4500 50.00 263774 EIC 2008 10 08 17 00 599-99 G co2 382.750 -999.990 ... L3 2009 01 20 10 35 -27.1500 -109.4500 50.00 267620 EIC 2008 10 08 17 00 600-99 G co2 382.890 -999.990 ... L3 2009 01 20 10 49 -27.1500 -109.4500 50.00 267621 EIC 2008 10 14 22 00 257-99 G co2 383.110 -999.990 ... L3 2009 01 20 10 07 -27.1500 -109.4500 50.00 267618 EIC 2008 10 14 22 00 258-99 G co2 382.680 -999.990 ... L3 2009 01 20 10 21 -27.1500 -109.4500 50.00 267619 EIC 2008 10 22 17 10 1805-99 G co2 381.860 -999.990 ... L3 2009 01 16 16 46 -27.1500 -109.4500 50.00 267616 EIC 2008 10 22 17 10 1806-99 G co2 381.360 -999.990 ... L3 2009 01 16 17 00 -27.1500 -109.4500 50.00 267617 EIC 2008 10 28 19 00 1609-99 G co2 382.630 -999.990 ... L3 2009 01 20 11 04 -27.1500 -109.4500 50.00 267622 EIC 2008 10 28 19 00 1610-99 G co2 382.560 -999.990 ... L3 2009 01 20 11 18 -27.1500 -109.4500 50.00 267623 EIC 2008 11 04 22 00 4493-99 G co2 383.370 -999.990 ... L8 2009 03 11 12 45 -27.1500 -109.4500 50.00 271130 EIC 2008 11 04 22 00 4494-99 G co2 383.520 -999.990 ... L8 2009 03 11 13 00 -27.1500 -109.4500 50.00 271131 EIC 2008 11 11 17 00 3859-99 G co2 383.340 -999.990 ... L8 2009 03 11 13 16 -27.1500 -109.4500 50.00 271132 EIC 2008 11 11 17 00 3860-99 G co2 383.270 -999.990 ... L8 2009 03 11 13 31 -27.1500 -109.4500 50.00 271133 EIC 2008 11 18 21 00 2045-99 G co2 383.130 -999.990 ... L8 2009 03 09 14 20 -27.1500 -109.4500 50.00 271076 EIC 2008 11 18 21 00 2046-99 G co2 383.340 -999.990 ... L8 2009 03 09 14 35 -27.1500 -109.4500 50.00 271077 EIC 2008 11 25 17 27 301-99 G co2 383.210 -999.990 ... L8 2009 03 09 14 50 -27.1500 -109.4500 50.00 271078 EIC 2008 11 25 17 27 302-99 G co2 383.100 -999.990 ... L8 2009 03 09 15 06 -27.1500 -109.4500 50.00 271079 EIC 2008 12 03 01 30 4947-99 G co2 385.060 -999.990 ... L8 2009 03 11 13 46 -27.1500 -109.4500 50.00 271128 EIC 2008 12 03 01 30 4948-99 G co2 384.980 -999.990 ... L8 2009 03 11 14 02 -27.1500 -109.4500 50.00 271129 EIC 2008 12 10 15 00 427-99 G co2 384.700 -999.990 ... L8 2009 03 11 12 14 -27.1500 -109.4500 50.00 271126 EIC 2008 12 10 15 00 428-99 G co2 384.770 -999.990 ... L8 2009 03 11 12 29 -27.1500 -109.4500 50.00 271127 EIC 2008 12 16 22 05 1507-99 G co2 383.740 -999.990 ... L8 2009 03 09 16 23 -27.1500 -109.4500 50.00 271124 EIC 2008 12 16 22 05 1508-99 G co2 383.810 -999.990 ... L8 2009 03 09 16 38 -27.1500 -109.4500 50.00 271125 EIC 2008 12 23 01 30 1351-99 G co2 382.610 -999.990 ... L3 2009 03 09 16 11 -27.1500 -109.4500 50.00 271122 EIC 2008 12 23 01 30 1352-99 G co2 382.600 -999.990 ... L3 2009 03 09 16 25 -27.1500 -109.4500 50.00 271123 EIC 2008 12 30 22 00 3181-99 G co2 384.220 -999.990 ... L8 2009 05 18 15 02 -27.1500 -109.4500 50.00 275354 EIC 2008 12 30 22 00 3182-99 G co2 384.130 -999.990 ... L8 2009 05 18 15 17 -27.1500 -109.4500 50.00 275355 EIC 2009 01 06 22 15 1377-99 G co2 383.390 -999.990 -.. L8 2009 05 18 12 28 -27.1500 -109.4500 50.00 275356 EIC 2009 01 06 22 15 1378-99 G co2 383.990 -999.990 +.. L8 2009 05 18 12 43 -27.1500 -109.4500 50.00 275357 EIC 2009 01 14 00 40 775-99 G co2 383.940 -999.990 ... L8 2009 04 02 10 39 -27.1500 -109.4500 50.00 272680 EIC 2009 01 14 00 40 776-99 G co2 384.080 -999.990 ... L8 2009 04 02 10 55 -27.1500 -109.4500 50.00 272681 EIC 2009 01 20 19 00 1991-99 G co2 384.830 -999.990 ... L8 2009 04 02 11 10 -27.1500 -109.4500 50.00 272682 EIC 2009 01 20 19 00 1992-99 G co2 384.920 -999.990 ... L8 2009 04 02 11 26 -27.1500 -109.4500 50.00 272683 EIC 2009 01 27 21 50 2035-99 G co2 384.580 -999.990 ... L8 2009 04 01 16 11 -27.1500 -109.4500 50.00 272678 EIC 2009 01 27 21 50 2036-99 G co2 384.310 -999.990 ... L8 2009 04 01 16 26 -27.1500 -109.4500 50.00 272679 EIC 2009 02 03 21 00 907-99 G co2 382.290 -999.990 ... L8 2009 05 16 15 54 -27.1500 -109.4500 50.00 275320 EIC 2009 02 03 21 00 908-99 G co2 382.640 -999.990 ... L8 2009 05 16 16 09 -27.1500 -109.4500 50.00 275321 EIC 2009 02 10 20 00 2577-99 G co2 383.160 -999.990 ... L8 2009 05 16 14 52 -27.1500 -109.4500 50.00 275318 EIC 2009 02 10 20 00 2578-99 G co2 383.460 -999.990 ... L8 2009 05 16 15 07 -27.1500 -109.4500 50.00 275319 EIC 2009 02 17 20 20 1105-99 G co2 384.550 -999.990 ... L8 2009 05 16 14 21 -27.1500 -109.4500 50.00 275316 EIC 2009 02 17 20 20 1106-99 G co2 384.360 -999.990 ... L8 2009 05 16 14 37 -27.1500 -109.4500 50.00 275317 EIC 2009 02 24 21 00 4479-99 G co2 383.850 -999.990 ... L8 2009 05 16 15 23 -27.1500 -109.4500 50.00 275314 EIC 2009 02 24 21 00 4480-99 G co2 383.580 -999.990 ... L8 2009 05 16 15 38 -27.1500 -109.4500 50.00 275315 EIC 2009 03 03 19 00 3945-99 G co2 382.530 -999.990 ... L8 2009 05 18 10 23 -27.1500 -109.4500 50.00 275322 EIC 2009 03 03 19 00 3946-99 G co2 382.690 -999.990 ... L8 2009 05 18 10 38 -27.1500 -109.4500 50.00 275323 EIC 2009 03 10 22 00 1639-99 G co2 383.640 -999.990 ... L8 2009 05 18 10 53 -27.1500 -109.4500 50.00 275324 EIC 2009 03 10 22 00 1640-99 G co2 383.560 -999.990 ... L8 2009 05 18 11 09 -27.1500 -109.4500 50.00 275325 EIC 2009 03 17 21 00 3-99 G co2 384.000 -999.990 ... L8 2009 05 18 11 24 -27.1500 -109.4500 50.00 275328 EIC 2009 03 17 21 00 4-99 G co2 384.280 -999.990 ... L8 2009 05 18 11 40 -27.1500 -109.4500 50.00 275329 EIC 2009 03 24 23 45 563-99 G co2 385.420 -999.990 ... L8 2009 05 18 12 58 -27.1500 -109.4500 50.00 275326 EIC 2009 03 24 23 45 564-99 G co2 385.450 -999.990 ... L8 2009 05 18 13 14 -27.1500 -109.4500 50.00 275327 EIC 2009 03 31 17 30 635-99 G co2 381.890 -999.990 .X. L3 2009 07 07 12 40 -27.1500 -109.4500 50.00 277799 EIC 2009 03 31 17 30 636-99 G co2 381.650 -999.990 .X. L3 2009 07 07 12 54 -27.1500 -109.4500 50.00 277800 EIC 2009 04 07 21 00 4059-99 G co2 384.330 -999.990 ... L3 2009 07 07 13 08 -27.1500 -109.4500 50.00 277801 EIC 2009 04 07 21 00 4060-99 G co2 384.100 -999.990 ... L3 2009 07 07 13 23 -27.1500 -109.4500 50.00 277802 EIC 2009 04 14 23 30 2796-99 G co2 383.770 -999.990 ... L10 2009 07 08 12 20 -27.1500 -109.4500 50.00 277790 EIC 2009 04 21 22 00 2491-99 G co2 384.810 -999.990 ... L3 2009 07 07 11 14 -27.1500 -109.4500 50.00 277791 EIC 2009 04 21 22 00 2492-99 G co2 384.830 -999.990 ... L3 2009 07 07 11 28 -27.1500 -109.4500 50.00 277792 EIC 2009 04 28 21 00 4813-99 G co2 383.190 -999.990 ... L3 2009 07 07 11 43 -27.1500 -109.4500 50.00 277795 EIC 2009 04 28 21 00 4814-99 G co2 383.320 -999.990 ... L3 2009 07 07 11 57 -27.1500 -109.4500 50.00 277796 EIC 2009 05 06 22 20 3521-99 G co2 383.530 -999.990 ... L3 2009 07 07 10 45 -27.1500 -109.4500 50.00 277793 EIC 2009 05 06 22 20 3522-99 G co2 383.730 -999.990 ... L3 2009 07 07 11 00 -27.1500 -109.4500 50.00 277794 EIC 2009 05 12 22 00 3137-99 G co2 384.340 -999.990 ... L3 2009 08 05 10 12 -27.1500 -109.4500 50.00 280540 EIC 2009 05 12 22 00 3138-99 G co2 384.210 -999.990 ... L3 2009 08 05 10 27 -27.1500 -109.4500 50.00 280541 EIC 2009 05 19 23 00 3619-99 G co2 386.070 -999.990 ... L3 2009 08 05 09 44 -27.1500 -109.4500 50.00 280542 EIC 2009 05 19 23 00 3620-99 G co2 385.810 -999.990 ... L3 2009 08 05 09 58 -27.1500 -109.4500 50.00 280543 EIC 2009 05 27 20 00 4611-99 G co2 331.720 -999.990 N.. L10 2009 08 03 12 38 -27.1500 -109.4500 50.00 280568 EIC 2009 05 27 20 00 4612-99 G co2 335.750 -999.990 N.. L10 2009 08 03 12 54 -27.1500 -109.4500 50.00 280569 EIC 2009 06 02 22 00 3723-99 G co2 383.210 -999.990 ... L10 2009 08 03 12 07 -27.1500 -109.4500 50.00 280570 EIC 2009 06 02 22 00 3724-99 G co2 383.220 -999.990 ... L10 2009 08 03 12 23 -27.1500 -109.4500 50.00 280571 EIC 2009 06 13 15 40 461-99 G co2 383.380 -999.990 ... L10 2009 10 01 12 23 -27.1500 -109.4500 50.00 284299 EIC 2009 06 13 15 40 462-99 G co2 383.670 -999.990 ... L10 2009 10 01 12 38 -27.1500 -109.4500 50.00 284300 EIC 2009 06 17 15 30 1051-99 G co2 384.770 -999.990 ... L10 2009 10 01 11 52 -27.1500 -109.4500 50.00 284297 EIC 2009 06 17 15 30 1052-99 G co2 384.660 -999.990 ... L10 2009 10 01 12 07 -27.1500 -109.4500 50.00 284298 EIC 2009 06 23 21 00 4207-99 G co2 383.410 -999.990 ... L10 2009 10 05 12 07 -27.1500 -109.4500 50.00 284531 EIC 2009 06 23 21 00 4208-99 G co2 383.710 -999.990 ... L10 2009 10 05 12 22 -27.1500 -109.4500 50.00 284532 EIC 2009 06 30 15 15 5009-99 G co2 384.170 -999.990 ... L10 2009 10 05 11 36 -27.1500 -109.4500 50.00 284533 EIC 2009 06 30 15 15 5010-99 G co2 384.220 -999.990 ... L10 2009 10 05 11 52 -27.1500 -109.4500 50.00 284534 EIC 2009 07 08 17 00 4197-99 G co2 383.400 -999.990 ... L10 2009 10 05 14 10 -27.1500 -109.4500 50.00 284541 EIC 2009 07 08 17 00 4198-99 G co2 383.340 -999.990 ... L10 2009 10 05 14 26 -27.1500 -109.4500 50.00 284542 EIC 2009 07 14 23 00 3211-99 G co2 384.390 -999.990 ... L10 2009 10 05 13 40 -27.1500 -109.4500 50.00 284539 EIC 2009 07 14 23 00 3212-99 G co2 384.130 -999.990 ... L10 2009 10 05 13 55 -27.1500 -109.4500 50.00 284540 EIC 2009 07 25 15 50 4873-99 G co2 383.240 -999.990 ... L10 2009 10 05 11 05 -27.1500 -109.4500 50.00 284529 EIC 2009 07 25 15 50 4874-99 G co2 383.420 -999.990 ... L10 2009 10 05 11 21 -27.1500 -109.4500 50.00 284530 EIC 2009 07 28 23 00 4756-99 G co2 384.520 -999.990 ... L10 2009 10 12 14 24 -27.1500 -109.4500 50.00 284528 EIC 2009 09 22 22 30 4479-99 G co2 384.330 -999.990 ... L10 2010 01 06 12 41 -27.1500 -109.4500 50.00 288277 EIC 2009 09 22 22 30 4480-99 G co2 383.900 -999.990 ... L10 2010 01 06 12 56 -27.1500 -109.4500 50.00 288278 EIC 2009 09 29 22 20 2577-99 G co2 385.140 -999.990 ... L10 2010 01 06 11 39 -27.1500 -109.4500 50.00 288279 EIC 2009 09 29 22 20 2578-99 G co2 385.100 -999.990 ... L10 2010 01 06 11 54 -27.1500 -109.4500 50.00 288280 EIC 2009 10 10 16 30 421-99 G co2 371.030 -999.990 A.. L10 2010 01 07 10 21 -27.1500 -109.4500 50.00 288271 EIC 2009 10 10 16 30 422-99 G co2 417.480 -999.990 A.. L10 2010 01 07 10 36 -27.1500 -109.4500 50.00 288272 EIC 2009 10 14 22 00 879-99 G co2 393.440 -999.990 N.. L10 2010 01 07 10 52 -27.1500 -109.4500 50.00 288269 EIC 2009 10 14 22 00 880-99 G co2 404.000 -999.990 N.. L10 2010 01 07 11 07 -27.1500 -109.4500 50.00 288270 EIC 2009 10 27 23 00 3483-99 G co2 385.530 -999.990 ... L10 2010 01 06 14 16 -27.1500 -109.4500 50.00 288265 EIC 2009 10 27 23 00 3484-99 G co2 385.340 -999.990 ... L10 2010 01 06 14 31 -27.1500 -109.4500 50.00 288266 EIC 2009 10 29 22 00 857-99 G co2 383.870 -999.990 ... L10 2010 01 06 14 46 -27.1500 -109.4500 50.00 288267 EIC 2009 10 29 22 00 858-99 G co2 383.890 -999.990 ... L10 2010 01 06 15 02 -27.1500 -109.4500 50.00 288268 EIC 2009 12 08 19 00 661-99 G co2 383.260 -999.990 ... L10 2010 06 07 13 58 -27.1500 -109.4500 50.00 297785 EIC 2009 12 08 19 00 662-99 G co2 383.260 -999.990 ... L10 2010 06 07 14 13 -27.1500 -109.4500 50.00 297786 EIC 2009 12 29 21 00 3157-99 G co2 384.520 -999.990 ... L10 2010 06 08 11 25 -27.1500 -109.4500 50.00 297799 EIC 2009 12 29 21 00 3158-99 G co2 384.760 -999.990 ... L10 2010 06 08 11 40 -27.1500 -109.4500 50.00 297800 EIC 2010 01 27 15 45 1377-99 G co2 386.380 -999.990 ... L10 2010 06 04 15 26 -27.1500 -109.4500 50.00 297787 EIC 2010 01 27 15 45 1378-99 G co2 386.240 -999.990 ... L10 2010 06 04 15 42 -27.1500 -109.4500 50.00 297788 EIC 2010 02 03 18 00 4493-99 G co2 384.540 -999.990 ... L10 2010 06 04 14 56 -27.1500 -109.4500 50.00 297789 EIC 2010 02 03 18 00 4494-99 G co2 384.600 -999.990 ... L10 2010 06 04 15 11 -27.1500 -109.4500 50.00 297790 EIC 2010 02 09 22 00 269-99 G co2 385.610 -999.990 ... L10 2010 06 04 14 25 -27.1500 -109.4500 50.00 297809 EIC 2010 02 09 22 00 270-99 G co2 385.740 -999.990 ... L10 2010 06 04 14 41 -27.1500 -109.4500 50.00 297810 EIC 2010 03 02 20 00 3635-99 G co2 348.520 -999.990 N.. L10 2010 06 07 15 32 -27.1500 -109.4500 50.00 297807 EIC 2010 03 02 20 00 3636-99 G co2 332.200 -999.990 N.. L10 2010 06 07 15 47 -27.1500 -109.4500 50.00 297808 EIC 2010 03 09 22 00 4523-99 G co2 386.330 -999.990 ... L8 2010 06 10 10 59 -27.1500 -109.4500 50.00 297948 EIC 2010 03 09 22 00 4524-99 G co2 386.150 -999.990 ... L8 2010 06 10 11 14 -27.1500 -109.4500 50.00 297949 EIC 2010 03 16 22 00 2073-99 G co2 385.260 -999.990 ... L8 2010 06 10 11 29 -27.1500 -109.4500 50.00 297950 EIC 2010 03 16 22 00 2074-99 G co2 385.470 -999.990 ... L8 2010 06 10 11 44 -27.1500 -109.4500 50.00 297951 EIC 2010 03 27 20 10 3625-99 G co2 384.600 -999.990 ... L10 2010 06 07 15 01 -27.1500 -109.4500 50.00 297805 EIC 2010 03 27 20 10 3626-99 G co2 384.660 -999.990 ... L10 2010 06 07 15 16 -27.1500 -109.4500 50.00 297806 EIC 2010 03 31 15 30 4277-99 G co2 383.880 -999.990 ... L10 2010 06 07 14 29 -27.1500 -109.4500 50.00 297803 EIC 2010 03 31 15 30 4278-99 G co2 384.280 -999.990 ... L10 2010 06 07 14 44 -27.1500 -109.4500 50.00 297804 EIC 2010 04 08 18 30 1343-99 G co2 383.590 -999.990 +.. L10 2010 08 10 17 01 -27.1500 -109.4500 50.00 301670 EIC 2010 04 08 18 30 1344-99 G co2 382.580 -999.990 -.. L10 2010 08 10 17 17 -27.1500 -109.4500 50.00 301671 EIC 2010 04 15 17 45 315-99 G co2 383.140 -999.990 ... L10 2010 08 11 11 06 -27.1500 -109.4500 50.00 301672 EIC 2010 04 15 17 45 316-99 G co2 383.100 -999.990 ... L10 2010 08 11 11 22 -27.1500 -109.4500 50.00 301673 EIC 2010 04 20 22 00 2179-99 G co2 384.610 -999.990 ... L10 2010 08 11 11 37 -27.1500 -109.4500 50.00 301674 EIC 2010 04 20 22 00 2180-99 G co2 384.350 -999.990 ... L10 2010 08 11 11 52 -27.1500 -109.4500 50.00 301675 EIC 2010 04 27 22 15 4679-99 G co2 385.940 -999.990 ... L10 2010 08 11 12 07 -27.1500 -109.4500 50.00 301676 EIC 2010 04 27 22 15 4680-99 G co2 385.540 -999.990 ... L10 2010 08 11 12 23 -27.1500 -109.4500 50.00 301677 EIC 2010 08 07 00 10 4251-99 G co2 388.060 -999.990 ... L10 2010 12 16 16 22 -27.1500 -109.4500 50.00 309325 EIC 2010 08 07 00 10 4252-99 G co2 387.820 -999.990 ... L10 2010 12 16 16 38 -27.1500 -109.4500 50.00 309326 EIC 2010 08 14 20 10 2295-99 G co2 385.550 -999.990 ... L10 2010 12 20 11 14 -27.1500 -109.4500 50.00 309323 EIC 2010 08 14 20 10 2296-99 G co2 385.380 -999.990 ... L10 2010 12 20 11 30 -27.1500 -109.4500 50.00 309324 EIC 2010 08 17 22 10 4531-99 G co2 387.100 -999.990 ... L10 2010 12 21 13 54 -27.1500 -109.4500 50.00 309321 EIC 2010 08 17 22 10 4532-99 G co2 387.180 -999.990 ... L10 2010 12 21 14 10 -27.1500 -109.4500 50.00 309322 EIC 2010 08 24 22 30 705-99 G co2 386.980 -999.990 ... L10 2010 12 21 14 26 -27.1500 -109.4500 50.00 309319 EIC 2010 08 24 22 30 706-99 G co2 386.760 -999.990 ... L10 2010 12 21 14 42 -27.1500 -109.4500 50.00 309320 EIC 2010 08 31 23 50 2895-99 G co2 386.820 -999.990 ... L10 2010 12 21 12 16 -27.1500 -109.4500 50.00 309335 EIC 2010 08 31 23 50 2896-99 G co2 386.790 -999.990 ... L10 2010 12 21 12 33 -27.1500 -109.4500 50.00 309336 EIC 2010 09 08 01 50 1927-99 G co2 387.820 -999.990 ... L10 2010 12 21 11 44 -27.1500 -109.4500 50.00 309337 EIC 2010 09 08 01 50 1928-99 G co2 387.800 -999.990 ... L10 2010 12 21 12 00 -27.1500 -109.4500 50.00 309338 EIC 2010 09 14 22 00 4943-99 G co2 386.050 -999.990 ... L10 2010 12 21 13 21 -27.1500 -109.4500 50.00 309315 EIC 2010 09 14 22 00 4944-99 G co2 385.980 -999.990 ... L10 2010 12 21 13 37 -27.1500 -109.4500 50.00 309316 EIC 2010 09 21 21 30 3795-99 G co2 386.940 -999.990 ... L10 2010 12 21 12 49 -27.1500 -109.4500 50.00 309317 EIC 2010 09 21 21 30 3796-99 G co2 386.750 -999.990 ... L10 2010 12 21 13 05 -27.1500 -109.4500 50.00 309318 EIC 2010 10 05 21 50 2055-99 G co2 386.590 -999.990 ... L10 2010 12 20 11 46 -27.1500 -109.4500 50.00 309329 EIC 2010 10 05 21 50 2056-99 G co2 386.560 -999.990 ... L10 2010 12 20 12 02 -27.1500 -109.4500 50.00 309330 EIC 2010 10 12 22 00 215-99 G co2 386.870 -999.990 ... L10 2010 12 20 12 18 -27.1500 -109.4500 50.00 309327 EIC 2010 10 12 22 00 216-99 G co2 386.930 -999.990 ... L10 2010 12 20 12 35 -27.1500 -109.4500 50.00 309328 EIC 2010 10 19 23 50 2451-99 G co2 387.980 -999.990 ... L10 2011 05 10 16 37 -27.1500 -109.4500 50.00 317424 EIC 2010 10 19 23 50 2452-99 G co2 387.720 -999.990 ... L10 2011 05 10 16 53 -27.1500 -109.4500 50.00 317425 EIC 2010 10 26 22 00 4383-99 G co2 386.070 -999.990 ... L8 2011 05 10 15 40 -27.1500 -109.4500 50.00 317426 EIC 2010 10 26 22 00 4384-99 G co2 386.260 -999.990 ... L8 2011 05 10 15 55 -27.1500 -109.4500 50.00 317427 EIC 2010 11 03 21 05 537-99 G co2 396.430 -999.990 +.. L8 2011 05 10 15 09 -27.1500 -109.4500 50.00 317422 EIC 2010 11 03 21 05 538-99 G co2 395.810 -999.990 -.. L8 2011 05 10 15 24 -27.1500 -109.4500 50.00 317423 EIC 2010 11 09 21 15 3601-99 G co2 386.130 -999.990 ... L8 2011 05 10 14 39 -27.1500 -109.4500 50.00 317420 EIC 2010 11 09 21 15 3602-99 G co2 386.290 -999.990 ... L8 2011 05 10 14 54 -27.1500 -109.4500 50.00 317421 EIC 2010 11 16 20 15 909-99 G co2 386.900 -999.990 ... L10 2011 05 10 11 45 -27.1500 -109.4500 50.00 317413 EIC 2010 11 16 20 15 910-99 G co2 387.090 -999.990 ... L10 2011 05 10 12 01 -27.1500 -109.4500 50.00 317412 EIC 2010 11 23 22 00 4783-99 G co2 389.440 -999.990 .X. L10 2011 05 10 12 17 -27.1500 -109.4500 50.00 317414 EIC 2010 11 23 22 00 4784-99 G co2 389.390 -999.990 .X. L10 2011 05 10 12 33 -27.1500 -109.4500 50.00 317415 EIC 2010 11 30 20 15 2493-99 G co2 387.560 -999.990 ... L8 2011 05 10 16 10 -27.1500 -109.4500 50.00 317406 EIC 2010 11 30 20 15 2494-99 G co2 387.220 -999.990 ... L8 2011 05 10 16 25 -27.1500 -109.4500 50.00 317407