# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-21 15:18:59 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO2 (Individual Flasks) # Thomas J Conway # tel: (303) 497-6681 # email: Thomas.J.Conway@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "National University of Ireland, Galway [NUI]" without # whom these measurements would not be possible. # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # site yr mo dy hr mn id me formula value unc flag inst ayr amo ady ahr amn lat lon masl evn MHD 1991 06 03 09 50 6187-66 P co2 358.390 -999.990 .X. S1 1991 06 24 09 32 53.3300 -9.9000 10.00 75383 MHD 1991 06 03 09 50 6188-66 P co2 358.370 -999.990 .X. S1 1991 06 24 09 34 53.3300 -9.9000 10.00 75384 MHD 1991 06 10 12 35 6191-66 P co2 358.820 -999.990 ... S1 1991 06 24 09 44 53.3300 -9.9000 10.00 75385 MHD 1991 06 10 12 35 6192-66 P co2 358.840 -999.990 ... S1 1991 06 24 09 46 53.3300 -9.9000 10.00 75386 MHD 1991 06 17 11 57 6365-66 P co2 356.890 -999.990 +.. S1 1991 07 23 08 44 53.3300 -9.9000 10.00 75387 MHD 1991 06 17 11 57 6366-66 P co2 356.200 -999.990 -.. S1 1991 07 23 08 46 53.3300 -9.9000 10.00 75388 MHD 1991 06 20 12 13 6165-66 P co2 353.220 -999.990 ... S1 1991 07 23 08 40 53.3300 -9.9000 10.00 75389 MHD 1991 06 20 12 13 6166-66 P co2 353.310 -999.990 ... S1 1991 07 23 08 42 53.3300 -9.9000 10.00 75390 MHD 1991 06 25 09 50 6167-66 P co2 355.550 -999.990 ... S1 1991 07 18 08 28 53.3300 -9.9000 10.00 75391 MHD 1991 06 25 09 50 6168-66 P co2 355.510 -999.990 ... S1 1991 07 18 08 30 53.3300 -9.9000 10.00 75392 MHD 1991 07 01 11 30 6068-66 P co2 355.180 -999.990 ... S1 1991 07 23 08 22 53.3300 -9.9000 10.00 75393 MHD 1991 07 09 10 10 6393-66 P co2 352.970 -999.990 ... S1 1991 07 30 14 52 53.3300 -9.9000 10.00 75394 MHD 1991 07 09 10 10 6394-66 P co2 352.930 -999.990 ... S1 1991 07 30 14 54 53.3300 -9.9000 10.00 75395 MHD 1991 07 15 10 05 6287-66 P co2 349.320 -999.990 ... S1 1991 07 30 14 48 53.3300 -9.9000 10.00 75396 MHD 1991 07 15 10 05 6288-66 P co2 349.260 -999.990 ... S1 1991 07 30 14 50 53.3300 -9.9000 10.00 75397 MHD 1991 07 23 15 10 6195-66 P co2 350.370 -999.990 ... S1 1991 08 09 14 18 53.3300 -9.9000 10.00 75398 MHD 1991 07 31 13 00 6135-66 P co2 358.110 -999.990 .X. S1 1991 08 09 14 20 53.3300 -9.9000 10.00 75399 MHD 1991 07 31 13 00 6136-66 P co2 358.240 -999.990 .X. S1 1991 08 09 14 22 53.3300 -9.9000 10.00 75400 MHD 1991 08 05 10 23 6123-66 P co2 348.680 -999.990 ... S1 1991 08 20 10 56 53.3300 -9.9000 10.00 75401 MHD 1991 08 05 10 23 6124-66 P co2 348.680 -999.990 ... S1 1991 08 20 10 58 53.3300 -9.9000 10.00 75402 MHD 1991 08 12 15 14 6245-66 P co2 348.080 -999.990 ... S1 1991 08 20 10 52 53.3300 -9.9000 10.00 75403 MHD 1991 08 12 15 14 6246-66 P co2 348.070 -999.990 ... S1 1991 08 20 10 54 53.3300 -9.9000 10.00 75404 MHD 1991 08 18 16 00 6057-66 P co2 347.170 -999.990 ... S1 1991 09 10 08 16 53.3300 -9.9000 10.00 75405 MHD 1991 08 18 16 00 6058-66 P co2 347.100 -999.990 ... S1 1991 09 10 08 18 53.3300 -9.9000 10.00 75406 MHD 1991 08 29 11 10 6089-66 P co2 362.120 -999.990 .X. S1 1991 09 10 08 12 53.3300 -9.9000 10.00 75407 MHD 1991 08 29 11 10 6090-66 P co2 362.280 -999.990 .X. S1 1991 09 10 08 14 53.3300 -9.9000 10.00 75408 MHD 1991 09 02 12 33 6193-66 P co2 349.650 -999.990 ... S1 1991 09 30 08 52 53.3300 -9.9000 10.00 75409 MHD 1991 09 02 12 33 6194-66 P co2 349.640 -999.990 ... S1 1991 09 30 08 54 53.3300 -9.9000 10.00 75410 MHD 1991 09 11 09 48 6205-66 P co2 349.760 -999.990 ... S1 1991 09 30 08 40 53.3300 -9.9000 10.00 75411 MHD 1991 09 16 09 18 6283-66 P co2 348.190 -999.990 ... S1 1991 10 04 08 16 53.3300 -9.9000 10.00 75412 MHD 1991 09 16 09 18 6284-66 P co2 348.180 -999.990 ... S1 1991 10 04 08 18 53.3300 -9.9000 10.00 75413 MHD 1991 09 23 10 15 6327-66 P co2 351.920 -999.990 ... S1 1991 10 04 08 20 53.3300 -9.9000 10.00 75414 MHD 1991 09 23 10 15 6328-66 P co2 351.870 -999.990 ... S1 1991 10 04 08 22 53.3300 -9.9000 10.00 75415 MHD 1991 10 01 10 45 6413-66 P co2 350.540 -999.990 ... S1 1991 10 23 09 20 53.3300 -9.9000 10.00 75416 MHD 1991 10 01 10 45 6414-66 P co2 350.520 -999.990 ... S1 1991 10 23 09 22 53.3300 -9.9000 10.00 75417 MHD 1991 10 07 14 32 6395-66 P co2 350.980 -999.990 ... S1 1991 10 23 08 40 53.3300 -9.9000 10.00 75418 MHD 1991 10 07 14 32 6396-66 P co2 350.970 -999.990 ... S1 1991 10 23 08 42 53.3300 -9.9000 10.00 75419 MHD 1991 10 14 09 17 6043-66 P co2 352.650 -999.990 ... S1 1991 11 19 12 08 53.3300 -9.9000 10.00 75420 MHD 1991 10 14 09 17 6044-66 P co2 352.620 -999.990 ... S1 1991 11 19 12 10 53.3300 -9.9000 10.00 75421 MHD 1991 10 21 16 52 6201-66 P co2 353.420 -999.990 ... S1 1991 11 22 08 28 53.3300 -9.9000 10.00 75422 MHD 1991 10 30 10 50 6040-66 P co2 355.190 -999.990 ... S1 1991 11 19 08 12 53.3300 -9.9000 10.00 75424 MHD 1991 10 30 10 50 6239-66 P co2 355.090 -999.990 ... S1 1991 11 19 08 14 53.3300 -9.9000 10.00 75425 MHD 1991 11 05 12 35 6253-66 P co2 355.530 -999.990 ... S1 1991 11 25 11 00 53.3300 -9.9000 10.00 75426 MHD 1991 11 05 12 35 6254-66 P co2 355.510 -999.990 ... S1 1991 11 25 11 02 53.3300 -9.9000 10.00 75427 MHD 1991 11 12 13 32 6041-66 P co2 356.770 -999.990 ... S1 1991 11 19 08 16 53.3300 -9.9000 10.00 75428 MHD 1991 11 12 13 32 6042-66 P co2 356.610 -999.990 ... S1 1991 11 19 08 18 53.3300 -9.9000 10.00 75429 MHD 1991 11 21 12 17 6421-66 P co2 358.580 -999.990 ... S1 1991 12 11 09 28 53.3300 -9.9000 10.00 75430 MHD 1991 11 21 12 17 6422-66 P co2 358.420 -999.990 ... S1 1991 12 11 09 30 53.3300 -9.9000 10.00 75431 MHD 1991 11 27 13 45 6123-66 P co2 356.700 -999.990 ... S1 1991 12 11 09 20 53.3300 -9.9000 10.00 75432 MHD 1991 11 27 13 45 6124-66 P co2 356.690 -999.990 ... S1 1991 12 11 09 22 53.3300 -9.9000 10.00 75433 MHD 1991 12 05 12 57 6169-66 P co2 367.880 -999.990 .X. S1 1992 01 02 08 40 53.3300 -9.9000 10.00 75434 MHD 1991 12 05 12 57 6170-66 P co2 367.880 -999.990 .X. S1 1992 01 02 08 42 53.3300 -9.9000 10.00 75435 MHD 1991 12 14 11 49 6061-66 P co2 364.560 -999.990 .X. S1 1992 01 02 08 28 53.3300 -9.9000 10.00 75436 MHD 1991 12 14 11 49 6062-66 P co2 364.300 -999.990 .X. S1 1992 01 02 08 30 53.3300 -9.9000 10.00 75437 MHD 1991 12 17 11 00 6095-66 P co2 359.820 -999.990 ... S1 1992 01 16 08 56 53.3300 -9.9000 10.00 75438 MHD 1991 12 17 11 00 6096-66 P co2 359.730 -999.990 ... S1 1992 01 16 08 58 53.3300 -9.9000 10.00 75439 MHD 1991 12 23 13 42 6249-66 P co2 358.450 -999.990 ... S1 1992 01 16 08 52 53.3300 -9.9000 10.00 75440 MHD 1991 12 23 13 42 6250-66 P co2 358.320 -999.990 ... S1 1992 01 16 08 54 53.3300 -9.9000 10.00 75441 MHD 1991 12 31 12 22 6145-66 P co2 358.950 -999.990 ... S1 1992 01 16 09 00 53.3300 -9.9000 10.00 75442 MHD 1991 12 31 12 22 6146-66 P co2 358.850 -999.990 ... S1 1992 01 16 09 02 53.3300 -9.9000 10.00 75443 MHD 1992 01 06 12 18 6309-66 P co2 357.990 -999.990 ... S1 1992 01 16 08 48 53.3300 -9.9000 10.00 75444 MHD 1992 01 06 12 18 6310-66 P co2 357.790 -999.990 ... S1 1992 01 16 08 50 53.3300 -9.9000 10.00 75445 MHD 1992 01 15 12 42 6237-66 P co2 364.490 -999.990 .X. S1 1992 02 05 09 44 53.3300 -9.9000 10.00 75446 MHD 1992 01 24 11 25 6203-66 P co2 363.100 -999.990 ... S1 1992 02 05 09 48 53.3300 -9.9000 10.00 75447 MHD 1992 01 24 11 25 6204-66 P co2 363.100 -999.990 ... S1 1992 02 05 09 50 53.3300 -9.9000 10.00 75448 MHD 1992 01 31 13 05 6187-66 P co2 368.650 -999.990 .X. S1 1992 02 13 08 12 53.3300 -9.9000 10.00 75449 MHD 1992 01 31 13 05 6188-66 P co2 368.620 -999.990 .X. S1 1992 02 13 08 14 53.3300 -9.9000 10.00 75450 MHD 1992 02 03 13 50 6459-66 P co2 358.820 -999.990 ... S1 1992 03 12 10 28 53.3300 -9.9000 10.00 75451 MHD 1992 02 03 13 50 6460-66 P co2 358.790 -999.990 ... S1 1992 03 12 10 30 53.3300 -9.9000 10.00 75452 MHD 1992 02 10 12 45 6099-66 P co2 359.360 -999.990 ... S1 1992 03 12 10 24 53.3300 -9.9000 10.00 75453 MHD 1992 02 10 12 45 6100-66 P co2 359.320 -999.990 ... S1 1992 03 12 10 26 53.3300 -9.9000 10.00 75454 MHD 1992 02 18 13 51 6019-66 P co2 359.980 -999.990 ... S1 1992 03 12 09 12 53.3300 -9.9000 10.00 75455 MHD 1992 02 18 13 51 6020-66 P co2 360.120 -999.990 ... S1 1992 03 12 09 14 53.3300 -9.9000 10.00 75456 MHD 1992 02 26 11 27 6461-66 P co2 360.520 -999.990 ... S1 1992 03 12 09 00 53.3300 -9.9000 10.00 75457 MHD 1992 02 26 11 27 6462-66 P co2 360.480 -999.990 ... S1 1992 03 12 09 02 53.3300 -9.9000 10.00 75458 MHD 1992 03 05 13 03 6155-66 P co2 359.520 -999.990 ... S1 1992 03 26 08 52 53.3300 -9.9000 10.00 75459 MHD 1992 03 05 13 03 6156-66 P co2 359.490 -999.990 ... S1 1992 03 26 08 54 53.3300 -9.9000 10.00 75460 MHD 1992 03 09 12 46 6083-66 P co2 360.190 -999.990 ... S1 1992 03 26 08 56 53.3300 -9.9000 10.00 75461 MHD 1992 03 09 12 46 6084-66 P co2 360.170 -999.990 ... S1 1992 03 26 08 58 53.3300 -9.9000 10.00 75462 MHD 1992 03 16 12 14 6481-66 P co2 358.720 -999.990 ... S1 1992 04 02 08 24 53.3300 -9.9000 10.00 75463 MHD 1992 03 16 12 14 6482-66 P co2 358.710 -999.990 ... S1 1992 04 02 08 26 53.3300 -9.9000 10.00 75464 MHD 1992 03 25 11 20 6497-66 P co2 358.930 -999.990 ... S1 1992 04 02 15 24 53.3300 -9.9000 10.00 75465 MHD 1992 03 25 11 20 6498-66 P co2 358.930 -999.990 ... S1 1992 04 02 15 26 53.3300 -9.9000 10.00 75466 MHD 1992 04 02 07 35 6477-66 P co2 361.770 -999.990 ... S1 1992 04 09 13 36 53.3300 -9.9000 10.00 75467 MHD 1992 04 02 07 35 6478-66 P co2 361.780 -999.990 ... S1 1992 04 09 13 38 53.3300 -9.9000 10.00 75468 MHD 1992 04 09 12 50 6538-66 P co2 362.560 -999.990 ... S1 1992 04 24 09 18 53.3300 -9.9000 10.00 75469 MHD 1992 04 13 11 50 6541-66 P co2 362.420 -999.990 ... S1 1992 04 24 09 16 53.3300 -9.9000 10.00 75470 MHD 1992 04 23 12 10 6413-66 P co2 360.970 -999.990 ... S1 1992 06 17 08 40 53.3300 -9.9000 10.00 75471 MHD 1992 04 23 12 10 6414-66 P co2 360.940 -999.990 ... S1 1992 06 17 08 42 53.3300 -9.9000 10.00 75472 MHD 1992 04 29 10 02 6091-66 P co2 362.040 -999.990 ... S1 1992 06 17 08 30 53.3300 -9.9000 10.00 75473 MHD 1992 05 03 10 30 6619-66 P co2 359.780 -999.990 ... S1 1992 06 12 14 24 53.3300 -9.9000 10.00 75474 MHD 1992 05 03 10 30 6620-66 P co2 360.020 -999.990 ... S1 1992 06 12 14 26 53.3300 -9.9000 10.00 75475 MHD 1992 05 11 11 41 6307-66 P co2 360.790 -999.990 ... S1 1992 06 12 09 28 53.3300 -9.9000 10.00 75476 MHD 1992 05 11 11 41 6308-66 P co2 360.760 -999.990 ... S1 1992 06 12 09 30 53.3300 -9.9000 10.00 75477 MHD 1992 05 20 11 45 6075-66 P co2 359.690 -999.990 ... S1 1992 07 16 08 24 53.3300 -9.9000 10.00 75478 MHD 1992 05 20 11 45 6076-66 P co2 359.720 -999.990 ... S1 1992 07 16 08 26 53.3300 -9.9000 10.00 75479 MHD 1992 06 03 12 07 6607-66 P co2 359.050 -999.990 ... S1 1992 07 16 08 28 53.3300 -9.9000 10.00 75480 MHD 1992 06 03 12 07 6608-66 P co2 359.040 -999.990 ... S1 1992 07 16 08 30 53.3300 -9.9000 10.00 75481 MHD 1992 06 10 10 30 6713-66 P co2 359.700 -999.990 ... S1 1992 07 10 09 32 53.3300 -9.9000 10.00 75482 MHD 1992 06 10 10 30 6714-66 P co2 359.750 -999.990 ... S1 1992 07 10 09 34 53.3300 -9.9000 10.00 75483 MHD 1992 06 14 10 02 6729-66 P co2 357.760 -999.990 ... S1 1992 07 10 09 28 53.3300 -9.9000 10.00 75484 MHD 1992 06 22 11 09 6341-66 P co2 354.990 -999.990 ... S1 1992 08 11 08 20 53.3300 -9.9000 10.00 75485 MHD 1992 06 22 11 09 6342-66 P co2 354.970 -999.990 ... S1 1992 08 11 08 22 53.3300 -9.9000 10.00 75486 MHD 1992 07 01 11 27 6315-66 P co2 358.900 -999.990 ... S1 1992 08 11 08 24 53.3300 -9.9000 10.00 75487 MHD 1992 07 01 11 27 6316-66 P co2 358.720 -999.990 ... S1 1992 08 11 08 26 53.3300 -9.9000 10.00 75488 MHD 1992 07 06 09 30 6299-66 P co2 357.230 -999.990 ... S1 1992 08 05 11 40 53.3300 -9.9000 10.00 75489 MHD 1992 07 06 09 30 6300-66 P co2 357.490 -999.990 ... S1 1992 08 05 11 42 53.3300 -9.9000 10.00 75490 MHD 1992 07 15 10 18 6453-66 P co2 354.440 -999.990 ... S1 1992 08 05 11 32 53.3300 -9.9000 10.00 75491 MHD 1992 07 15 10 18 6454-66 P co2 354.390 -999.990 ... S1 1992 08 05 11 34 53.3300 -9.9000 10.00 75492 MHD 1992 07 20 13 23 6803-66 P co2 352.570 -999.990 ... S1 1992 08 19 09 48 53.3300 -9.9000 10.00 75493 MHD 1992 07 20 13 23 6804-66 P co2 352.570 -999.990 ... S1 1992 08 19 09 50 53.3300 -9.9000 10.00 75494 MHD 1992 07 26 10 48 6805-66 P co2 348.870 -999.990 ... S1 1992 08 19 09 44 53.3300 -9.9000 10.00 75495 MHD 1992 07 26 10 48 6806-66 P co2 348.810 -999.990 ... S1 1992 08 19 09 46 53.3300 -9.9000 10.00 75496 MHD 1992 08 03 11 14 6807-66 P co2 346.950 -999.990 +.. S1 1992 09 17 13 32 53.3300 -9.9000 10.00 75497 MHD 1992 08 03 11 14 6808-66 P co2 346.310 -999.990 -.. S1 1992 09 17 13 34 53.3300 -9.9000 10.00 75498 MHD 1992 08 10 14 01 6809-66 P co2 346.240 -999.990 ... S1 1992 09 17 13 28 53.3300 -9.9000 10.00 75499 MHD 1992 08 10 14 01 6810-66 P co2 346.250 -999.990 ... S1 1992 09 17 13 30 53.3300 -9.9000 10.00 75500 MHD 1992 08 18 12 04 6647-66 P co2 345.710 -999.990 ... S1 1992 09 17 14 48 53.3300 -9.9000 10.00 75501 MHD 1992 08 18 12 04 6648-66 P co2 345.720 -999.990 ... S1 1992 09 17 14 50 53.3300 -9.9000 10.00 75502 MHD 1992 08 24 11 15 6699-66 P co2 346.590 -999.990 ... S1 1992 09 17 14 44 53.3300 -9.9000 10.00 75503 MHD 1992 08 24 11 15 6700-66 P co2 346.570 -999.990 ... S1 1992 09 17 14 46 53.3300 -9.9000 10.00 75504 MHD 1992 08 31 13 05 6061-66 P co2 346.110 -999.990 ... S1 1992 10 06 09 16 53.3300 -9.9000 10.00 75505 MHD 1992 08 31 13 05 6062-66 P co2 345.970 -999.990 ... S1 1992 10 06 09 18 53.3300 -9.9000 10.00 75506 MHD 1992 09 07 08 45 6281-66 P co2 346.670 -999.990 ... S1 1992 10 06 09 12 53.3300 -9.9000 26.00 75507 MHD 1992 09 07 08 45 6282-66 P co2 346.560 -999.990 ... S1 1992 10 06 09 14 53.3300 -9.9000 26.00 75508 MHD 1992 09 14 09 35 6771-66 P co2 345.890 -999.990 ... S1 1992 10 16 12 00 53.3300 -9.9000 26.00 75509 MHD 1992 09 14 09 35 6772-66 P co2 345.950 -999.990 ... S1 1992 10 16 12 02 53.3300 -9.9000 26.00 75510 MHD 1992 09 22 15 05 6369-66 P co2 346.490 -999.990 ... S1 1992 10 16 11 40 53.3300 -9.9000 26.00 75511 MHD 1992 09 22 15 05 6370-66 P co2 346.480 -999.990 ... S1 1992 10 16 11 42 53.3300 -9.9000 26.00 75512 MHD 1992 09 29 11 37 6665-66 P co2 348.890 -999.990 ... S1 1992 10 30 09 56 53.3300 -9.9000 26.00 75513 MHD 1992 09 29 11 37 6666-66 P co2 348.890 -999.990 ... S1 1992 10 30 09 58 53.3300 -9.9000 26.00 75514 MHD 1992 10 09 13 20 6353-66 P co2 351.440 -999.990 ... S1 1992 10 30 10 00 53.3300 -9.9000 26.00 75515 MHD 1992 10 09 13 20 6354-66 P co2 351.520 -999.990 ... S1 1992 10 30 10 02 53.3300 -9.9000 26.00 75516 MHD 1992 10 14 09 55 6389-66 P co2 352.780 -999.990 ... S1 1992 11 17 11 56 53.3300 -9.9000 26.00 75517 MHD 1992 10 14 09 55 6390-66 P co2 352.740 -999.990 ... S1 1992 11 17 11 58 53.3300 -9.9000 26.00 75518 MHD 1992 10 22 12 52 6091-66 P co2 353.960 -999.990 ... S1 1992 11 17 12 00 53.3300 -9.9000 26.00 75519 MHD 1992 10 22 12 52 6092-66 P co2 353.970 -999.990 ... S1 1992 11 17 12 02 53.3300 -9.7300 26.00 75520 MHD 1992 10 26 18 20 6519-66 P co2 356.440 -999.990 ... S1 1992 12 08 13 12 53.3300 -9.7300 26.00 75521 MHD 1992 10 26 18 20 6520-66 P co2 356.450 -999.990 ... S1 1992 12 08 13 14 53.3300 -9.7300 26.00 75522 MHD 1992 11 02 13 00 6123-66 P co2 356.250 -999.990 ... S1 1992 12 11 08 20 53.3300 -9.7300 26.00 75523 MHD 1992 11 02 13 00 6124-66 P co2 356.210 -999.990 ... S1 1992 12 11 08 22 53.3300 -9.7300 26.00 75524 MHD 1992 11 09 15 40 6513-66 P co2 356.670 -999.990 ... S1 1992 12 11 08 16 53.3300 -9.7300 26.00 75525 MHD 1992 11 09 15 40 6514-66 P co2 356.620 -999.990 ... S1 1992 12 11 08 18 53.3300 -9.7300 26.00 75526 MHD 1992 11 16 14 00 6017-66 P co2 359.030 -999.990 ... S1 1992 12 11 11 24 53.3300 -9.7300 26.00 75527 MHD 1992 11 16 14 00 6018-66 P co2 359.010 -999.990 ... S1 1992 12 11 11 26 53.3300 -9.7300 26.00 75528 MHD 1992 11 23 14 49 6265-66 P co2 356.410 -999.990 ... S1 1992 12 11 11 20 53.3300 -9.7300 26.00 75529 MHD 1992 11 23 14 49 6266-66 P co2 356.380 -999.990 ... S1 1992 12 11 11 22 53.3300 -9.7300 26.00 75530 MHD 1992 11 30 15 44 6475-66 P co2 357.590 -999.990 ... S1 1993 01 06 09 00 53.3300 -9.7300 26.00 75531 MHD 1992 11 30 15 44 6476-66 P co2 357.550 -999.990 ... S1 1993 01 06 09 02 53.3300 -9.7300 26.00 75532 MHD 1992 12 08 13 05 6351-66 P co2 359.110 -999.990 ... S1 1993 01 06 10 16 53.3300 -9.7300 26.00 75533 MHD 1992 12 08 13 05 6352-66 P co2 359.040 -999.990 ... S1 1993 01 06 10 18 53.3300 -9.7300 26.00 75534 MHD 1992 12 14 11 35 6533-66 P co2 355.540 -999.990 ... S1 1993 02 04 11 00 53.3300 -9.7300 26.00 75535 MHD 1992 12 14 11 35 6534-66 P co2 355.480 -999.990 ... S1 1993 02 04 11 02 53.3300 -9.7300 26.00 75536 MHD 1992 12 22 13 50 6853-66 P co2 358.760 -999.990 ... S1 1993 02 04 11 20 53.3300 -9.7300 26.00 75537 MHD 1992 12 22 13 50 6854-66 P co2 358.690 -999.990 ... S1 1993 02 04 11 22 53.3300 -9.7300 26.00 75538 MHD 1992 12 31 14 45 6113-66 P co2 359.200 -999.990 ... S1 1993 02 04 11 04 53.3300 -9.7300 26.00 75539 MHD 1992 12 31 14 45 6114-66 P co2 359.180 -999.990 ... S1 1993 02 04 11 06 53.3300 -9.7300 26.00 75540 MHD 1993 01 04 10 40 6451-66 P co2 359.830 -999.990 ... S1 1993 02 04 11 08 53.3300 -9.7300 26.00 75541 MHD 1993 01 04 10 40 6452-66 P co2 359.820 -999.990 ... S1 1993 02 04 11 10 53.3300 -9.7300 26.00 75542 MHD 1993 01 11 15 20 6345-66 P co2 360.030 -999.990 ... S1 1993 02 19 08 48 53.3300 -9.7300 26.00 75543 MHD 1993 01 11 15 20 6346-66 P co2 360.030 -999.990 ... S1 1993 02 19 08 50 53.3300 -9.7300 26.00 75544 MHD 1993 01 20 15 45 6219-66 P co2 364.240 -999.990 .X. S1 1993 02 19 08 52 53.3300 -9.7300 26.00 75545 MHD 1993 01 20 15 45 6220-66 P co2 364.260 -999.990 .X. S1 1993 02 19 08 54 53.3300 -9.7300 26.00 75546 MHD 1993 01 26 17 43 6165-66 P co2 357.170 -999.990 ... S1 1993 02 24 13 08 53.3300 -9.7300 26.00 75547 MHD 1993 01 26 17 43 6166-66 P co2 357.130 -999.990 ... S1 1993 02 24 13 10 53.3300 -9.7300 26.00 75548 MHD 1993 02 03 11 23 6331-66 P co2 360.260 -999.990 ... S1 1993 02 24 12 56 53.3300 -9.7300 26.00 75549 MHD 1993 02 03 11 23 6332-66 P co2 360.240 -999.990 ... S1 1993 02 24 12 58 53.3300 -9.7300 26.00 75550 MHD 1993 02 13 18 50 6687-66 P co2 360.630 -999.990 ... S1 1993 03 08 10 04 53.3300 -9.9000 26.00 75551 MHD 1993 02 13 18 50 6688-66 P co2 360.510 -999.990 ... S1 1993 03 08 10 06 53.3300 -9.9000 26.00 75552 MHD 1993 02 17 10 45 6387-66 P co2 359.690 -999.990 ... S1 1993 03 08 10 00 53.3300 -9.9000 26.00 75553 MHD 1993 02 17 10 45 6388-66 P co2 359.620 -999.990 ... S1 1993 03 08 10 02 53.3300 -9.9000 26.00 75554 MHD 1993 02 22 11 20 6295-66 P co2 358.960 -999.990 ... S1 1993 03 16 09 20 53.3300 -9.9000 26.00 75555 MHD 1993 02 22 11 20 6296-66 P co2 359.020 -999.990 ... S1 1993 03 16 09 22 53.3300 -9.9000 26.00 75556 MHD 1993 03 03 15 05 6073-66 P co2 360.890 -999.990 ... S1 1993 03 18 10 36 53.3300 -9.9000 26.00 75557 MHD 1993 03 11 12 05 6139-66 P co2 360.720 -999.990 ... S1 1993 04 02 09 00 53.3300 -9.9000 26.00 75558 MHD 1993 03 11 12 05 6140-66 P co2 360.770 -999.990 ... S1 1993 04 02 09 02 53.3300 -9.9000 26.00 75559 MHD 1993 03 11 12 45 6148-66 P co2 -999.990 -999.990 *.. S1 1993 04 02 10 36 53.3300 -9.9000 26.00 75560 MHD 1993 03 16 11 10 6666-66 P co2 360.670 -999.990 ... S1 1993 04 08 09 02 53.3300 -9.9000 26.00 75562 MHD 1993 03 22 18 24 6881-66 P co2 363.600 -999.990 ... S1 1993 04 08 09 00 53.3300 -9.9000 26.00 75563 MHD 1993 03 22 18 33 6905-66 P co2 361.660 -999.990 ... S1 1993 04 08 09 44 53.3300 -9.9000 26.00 75564 MHD 1993 03 22 18 33 6906-66 P co2 361.640 -999.990 ... S1 1993 04 08 09 46 53.3300 -9.9000 26.00 75565 MHD 1993 03 26 11 00 6907-66 P co2 360.860 -999.990 ... S1 1993 04 08 09 32 53.3300 -9.9000 26.00 75566 MHD 1993 03 26 11 00 6908-66 P co2 360.930 -999.990 ... S1 1993 04 08 09 34 53.3300 -9.9000 26.00 75567 MHD 1993 03 30 08 45 6207-66 P co2 362.220 -999.990 ... S1 1993 04 27 09 52 53.3300 -9.9000 26.00 75568 MHD 1993 03 30 08 45 6208-66 P co2 361.950 -999.990 ... S1 1993 04 27 09 54 53.3300 -9.9000 26.00 75569 MHD 1993 04 05 12 40 6541-66 P co2 360.950 -999.990 ... S1 1993 04 27 09 48 53.3300 -9.9000 26.00 75570 MHD 1993 04 05 12 40 6542-66 P co2 360.950 -999.990 ... S1 1993 04 27 09 50 53.3300 -9.9000 26.00 75571 MHD 1993 04 10 10 20 6444-66 P co2 363.980 -999.990 ... S1 1993 05 28 10 36 53.3300 -9.9000 26.00 75572 MHD 1993 04 15 09 38 6057-66 P co2 363.660 -999.990 ... S1 1993 05 07 08 28 53.3300 -9.9000 26.00 75573 MHD 1993 04 15 09 38 6058-66 P co2 363.670 -999.990 ... S1 1993 05 07 08 30 53.3300 -9.9000 26.00 75574 MHD 1993 04 20 14 35 6275-66 P co2 362.240 -999.990 ... S1 1993 05 12 09 12 53.3300 -9.9000 26.00 75575 MHD 1993 04 20 14 35 6276-66 P co2 362.220 -999.990 ... S1 1993 05 12 09 14 53.3300 -9.9000 26.00 75576 MHD 1993 04 27 10 45 6347-66 P co2 361.260 -999.990 ... S1 1993 05 12 09 28 53.3300 -9.9000 26.00 75577 MHD 1993 04 27 10 45 6348-66 P co2 361.070 -999.990 ... S1 1993 05 12 09 30 53.3300 -9.9000 26.00 75578 MHD 1993 05 03 11 00 6757-66 P co2 362.950 -999.990 ... S1 1993 05 28 10 32 53.3300 -9.9000 26.00 75579 MHD 1993 05 03 11 00 6758-66 P co2 362.920 -999.990 ... S1 1993 05 28 10 34 53.3300 -9.9000 26.00 75580 MHD 1993 05 06 13 00 6879-66 P co2 364.680 -999.990 +.. S1 1993 05 28 10 28 53.3300 -9.9000 26.00 75581 MHD 1993 05 06 13 00 6880-66 P co2 363.960 -999.990 -.. S1 1993 05 28 10 30 53.3300 -9.9000 26.00 75582 MHD 1993 05 18 12 00 6597-66 P co2 361.910 -999.990 ... S1 1993 06 18 11 28 53.3300 -9.9000 26.00 75583 MHD 1993 05 18 12 00 6598-66 P co2 361.880 -999.990 ... S1 1993 06 18 11 30 53.3300 -9.9000 26.00 75584 MHD 1993 05 21 14 10 6801-66 P co2 357.270 -999.990 .X. S1 1993 06 18 11 24 53.3300 -9.9000 26.00 75585 MHD 1993 05 21 14 10 6802-66 P co2 357.260 -999.990 .X. S1 1993 06 18 11 26 53.3300 -9.9000 26.00 75586 MHD 1993 05 28 10 00 6403-66 P co2 359.040 -999.990 ... S1 1993 06 18 11 08 53.3300 -9.9000 26.00 75587 MHD 1993 05 28 10 00 6404-66 P co2 359.220 -999.990 ... S1 1993 06 18 11 10 53.3300 -9.9000 26.00 75588 MHD 1993 06 02 13 35 6513-66 P co2 359.570 -999.990 ... S1 1993 06 18 11 20 53.3300 -9.9000 26.00 75589 MHD 1993 06 02 13 35 6514-66 P co2 359.530 -999.990 ... S1 1993 06 18 11 22 53.3300 -9.9000 26.00 75590 MHD 1993 06 08 10 15 6215-66 P co2 356.720 -999.990 -.. S1 1993 06 30 11 00 53.3300 -9.9000 26.00 75591 MHD 1993 06 08 10 15 6216-66 P co2 357.800 -999.990 +.. S1 1993 06 30 11 02 53.3300 -9.9000 26.00 75592 MHD 1993 06 15 11 10 6357-66 P co2 356.690 -999.990 ... S1 1993 06 30 10 56 53.3300 -9.9000 26.00 75593 MHD 1993 06 15 11 10 6358-66 P co2 356.700 -999.990 ... S1 1993 06 30 10 58 53.3300 -9.9000 26.00 75594 MHD 1993 06 18 15 55 6369-66 P co2 357.500 -999.990 ... S1 1993 07 14 08 12 53.3300 -9.9000 26.00 75595 MHD 1993 06 18 15 55 6370-66 P co2 357.460 -999.990 ... S1 1993 07 14 08 14 53.3300 -9.9000 26.00 75596 MHD 1993 06 28 15 30 6795-66 P co2 357.890 -999.990 ... S1 1993 07 14 08 16 53.3300 -9.9000 26.00 75597 MHD 1993 06 28 15 30 6796-66 P co2 357.810 -999.990 ... S1 1993 07 14 08 18 53.3300 -9.9000 26.00 75598 MHD 1993 07 08 16 45 6707-66 P co2 355.150 -999.990 ... S1 1993 08 04 09 16 53.3300 -9.9000 26.00 75599 MHD 1993 07 08 16 45 6708-66 P co2 355.140 -999.990 ... S1 1993 08 04 09 18 53.3300 -9.9000 26.00 75600 MHD 1993 07 15 14 15 6883-66 P co2 351.670 -999.990 ... S1 1993 08 04 09 20 53.3300 -9.9000 26.00 75601 MHD 1993 07 15 14 15 6884-66 P co2 351.660 -999.990 ... S1 1993 08 04 09 22 53.3300 -9.9000 26.00 75602 MHD 1993 07 21 14 00 6115-66 P co2 353.240 -999.990 ... S1 1993 08 11 10 28 53.3300 -9.9000 26.00 75603 MHD 1993 07 21 14 00 6116-66 P co2 353.220 -999.990 ... S1 1993 08 11 10 30 53.3300 -9.9000 26.00 75604 MHD 1993 07 27 21 00 6675-66 P co2 351.120 -999.990 ... S1 1993 08 11 10 32 53.3300 -9.9000 26.00 75605 MHD 1993 07 27 21 00 6676-66 P co2 351.080 -999.990 ... S1 1993 08 11 10 34 53.3300 -9.9000 26.00 75606 MHD 1993 08 03 12 50 6425-66 P co2 349.410 -999.990 ... S1 1993 08 31 08 24 53.3300 -9.9000 26.00 75607 MHD 1993 08 03 12 50 6426-66 P co2 349.550 -999.990 ... S1 1993 08 31 08 26 53.3300 -9.9000 26.00 75608 MHD 1993 08 12 17 15 6065-66 P co2 349.460 -999.990 ... S1 1993 08 31 11 24 53.3300 -9.9000 26.00 75609 MHD 1993 08 12 17 15 6066-66 P co2 349.440 -999.990 ... S1 1993 08 31 11 26 53.3300 -9.9000 26.00 75610 MHD 1993 08 16 15 50 6229-66 P co2 348.710 -999.990 ... S1 1993 08 31 09 16 53.3300 -9.9000 26.00 75611 MHD 1993 08 16 15 50 6230-66 P co2 348.670 -999.990 ... S1 1993 08 31 09 18 53.3300 -9.9000 26.00 75612 MHD 1993 08 17 12 00 6331-66 P co2 360.610 -999.990 -.. S1 1993 08 31 08 52 53.3300 -9.9000 26.00 75613 MHD 1993 08 17 12 00 6332-66 P co2 361.590 -999.990 +.. S1 1993 08 31 08 54 53.3300 -9.9000 26.00 75614 MHD 1993 08 24 13 00 6623-66 P co2 346.170 -999.990 ... S1 1993 09 22 08 12 53.3300 -9.9000 26.00 75615 MHD 1993 08 24 13 00 6624-66 P co2 346.180 -999.990 ... S1 1993 09 22 08 14 53.3300 -9.9000 26.00 75616 MHD 1993 08 30 10 45 6171-66 P co2 352.960 -999.990 .X. S1 1993 09 22 08 16 53.3300 -9.9000 26.00 75617 MHD 1993 08 30 10 45 6172-66 P co2 353.110 -999.990 .X. S1 1993 09 22 08 18 53.3300 -9.9000 26.00 75618 MHD 1993 09 04 11 30 6755-66 P co2 352.010 -999.990 .X. S1 1993 09 24 09 48 53.3300 -9.9000 26.00 75619 MHD 1993 09 04 11 30 6756-66 P co2 352.130 -999.990 .X. S1 1993 09 24 09 50 53.3300 -9.9000 26.00 75620 MHD 1993 09 10 16 35 6227-66 P co2 350.110 -999.990 ... S1 1993 09 24 09 44 53.3300 -9.9000 26.00 75621 MHD 1993 09 10 16 35 6228-66 P co2 350.050 -999.990 ... S1 1993 09 24 09 46 53.3300 -9.9000 26.00 75622 MHD 1993 09 16 13 05 6161-66 P co2 349.240 -999.990 ... S1 1993 10 29 08 24 53.3300 -9.9000 26.00 75623 MHD 1993 09 16 13 05 6162-66 P co2 349.250 -999.990 ... S1 1993 10 29 08 26 53.3300 -9.9000 26.00 75624 MHD 1993 09 21 16 35 6153-66 P co2 350.240 -999.990 ... S1 1993 10 28 08 12 53.3300 -9.9000 26.00 75625 MHD 1993 09 21 16 35 6154-66 P co2 350.130 -999.990 ... S1 1993 10 28 08 14 53.3300 -9.9000 26.00 75626 MHD 1993 09 27 16 38 6855-66 P co2 350.730 -999.990 ... S1 1993 10 22 09 20 53.3300 -9.9000 26.00 75627 MHD 1993 09 27 16 38 6856-66 P co2 350.680 -999.990 ... S1 1993 10 22 09 22 53.3300 -9.9000 26.00 75628 MHD 1993 10 06 11 45 6333-66 P co2 350.700 -999.990 ... S1 1993 10 22 09 44 53.3300 -9.9000 26.00 75629 MHD 1993 10 06 11 45 6334-66 P co2 350.620 -999.990 ... S1 1993 10 22 09 46 53.3300 -9.9000 26.00 75630 MHD 1993 10 15 18 15 6077-66 P co2 353.300 -999.990 ... S1 1993 11 04 08 52 53.3300 -9.9000 26.00 75631 MHD 1993 10 15 18 15 6078-66 P co2 353.310 -999.990 ... S1 1993 11 04 08 54 53.3300 -9.9000 26.00 75632 MHD 1993 10 19 14 05 6805-66 P co2 355.440 -999.990 ... S1 1993 11 04 08 56 53.3300 -9.9000 26.00 75633 MHD 1993 10 19 14 05 6806-66 P co2 355.420 -999.990 ... S1 1993 11 04 08 58 53.3300 -9.9000 26.00 75634 MHD 1993 10 27 12 40 6691-66 P co2 368.430 -999.990 .X. S1 1993 12 09 12 32 53.3300 -9.9000 26.00 75635 MHD 1993 10 27 12 40 6692-66 P co2 368.310 -999.990 .X. S1 1993 12 09 12 34 53.3300 -9.9000 26.00 75636 MHD 1993 11 01 16 50 6925-66 P co2 -999.990 -999.990 *.. S1 1993 12 09 12 44 53.3300 -9.9000 26.00 75637 MHD 1993 11 01 16 50 6926-66 P co2 -999.990 -999.990 *.. S1 1993 12 09 12 46 53.3300 -9.9000 26.00 75638 MHD 1993 11 08 16 10 6809-66 P co2 356.580 -999.990 ... S1 1993 12 09 11 24 53.3300 -9.9000 26.00 75639 MHD 1993 11 08 16 10 6810-66 P co2 356.520 -999.990 ... S1 1993 12 09 11 26 53.3300 -9.9000 26.00 75640 MHD 1993 11 20 14 50 6449-66 P co2 362.510 -999.990 .X. S1 1993 12 17 09 56 53.3300 -9.9000 26.00 75641 MHD 1993 11 20 14 50 6450-66 P co2 362.380 -999.990 .X. S1 1993 12 17 09 58 53.3300 -9.9000 26.00 75642 MHD 1993 11 29 13 10 6111-66 P co2 357.120 -999.990 ... S1 1993 12 22 08 48 53.3300 -9.9000 26.00 75643 MHD 1993 11 29 13 10 6112-66 P co2 357.050 -999.990 ... S1 1993 12 22 08 50 53.3300 -9.9000 26.00 75644 MHD 1993 12 06 11 30 6125-66 P co2 357.570 -999.990 ... S1 1994 01 25 09 44 53.3300 -9.9000 26.00 75645 MHD 1993 12 06 11 30 6126-66 P co2 357.590 -999.990 ... S1 1994 01 25 09 46 53.3300 -9.9000 26.00 75646 MHD 1993 12 14 13 50 6057-66 P co2 358.650 -999.990 ... S1 1994 01 25 09 48 53.3300 -9.9000 26.00 75647 MHD 1993 12 14 13 50 6058-66 P co2 358.550 -999.990 ... S1 1994 01 25 09 50 53.3300 -9.9000 26.00 75648 MHD 1993 12 21 15 30 6817-66 P co2 359.610 -999.990 ... S1 1994 01 20 09 20 53.3300 -9.9000 26.00 75649 MHD 1993 12 21 15 30 6818-66 P co2 359.580 -999.990 ... S1 1994 01 20 09 22 53.3300 -9.9000 26.00 75650 MHD 1993 12 28 14 30 6405-66 P co2 360.340 -999.990 ... S1 1994 01 20 09 24 53.3300 -9.9000 26.00 75651 MHD 1993 12 28 14 30 6406-66 P co2 360.270 -999.990 ... S1 1994 01 20 09 26 53.3300 -9.9000 26.00 75652 MHD 1994 01 03 13 30 6747-66 P co2 360.500 -999.990 ... S1 1994 01 20 09 16 53.3300 -9.9000 26.00 75653 MHD 1994 01 03 13 30 6748-66 P co2 360.490 -999.990 ... S1 1994 01 20 09 18 53.3300 -9.9000 26.00 75654 MHD 1994 01 10 08 00 6755-66 P co2 361.110 -999.990 ... S1 1994 01 27 09 52 53.3300 -9.9000 26.00 75655 MHD 1994 01 10 08 00 6756-66 P co2 361.100 -999.990 ... S1 1994 01 27 09 54 53.3300 -9.9000 26.00 75656 MHD 1994 01 17 11 10 6831-66 P co2 360.550 -999.990 ... S1 1994 01 27 09 56 53.3300 -9.9000 26.00 75657 MHD 1994 01 17 11 10 6832-66 P co2 360.550 -999.990 ... S1 1994 01 27 09 58 53.3300 -9.9000 26.00 75658 MHD 1994 01 24 15 10 6521-66 P co2 359.670 -999.990 ... S1 1994 02 25 08 52 53.3300 -9.9000 26.00 75659 MHD 1994 01 24 15 10 6522-66 P co2 359.640 -999.990 ... S1 1994 02 25 08 54 53.3300 -9.9000 26.00 75660 MHD 1994 01 31 16 30 6539-66 P co2 359.220 -999.990 ... S1 1994 02 25 08 48 53.3300 -9.9000 26.00 75661 MHD 1994 01 31 16 30 6540-66 P co2 359.130 -999.990 ... S1 1994 02 25 08 50 53.3300 -9.9000 26.00 75662 MHD 1994 02 03 12 05 6113-66 P co2 364.570 -999.990 .X. S1 1994 02 25 09 00 53.3300 -9.9000 26.00 75663 MHD 1994 02 03 12 05 6114-66 P co2 364.500 -999.990 .X. S1 1994 02 25 09 02 53.3300 -9.9000 26.00 75664 MHD 1994 02 08 13 15 6783-66 P co2 361.350 -999.990 ... S1 1994 02 25 08 56 53.3300 -9.9000 26.00 75665 MHD 1994 02 08 13 15 6784-66 P co2 361.290 -999.990 ... S1 1994 02 25 08 58 53.3300 -9.9000 26.00 75666 MHD 1994 02 15 09 00 6337-66 P co2 374.090 -999.990 .X. S1 1994 03 04 14 48 53.3300 -9.9000 26.00 75667 MHD 1994 02 15 09 00 6338-66 P co2 374.090 -999.990 .X. S1 1994 03 04 14 50 53.3300 -9.9000 26.00 75668 MHD 1994 02 23 11 40 6459-66 P co2 373.310 -999.990 .X. S1 1994 03 04 14 44 53.3300 -9.9000 26.00 75669 MHD 1994 02 23 11 40 6460-66 P co2 373.450 -999.990 .X. S1 1994 03 04 14 46 53.3300 -9.9000 26.00 75670 MHD 1994 03 02 12 05 6307-66 P co2 362.430 -999.990 ... S1 1994 03 18 08 52 53.3300 -9.9000 26.00 75671 MHD 1994 03 02 12 05 6308-66 P co2 362.420 -999.990 ... S1 1994 03 18 08 54 53.3300 -9.9000 26.00 75672 MHD 1994 03 07 09 45 6265-66 P co2 361.340 -999.990 ... S1 1994 03 18 09 24 53.3300 -9.9000 26.00 75673 MHD 1994 03 07 09 45 6266-66 P co2 361.290 -999.990 ... S1 1994 03 18 09 26 53.3300 -9.9000 26.00 75674 MHD 1994 03 16 10 00 6779-66 P co2 364.790 -999.990 ... S1 1994 03 30 08 12 53.3300 -9.9000 26.00 75675 MHD 1994 03 16 10 00 6780-66 P co2 364.770 -999.990 ... S1 1994 03 30 08 14 53.3300 -9.9000 26.00 75676 MHD 1994 03 20 15 00 6435-66 P co2 359.400 -999.990 .X. S1 1994 03 30 08 16 53.3300 -9.9000 26.00 75677 MHD 1994 03 20 15 00 6436-66 P co2 359.210 -999.990 .X. S1 1994 03 30 08 18 53.3300 -9.9000 26.00 75678 MHD 1994 03 23 18 00 6311-66 P co2 361.970 -999.990 ... S1 1994 04 12 10 00 53.3300 -9.9000 26.00 75679 MHD 1994 03 23 18 00 6312-66 P co2 361.940 -999.990 ... S1 1994 04 12 10 02 53.3300 -9.9000 26.00 75680 MHD 1994 03 28 12 45 6637-66 P co2 362.600 -999.990 ... S1 1994 04 12 09 56 53.3300 -9.9000 26.00 75681 MHD 1994 03 28 12 45 6638-66 P co2 362.620 -999.990 ... S1 1994 04 12 09 58 53.3300 -9.9000 26.00 75682 MHD 1994 04 04 07 30 6589-66 P co2 363.590 -999.990 ... S1 1994 04 26 09 12 53.3300 -9.9000 26.00 75683 MHD 1994 04 04 07 30 6590-66 P co2 363.590 -999.990 ... S1 1994 04 26 09 14 53.3300 -9.9000 26.00 75684 MHD 1994 04 13 07 50 6427-66 P co2 364.060 -999.990 ... S1 1994 05 05 14 56 53.3300 -9.9000 26.00 75685 MHD 1994 04 13 07 50 6428-66 P co2 364.060 -999.990 ... S1 1994 05 05 14 58 53.3300 -9.9000 26.00 75686 MHD 1994 04 19 07 15 6553-66 P co2 362.750 -999.990 ... S1 1994 05 05 14 52 53.3300 -9.9000 26.00 75687 MHD 1994 04 19 07 15 6554-66 P co2 362.750 -999.990 ... S1 1994 05 05 14 54 53.3300 -9.9000 26.00 75688 MHD 1994 04 25 07 30 6719-66 P co2 363.600 -999.990 ... S1 1994 05 19 09 44 53.3300 -9.9000 26.00 75689 MHD 1994 04 25 07 30 6720-66 P co2 363.530 -999.990 ... S1 1994 05 19 09 46 53.3300 -9.9000 26.00 75690 MHD 1994 05 03 13 17 6409-66 P co2 362.830 -999.990 ... S1 1994 05 19 09 52 53.3300 -9.9000 26.00 75691 MHD 1994 05 03 13 17 6410-66 P co2 362.800 -999.990 ... S1 1994 05 19 09 54 53.3300 -9.9000 26.00 75692 MHD 1994 05 12 16 30 6847-66 P co2 357.380 -999.990 .X. S1 1994 05 19 09 56 53.3300 -9.9000 26.00 75693 MHD 1994 05 12 16 30 6848-66 P co2 357.360 -999.990 .X. S1 1994 05 19 09 58 53.3300 -9.9000 26.00 75694 MHD 1994 05 18 10 20 6919-66 P co2 363.840 -999.990 ... S1 1994 06 14 09 12 53.3300 -9.9000 26.00 75695 MHD 1994 05 18 10 20 6920-66 P co2 363.380 -999.990 ... S1 1994 06 14 09 14 53.3300 -9.9000 26.00 75696 MHD 1994 05 25 15 50 6125-66 P co2 360.080 -999.990 ... S1 1994 06 14 08 20 53.3300 -9.9000 26.00 75697 MHD 1994 05 25 15 50 6126-66 P co2 359.890 -999.990 ... S1 1994 06 14 08 22 53.3300 -9.9000 26.00 75698 MHD 1994 05 31 10 45 6509-66 P co2 361.550 -999.990 ... S1 1994 06 28 08 44 53.3300 -9.9000 26.00 75699 MHD 1994 05 31 10 45 6510-66 P co2 361.180 -999.990 ... S1 1994 06 28 08 46 53.3300 -9.9000 26.00 75700 MHD 1994 06 06 08 15 6405-66 P co2 360.530 -999.990 ... S1 1994 06 28 08 48 53.3300 -9.9000 26.00 75701 MHD 1994 06 06 08 15 6406-66 P co2 360.470 -999.990 ... S1 1994 06 28 08 50 53.3300 -9.9000 26.00 75702 MHD 1994 06 15 13 07 6144-66 P co2 359.540 -999.990 ... S1 1994 06 30 09 46 53.3300 -9.9000 26.00 75703 MHD 1994 06 15 13 15 6465-66 P co2 359.330 -999.990 ... S1 1994 06 30 12 00 53.3300 -9.9000 26.00 75704 MHD 1994 06 15 13 15 6466-66 P co2 359.180 -999.990 ... S1 1994 06 30 12 02 53.3300 -9.9000 26.00 75705 MHD 1994 06 20 18 57 6159-66 P co2 356.660 -999.990 +.. S1 1994 07 12 08 44 53.3300 -9.9000 26.00 75706 MHD 1994 06 20 18 57 6160-66 P co2 351.770 -999.990 -.. S1 1994 07 12 08 46 53.3300 -9.9000 26.00 75707 MHD 1994 06 29 14 05 6333-66 P co2 358.190 -999.990 ... S1 1994 07 12 08 40 53.3300 -9.9000 26.00 75708 MHD 1994 06 29 14 05 6334-66 P co2 358.140 -999.990 ... S1 1994 07 12 08 42 53.3300 -9.9000 26.00 75709 MHD 1994 07 05 11 46 6919-66 P co2 356.350 -999.990 ... S1 1994 07 20 08 12 53.3300 -9.9000 26.00 75710 MHD 1994 07 05 11 46 6920-66 P co2 355.980 -999.990 ... S1 1994 07 20 08 14 53.3300 -9.9000 26.00 75711 MHD 1994 07 11 08 05 6657-66 P co2 355.620 -999.990 ... S1 1994 07 26 11 08 53.3300 -9.9000 26.00 75712 MHD 1994 07 11 08 05 6658-66 P co2 355.770 -999.990 ... S1 1994 07 26 11 10 53.3300 -9.9000 26.00 75713 MHD 1994 07 19 11 05 6459-66 P co2 353.310 -999.990 ... S1 1994 08 18 09 20 53.3300 -9.9000 26.00 75714 MHD 1994 07 19 11 05 6460-66 P co2 353.240 -999.990 ... S1 1994 08 18 09 22 53.3300 -9.9000 26.00 75715 MHD 1994 07 27 12 30 6759-66 P co2 353.000 -999.990 ... S1 1994 08 18 09 44 53.3300 -9.9000 26.00 75716 MHD 1994 07 27 12 30 6760-66 P co2 353.010 -999.990 ... S1 1994 08 18 09 46 53.3300 -9.9000 26.00 75717 MHD 1994 08 02 12 30 6333-66 P co2 358.330 -999.990 .X. S1 1994 08 31 11 04 53.3300 -9.9000 26.00 75718 MHD 1994 08 02 12 30 6334-66 P co2 358.740 -999.990 .X. S1 1994 08 31 11 06 53.3300 -9.9000 26.00 75719 MHD 1994 08 08 15 40 6121-66 P co2 346.380 -999.990 .X. S1 1994 08 31 11 00 53.3300 -9.9000 26.00 75720 MHD 1994 08 08 15 40 6122-66 P co2 346.200 -999.990 .X. S1 1994 08 31 11 02 53.3300 -9.9000 26.00 75721 MHD 1994 08 17 10 45 6529-66 P co2 349.620 -999.990 ... S1 1994 09 09 08 28 53.3300 -9.9000 26.00 75722 MHD 1994 08 17 10 45 6530-66 P co2 349.670 -999.990 ... S1 1994 09 09 08 30 53.3300 -9.9000 26.00 75723 MHD 1994 08 23 08 00 6299-66 P co2 348.990 -999.990 ... S1 1994 09 09 08 40 53.3300 -9.9000 26.00 75724 MHD 1994 08 23 08 00 6300-66 P co2 348.970 -999.990 ... S1 1994 09 09 08 42 53.3300 -9.9000 26.00 75725 MHD 1994 08 29 13 15 6741-66 P co2 349.490 -999.990 ... S1 1994 09 14 10 48 53.3300 -9.9000 26.00 75726 MHD 1994 08 29 13 15 6742-66 P co2 349.390 -999.990 ... S1 1994 09 14 10 50 53.3300 -9.9000 26.00 75727 MHD 1994 09 05 08 20 6313-66 P co2 349.670 -999.990 ... S1 1994 09 14 10 52 53.3300 -9.9000 26.00 75728 MHD 1994 09 05 08 20 6314-66 P co2 349.560 -999.990 ... S1 1994 09 14 10 54 53.3300 -9.9000 26.00 75729 MHD 1994 09 11 11 13 6817-66 P co2 351.250 -999.990 ... S1 1994 10 04 09 56 53.3300 -9.9000 26.00 75730 MHD 1994 09 11 11 13 6818-66 P co2 351.280 -999.990 ... S1 1994 10 04 09 58 53.3300 -9.9000 26.00 75731 MHD 1994 09 19 12 05 6413-66 P co2 351.380 -999.990 ... S1 1994 10 04 10 00 53.3300 -9.9000 26.00 75732 MHD 1994 09 19 12 05 6414-66 P co2 351.300 -999.990 ... S1 1994 10 04 10 02 53.3300 -9.9000 26.00 75733 MHD 1994 10 06 11 16 6823-66 P co2 353.840 -999.990 ... S1 1994 10 26 08 52 53.3300 -9.9000 26.00 75734 MHD 1994 10 06 11 16 6824-66 P co2 353.630 -999.990 ... S1 1994 10 26 08 54 53.3300 -9.9000 26.00 75735 MHD 1994 10 14 10 45 6165-66 P co2 374.470 -999.990 .X. S1 1994 11 15 08 52 53.3300 -9.9000 26.00 75736 MHD 1994 10 14 10 45 6166-66 P co2 374.500 -999.990 .X. S1 1994 11 15 08 54 53.3300 -9.9000 26.00 75737 MHD 1994 11 01 12 15 6325-66 P co2 -999.990 -999.990 *.. S1 1994 11 15 08 48 53.3300 -9.9000 26.00 75738 MHD 1994 11 01 12 15 6326-66 P co2 -999.990 -999.990 *.. S1 1994 11 15 08 50 53.3300 -9.9000 26.00 75739 MHD 1994 11 11 12 30 6591-66 P co2 364.200 -999.990 .X. S1 1995 01 05 09 16 53.3300 -9.9000 26.00 75740 MHD 1994 11 11 12 30 6592-66 P co2 364.140 -999.990 .X. S1 1995 01 05 09 18 53.3300 -9.9000 26.00 75741 MHD 1994 11 15 15 45 6549-66 P co2 360.060 -999.990 ... S1 1995 01 05 10 32 53.3300 -9.9000 26.00 75742 MHD 1994 11 15 15 45 6550-66 P co2 359.980 -999.990 ... S1 1995 01 05 10 34 53.3300 -9.9000 26.00 75743 MHD 1994 11 22 18 30 6117-66 P co2 358.980 -999.990 ... S1 1995 01 05 11 08 53.3300 -9.9000 26.00 75744 MHD 1994 11 22 18 30 6118-66 P co2 358.790 -999.990 ... S1 1995 01 05 11 10 53.3300 -9.9000 26.00 75745 MHD 1994 12 03 17 40 6887-66 P co2 361.210 -999.990 ... S1 1995 01 05 10 28 53.3300 -9.9000 26.00 75746 MHD 1994 12 03 17 40 6888-66 P co2 361.340 -999.990 ... S1 1995 01 05 10 30 53.3300 -9.9000 26.00 75747 MHD 1994 12 07 15 12 6263-66 P co2 361.020 -999.990 ... S1 1995 01 05 09 20 53.3300 -9.9000 26.00 75748 MHD 1994 12 07 15 12 6264-66 P co2 360.960 -999.990 ... S1 1995 01 05 09 22 53.3300 -9.9000 26.00 75749 MHD 1994 12 12 12 34 6289-66 P co2 -999.990 -999.990 *.. S1 1995 01 05 10 20 53.3300 -9.9000 26.00 75750 MHD 1994 12 12 12 34 6290-66 P co2 -999.990 -999.990 *.. S1 1995 01 05 10 22 53.3300 -9.9000 26.00 75751 MHD 1994 12 14 12 50 6211-66 P co2 362.840 -999.990 ... S1 1995 01 11 10 02 53.3300 -9.9000 26.00 75752 MHD 1994 12 20 15 40 6021-66 P co2 361.050 -999.990 ... S1 1995 01 11 10 24 53.3300 -9.9000 26.00 75753 MHD 1994 12 20 15 40 6022-66 P co2 360.910 -999.990 ... S1 1995 01 11 10 26 53.3300 -9.9000 26.00 75754 MHD 1994 12 21 14 17 6703-66 P co2 363.790 -999.990 ... S1 1995 01 11 10 28 53.3300 -9.9000 26.00 75755 MHD 1994 12 21 14 17 6704-66 P co2 363.610 -999.990 ... S1 1995 01 11 10 30 53.3300 -9.9000 26.00 75756 MHD 1994 12 26 17 05 6783-66 P co2 362.270 -999.990 ... S1 1995 01 11 10 04 53.3300 -9.9000 26.00 75757 MHD 1994 12 26 17 05 6784-66 P co2 362.250 -999.990 ... S1 1995 01 11 10 06 53.3300 -9.9000 26.00 75758 MHD 1995 01 04 12 37 6501-66 P co2 363.040 -999.990 ... S1 1995 01 19 09 56 53.3300 -9.9000 26.00 75759 MHD 1995 01 04 12 37 6502-66 P co2 363.050 -999.990 ... S1 1995 01 19 09 58 53.3300 -9.9000 26.00 75760 MHD 1995 01 09 12 30 6721-66 P co2 361.910 -999.990 ... S1 1995 01 25 09 16 53.3300 -9.9000 26.00 75761 MHD 1995 01 09 12 30 6722-66 P co2 361.830 -999.990 ... S1 1995 01 25 09 18 53.3300 -9.9000 26.00 75762 MHD 1995 01 16 11 15 6753-66 P co2 362.490 -999.990 ... S1 1995 02 10 10 16 53.3300 -9.9000 26.00 75763 MHD 1995 01 16 11 15 6754-66 P co2 362.480 -999.990 ... S1 1995 02 10 10 18 53.3300 -9.9000 26.00 75764 MHD 1995 01 23 11 50 6193-66 P co2 364.480 -999.990 ... S1 1995 02 10 10 24 53.3300 -9.9000 26.00 75765 MHD 1995 01 23 11 50 6194-66 P co2 364.600 -999.990 ... S1 1995 02 10 10 26 53.3300 -9.9000 26.00 75766 MHD 1995 01 25 10 05 6301-66 P co2 366.460 -999.990 ... S1 1995 02 09 09 16 53.3300 -9.9000 26.00 75767 MHD 1995 01 25 10 05 6302-66 P co2 366.470 -999.990 ... S1 1995 02 09 09 18 53.3300 -9.9000 26.00 75768 MHD 1995 01 30 09 55 6909-66 P co2 369.950 -999.990 .X. S1 1995 02 09 09 12 53.3300 -9.9000 26.00 75769 MHD 1995 01 30 09 55 6910-66 P co2 369.860 -999.990 .X. S1 1995 02 09 09 14 53.3300 -9.9000 26.00 75770 MHD 1995 02 01 11 10 6037-66 P co2 364.310 -999.990 +.. S1 1995 02 14 10 36 53.3300 -9.9000 26.00 75771 MHD 1995 02 01 11 10 6038-66 P co2 362.880 -999.990 -.. S1 1995 02 14 10 38 53.3300 -9.9000 26.00 75772 MHD 1995 02 06 13 50 6249-66 P co2 361.660 -999.990 ... S1 1995 02 14 10 48 53.3300 -9.9000 26.00 75773 MHD 1995 02 06 13 50 6250-66 P co2 361.550 -999.990 ... S1 1995 02 14 10 50 53.3300 -9.9000 26.00 75774 MHD 1995 02 09 15 10 6215-66 P co2 363.800 -999.990 ... S1 1995 02 22 09 48 53.3300 -9.9000 26.00 75775 MHD 1995 02 09 15 10 6216-66 P co2 363.720 -999.990 ... S1 1995 02 22 09 50 53.3300 -9.9000 26.00 75776 MHD 1995 02 13 12 52 6413-66 P co2 366.060 -999.990 ... S1 1995 02 22 10 00 53.3300 -9.9000 26.00 75777 MHD 1995 02 13 12 52 6414-66 P co2 365.870 -999.990 ... S1 1995 02 22 10 02 53.3300 -9.9000 26.00 75778 MHD 1995 02 20 11 05 6027-66 P co2 363.760 -999.990 ... S1 1995 03 15 10 52 53.3300 -9.9000 26.00 75779 MHD 1995 02 20 11 05 6028-66 P co2 363.690 -999.990 ... S1 1995 03 15 10 54 53.3300 -9.9000 26.00 75780 MHD 1995 02 27 11 00 6711-66 P co2 363.090 -999.990 ... S1 1995 03 15 10 56 53.3300 -9.9000 26.00 75781 MHD 1995 02 27 11 00 6712-66 P co2 362.990 -999.990 ... S1 1995 03 15 10 58 53.3300 -9.9000 26.00 75782 MHD 1995 03 07 09 50 6021-66 P co2 365.000 -999.990 ... S1 1995 03 31 10 16 53.3300 -9.9000 26.00 75783 MHD 1995 03 07 09 50 6022-66 P co2 364.700 -999.990 ... S1 1995 03 31 10 18 53.3300 -9.9000 26.00 75784 MHD 1995 03 13 11 55 6815-66 P co2 363.160 -999.990 ... S1 1995 03 31 10 24 53.3300 -9.9000 26.00 75785 MHD 1995 03 13 11 55 6816-66 P co2 362.970 -999.990 ... S1 1995 03 31 10 26 53.3300 -9.9000 26.00 75786 MHD 1995 03 24 15 00 6333-66 P co2 364.960 -999.990 ... S1 1995 04 18 08 28 53.3300 -9.9000 26.00 75787 MHD 1995 03 24 15 00 6334-66 P co2 365.040 -999.990 ... S1 1995 04 18 08 30 53.3300 -9.9000 26.00 75788 MHD 1995 03 27 16 45 6573-66 P co2 365.240 -999.990 ... S1 1995 04 18 08 40 53.3300 -9.9000 26.00 75789 MHD 1995 03 27 16 45 6574-66 P co2 365.150 -999.990 ... S1 1995 04 18 08 42 53.3300 -9.9000 26.00 75790 MHD 1995 03 29 14 55 6421-66 P co2 370.110 -999.990 .X. S1 1995 04 21 09 28 53.3300 -9.9000 26.00 75791 MHD 1995 03 29 14 55 6422-66 P co2 370.120 -999.990 .X. S1 1995 04 21 09 30 53.3300 -9.9000 26.00 75792 MHD 1995 04 05 13 45 6465-66 P co2 363.060 -999.990 ... S1 1995 04 21 09 24 53.3300 -9.9000 26.00 75793 MHD 1995 04 05 13 45 6466-66 P co2 363.200 -999.990 ... S1 1995 04 21 09 26 53.3300 -9.9000 26.00 75794 MHD 1995 04 11 13 10 6011-66 P co2 365.790 -999.990 ... S1 1995 05 05 10 00 53.3300 -9.9000 26.00 75795 MHD 1995 04 11 13 10 6012-66 P co2 365.940 -999.990 ... S1 1995 05 05 10 02 53.3300 -9.9000 26.00 75796 MHD 1995 04 17 16 35 6681-66 P co2 364.520 -999.990 ... S1 1995 05 05 09 56 53.3300 -9.9000 26.00 75797 MHD 1995 04 17 16 35 6682-66 P co2 364.400 -999.990 ... S1 1995 05 05 09 58 53.3300 -9.9000 26.00 75798 MHD 1995 04 24 08 50 6137-66 P co2 368.250 -999.990 ... S1 1995 05 17 09 00 53.3300 -9.9000 26.00 75799 MHD 1995 04 24 08 50 6138-66 P co2 368.120 -999.990 ... S1 1995 05 17 09 02 53.3300 -9.9000 26.00 75800 MHD 1995 05 02 07 20 6705-66 P co2 365.660 -999.990 +.. S1 1995 05 17 09 12 53.3300 -9.9000 26.00 75801 MHD 1995 05 02 07 20 6706-66 P co2 364.970 -999.990 -.. S1 1995 05 17 09 14 53.3300 -9.9000 26.00 75802 MHD 1995 05 07 18 25 6799-66 P co2 364.200 -999.990 ... S1 1995 05 17 09 16 53.3300 -9.9000 26.00 75803 MHD 1995 05 07 18 25 6800-66 P co2 364.270 -999.990 ... S1 1995 05 17 09 18 53.3300 -9.9000 26.00 75804 MHD 1995 05 18 09 20 6027-66 P co2 364.330 -999.990 ... S1 1995 06 12 10 36 53.3300 -9.9000 26.00 75805 MHD 1995 05 18 09 20 6028-66 P co2 364.080 -999.990 ... S1 1995 06 12 10 38 53.3300 -9.9000 26.00 75806 MHD 1995 05 26 20 10 6761-66 P co2 361.440 -999.990 ... S1 1995 06 12 10 28 53.3300 -9.9000 26.00 75807 MHD 1995 05 26 20 10 6762-66 P co2 361.570 -999.990 ... S1 1995 06 12 10 30 53.3300 -9.9000 26.00 75808 MHD 1995 05 30 11 45 6773-66 P co2 361.960 -999.990 ... S1 1995 06 21 09 32 53.3300 -9.9000 26.00 75809 MHD 1995 05 30 11 45 6774-66 P co2 361.820 -999.990 ... S1 1995 06 21 09 34 53.3300 -9.9000 26.00 75810 MHD 1995 06 05 10 25 6567-66 P co2 362.630 -999.990 ... S1 1995 06 21 10 04 53.3300 -9.9000 26.00 75811 MHD 1995 06 05 10 25 6568-66 P co2 362.630 -999.990 ... S1 1995 06 21 10 06 53.3300 -9.9000 26.00 75812 MHD 1995 06 13 16 10 6543-66 P co2 360.200 -999.990 ... S1 1995 06 28 09 24 53.3300 -9.9000 26.00 75813 MHD 1995 06 13 16 10 6544-66 P co2 360.180 -999.990 ... S1 1995 06 28 09 26 53.3300 -9.9000 26.00 75814 MHD 1995 06 19 09 20 6837-66 P co2 360.870 -999.990 ... S1 1995 06 28 09 20 53.3300 -9.9000 26.00 75815 MHD 1995 06 19 09 20 6838-66 P co2 360.830 -999.990 ... S1 1995 06 28 09 22 53.3300 -9.9000 26.00 75816 MHD 1995 06 26 11 30 6537-66 P co2 356.930 -999.990 ... S1 1995 07 25 11 20 53.3300 -9.9000 26.00 75817 MHD 1995 06 26 11 30 6538-66 P co2 357.030 -999.990 ... S1 1995 07 25 11 22 53.3300 -9.9000 26.00 75818 MHD 1995 07 04 16 05 6765-66 P co2 359.790 -999.990 ... S1 1995 08 04 10 20 53.3300 -9.9000 26.00 75819 MHD 1995 07 04 16 05 6766-66 P co2 359.760 -999.990 ... S1 1995 08 04 10 22 53.3300 -9.9000 26.00 75820 MHD 1995 07 07 08 35 6429-66 P co2 362.670 -999.990 .X. S1 1995 08 14 10 52 53.3300 -9.9000 26.00 75821 MHD 1995 07 07 08 35 6430-66 P co2 362.680 -999.990 .X. S1 1995 08 14 10 54 53.3300 -9.9000 26.00 75822 MHD 1995 07 17 10 45 6313-66 P co2 356.540 -999.990 ... S1 1995 08 14 09 56 53.3300 -9.9000 26.00 75823 MHD 1995 07 17 10 45 6314-66 P co2 356.470 -999.990 ... S1 1995 08 14 09 58 53.3300 -9.9000 26.00 75824 MHD 1995 07 24 16 42 6801-66 P co2 355.750 -999.990 ... S1 1995 08 18 10 04 53.3300 -9.9000 26.00 75825 MHD 1995 07 24 16 42 6802-66 P co2 355.720 -999.990 ... S1 1995 08 18 10 06 53.3300 -9.9000 26.00 75826 MHD 1995 07 25 18 50 6853-66 P co2 342.610 -999.990 .X. S1 1995 08 22 08 44 53.3300 -9.9000 26.00 75827 MHD 1995 07 25 18 50 6854-66 P co2 342.840 -999.990 .X. S1 1995 08 22 08 46 53.3300 -9.9000 26.00 75828 MHD 1995 08 02 07 45 6229-66 P co2 355.670 -999.990 ... S1 1995 09 01 09 12 53.3300 -9.9000 26.00 75829 MHD 1995 08 02 07 45 6230-66 P co2 355.700 -999.990 ... S1 1995 09 01 09 14 53.3300 -9.9000 26.00 75830 MHD 1995 08 11 14 45 6517-66 P co2 353.610 -999.990 ... S1 1995 08 28 11 00 53.3300 -9.9000 26.00 75831 MHD 1995 08 11 14 45 6518-66 P co2 353.560 -999.990 ... S1 1995 08 28 11 02 53.3300 -9.9000 26.00 75832 MHD 1995 08 13 10 47 6111-66 P co2 352.460 -999.990 ... S1 1995 09 07 12 32 53.3300 -9.9000 26.00 75833 MHD 1995 08 13 10 47 6112-66 P co2 352.410 -999.990 ... S1 1995 09 07 12 34 53.3300 -9.9000 26.00 75834 MHD 1995 08 23 08 35 6891-66 P co2 350.700 -999.990 ... S1 1995 09 07 12 36 53.3300 -9.9000 26.00 75835 MHD 1995 08 23 08 35 6892-66 P co2 350.690 -999.990 ... S1 1995 09 07 12 38 53.3300 -9.9000 26.00 75836 MHD 1995 08 31 14 20 6501-66 P co2 354.920 -999.990 ... S1 1995 09 25 09 52 53.3300 -9.9000 26.00 75837 MHD 1995 08 31 14 20 6502-66 P co2 354.920 -999.990 ... S1 1995 09 25 09 54 53.3300 -9.9000 26.00 75838 MHD 1995 09 07 08 23 6871-66 P co2 358.840 -999.990 .X. S1 1995 09 21 08 12 53.3300 -9.9000 26.00 75839 MHD 1995 09 07 08 23 6872-66 P co2 358.770 -999.990 .X. S1 1995 09 21 08 14 53.3300 -9.9000 26.00 75840 MHD 1995 09 15 17 00 6519-66 P co2 356.840 -999.990 ... S1 1995 10 03 12 08 53.3300 -9.9000 26.00 75841 MHD 1995 09 15 17 00 6520-66 P co2 356.770 -999.990 ... S1 1995 10 03 12 10 53.3300 -9.9000 26.00 75842 MHD 1995 09 21 09 50 6295-66 P co2 354.130 -999.990 ... S1 1995 10 03 12 04 53.3300 -9.9000 26.00 75843 MHD 1995 09 21 09 50 6296-66 P co2 354.180 -999.990 ... S1 1995 10 03 12 06 53.3300 -9.9000 26.00 75844 MHD 1995 09 25 10 15 6187-66 P co2 356.270 -999.990 ... S1 1995 10 17 12 32 53.3300 -9.9000 26.00 75845 MHD 1995 09 25 10 15 6188-66 P co2 356.270 -999.990 ... S1 1995 10 17 12 34 53.3300 -9.9000 26.00 75846 MHD 1995 10 02 11 00 6413-66 P co2 356.180 -999.990 ... S1 1995 10 17 12 36 53.3300 -9.9000 26.00 75847 MHD 1995 10 02 11 00 6414-66 P co2 356.060 -999.990 ... S1 1995 10 17 12 38 53.3300 -9.9000 26.00 75848 MHD 1995 10 09 14 15 6675-66 P co2 356.230 -999.990 ... S1 1995 11 28 11 56 53.3300 -9.9000 26.00 75849 MHD 1995 10 09 14 15 6676-66 P co2 355.960 -999.990 ... S1 1995 11 28 11 58 53.3300 -9.9000 26.00 75850 MHD 1995 10 18 13 15 6921-66 P co2 357.750 -999.990 ... S1 1995 11 28 12 00 53.3300 -9.9000 26.00 75851 MHD 1995 10 18 13 15 6922-66 P co2 357.740 -999.990 ... S1 1995 11 28 12 02 53.3300 -9.9000 26.00 75852 MHD 1995 10 25 12 13 6429-66 P co2 358.960 -999.990 ... S1 1995 11 28 08 40 53.3300 -9.9000 26.00 75853 MHD 1995 10 25 12 13 6430-66 P co2 358.850 -999.990 ... S1 1995 11 28 08 42 53.3300 -9.9000 26.00 75854 MHD 1995 11 03 11 15 6055-66 P co2 372.290 -999.990 .X. S1 1995 11 28 08 44 53.3300 -9.9000 26.00 75855 MHD 1995 11 03 11 15 6056-66 P co2 372.200 -999.990 .X. S1 1995 11 28 08 46 53.3300 -9.9000 26.00 75856 MHD 1995 11 07 12 30 6407-66 P co2 359.910 -999.990 ... S1 1995 11 28 09 28 53.3300 -9.9000 26.00 75857 MHD 1995 11 07 12 30 6408-66 P co2 359.850 -999.990 ... S1 1995 11 28 09 30 53.3300 -9.9000 26.00 75858 MHD 1995 11 14 10 35 6005-66 P co2 367.170 -999.990 .X. S1 1995 11 30 10 28 53.3300 -9.9000 26.00 75859 MHD 1995 11 14 10 35 6006-66 P co2 367.150 -999.990 .X. S1 1995 11 30 10 30 53.3300 -9.9000 26.00 75860 MHD 1995 11 21 20 15 6763-66 P co2 362.620 -999.990 ... S1 1996 01 05 10 52 53.3300 -9.9000 26.00 75861 MHD 1995 11 21 20 15 6764-66 P co2 362.510 -999.990 ... S1 1996 01 05 10 54 53.3300 -9.9000 26.00 75862 MHD 1995 11 29 17 25 6931-66 P co2 364.050 -999.990 ... S1 1996 01 10 10 48 53.3300 -9.9000 26.00 75863 MHD 1995 11 29 17 25 6932-66 P co2 363.910 -999.990 ... S1 1996 01 10 10 50 53.3300 -9.9000 26.00 75864 MHD 1995 12 07 10 10 6751-66 P co2 371.440 -999.990 N.. S1 1996 01 11 10 24 53.3300 -9.9000 26.00 75865 MHD 1995 12 14 14 00 6739-66 P co2 365.380 -999.990 ... S1 1996 01 11 10 20 53.3300 -9.9000 26.00 75866 MHD 1995 12 14 14 00 6740-66 P co2 365.350 -999.990 ... S1 1996 01 11 10 22 53.3300 -9.9000 26.00 75867 MHD 1995 12 18 12 00 439-91 P co2 380.960 -999.990 .X. S1 1996 01 18 09 00 53.3300 -9.9000 26.00 75868 MHD 1995 12 18 12 00 440-91 P co2 380.900 -999.990 .X. S1 1996 01 18 09 02 53.3300 -9.9000 26.00 75869 MHD 1995 12 31 13 00 1579-91 P co2 379.250 -999.990 .X. S1 1996 01 18 08 56 53.3300 -9.9000 26.00 75870 MHD 1995 12 31 13 00 1580-91 P co2 379.220 -999.990 .X. S1 1996 01 18 08 58 53.3300 -9.9000 26.00 75871 MHD 1996 01 05 11 04 6895-66 P co2 364.110 -999.990 ... S1 1996 01 26 08 40 53.3300 -9.9000 26.00 75872 MHD 1996 01 05 11 04 6896-66 P co2 364.070 -999.990 ... S1 1996 01 26 08 42 53.3300 -9.9000 26.00 75873 MHD 1996 01 09 12 45 6899-66 P co2 364.340 -999.990 ... S1 1996 01 26 08 44 53.3300 -9.9000 26.00 75874 MHD 1996 01 09 12 45 6900-66 P co2 364.380 -999.990 ... S1 1996 01 26 08 46 53.3300 -9.9000 26.00 75875 MHD 1996 01 19 16 20 6007-66 P co2 365.870 -999.990 ... S1 1996 02 01 10 20 53.3300 -9.9000 26.00 75876 MHD 1996 01 19 16 20 6008-66 P co2 365.690 -999.990 ... S1 1996 02 01 10 22 53.3300 -9.9000 26.00 75877 MHD 1996 01 23 16 20 6605-66 P co2 375.210 -999.990 .X. S1 1996 02 01 10 04 53.3300 -9.9000 26.00 75878 MHD 1996 01 23 16 20 6606-66 P co2 375.230 -999.990 .X. S1 1996 02 01 10 06 53.3300 -9.9000 26.00 75879 MHD 1996 01 29 09 15 6139-66 P co2 367.490 -999.990 ... S1 1996 03 08 09 12 53.3300 -9.9000 26.00 75880 MHD 1996 01 29 09 15 6140-66 P co2 367.430 -999.990 ... S1 1996 03 08 09 14 53.3300 -9.9000 26.00 75881 MHD 1996 02 06 17 28 6281-66 P co2 365.560 -999.990 ... S1 1996 03 08 09 24 53.3300 -9.9000 26.00 75882 MHD 1996 02 06 17 28 6282-66 P co2 365.580 -999.990 ... S1 1996 03 08 09 26 53.3300 -9.9000 26.00 75883 MHD 1996 02 16 09 05 6275-66 P co2 367.300 -999.990 +.. S1 1996 03 05 08 40 53.3300 -9.9000 26.00 75884 MHD 1996 02 16 09 05 6276-66 P co2 365.970 -999.990 -.. S1 1996 03 05 08 42 53.3300 -9.9000 26.00 75885 MHD 1996 02 21 10 00 6861-66 P co2 366.060 -999.990 ... S1 1996 03 05 08 44 53.3300 -9.9000 26.00 75886 MHD 1996 02 21 10 00 6862-66 P co2 366.080 -999.990 ... S1 1996 03 05 08 46 53.3300 -9.9000 26.00 75887 MHD 1996 02 25 17 20 6579-66 P co2 369.400 -999.990 ... S1 1996 03 18 11 00 53.3300 -9.9000 26.00 75888 MHD 1996 02 25 17 20 6580-66 P co2 369.410 -999.990 ... S1 1996 03 18 11 02 53.3300 -9.9000 26.00 75889 MHD 1996 02 28 10 08 6129-66 P co2 365.570 -999.990 ... S1 1996 03 18 10 56 53.3300 -9.9000 26.00 75890 MHD 1996 02 28 10 08 6130-66 P co2 365.540 -999.990 ... S1 1996 03 18 10 58 53.3300 -9.9000 26.00 75891 MHD 1996 03 07 09 25 725-91 P co2 369.620 -999.990 ... S1 1996 04 05 10 24 53.3300 -9.9000 26.00 75892 MHD 1996 03 07 09 25 726-91 P co2 369.560 -999.990 ... S1 1996 04 05 10 26 53.3300 -9.9000 26.00 75893 MHD 1996 03 15 13 30 981-91 P co2 376.410 -999.990 .X. S1 1996 04 05 09 52 53.3300 -9.9000 26.00 75894 MHD 1996 03 15 13 30 982-91 P co2 376.370 -999.990 .X. S1 1996 04 05 09 54 53.3300 -9.9000 26.00 75895 MHD 1996 03 22 10 50 315-91 P co2 394.630 -999.990 .Z. S1 1996 04 10 10 56 53.3300 -9.9000 26.00 75896 MHD 1996 03 22 10 50 316-91 P co2 394.640 -999.990 .Z. S1 1996 04 10 10 58 53.3300 -9.9000 26.00 75897 MHD 1996 03 28 10 00 1909-91 P co2 368.500 -999.990 ... S1 1996 04 10 11 00 53.3300 -9.9000 26.00 75898 MHD 1996 03 28 10 00 1910-91 P co2 368.380 -999.990 ... S1 1996 04 10 11 02 53.3300 -9.9000 26.00 75899 MHD 1996 04 04 16 55 93-91 P co2 370.490 -999.990 ... S1 1996 04 17 09 12 53.3300 -9.9000 26.00 75900 MHD 1996 04 04 16 55 94-91 P co2 370.430 -999.990 ... S1 1996 04 17 09 14 53.3300 -9.9000 26.00 75901 MHD 1996 04 08 11 00 503-91 P co2 366.280 -999.990 ... S1 1996 04 17 09 16 53.3300 -9.9000 26.00 75902 MHD 1996 04 08 11 00 504-91 P co2 366.190 -999.990 ... S1 1996 04 17 09 18 53.3300 -9.9000 26.00 75903 MHD 1996 04 16 14 30 375-91 P co2 365.850 -999.990 ... S1 1996 04 30 09 24 53.3300 -9.9000 26.00 75904 MHD 1996 04 16 14 30 376-91 P co2 365.780 -999.990 ... S1 1996 04 30 09 26 53.3300 -9.9000 26.00 75905 MHD 1996 04 22 10 00 1577-91 P co2 367.530 -999.990 ... S1 1996 05 08 08 40 53.3300 -9.9000 26.00 75906 MHD 1996 04 22 10 00 1578-91 P co2 367.500 -999.990 ... S1 1996 05 08 08 42 53.3300 -9.9000 26.00 75907 MHD 1996 04 29 09 05 235-91 P co2 366.700 -999.990 ... S1 1996 05 23 09 48 53.3300 -9.9000 26.00 75908 MHD 1996 04 29 09 05 236-91 P co2 366.620 -999.990 ... S1 1996 05 23 09 50 53.3300 -9.9000 26.00 75909 MHD 1996 05 09 15 00 355-91 P co2 366.660 -999.990 ... S1 1996 05 23 09 52 53.3300 -9.9000 26.00 75910 MHD 1996 05 09 15 00 356-91 P co2 366.790 -999.990 ... S1 1996 05 23 09 54 53.3300 -9.9000 26.00 75911 MHD 1996 05 17 10 05 209-91 P co2 366.850 -999.990 ... S1 1996 06 06 11 00 53.3300 -9.9000 26.00 75912 MHD 1996 05 17 10 05 210-91 P co2 366.810 -999.990 ... S1 1996 06 06 11 02 53.3300 -9.9000 26.00 75913 MHD 1996 05 21 10 45 621-91 P co2 367.320 -999.990 ... S1 1996 06 06 10 48 53.3300 -9.9000 26.00 75914 MHD 1996 05 21 10 45 622-91 P co2 367.270 -999.990 ... S1 1996 06 06 10 50 53.3300 -9.9000 26.00 75915 MHD 1996 05 28 10 50 1233-91 P co2 364.920 -999.990 ... S1 1996 06 12 09 56 53.3300 -9.9000 26.00 75916 MHD 1996 05 28 10 50 1234-91 P co2 364.910 -999.990 ... S1 1996 06 12 09 58 53.3300 -9.9000 26.00 75917 MHD 1996 06 04 11 35 987-91 P co2 365.500 -999.990 ... S1 1996 06 12 10 00 53.3300 -9.9000 26.00 75918 MHD 1996 06 04 11 35 988-91 P co2 365.280 -999.990 ... S1 1996 06 12 10 02 53.3300 -9.9000 26.00 75919 MHD 1996 06 10 09 00 377-91 P co2 365.710 -999.990 ... S1 1996 07 08 08 20 53.3300 -9.9000 26.00 75920 MHD 1996 06 10 09 00 378-91 P co2 365.730 -999.990 ... S1 1996 07 08 08 22 53.3300 -9.9000 26.00 75921 MHD 1996 06 18 10 05 686-91 P co2 364.610 -999.990 ... S1 1996 07 08 08 18 53.3300 -9.9000 26.00 75922 MHD 1996 06 24 14 25 767-91 P co2 364.390 -999.990 ... S1 1996 07 22 10 24 53.3300 -9.9000 26.00 75923 MHD 1996 06 24 14 25 768-91 P co2 364.440 -999.990 ... S1 1996 07 22 10 26 53.3300 -9.9000 26.00 75924 MHD 1996 07 07 11 25 1159-91 P co2 360.590 -999.990 ... S1 1996 07 22 10 28 53.3300 -9.9000 26.00 75925 MHD 1996 07 07 11 25 1160-91 P co2 360.460 -999.990 ... S1 1996 07 22 10 30 53.3300 -9.9000 26.00 75926 MHD 1996 07 10 13 15 327-91 P co2 362.140 -999.990 ... S1 1996 08 09 08 20 53.3300 -9.9000 26.00 75927 MHD 1996 07 10 13 15 328-91 P co2 362.150 -999.990 ... S1 1996 08 09 08 22 53.3300 -9.9000 26.00 75928 MHD 1996 07 19 18 45 1334-91 P co2 358.440 -999.990 ... S1 1996 08 09 08 42 53.3300 -9.9000 26.00 75929 MHD 1996 07 24 17 30 1172-91 P co2 357.140 -999.990 ... S1 1996 08 21 08 20 53.3300 -9.9000 26.00 75930 MHD 1996 08 01 12 20 831-91 P co2 355.940 -999.990 ... S1 1996 08 16 09 24 53.3300 -9.9000 26.00 75931 MHD 1996 08 01 12 20 832-91 P co2 355.920 -999.990 ... S1 1996 08 16 09 26 53.3300 -9.9000 26.00 75932 MHD 1996 08 07 16 30 609-91 P co2 355.260 -999.990 ... S1 1996 09 10 08 48 53.3300 -9.9000 26.00 75933 MHD 1996 08 07 16 30 610-91 P co2 355.270 -999.990 ... S1 1996 09 10 08 50 53.3300 -9.9000 26.00 75934 MHD 1996 08 13 16 55 1413-91 P co2 356.950 -999.990 ... S1 1996 09 10 09 56 53.3300 -9.9000 26.00 75935 MHD 1996 08 13 16 55 1414-91 P co2 356.960 -999.990 ... S1 1996 09 10 09 58 53.3300 -9.9000 26.00 75936 MHD 1996 08 19 14 45 33-91 P co2 -999.990 -999.990 *.. S1 1996 09 20 14 52 53.3300 -9.9000 26.00 75937 MHD 1996 08 19 14 45 34-91 P co2 355.110 -999.990 -.. S1 1996 09 20 14 54 53.3300 -9.9000 26.00 75938 MHD 1996 09 08 14 15 295-91 P co2 352.290 -999.990 ... S1 1996 09 20 15 12 53.3300 -9.9000 26.00 75939 MHD 1996 09 08 14 15 296-91 P co2 352.450 -999.990 ... S1 1996 09 20 15 14 53.3300 -9.9000 26.00 75940 MHD 1996 09 13 14 50 535-91 P co2 356.400 -999.990 ... S1 1996 09 24 08 16 53.3300 -9.9000 26.00 75941 MHD 1996 09 13 14 50 536-91 P co2 356.450 -999.990 ... S1 1996 09 24 08 18 53.3300 -9.9000 26.00 75942 MHD 1996 09 18 08 55 1733-91 P co2 362.960 -999.990 .X. S1 1996 09 24 08 20 53.3300 -9.9000 26.00 75943 MHD 1996 09 18 08 55 1734-91 P co2 362.820 -999.990 .X. S1 1996 09 24 08 22 53.3300 -9.9000 26.00 75944 MHD 1996 09 23 14 55 1285-91 P co2 355.080 -999.990 ... S1 1996 10 16 16 25 53.3300 -9.9000 26.00 75945 MHD 1996 09 23 14 55 1286-91 P co2 355.050 -999.990 ... S1 1996 10 16 16 26 53.3300 -9.9000 26.00 75946 MHD 1996 09 30 09 45 1319-91 P co2 356.190 -999.990 ... S1 1996 10 16 16 27 53.3300 -9.9000 26.00 75947 MHD 1996 09 30 09 45 1320-91 P co2 356.040 -999.990 ... S1 1996 10 16 16 28 53.3300 -9.9000 26.00 75948 MHD 1996 10 07 09 30 273-91 P co2 358.110 -999.990 ... S1 1996 10 24 16 45 53.3300 -9.9000 26.00 75949 MHD 1996 10 07 09 30 274-91 P co2 357.990 -999.990 ... S1 1996 10 24 16 46 53.3300 -9.9000 26.00 75950 MHD 1996 10 16 15 15 1413-91 P co2 359.610 -999.990 ... S1 1996 10 24 16 43 53.3300 -9.9000 26.00 75951 MHD 1996 10 16 15 15 1414-91 P co2 359.610 -999.990 ... S1 1996 10 24 16 44 53.3300 -9.9000 26.00 75952 MHD 1996 10 21 09 30 1819-91 P co2 360.250 -999.990 ... S1 1996 11 15 10 29 53.3300 -9.9000 26.00 75953 MHD 1996 10 21 09 30 1820-91 P co2 360.150 -999.990 ... S1 1996 11 15 10 30 53.3300 -9.9000 26.00 75954 MHD 1996 10 30 09 30 2033-91 P co2 361.030 -999.990 ... S1 1996 11 22 14 23 53.3300 -9.9000 26.00 75955 MHD 1996 10 30 09 30 2034-91 P co2 361.000 -999.990 ... S1 1996 11 22 14 24 53.3300 -9.9000 26.00 75956 MHD 1996 11 03 11 45 1455-91 P co2 363.510 -999.990 ... S1 1996 12 03 15 50 53.3300 -9.9000 26.00 75957 MHD 1996 11 03 11 45 1456-91 P co2 363.440 -999.990 ... S1 1996 12 03 15 51 53.3300 -9.9000 26.00 75958 MHD 1996 11 08 10 05 1593-91 P co2 361.140 -999.990 ... S1 1996 12 03 15 53 53.3300 -9.9000 26.00 75959 MHD 1996 11 08 10 05 1594-91 P co2 361.160 -999.990 ... S1 1996 12 03 15 54 53.3300 -9.9000 26.00 75960 MHD 1996 11 28 18 20 1493-91 P co2 364.490 -999.990 ... S1 1996 12 27 13 07 53.3300 -9.9000 26.00 75961 MHD 1996 11 28 18 20 1494-91 P co2 364.540 -999.990 ... S1 1996 12 27 13 08 53.3300 -9.9000 26.00 75962 MHD 1996 12 06 18 30 439-91 P co2 366.530 -999.990 ... S1 1996 12 27 13 09 53.3300 -9.9000 26.00 75963 MHD 1996 12 06 18 30 440-91 P co2 366.480 -999.990 ... S1 1996 12 27 13 10 53.3300 -9.9000 26.00 75964 MHD 1996 12 10 11 10 1779-91 P co2 376.210 -999.990 .X. S1 1997 01 08 09 28 53.3300 -9.9000 26.00 75965 MHD 1996 12 10 11 10 1780-91 P co2 376.180 -999.990 .X. S1 1997 01 08 09 30 53.3300 -9.9000 26.00 75966 MHD 1996 12 17 13 30 1339-91 P co2 373.740 -999.990 .X. S1 1997 01 08 09 24 53.3300 -9.9000 26.00 75967 MHD 1996 12 17 13 30 1340-91 P co2 373.720 -999.990 .X. S1 1997 01 08 09 26 53.3300 -9.9000 26.00 75968 MHD 1996 12 23 10 00 479-91 P co2 369.080 -999.990 +.. S1 1997 01 21 14 47 53.3300 -9.9000 26.00 75969 MHD 1996 12 23 10 00 480-91 P co2 367.970 -999.990 -.. S1 1997 01 21 14 48 53.3300 -9.9000 26.00 75970 MHD 1996 12 31 15 15 1247-91 P co2 369.740 -999.990 ... S1 1997 01 21 14 45 53.3300 -9.9000 26.00 75971 MHD 1996 12 31 15 15 1248-91 P co2 369.710 -999.990 ... S1 1997 01 21 14 46 53.3300 -9.9000 26.00 75972 MHD 1997 01 06 11 05 41-91 P co2 368.010 -999.990 ... S1 1997 01 28 14 41 53.3300 -9.9000 26.00 75973 MHD 1997 01 06 11 05 42-91 P co2 367.950 -999.990 ... S1 1997 01 28 14 42 53.3300 -9.9000 26.00 75974 MHD 1997 01 13 10 10 455-91 P co2 365.310 -999.990 ... S1 1997 01 28 14 38 53.3300 -9.9000 26.00 75975 MHD 1997 01 13 10 10 456-91 P co2 365.300 -999.990 ... S1 1997 01 28 14 39 53.3300 -9.9000 26.00 75976 MHD 1997 01 24 11 10 3-91 P co2 366.170 -999.990 ... S1 1997 02 24 15 25 53.3300 -9.9000 26.00 75977 MHD 1997 01 24 11 10 4-91 P co2 366.210 -999.990 ... S1 1997 02 24 15 26 53.3300 -9.9000 26.00 75978 MHD 1997 01 30 09 40 343-91 P co2 374.510 -999.990 .X. S1 1997 02 24 15 28 53.3300 -9.9000 26.00 75979 MHD 1997 01 30 09 40 344-91 P co2 374.580 -999.990 .X. S1 1997 02 24 15 29 53.3300 -9.9000 26.00 75980 MHD 1997 02 03 12 25 331-91 P co2 368.990 -999.990 +.. S1 1997 03 13 17 05 53.3300 -9.9000 26.00 75981 MHD 1997 02 03 12 25 332-91 P co2 366.690 -999.990 -.. S1 1997 03 13 17 06 53.3300 -9.9000 26.00 75982 MHD 1997 02 10 16 10 837-91 P co2 367.390 -999.990 ... S1 1997 03 13 17 03 53.3300 -9.9000 26.00 75983 MHD 1997 02 10 16 10 838-91 P co2 367.340 -999.990 ... S1 1997 03 13 17 04 53.3300 -9.9000 26.00 75984 MHD 1997 02 17 10 35 1577-91 P co2 365.760 -999.990 ... S1 1997 03 17 13 59 53.3300 -9.9000 26.00 75985 MHD 1997 02 17 10 35 1578-91 P co2 365.770 -999.990 ... S1 1997 03 17 14 00 53.3300 -9.9000 26.00 75986 MHD 1997 02 25 09 40 521-91 P co2 367.320 -999.990 ... S1 1997 03 17 13 57 53.3300 -9.9000 26.00 75987 MHD 1997 02 25 09 40 522-91 P co2 367.290 -999.990 ... S1 1997 03 17 13 58 53.3300 -9.9000 26.00 75988 MHD 1997 03 07 10 38 141-91 P co2 367.130 -999.990 ... S1 1997 03 31 12 51 53.3300 -9.9000 26.00 75989 MHD 1997 03 07 10 38 142-91 P co2 367.120 -999.990 ... S1 1997 03 31 12 52 53.3300 -9.9000 26.00 75990 MHD 1997 03 16 17 00 1477-91 P co2 366.380 -999.990 ... S1 1997 03 31 12 49 53.3300 -9.9000 26.00 75991 MHD 1997 03 16 17 00 1478-91 P co2 366.380 -999.990 ... S1 1997 03 31 12 50 53.3300 -9.9000 26.00 75992 MHD 1997 03 18 12 05 1035-91 P co2 368.230 -999.990 ... S1 1997 04 07 13 23 53.3300 -9.9000 26.00 75993 MHD 1997 03 18 12 05 1036-91 P co2 367.990 -999.990 ... S1 1997 04 07 13 24 53.3300 -9.9000 26.00 75994 MHD 1997 03 26 09 50 2029-91 P co2 368.040 -999.990 ... S1 1997 04 07 13 25 53.3300 -9.9000 26.00 75995 MHD 1997 03 26 09 50 2030-91 P co2 368.040 -999.990 ... S1 1997 04 07 13 26 53.3300 -9.9000 26.00 75996 MHD 1997 04 03 15 30 143-91 P co2 367.320 -999.990 ... S1 1997 05 01 12 01 53.3300 -9.9000 26.00 75997 MHD 1997 04 03 15 30 144-91 P co2 367.260 -999.990 ... S1 1997 05 01 12 03 53.3300 -9.9000 26.00 75998 MHD 1997 04 12 08 30 175-91 P co2 370.200 -999.990 ... S1 1997 05 01 11 57 53.3300 -9.9000 26.00 75999 MHD 1997 04 12 08 30 176-91 P co2 370.120 -999.990 ... S1 1997 05 01 11 58 53.3300 -9.9000 26.00 76000 MHD 1997 04 19 09 05 4259-91 P co2 367.460 -999.990 ... S1 1997 05 12 15 56 53.3300 -9.9000 26.00 76001 MHD 1997 04 19 09 05 4260-91 P co2 367.400 -999.990 ... S1 1997 05 12 15 57 53.3300 -9.9000 26.00 76002 MHD 1997 04 23 08 15 1021-91 P co2 366.660 -999.990 ... S1 1997 05 15 15 35 53.3300 -9.9000 26.00 76003 MHD 1997 04 23 08 15 1022-91 P co2 366.640 -999.990 ... S1 1997 05 15 15 36 53.3300 -9.9000 26.00 76004 MHD 1997 04 29 08 20 821-91 P co2 372.990 -999.990 .X. S1 1997 05 15 15 39 53.3300 -9.9000 26.00 76005 MHD 1997 04 29 08 20 822-91 P co2 372.910 -999.990 .X. S1 1997 05 15 15 40 53.3300 -9.9000 26.00 76006 MHD 1997 05 04 11 15 4213-91 P co2 367.400 -999.990 ... S1 1997 05 29 15 39 53.3300 -9.9000 26.00 76007 MHD 1997 05 04 11 15 4214-91 P co2 367.000 -999.990 ... S1 1997 05 29 15 40 53.3300 -9.9000 26.00 76008 MHD 1997 05 09 11 28 4215-91 P co2 368.370 -999.990 ... S1 1997 05 29 15 41 53.3300 -9.9000 26.00 76009 MHD 1997 05 09 11 28 4216-91 P co2 368.380 -999.990 ... S1 1997 05 29 15 42 53.3300 -9.9000 26.00 76010 MHD 1997 05 14 10 20 4279-91 P co2 367.980 -999.990 ... S1 1997 06 13 15 27 53.3300 -9.9000 26.00 76011 MHD 1997 05 14 10 20 4280-91 P co2 368.030 -999.990 ... L3 1997 06 11 13 43 53.3300 -9.9000 26.00 76012 MHD 1997 05 14 10 20 4280-91 P co2 368.040 -999.990 ... S1 1997 06 13 15 29 53.3300 -9.9000 26.00 76012 MHD 1997 05 17 10 40 4281-91 P co2 375.820 -999.990 .X. S1 1997 06 13 15 58 53.3300 -9.9000 26.00 76013 MHD 1997 05 17 10 40 4282-91 P co2 376.130 -999.990 .X. S1 1997 06 13 15 59 53.3300 -9.9000 26.00 76014 MHD 1997 05 17 10 40 4282-91 P co2 376.450 -999.990 .X. L3 1997 06 11 12 20 53.3300 -9.9000 26.00 76014 MHD 1997 05 27 08 35 657-91 P co2 368.030 -999.990 ... S1 1997 07 03 12 25 53.3300 -9.9000 26.00 76015 MHD 1997 05 27 08 35 658-91 P co2 367.940 -999.990 ... S1 1997 07 03 12 26 53.3300 -9.9000 26.00 76016 MHD 1997 05 27 08 35 658-91 P co2 367.960 -999.990 ... L3 1997 07 02 16 00 53.3300 -9.9000 26.00 76016 MHD 1997 06 15 15 00 4009-91 P co2 365.850 -999.990 ... S1 1997 07 03 12 54 53.3300 -9.9000 26.00 76017 MHD 1997 06 15 15 00 4010-91 P co2 365.920 -999.990 ... S1 1997 07 03 12 55 53.3300 -9.9000 26.00 76018 MHD 1997 06 15 15 00 4010-91 P co2 366.050 -999.990 ... L3 1997 07 02 16 14 53.3300 -9.9000 26.00 76018 MHD 1997 06 19 09 50 1681-91 P co2 365.250 -999.990 ... S1 1997 07 21 14 56 53.3300 -9.9000 26.00 76019 MHD 1997 06 19 09 50 1682-91 P co2 365.070 -999.990 ... L3 1997 07 18 15 13 53.3300 -9.9000 26.00 76020 MHD 1997 06 19 09 50 1682-91 P co2 365.300 -999.990 ... S1 1997 07 21 14 57 53.3300 -9.9000 26.00 76020 MHD 1997 06 26 17 15 1811-91 P co2 362.120 -999.990 ... S1 1997 07 21 14 58 53.3300 -9.9000 26.00 76021 MHD 1997 06 26 17 15 1812-91 P co2 361.960 -999.990 ... L3 1997 07 18 14 59 53.3300 -9.9000 26.00 76022 MHD 1997 06 26 17 15 1812-91 P co2 362.210 -999.990 ... S1 1997 07 21 14 59 53.3300 -9.9000 26.00 76022 MHD 1997 07 04 11 10 1463-91 P co2 361.660 -999.990 ... S1 1997 07 21 14 52 53.3300 -9.9000 26.00 76023 MHD 1997 07 04 11 10 1464-91 P co2 361.440 -999.990 ... L3 1997 07 18 15 26 53.3300 -9.9000 26.00 76024 MHD 1997 07 04 11 10 1464-91 P co2 361.680 -999.990 ... S1 1997 07 21 14 53 53.3300 -9.9000 26.00 76024 MHD 1997 07 07 12 10 1481-91 P co2 362.670 -999.990 ... S1 1997 07 21 14 54 53.3300 -9.9000 26.00 76025 MHD 1997 07 07 12 10 1482-91 P co2 362.380 -999.990 ... L3 1997 07 18 15 40 53.3300 -9.9000 26.00 76026 MHD 1997 07 07 12 10 1482-91 P co2 362.690 -999.990 ... S1 1997 07 21 14 55 53.3300 -9.9000 26.00 76026 MHD 1997 07 15 11 00 1721-91 P co2 355.710 -999.990 .X. L3 1997 08 06 12 08 53.3300 -9.9000 26.00 76027 MHD 1997 07 15 11 00 1722-91 P co2 355.680 -999.990 .X. L3 1997 08 06 12 18 53.3300 -9.9000 26.00 76028 MHD 1997 07 23 17 30 317-91 P co2 356.610 -999.990 ... L3 1997 08 06 13 11 53.3300 -9.9000 26.00 76029 MHD 1997 07 23 17 30 318-91 P co2 356.570 -999.990 ... L3 1997 08 06 13 22 53.3300 -9.9000 26.00 76030 MHD 1997 07 28 11 00 7-91 P co2 357.580 -999.990 ... L3 1997 08 26 16 31 53.3300 -9.9000 26.00 76031 MHD 1997 07 28 11 00 8-91 P co2 357.470 -999.990 ... L3 1997 08 26 16 44 53.3300 -9.9000 26.00 76032 MHD 1997 08 07 11 33 1403-91 P co2 370.090 -999.990 +.. L3 1997 08 27 08 19 53.3300 -9.9000 26.00 76033 MHD 1997 08 07 11 33 1404-91 P co2 369.380 -999.990 -.. L3 1997 08 27 08 33 53.3300 -9.9000 26.00 76034 MHD 1997 08 13 15 45 1421-91 P co2 354.960 -999.990 ... L3 1997 09 03 09 07 53.3300 -9.9000 26.00 76035 MHD 1997 08 13 15 45 1422-91 P co2 354.950 -999.990 ... L3 1997 09 03 09 21 53.3300 -9.9000 26.00 76036 MHD 1997 08 21 10 33 4445-91 P co2 359.080 -999.990 .X. L3 1997 09 03 13 22 53.3300 -9.9000 26.00 76037 MHD 1997 08 21 10 33 4446-91 P co2 359.070 -999.990 .X. L3 1997 09 03 13 36 53.3300 -9.9000 26.00 76038 MHD 1997 08 25 12 35 479-91 P co2 354.610 -999.990 -.. L3 1997 09 10 12 23 53.3300 -9.9000 26.00 76039 MHD 1997 08 25 12 35 480-91 P co2 355.230 -999.990 +.. L3 1997 09 10 12 37 53.3300 -9.9000 26.00 76040 MHD 1997 09 01 12 00 4419-91 P co2 353.850 -999.990 ... L3 1997 09 10 12 59 53.3300 -9.9000 26.00 76041 MHD 1997 09 01 12 00 4420-91 P co2 353.810 -999.990 ... L3 1997 09 10 13 13 53.3300 -9.9000 26.00 76042 MHD 1997 09 08 11 00 95-91 P co2 355.740 -999.990 ... L3 1997 10 08 10 00 53.3300 -9.9000 26.00 76043 MHD 1997 09 08 11 00 96-91 P co2 356.050 -999.990 ... L3 1997 10 08 10 13 53.3300 -9.9000 26.00 76044 MHD 1997 09 18 12 00 355-91 P co2 355.570 -999.990 ... L3 1997 10 08 10 27 53.3300 -9.9000 26.00 76045 MHD 1997 09 18 12 00 356-91 P co2 355.370 -999.990 ... L3 1997 10 08 10 40 53.3300 -9.9000 26.00 76046 MHD 1997 09 24 12 00 1037-91 P co2 363.680 -999.990 +.. L3 1997 10 10 13 14 53.3300 -9.9000 26.00 76047 MHD 1997 09 24 12 00 1038-91 P co2 360.220 -999.990 -.. L3 1997 10 10 13 27 53.3300 -9.9000 26.00 76048 MHD 1997 09 29 12 00 4263-91 P co2 357.320 -999.990 ... L3 1997 10 10 14 36 53.3300 -9.9000 26.00 76049 MHD 1997 09 29 12 00 4264-91 P co2 357.670 -999.990 ... L3 1997 10 10 14 49 53.3300 -9.9000 26.00 76050 MHD 1997 10 07 16 55 1211-91 P co2 358.790 -999.990 ... L3 1997 10 22 11 22 53.3300 -9.9000 26.00 76051 MHD 1997 10 07 16 55 1212-91 P co2 359.070 -999.990 ... L3 1997 10 22 11 36 53.3300 -9.9000 26.00 76052 MHD 1997 10 14 12 30 1807-91 P co2 361.230 -999.990 ... L3 1997 10 22 10 19 53.3300 -9.9000 26.00 76053 MHD 1997 10 14 12 30 1808-91 P co2 361.380 -999.990 ... L3 1997 10 22 10 32 53.3300 -9.9000 26.00 76054 MHD 1997 10 18 14 55 691-91 P co2 367.690 -999.990 +.. L3 1997 12 04 09 45 53.3300 -9.9000 26.00 76055 MHD 1997 10 18 14 55 692-91 P co2 366.100 -999.990 -.. L3 1997 12 04 09 58 53.3300 -9.9000 26.00 76056 MHD 1997 11 06 17 30 2051-91 P co2 367.970 -999.990 -.. L3 1997 12 04 10 11 53.3300 -9.9000 26.00 76057 MHD 1997 11 06 17 30 2052-91 P co2 369.390 -999.990 +.. L3 1997 12 04 10 25 53.3300 -9.9000 26.00 76058 MHD 1997 11 10 14 35 859-91 P co2 368.440 -999.990 ... L3 1998 01 07 15 30 53.3300 -9.9000 26.00 76059 MHD 1997 11 10 14 35 860-91 P co2 368.940 -999.990 ... L3 1998 01 07 15 44 53.3300 -9.9000 26.00 76060 MHD 1997 11 17 13 30 1249-91 P co2 368.510 -999.990 ... L3 1998 01 07 15 03 53.3300 -9.9000 26.00 76061 MHD 1997 11 17 13 30 1250-91 P co2 368.370 -999.990 ... L3 1998 01 07 15 16 53.3300 -9.9000 26.00 76062 MHD 1997 11 18 15 00 4286-91 P co2 366.330 -999.990 ... L3 1998 01 08 13 13 53.3300 -9.9000 26.00 76063 MHD 1997 11 18 15 07 4283-91 P co2 370.850 -999.990 +.. L3 1998 01 07 14 35 53.3300 -9.9000 26.00 76064 MHD 1997 11 18 15 07 4284-91 P co2 369.120 -999.990 -.. L3 1998 01 07 14 49 53.3300 -9.9000 26.00 76065 MHD 1997 11 25 15 05 595-91 P co2 380.660 -999.990 .X. L3 1998 01 21 11 33 53.3300 -9.9000 26.00 76066 MHD 1997 11 25 15 05 596-91 P co2 380.970 -999.990 .X. L3 1998 01 21 11 47 53.3300 -9.9000 26.00 76067 MHD 1997 12 05 15 23 1861-91 P co2 370.270 -999.990 ... L3 1998 01 21 12 01 53.3300 -9.9000 26.00 76068 MHD 1997 12 05 15 23 1862-91 P co2 370.130 -999.990 ... L3 1998 01 21 12 14 53.3300 -9.9000 26.00 76069 MHD 1997 12 08 09 30 1597-91 P co2 375.370 -999.990 +.. L3 1998 01 22 15 01 53.3300 -9.9000 26.00 76070 MHD 1997 12 08 09 30 1598-91 P co2 370.100 -999.990 -.. L3 1998 01 22 15 14 53.3300 -9.9000 26.00 76071 MHD 1997 12 16 13 15 4215-91 P co2 370.560 -999.990 ... L3 1998 01 22 14 33 53.3300 -9.9000 26.00 76072 MHD 1997 12 16 13 15 4216-91 P co2 370.690 -999.990 ... L3 1998 01 22 14 47 53.3300 -9.9000 26.00 76073 MHD 1997 12 22 19 00 1247-91 P co2 366.880 -999.990 .X. L3 1998 01 27 13 26 53.3300 -9.9000 26.00 76074 MHD 1997 12 22 19 00 1248-91 P co2 366.870 -999.990 .X. L3 1998 01 27 13 40 53.3300 -9.9000 26.00 76075 MHD 1998 01 02 12 15 4661-91 P co2 367.890 -999.990 ... L3 1998 01 27 12 04 53.3300 -9.9000 26.00 76076 MHD 1998 01 02 12 15 4662-91 P co2 368.010 -999.990 ... L3 1998 01 27 12 17 53.3300 -9.9000 26.00 76077 MHD 1998 01 06 11 00 311-91 P co2 379.310 -999.990 .X. L3 1998 02 16 10 51 53.3300 -9.9000 26.00 76078 MHD 1998 01 06 11 00 312-91 P co2 379.720 -999.990 .X. L3 1998 02 16 11 05 53.3300 -9.9000 26.00 76079 MHD 1998 01 14 09 00 1863-91 P co2 373.430 -999.990 ... L3 1998 02 16 11 19 53.3300 -9.9000 26.00 76080 MHD 1998 01 14 09 00 1864-91 P co2 373.460 -999.990 ... L3 1998 02 16 11 32 53.3300 -9.9000 26.00 76081 MHD 1998 01 21 12 25 4225-91 P co2 396.640 -999.990 +.. L3 1998 03 05 11 50 53.3300 -9.9000 26.00 76082 MHD 1998 01 21 12 25 4226-91 P co2 391.070 -999.990 -.. L3 1998 03 05 12 04 53.3300 -9.9000 26.00 76083 MHD 1998 01 30 16 35 4767-91 P co2 377.610 -999.990 .Z. L3 1998 03 05 13 12 53.3300 -9.9000 26.00 76084 MHD 1998 01 30 16 35 4768-91 P co2 377.590 -999.990 .Z. L3 1998 03 05 13 26 53.3300 -9.9000 26.00 76085 MHD 1998 02 05 18 30 1957-91 P co2 368.100 -999.990 ... L3 1998 03 12 13 15 53.3300 -9.9000 26.00 76086 MHD 1998 02 05 18 30 1958-91 P co2 368.110 -999.990 ... L3 1998 03 12 13 28 53.3300 -9.9000 26.00 76087 MHD 1998 02 12 12 00 4229-91 P co2 375.110 -999.990 +.. L3 1998 03 10 11 02 53.3300 -9.9000 26.00 76088 MHD 1998 02 12 12 00 4230-91 P co2 373.930 -999.990 -.. L3 1998 03 10 11 16 53.3300 -9.9000 26.00 76089 MHD 1998 02 16 12 45 4435-91 P co2 369.160 -999.990 ... L3 1998 03 10 12 53 53.3300 -9.9000 26.00 76090 MHD 1998 02 16 12 45 4436-91 P co2 369.180 -999.990 ... L3 1998 03 10 13 07 53.3300 -9.9000 26.00 76091 MHD 1998 02 23 12 05 1175-91 P co2 368.760 -999.990 ... L3 1998 03 20 15 01 53.3300 -9.9000 26.00 76092 MHD 1998 02 23 12 05 1176-91 P co2 368.710 -999.990 ... L3 1998 03 20 15 14 53.3300 -9.9000 26.00 76093 MHD 1998 03 02 12 05 4455-91 P co2 368.590 -999.990 ... L3 1998 03 20 14 33 53.3300 -9.9000 26.00 76094 MHD 1998 03 02 12 05 4456-91 P co2 368.610 -999.990 ... L3 1998 03 20 14 47 53.3300 -9.9000 26.00 76095 MHD 1998 03 10 12 00 359-91 P co2 371.580 -999.990 +.. L3 1998 04 14 10 24 53.3300 -9.9000 26.00 76096 MHD 1998 03 10 12 00 360-91 P co2 370.010 -999.990 -.. L3 1998 04 14 10 38 53.3300 -9.9000 26.00 76097 MHD 1998 03 16 09 40 1735-91 P co2 354.580 -999.990 .Z. L3 1998 04 13 16 38 53.3300 -9.9000 26.00 76098 MHD 1998 03 16 09 40 1736-91 P co2 354.320 -999.990 .Z. L3 1998 04 13 16 51 53.3300 -9.9000 26.00 76099 MHD 1998 03 25 14 00 1451-91 P co2 368.240 -999.990 ... L3 1998 04 20 09 53 53.3300 -9.9000 26.00 76100 MHD 1998 03 25 14 00 1452-91 P co2 368.190 -999.990 ... L3 1998 04 20 10 06 53.3300 -9.9000 26.00 76101 MHD 1998 03 29 13 10 1605-91 P co2 379.020 -999.990 .Z. L3 1998 04 20 12 39 53.3300 -9.9000 26.00 76102 MHD 1998 03 29 13 10 1606-91 P co2 378.960 -999.990 .Z. L3 1998 04 20 12 52 53.3300 -9.9000 26.00 76103 MHD 1998 04 03 08 20 1123-91 P co2 377.540 -999.990 +.. L3 1998 04 28 14 08 53.3300 -9.9000 26.00 76104 MHD 1998 04 03 08 20 1124-91 P co2 376.280 -999.990 -.. L3 1998 04 28 14 22 53.3300 -9.9000 26.00 76105 MHD 1998 04 08 08 40 4381-91 P co2 369.980 -999.990 ... L3 1998 04 28 13 13 53.3300 -9.9000 26.00 76106 MHD 1998 04 08 08 40 4382-91 P co2 370.000 -999.990 ... L3 1998 04 28 13 27 53.3300 -9.9000 26.00 76107 MHD 1998 04 13 14 50 100-91 P co2 371.190 -999.990 ... L3 1998 05 19 11 57 53.3300 -9.9000 26.00 76109 MHD 1998 04 13 14 50 99-91 P co2 371.160 -999.990 ... L3 1998 05 19 11 43 53.3300 -9.9000 26.00 76108 MHD 1998 04 19 14 45 610-91 P co2 385.450 -999.990 .Z. L3 1998 05 19 12 11 53.3300 -9.9000 26.00 76110 MHD 1998 04 27 12 00 1031-91 P co2 370.540 -999.990 ... L3 1998 07 07 15 46 53.3300 -9.9000 26.00 76111 MHD 1998 04 27 12 00 1032-91 P co2 370.570 -999.990 ... L3 1998 07 07 15 59 53.3300 -9.9000 26.00 76112 MHD 1998 05 05 16 40 1403-91 P co2 370.150 -999.990 ... L3 1998 07 08 09 18 53.3300 -9.9000 26.00 76113 MHD 1998 05 05 16 40 1404-91 P co2 370.060 -999.990 ... L3 1998 07 08 09 32 53.3300 -9.9000 26.00 76114 MHD 1998 05 11 14 25 927-91 P co2 371.740 -999.990 ... L3 1998 07 09 11 49 53.3300 -9.9000 26.00 76115 MHD 1998 05 11 14 25 928-91 P co2 371.860 -999.990 ... L3 1998 07 09 12 03 53.3300 -9.9000 26.00 76116 MHD 1998 05 22 13 15 4217-91 P co2 365.610 -999.990 .X. L3 1998 07 09 11 22 53.3300 -9.9000 26.00 76117 MHD 1998 05 22 13 15 4218-91 P co2 365.700 -999.990 .X. L3 1998 07 09 11 35 53.3300 -9.9000 26.00 76118 MHD 1998 05 27 13 30 829-91 P co2 367.660 -999.990 ... L3 1998 07 06 14 32 53.3300 -9.9000 26.00 76119 MHD 1998 05 27 13 30 830-91 P co2 367.670 -999.990 ... L3 1998 07 06 14 46 53.3300 -9.9000 26.00 76120 MHD 1998 06 03 12 50 4601-91 P co2 367.780 -999.990 ... L3 1998 07 06 15 00 53.3300 -9.9000 26.00 76121 MHD 1998 06 03 12 50 4602-91 P co2 367.780 -999.990 ... L3 1998 07 06 15 13 53.3300 -9.9000 26.00 76122 MHD 1998 06 08 13 40 1495-91 P co2 366.330 -999.990 ... L3 1998 07 13 11 31 53.3300 -9.9000 26.00 76123 MHD 1998 06 08 13 40 1496-91 P co2 366.330 -999.990 ... L3 1998 07 13 11 45 53.3300 -9.9000 26.00 76124 MHD 1998 06 18 09 30 4095-91 P co2 367.080 -999.990 ... L3 1998 07 13 11 58 53.3300 -9.9000 26.00 76125 MHD 1998 06 18 09 30 4096-91 P co2 367.040 -999.990 ... L3 1998 07 13 12 12 53.3300 -9.9000 26.00 76126 MHD 1998 06 22 14 55 63-91 P co2 365.950 -999.990 ... L3 1998 08 04 14 24 53.3300 -9.9000 26.00 76127 MHD 1998 06 22 14 55 64-91 P co2 365.790 -999.990 ... L3 1998 08 04 14 38 53.3300 -9.9000 26.00 76128 MHD 1998 06 29 08 50 4679-91 P co2 365.400 -999.990 ... L3 1998 08 04 14 52 53.3300 -9.9000 26.00 76129 MHD 1998 06 29 08 50 4680-91 P co2 365.310 -999.990 ... L3 1998 08 04 15 05 53.3300 -9.9000 26.00 76130 MHD 1998 07 07 11 00 247-91 P co2 363.300 -999.990 ... L3 1998 08 12 15 00 53.3300 -9.9000 26.00 76131 MHD 1998 07 07 11 00 248-91 P co2 363.270 -999.990 ... L3 1998 08 12 15 14 53.3300 -9.9000 26.00 76132 MHD 1998 07 13 09 35 831-91 P co2 362.720 -999.990 ... L3 1998 08 12 15 27 53.3300 -9.9000 26.00 76133 MHD 1998 07 13 09 35 832-91 P co2 362.700 -999.990 ... L3 1998 08 12 15 41 53.3300 -9.9000 26.00 76134 MHD 1998 07 20 17 00 1563-91 P co2 359.780 -999.990 ... L3 1998 08 28 11 14 53.3300 -9.9000 26.00 76135 MHD 1998 07 20 17 00 1564-91 P co2 359.820 -999.990 ... L3 1998 08 28 11 27 53.3300 -9.9000 26.00 76136 MHD 1998 07 27 10 20 655-91 P co2 360.000 -999.990 ... L3 1998 08 28 11 43 53.3300 -9.9000 26.00 76137 MHD 1998 07 27 10 20 656-91 P co2 360.040 -999.990 ... L3 1998 08 28 11 56 53.3300 -9.9000 26.00 76138 MHD 1998 08 04 15 10 845-91 P co2 357.280 -999.990 ... L3 1998 10 08 11 20 53.3300 -9.9000 26.00 76139 MHD 1998 08 04 15 10 846-91 P co2 357.250 -999.990 ... L3 1998 10 08 11 34 53.3300 -9.9000 26.00 76140 MHD 1998 08 11 16 50 1987-91 P co2 358.670 -999.990 ... L3 1998 10 08 14 22 53.3300 -9.9000 26.00 76141 MHD 1998 08 11 16 50 1988-91 P co2 358.640 -999.990 ... L3 1998 10 08 14 36 53.3300 -9.9000 26.00 76142 MHD 1998 08 14 09 00 87-91 P co2 357.750 -999.990 ... L3 1998 09 15 14 25 53.3300 -9.9000 26.00 76143 MHD 1998 08 14 09 00 88-91 P co2 357.640 -999.990 ... L3 1998 09 15 14 39 53.3300 -9.9000 26.00 76144 MHD 1998 08 25 10 30 4673-91 P co2 358.150 -999.990 ... L3 1998 09 15 15 20 53.3300 -9.9000 26.00 76145 MHD 1998 08 25 10 30 4674-91 P co2 358.160 -999.990 ... L3 1998 09 15 15 33 53.3300 -9.9000 26.00 76146 MHD 1998 09 01 13 20 749-91 P co2 358.100 -999.990 ... L3 1998 10 08 16 13 53.3300 -9.9000 26.00 76147 MHD 1998 09 01 13 20 750-91 P co2 358.150 -999.990 ... L3 1998 10 08 16 27 53.3300 -9.9000 26.00 76148 MHD 1998 09 08 08 45 1067-91 P co2 359.260 -999.990 ... L3 1998 10 08 15 19 53.3300 -9.9000 26.00 76149 MHD 1998 09 08 08 45 1068-91 P co2 359.230 -999.990 ... L3 1998 10 08 15 32 53.3300 -9.9000 26.00 76150 MHD 1998 09 15 09 15 1977-91 P co2 359.770 -999.990 ... L3 1998 10 26 14 05 53.3300 -9.9000 26.00 76151 MHD 1998 09 15 09 15 1978-91 P co2 359.700 -999.990 ... L3 1998 10 26 14 19 53.3300 -9.9000 26.00 76152 MHD 1998 09 21 08 55 4395-91 P co2 370.290 -999.990 .X. L3 1998 10 26 13 38 53.3300 -9.9000 26.00 76153 MHD 1998 09 21 08 55 4396-91 P co2 370.560 -999.990 .X. L3 1998 10 26 13 52 53.3300 -9.9000 26.00 76154 MHD 1998 10 09 09 15 1403-91 P co2 363.610 -999.990 ... L3 1998 11 03 13 15 53.3300 -9.9000 26.00 76155 MHD 1998 10 09 09 15 1404-91 P co2 363.560 -999.990 ... L3 1998 11 03 13 28 53.3300 -9.9000 26.00 76156 MHD 1998 10 12 10 50 1501-91 P co2 364.940 -999.990 ... L3 1998 11 03 12 47 53.3300 -9.9000 26.00 76157 MHD 1998 10 12 10 50 1502-91 P co2 364.880 -999.990 ... L3 1998 11 03 13 01 53.3300 -9.9000 26.00 76158 MHD 1998 10 18 12 30 443-91 P co2 363.770 -999.990 ... L3 1998 12 09 13 43 53.3300 -9.9000 26.00 76159 MHD 1998 10 18 12 30 444-91 P co2 363.800 -999.990 ... L3 1998 12 09 13 57 53.3300 -9.9000 26.00 76160 MHD 1998 10 27 12 05 2015-91 P co2 367.030 -999.990 ... L3 1998 12 09 12 19 53.3300 -9.9000 26.00 76161 MHD 1998 10 27 12 05 2016-91 P co2 367.030 -999.990 ... L3 1998 12 09 12 33 53.3300 -9.9000 26.00 76162 MHD 1998 11 06 14 45 4290-91 P co2 367.420 -999.990 ... L3 1998 12 02 10 25 53.3300 -9.9000 26.00 76163 MHD 1998 11 09 12 00 4392-91 P co2 367.010 -999.990 ... L3 1998 12 02 10 38 53.3300 -9.9000 26.00 76164 MHD 1998 11 16 13 45 89-98 P co2 370.390 -999.990 ... L3 1999 01 11 14 15 53.3300 -9.9000 26.00 76165 MHD 1998 11 24 10 00 1141-91 P co2 368.550 -999.990 ... L3 1999 01 21 11 38 53.3300 -9.9000 26.00 76166 MHD 1998 11 24 10 00 1142-91 P co2 368.550 -999.990 ... L3 1999 01 21 11 52 53.3300 -9.9000 26.00 76167 MHD 1998 11 30 17 05 1217-91 P co2 368.300 -999.990 ... L3 1999 01 19 09 21 53.3300 -9.9000 26.00 76168 MHD 1998 11 30 17 05 1218-91 P co2 368.300 -999.990 ... L3 1999 01 19 09 35 53.3300 -9.9000 26.00 76169 MHD 1998 12 08 17 05 1491-91 P co2 369.700 -999.990 ... L3 1999 01 19 10 16 53.3300 -9.9000 26.00 76170 MHD 1998 12 08 17 05 1492-91 P co2 369.690 -999.990 ... L3 1999 01 19 10 30 53.3300 -9.9000 26.00 76171 MHD 1998 12 21 17 35 4453-91 P co2 369.700 -999.990 ... L3 1999 02 03 10 24 53.3300 -9.9000 26.00 76172 MHD 1998 12 21 17 35 4454-91 P co2 369.720 -999.990 ... L3 1999 02 03 10 38 53.3300 -9.9000 26.00 76173 MHD 1999 01 01 14 35 4731-91 P co2 371.250 -999.990 ... L3 1999 02 03 09 57 53.3300 -9.9000 26.00 76174 MHD 1999 01 01 14 35 4732-91 P co2 371.270 -999.990 ... L3 1999 02 03 10 10 53.3300 -9.9000 26.00 76175 MHD 1999 01 04 15 50 399-91 P co2 371.130 -999.990 ... L3 1999 02 18 13 35 53.3300 -9.9000 26.00 76176 MHD 1999 01 04 15 50 400-91 P co2 371.210 -999.990 ... L3 1999 02 18 13 48 53.3300 -9.9000 26.00 76177 MHD 1999 01 12 13 45 4375-91 P co2 370.920 -999.990 ... L3 1999 02 18 14 56 53.3300 -9.9000 26.00 76178 MHD 1999 01 12 13 45 4376-91 P co2 370.980 -999.990 ... L3 1999 02 18 15 10 53.3300 -9.9000 26.00 76179 MHD 1999 01 18 10 30 685-91 P co2 370.210 -999.990 ... L3 1999 03 31 12 10 53.3300 -9.9000 26.00 76180 MHD 1999 01 18 10 30 686-91 P co2 370.100 -999.990 ... L3 1999 03 31 12 24 53.3300 -9.9000 26.00 76181 MHD 1999 01 25 10 00 1227-91 P co2 370.670 -999.990 ... L3 1999 03 25 16 33 53.3300 -9.9000 26.00 76182 MHD 1999 02 01 13 50 161-91 P co2 373.460 -999.990 ... L3 1999 03 30 11 48 53.3300 -9.9000 26.00 76183 MHD 1999 02 01 13 50 162-91 P co2 373.460 -999.990 ... L3 1999 03 30 12 02 53.3300 -9.9000 26.00 76184 MHD 1999 02 03 12 05 4163-91 P co2 370.760 -999.990 ... L3 1999 03 30 12 43 53.3300 -9.9000 26.00 76185 MHD 1999 02 03 12 05 4164-91 P co2 370.800 -999.990 ... L3 1999 03 30 12 57 53.3300 -9.9000 26.00 76186 MHD 1999 02 12 11 50 4225-91 P co2 372.030 -999.990 ... L3 1999 04 13 15 22 53.3300 -9.9000 26.00 76187 MHD 1999 02 12 11 50 4226-91 P co2 371.980 -999.990 ... L3 1999 04 13 15 36 53.3300 -9.9000 26.00 76188 MHD 1999 02 17 12 10 4243-91 P co2 369.720 -999.990 ... L3 1999 04 13 14 28 53.3300 -9.9000 26.00 76189 MHD 1999 02 17 12 10 4244-91 P co2 369.780 -999.990 ... L3 1999 04 13 14 41 53.3300 -9.9000 26.00 76190 MHD 1999 02 25 11 05 71-91 P co2 371.640 -999.990 ... L3 1999 04 13 11 38 53.3300 -9.9000 26.00 76191 MHD 1999 02 25 11 05 72-91 P co2 371.620 -999.990 ... L3 1999 04 13 11 51 53.3300 -9.9000 26.00 76192 MHD 1999 03 01 11 50 265-91 P co2 370.600 -999.990 ... L3 1999 04 13 11 11 53.3300 -9.9000 26.00 76193 MHD 1999 03 01 11 50 266-91 P co2 370.480 -999.990 ... L3 1999 04 13 11 24 53.3300 -9.9000 26.00 76194 MHD 1999 03 09 14 00 147-98 P co2 377.170 -999.990 .X. L3 1999 04 06 13 12 53.3300 -9.9000 26.00 76195 MHD 1999 03 09 14 00 148-98 P co2 377.190 -999.990 .X. L3 1999 04 06 13 25 53.3300 -9.9000 26.00 76196 MHD 1999 03 12 12 10 149-98 P co2 372.290 -999.990 ... L3 1999 04 06 12 44 53.3300 -9.9000 26.00 76197 MHD 1999 03 12 12 10 150-98 P co2 372.360 -999.990 ... L3 1999 04 06 12 58 53.3300 -9.9000 26.00 76198 MHD 1999 03 15 10 00 1381-91 P co2 371.610 -999.990 ... L3 1999 04 19 14 05 53.3300 -9.9000 26.00 76199 MHD 1999 03 15 10 00 1382-91 P co2 371.810 -999.990 ... L3 1999 04 19 14 18 53.3300 -9.9000 26.00 76200 MHD 1999 03 22 10 10 4265-91 P co2 373.730 -999.990 ... L3 1999 04 19 15 27 53.3300 -9.9000 26.00 76201 MHD 1999 03 22 10 10 4266-91 P co2 373.760 -999.990 ... L3 1999 04 19 15 40 53.3300 -9.9000 26.00 76202 MHD 1999 03 29 11 30 667-91 P co2 373.130 -999.990 ... L3 1999 04 19 14 32 53.3300 -9.9000 26.00 76203 MHD 1999 03 29 11 30 668-91 P co2 372.940 -999.990 ... L3 1999 04 19 14 46 53.3300 -9.9000 26.00 76204 MHD 1999 03 31 10 55 529-91 P co2 373.270 -999.990 ... L3 1999 04 29 12 40 53.3300 -9.9000 26.00 76205 MHD 1999 03 31 10 55 530-91 P co2 373.270 -999.990 ... L3 1999 04 29 12 54 53.3300 -9.9000 26.00 76206 MHD 1999 04 06 10 30 4351-91 P co2 372.520 -999.990 ... L3 1999 04 29 13 08 53.3300 -9.9000 26.00 76207 MHD 1999 04 06 10 30 4352-91 P co2 372.510 -999.990 ... L3 1999 04 29 13 21 53.3300 -9.9000 26.00 76208 MHD 1999 04 12 09 05 465-91 P co2 373.870 -999.990 ... L3 1999 05 17 10 45 53.3300 -9.9000 26.00 76209 MHD 1999 04 12 09 05 466-91 P co2 373.880 -999.990 ... L3 1999 05 17 10 58 53.3300 -9.9000 26.00 76210 MHD 1999 04 22 09 55 703-91 P co2 374.330 -999.990 ... L3 1999 05 17 09 21 53.3300 -9.9000 26.00 76211 MHD 1999 04 22 09 55 704-91 P co2 374.290 -999.990 ... L3 1999 05 17 09 35 53.3300 -9.9000 26.00 76212 MHD 1999 05 07 09 55 191-98 P co2 375.700 -999.990 ... L3 1999 06 14 14 30 53.3300 -9.9000 26.00 76213 MHD 1999 05 07 09 55 192-98 P co2 375.600 -999.990 ... L3 1999 06 14 14 43 53.3300 -9.9000 26.00 76214 MHD 1999 05 12 10 00 1373-91 P co2 372.290 -999.990 ... L3 1999 06 14 13 08 53.3300 -9.9000 26.00 76215 MHD 1999 05 12 10 00 1374-91 P co2 372.270 -999.990 ... L3 1999 06 14 13 21 53.3300 -9.9000 26.00 76216 MHD 1999 05 21 09 40 1589-91 P co2 372.300 -999.990 ... L3 1999 06 09 13 15 53.3300 -9.9000 26.00 76217 MHD 1999 05 21 09 40 1590-91 P co2 372.270 -999.990 ... L3 1999 06 09 13 29 53.3300 -9.9000 26.00 76218 MHD 1999 05 24 09 40 741-91 P co2 372.880 -999.990 ... L3 1999 06 09 14 39 53.3300 -9.9000 26.00 76219 MHD 1999 05 24 09 40 742-91 P co2 372.950 -999.990 ... L3 1999 06 09 14 53 53.3300 -9.9000 26.00 76220 MHD 1999 06 02 09 50 121-98 P co2 379.080 -999.990 .X. L3 1999 08 17 12 57 53.3300 -9.9000 26.00 76221 MHD 1999 06 02 09 50 122-98 P co2 379.060 -999.990 .X. L3 1999 08 17 13 10 53.3300 -9.9000 26.00 76222 MHD 1999 06 09 12 45 4735-91 P co2 370.780 -999.990 ... L3 1999 08 17 14 19 53.3300 -9.9000 26.00 76223 MHD 1999 06 09 12 45 4736-91 P co2 370.840 -999.990 ... L3 1999 08 17 14 32 53.3300 -9.9000 26.00 76224 MHD 1999 06 14 15 30 1637-91 P co2 369.820 -999.990 ... L3 1999 07 16 15 00 53.3300 -9.9000 26.00 76225 MHD 1999 06 14 15 30 1638-91 P co2 369.820 -999.990 ... L3 1999 07 16 15 14 53.3300 -9.9000 26.00 76226 MHD 1999 06 21 09 35 4041-91 P co2 369.520 -999.990 ... L3 1999 07 16 14 33 53.3300 -9.9000 26.00 76227 MHD 1999 06 21 09 35 4042-91 P co2 369.510 -999.990 ... L3 1999 07 16 14 46 53.3300 -9.9000 26.00 76228 MHD 1999 06 28 12 55 177-98 P co2 369.140 -999.990 ... L3 1999 08 02 13 37 53.3300 -9.9000 26.00 76229 MHD 1999 06 28 12 55 178-98 P co2 369.190 -999.990 ... L3 1999 08 02 13 51 53.3300 -9.9000 26.00 76230 MHD 1999 07 06 15 55 161-91 P co2 366.690 -999.990 ... L3 1999 08 26 11 52 53.3300 -9.9000 26.00 76231 MHD 1999 07 06 15 55 162-91 P co2 366.770 -999.990 ... L3 1999 08 26 12 06 53.3300 -9.9000 26.00 76232 MHD 1999 07 20 15 00 4417-91 P co2 362.500 -999.990 ... L3 1999 08 26 12 20 53.3300 -9.9000 26.00 76233 MHD 1999 07 20 15 00 4418-91 P co2 362.520 -999.990 ... L3 1999 08 26 12 33 53.3300 -9.9000 26.00 76234 MHD 1999 07 26 15 00 1367-91 P co2 357.340 -999.990 .X. L3 1999 09 02 14 43 53.3300 -9.9000 26.00 76235 MHD 1999 07 26 15 00 1368-91 P co2 357.500 -999.990 .X. L3 1999 09 02 14 57 53.3300 -9.9000 26.00 76236 MHD 1999 08 13 09 05 4225-91 P co2 360.080 -999.990 ... L3 1999 09 02 15 12 53.3300 -9.9000 26.00 76237 MHD 1999 08 13 09 05 4226-91 P co2 360.050 -999.990 ... L3 1999 09 02 15 26 53.3300 -9.9000 26.00 76238 MHD 1999 08 16 11 15 1661-91 P co2 360.070 -999.990 ... L3 1999 10 01 12 26 53.3300 -9.9000 26.00 76239 MHD 1999 08 16 11 15 1662-91 P co2 360.080 -999.990 ... L3 1999 10 01 12 40 53.3300 -9.9000 26.00 76240 MHD 1999 08 23 13 05 4331-91 P co2 364.280 -999.990 +.. L3 1999 10 01 12 54 53.3300 -9.9000 26.00 76241 MHD 1999 08 23 13 05 4332-91 P co2 363.720 -999.990 -.. L3 1999 10 01 13 07 53.3300 -9.9000 26.00 76242 MHD 1999 08 27 09 30 401-91 P co2 359.510 -999.990 ... L3 1999 10 08 11 18 53.3300 -9.9000 26.00 76243 MHD 1999 08 27 09 30 402-91 P co2 359.490 -999.990 ... L3 1999 10 08 11 32 53.3300 -9.9000 26.00 76244 MHD 1999 08 31 10 50 4161-91 P co2 360.250 -999.990 ... L3 1999 10 08 10 51 53.3300 -9.9000 26.00 76245 MHD 1999 08 31 10 50 4162-91 P co2 360.330 -999.990 ... L3 1999 10 08 11 04 53.3300 -9.9000 26.00 76246 MHD 1999 09 07 15 00 1237-91 P co2 359.520 -999.990 ... L3 1999 10 08 12 14 53.3300 -9.9000 26.00 76247 MHD 1999 09 07 15 00 1238-91 P co2 359.470 -999.990 ... L3 1999 10 08 12 28 53.3300 -9.9000 26.00 76248 MHD 1999 09 09 15 10 1301-91 P co2 359.240 -999.990 ... L3 1999 10 08 12 41 53.3300 -9.9000 26.00 76249 MHD 1999 09 09 15 10 1302-91 P co2 359.190 -999.990 ... L3 1999 10 08 12 55 53.3300 -9.9000 26.00 76250 MHD 1999 09 30 12 45 595-91 P co2 362.870 -999.990 ... L3 1999 10 28 15 09 53.3300 -9.9000 26.00 76251 MHD 1999 09 30 12 45 596-91 P co2 362.830 -999.990 ... L3 1999 10 28 15 23 53.3300 -9.9000 26.00 76252 MHD 1999 10 06 13 50 1649-91 P co2 362.760 -999.990 ... L3 1999 10 28 14 42 53.3300 -9.9000 26.00 76253 MHD 1999 10 06 13 50 1650-91 P co2 362.810 -999.990 ... L3 1999 10 28 14 56 53.3300 -9.9000 26.00 76254 MHD 1999 10 11 08 50 4169-91 P co2 364.240 -999.990 ... L3 1999 11 10 11 47 53.3300 -9.9000 26.00 76255 MHD 1999 10 11 08 50 4170-91 P co2 364.290 -999.990 ... L3 1999 11 10 12 01 53.3300 -9.9000 26.00 76256 MHD 1999 10 14 12 35 4199-91 P co2 367.010 -999.990 ... L3 1999 11 10 10 08 53.3300 -9.9000 26.00 76257 MHD 1999 10 14 12 35 4200-91 P co2 366.940 -999.990 ... L3 1999 11 10 10 22 53.3300 -9.9000 26.00 76258 MHD 1999 10 18 09 45 1591-91 P co2 378.540 -999.990 .X. L3 1999 11 11 15 13 53.3300 -9.9000 26.00 76259 MHD 1999 10 18 09 45 1592-91 P co2 378.530 -999.990 .X. L3 1999 11 11 15 27 53.3300 -9.9000 26.00 76260 MHD 1999 10 26 16 00 200-98 P co2 368.400 -999.990 ... L3 1999 11 11 14 56 53.3300 -9.9000 26.00 76261 MHD 1999 11 01 13 40 75-91 P co2 368.020 -999.990 ... L3 1999 12 16 11 21 53.3300 -9.9000 26.00 76262 MHD 1999 11 01 13 40 76-91 P co2 368.020 -999.990 ... L3 1999 12 16 11 35 53.3300 -9.9000 26.00 76263 MHD 1999 11 12 11 30 1937-91 P co2 372.150 -999.990 ... L3 1999 12 16 10 54 53.3300 -9.9000 26.00 76264 MHD 1999 11 12 11 30 1938-91 P co2 372.330 -999.990 ... L3 1999 12 16 11 08 53.3300 -9.9000 26.00 76265 MHD 1999 11 17 15 35 549-91 P co2 368.030 -999.990 ... L3 1999 12 16 15 32 53.3300 -9.9000 26.00 76266 MHD 1999 11 17 15 35 550-91 P co2 368.040 -999.990 ... L3 1999 12 16 15 45 53.3300 -9.9000 26.00 76267 MHD 1999 11 22 10 30 1993-91 P co2 371.620 -999.990 ... L3 1999 12 16 15 03 53.3300 -9.9000 26.00 76268 MHD 1999 11 22 10 30 1994-91 P co2 371.590 -999.990 ... L3 1999 12 16 15 16 53.3300 -9.9000 26.00 76269 MHD 1999 11 29 11 20 459-91 P co2 370.130 -999.990 ... L3 1999 12 27 09 31 53.3300 -9.9000 26.00 76270 MHD 1999 11 29 11 20 460-91 P co2 370.010 -999.990 ... L3 1999 12 27 09 45 53.3300 -9.9000 26.00 76271 MHD 1999 12 06 13 45 1275-91 P co2 369.590 -999.990 ... L3 1999 12 27 11 49 53.3300 -9.9000 26.00 76272 MHD 1999 12 06 13 45 1276-91 P co2 369.620 -999.990 ... L3 1999 12 27 12 03 53.3300 -9.9000 26.00 76273 MHD 1999 12 13 10 20 523-91 P co2 371.320 -999.990 ... L3 2000 01 25 13 11 53.3300 -9.9000 26.00 76274 MHD 1999 12 13 10 20 524-91 P co2 371.120 -999.990 ... L3 2000 01 25 13 25 53.3300 -9.9000 26.00 76275 MHD 1999 12 20 15 25 2027-91 P co2 374.470 -999.990 ... L3 2000 01 25 13 39 53.3300 -9.9000 26.00 76276 MHD 1999 12 20 15 25 2028-91 P co2 374.580 -999.990 ... L3 2000 01 25 13 52 53.3300 -9.9000 26.00 76277 MHD 1999 12 30 12 50 4003-91 P co2 371.110 -999.990 ... L3 2000 01 26 10 58 53.3300 -9.9000 26.00 76278 MHD 1999 12 30 12 50 4004-91 P co2 371.050 -999.990 ... L3 2000 01 26 11 12 53.3300 -9.9000 26.00 76279 MHD 2000 01 04 13 05 1667-91 P co2 372.190 -999.990 ... L3 2000 01 25 16 26 53.3300 -9.9000 26.00 76280 MHD 2000 01 04 13 05 1668-91 P co2 372.180 -999.990 ... L3 2000 01 25 16 39 53.3300 -9.9000 26.00 76281 MHD 2000 01 10 11 45 143-91 P co2 371.600 -999.990 ... L3 2000 02 22 13 37 53.3300 -9.9000 26.00 76282 MHD 2000 01 10 11 45 144-91 P co2 371.660 -999.990 ... L3 2000 02 22 13 51 53.3300 -9.9000 26.00 76283 MHD 2000 01 19 10 30 4737-91 P co2 373.480 -999.990 ... L3 2000 02 22 10 52 53.3300 -9.9000 26.00 76284 MHD 2000 01 19 10 30 4738-91 P co2 373.500 -999.990 ... L3 2000 02 22 11 06 53.3300 -9.9000 26.00 76285 MHD 2000 01 27 12 00 553-91 P co2 372.380 -999.990 +.. L3 2000 03 24 10 01 53.3300 -9.9000 26.00 76286 MHD 2000 01 27 12 00 554-91 P co2 371.660 -999.990 -.. L3 2000 03 24 10 14 53.3300 -9.9000 26.00 76287 MHD 2000 02 01 12 05 587-91 P co2 372.960 -999.990 ... L3 2000 03 24 10 27 53.3300 -9.9000 26.00 76288 MHD 2000 02 01 12 05 588-91 P co2 372.940 -999.990 ... L3 2000 03 24 10 40 53.3300 -9.9000 26.00 76289 MHD 2000 02 07 12 55 1145-91 P co2 372.300 -999.990 ... L3 2000 04 07 15 27 53.3300 -9.9000 26.00 76290 MHD 2000 02 07 12 55 1146-91 P co2 372.290 -999.990 ... L3 2000 04 07 15 40 53.3300 -9.9000 26.00 76291 MHD 2000 02 15 12 00 1227-91 P co2 372.590 -999.990 ... L3 2000 04 07 15 01 53.3300 -9.9000 26.00 76292 MHD 2000 02 15 12 00 1228-91 P co2 372.730 -999.990 ... L3 2000 04 07 15 14 53.3300 -9.9000 26.00 76293 MHD 2000 02 23 15 25 4163-91 P co2 373.450 -999.990 ... L3 2000 04 13 14 19 53.3300 -9.9000 26.00 76294 MHD 2000 02 23 15 25 4164-91 P co2 373.490 -999.990 ... L3 2000 04 13 14 32 53.3300 -9.9000 26.00 76295 MHD 2000 02 29 10 00 1007-91 P co2 373.130 -999.990 ... L3 2000 04 13 13 53 53.3300 -9.9000 26.00 76296 MHD 2000 02 29 10 00 1008-91 P co2 373.050 -999.990 ... L3 2000 04 13 14 06 53.3300 -9.9000 26.00 76297 MHD 2000 03 06 10 15 1951-91 P co2 371.250 -999.990 ... L3 2000 04 10 14 44 53.3300 -9.9000 26.00 76298 MHD 2000 03 06 10 15 1952-91 P co2 371.440 -999.990 ... L3 2000 04 10 14 57 53.3300 -9.9000 26.00 76299 MHD 2000 03 13 15 45 731-91 P co2 372.010 -999.990 ... L3 2000 04 10 13 26 53.3300 -9.9000 26.00 76300 MHD 2000 03 13 15 45 732-91 P co2 372.000 -999.990 ... L3 2000 04 10 13 39 53.3300 -9.9000 26.00 76301 MHD 2000 03 22 12 25 1989-91 P co2 375.810 -999.990 ... L3 2000 05 11 13 52 53.3300 -9.9000 26.00 76302 MHD 2000 03 22 12 25 1990-91 P co2 375.910 -999.990 ... L3 2000 05 11 14 05 53.3300 -9.9000 26.00 76303 MHD 2000 03 24 12 50 4537-91 P co2 374.280 -999.990 ... L3 2000 05 11 13 26 53.3300 -9.9000 26.00 76304 MHD 2000 03 24 12 50 4538-91 P co2 374.290 -999.990 ... L3 2000 05 11 13 39 53.3300 -9.9000 26.00 76305 MHD 2000 04 06 15 00 147-98 P co2 373.330 -999.990 ... L3 2000 05 11 10 18 53.3300 -9.9000 26.00 76306 MHD 2000 04 06 15 00 148-98 P co2 373.400 -999.990 ... L3 2000 05 11 10 31 53.3300 -9.9000 26.00 76307 MHD 2000 04 10 15 15 4583-91 P co2 375.170 -999.990 ... L3 2000 05 11 09 26 53.3300 -9.9000 26.00 76308 MHD 2000 04 10 15 15 4584-91 P co2 375.030 -999.990 ... L3 2000 05 11 09 39 53.3300 -9.9000 26.00 76309 MHD 2000 04 20 16 25 4451-91 P co2 373.690 -999.990 ... L3 2000 06 08 11 08 53.3300 -9.9000 26.00 76310 MHD 2000 04 20 16 25 4452-91 P co2 373.710 -999.990 ... L3 2000 06 08 11 21 53.3300 -9.9000 26.00 76311 MHD 2000 04 27 08 50 1561-91 P co2 379.300 -999.990 +.. L3 2000 06 06 10 18 53.3300 -9.9000 26.00 76312 MHD 2000 04 27 08 50 1562-91 P co2 374.640 -999.990 -.. L3 2000 06 06 10 31 53.3300 -9.9000 26.00 76313 MHD 2000 05 03 11 00 4739-91 P co2 375.770 -999.990 ... L3 2000 06 06 09 25 53.3300 -9.9000 26.00 76314 MHD 2000 05 03 11 00 4740-91 P co2 375.550 -999.990 ... L3 2000 06 06 09 38 53.3300 -9.9000 26.00 76315 MHD 2000 05 11 11 30 1449-91 P co2 367.470 -999.990 .X. L3 2000 07 07 12 49 53.3300 -9.9000 26.00 76316 MHD 2000 05 11 11 30 1450-91 P co2 367.740 -999.990 .X. L3 2000 07 07 13 02 53.3300 -9.9000 26.00 76317 MHD 2000 05 15 09 30 4545-91 P co2 374.190 -999.990 ... L3 2000 07 07 12 21 53.3300 -9.9000 26.00 76318 MHD 2000 05 15 09 30 4546-91 P co2 374.190 -999.990 ... L3 2000 07 07 12 34 53.3300 -9.9000 26.00 76319 MHD 2000 05 23 16 40 379-91 P co2 373.820 -999.990 ... L3 2000 07 07 11 55 53.3300 -9.9000 26.00 76320 MHD 2000 05 23 16 40 380-91 P co2 373.850 -999.990 ... L3 2000 07 07 12 08 53.3300 -9.9000 26.00 76321 MHD 2000 06 01 15 15 4709-91 P co2 371.400 -999.990 ... L3 2000 07 07 11 29 53.3300 -9.9000 26.00 76322 MHD 2000 06 01 15 15 4710-91 P co2 371.330 -999.990 ... L3 2000 07 07 11 42 53.3300 -9.9000 26.00 76323 MHD 2000 06 06 15 30 4513-91 P co2 372.470 -999.990 ... L3 2000 07 25 15 08 53.3300 -9.9000 26.00 76324 MHD 2000 06 06 15 30 4514-91 P co2 372.510 -999.990 ... L3 2000 07 25 15 21 53.3300 -9.9000 26.00 76325 MHD 2000 06 12 12 10 767-91 P co2 371.340 -999.990 ... L3 2000 07 25 14 16 53.3300 -9.9000 26.00 76326 MHD 2000 06 12 12 10 768-91 P co2 371.370 -999.990 ... L3 2000 07 25 14 29 53.3300 -9.9000 26.00 76327 MHD 2000 06 20 13 55 163-98 P co2 370.530 -999.990 ... L3 2000 07 31 14 34 53.3300 -9.9000 26.00 76328 MHD 2000 06 20 13 55 164-98 P co2 370.510 -999.990 ... L3 2000 07 31 14 47 53.3300 -9.9000 26.00 76329 MHD 2000 07 04 11 00 4671-91 P co2 371.630 -999.990 ... L3 2000 07 31 15 13 53.3300 -9.9000 26.00 76330 MHD 2000 07 04 11 00 4672-91 P co2 371.220 -999.990 ... L3 2000 07 31 15 26 53.3300 -9.9000 26.00 76331 MHD 2000 07 14 16 25 1821-91 P co2 366.800 -999.990 ... L3 2000 08 18 11 21 53.3300 -9.9000 26.00 76332 MHD 2000 07 14 16 25 1822-91 P co2 366.720 -999.990 ... L3 2000 08 18 11 34 53.3300 -9.9000 26.00 76333 MHD 2000 07 21 11 50 4691-91 P co2 364.340 -999.990 ... L3 2000 08 18 13 34 53.3300 -9.9000 26.00 76334 MHD 2000 07 21 11 50 4692-91 P co2 364.510 -999.990 ... L3 2000 08 18 13 47 53.3300 -9.9000 26.00 76335 MHD 2000 07 26 14 55 133-91 P co2 364.120 -999.990 ... L3 2000 08 23 09 55 53.3300 -9.9000 26.00 76336 MHD 2000 07 26 14 55 134-91 P co2 364.000 -999.990 ... L3 2000 08 23 10 08 53.3300 -9.9000 26.00 76337 MHD 2000 08 01 09 10 301-91 P co2 363.120 -999.990 ... L3 2000 08 23 10 21 53.3300 -9.9000 26.00 76338 MHD 2000 08 01 09 10 302-91 P co2 363.110 -999.990 ... L3 2000 08 23 10 35 53.3300 -9.9000 26.00 76339 MHD 2000 08 08 09 00 1491-91 P co2 362.260 -999.990 ... L3 2000 08 30 08 41 53.3300 -9.9000 26.00 76340 MHD 2000 08 08 09 00 1492-91 P co2 362.270 -999.990 ... L3 2000 08 30 08 54 53.3300 -9.9000 26.00 76341 MHD 2000 08 14 16 05 1697-91 P co2 361.700 -999.990 ... L3 2000 08 30 09 07 53.3300 -9.9000 26.00 76342 MHD 2000 08 14 16 05 1698-91 P co2 361.660 -999.990 ... L3 2000 08 30 09 20 53.3300 -9.9000 26.00 76343 MHD 2000 08 22 13 50 1781-91 P co2 360.610 -999.990 ... L3 2000 10 03 10 48 53.3300 -9.9000 26.00 76344 MHD 2000 08 22 13 50 1782-91 P co2 360.330 -999.990 ... L3 2000 10 03 11 01 53.3300 -9.9000 26.00 76345 MHD 2000 08 31 10 20 10-98 P co2 360.000 -999.990 ... L3 2000 10 03 08 23 53.3300 -9.9000 26.00 76347 MHD 2000 08 31 10 20 9-98 P co2 359.990 -999.990 ... L3 2000 10 03 08 09 53.3300 -9.9000 26.00 76346 MHD 2000 09 09 11 15 1373-91 P co2 360.370 -999.990 -.. L3 2000 09 29 14 54 53.3300 -9.9000 26.00 76348 MHD 2000 09 09 11 15 1374-91 P co2 365.960 -999.990 +.. L3 2000 09 29 15 07 53.3300 -9.9000 26.00 76349 MHD 2000 09 14 11 45 1703-91 P co2 361.090 -999.990 ... L3 2000 09 29 14 28 53.3300 -9.9000 26.00 76350 MHD 2000 09 14 11 45 1704-91 P co2 361.100 -999.990 ... L3 2000 09 29 14 41 53.3300 -9.9000 26.00 76351 MHD 2000 09 18 09 30 227-91 P co2 362.050 -999.990 ... L3 2000 11 14 14 07 53.3300 -9.9000 26.00 76352 MHD 2000 09 18 09 30 228-91 P co2 361.970 -999.990 ... L3 2000 11 14 14 20 53.3300 -9.9000 26.00 76353 MHD 2000 10 02 14 20 4427-91 P co2 363.660 -999.990 ... L3 2000 11 14 13 41 53.3300 -9.9000 26.00 76354 MHD 2000 10 02 14 20 4428-91 P co2 363.690 -999.990 ... L3 2000 11 14 13 54 53.3300 -9.9000 26.00 76355 MHD 2000 10 10 11 10 617-91 P co2 366.040 -999.990 ... L3 2000 11 03 14 16 53.3300 -9.9000 26.00 76356 MHD 2000 10 10 11 10 618-91 P co2 366.060 -999.990 ... L3 2000 11 03 14 29 53.3300 -9.9000 26.00 76357 MHD 2000 10 16 12 20 4801-91 P co2 366.970 -999.990 ... L3 2000 11 03 14 42 53.3300 -9.9000 26.00 76358 MHD 2000 10 16 12 20 4802-91 P co2 366.890 -999.990 ... L3 2000 11 03 14 55 53.3300 -9.9000 26.00 76359 MHD 2000 10 23 09 20 343-91 P co2 368.170 -999.990 ... L3 2000 11 28 09 40 53.3300 -9.9000 26.00 76360 MHD 2000 10 23 09 20 344-91 P co2 368.300 -999.990 ... L3 2000 11 28 09 53 53.3300 -9.9000 26.00 76361 MHD 2000 11 01 11 05 1845-91 P co2 370.130 -999.990 ... L3 2000 11 28 08 50 53.3300 -9.9000 26.00 76362 MHD 2000 11 01 11 05 1846-91 P co2 370.160 -999.990 ... L3 2000 11 28 09 03 53.3300 -9.9000 26.00 76363 MHD 2000 11 09 15 35 63-91 P co2 369.980 -999.990 ... L3 2000 12 26 12 27 53.3300 -9.9000 26.00 76364 MHD 2000 11 09 15 35 64-91 P co2 369.990 -999.990 ... L3 2000 12 26 12 40 53.3300 -9.9000 26.00 76365 MHD 2000 11 17 12 10 1079-91 P co2 370.920 -999.990 ... L3 2000 12 26 11 59 53.3300 -9.9000 26.00 76366 MHD 2000 11 17 12 10 1080-91 P co2 370.910 -999.990 ... L3 2000 12 26 12 12 53.3300 -9.9000 26.00 76367 MHD 2000 11 21 12 40 4077-91 P co2 378.790 -999.990 .X. L3 2000 12 27 08 28 53.3300 -9.9000 26.00 76368 MHD 2000 11 21 12 40 4078-91 P co2 378.750 -999.990 .X. L3 2000 12 27 08 41 53.3300 -9.9000 26.00 76369 MHD 2000 11 22 10 15 4963-91 P co2 372.140 -999.990 ... L3 2000 12 27 08 54 53.3300 -9.9000 26.00 76370 MHD 2000 11 22 10 15 4964-91 P co2 372.190 -999.990 ... L3 2000 12 27 09 07 53.3300 -9.9000 26.00 76371 MHD 2000 12 01 14 25 4753-91 P co2 372.790 -999.990 ... L3 2000 12 27 10 16 53.3300 -9.9000 26.00 76372 MHD 2000 12 01 14 25 4754-91 P co2 372.800 -999.990 ... L3 2000 12 27 10 29 53.3300 -9.9000 26.00 76373 MHD 2000 12 04 11 35 131-91 P co2 373.250 -999.990 ... L3 2000 12 27 10 42 53.3300 -9.9000 26.00 76374 MHD 2000 12 04 11 35 132-91 P co2 373.230 -999.990 ... L3 2000 12 27 10 55 53.3300 -9.9000 26.00 76375 MHD 2000 12 12 12 50 1771-91 P co2 376.480 -999.990 ... L3 2001 01 30 09 12 53.3300 -9.9000 26.00 76376 MHD 2000 12 12 12 50 1772-91 P co2 376.440 -999.990 ... L3 2001 01 30 09 25 53.3300 -9.9000 26.00 76377 MHD 2000 12 19 10 30 4071-91 P co2 372.460 -999.990 ... L3 2001 01 30 09 38 53.3300 -9.9000 26.00 76378 MHD 2000 12 19 10 30 4072-91 P co2 372.420 -999.990 ... L3 2001 01 30 09 51 53.3300 -9.9000 26.00 76379 MHD 2001 01 03 13 45 71-91 P co2 373.910 -999.990 ... L3 2001 01 30 14 05 53.3300 -9.9000 26.00 76380 MHD 2001 01 03 13 45 72-91 P co2 373.890 -999.990 ... L3 2001 01 30 14 18 53.3300 -9.9000 26.00 76381 MHD 2001 01 08 14 55 251-91 P co2 373.120 -999.990 ... L3 2001 01 30 13 39 53.3300 -9.9000 26.00 76382 MHD 2001 01 08 14 55 252-91 P co2 373.050 -999.990 ... L3 2001 01 30 13 52 53.3300 -9.9000 26.00 76383 MHD 2001 01 11 10 45 41-91 P co2 379.010 -999.990 .X. L3 2001 02 14 11 15 53.3300 -9.9000 26.00 76384 MHD 2001 01 11 10 45 42-91 P co2 378.950 -999.990 .X. L3 2001 02 14 11 28 53.3300 -9.9000 26.00 76385 MHD 2001 01 17 11 05 459-91 P co2 392.680 -999.990 .Z. L3 2001 02 14 11 41 53.3300 -9.9000 26.00 76386 MHD 2001 01 17 11 05 460-91 P co2 392.690 -999.990 .Z. L3 2001 02 14 11 54 53.3300 -9.9000 26.00 76387 MHD 2001 01 24 10 45 1631-91 P co2 373.610 -999.990 ... L3 2001 03 02 09 24 53.3300 -9.9000 26.00 76388 MHD 2001 01 24 10 45 1632-91 P co2 373.650 -999.990 ... L3 2001 03 02 09 37 53.3300 -9.9000 26.00 76389 MHD 2001 01 30 10 35 4699-91 P co2 374.810 -999.990 ... L3 2001 03 02 08 32 53.3300 -9.9000 26.00 76390 MHD 2001 01 30 10 35 4700-91 P co2 374.740 -999.990 ... L3 2001 03 02 08 45 53.3300 -9.9000 26.00 76391 MHD 2001 02 06 11 35 4579-91 P co2 375.840 -999.990 ... L3 2001 03 12 11 07 53.3300 -9.9000 26.00 76392 MHD 2001 02 06 11 35 4580-91 P co2 375.800 -999.990 ... L3 2001 03 12 11 20 53.3300 -9.9000 26.00 76393 MHD 2001 02 12 14 25 111-91 P co2 374.940 -999.990 ... L3 2001 03 21 09 28 53.3300 -9.9000 26.00 76394 MHD 2001 02 12 14 25 112-91 P co2 374.890 -999.990 ... L3 2001 03 21 09 41 53.3300 -9.9000 26.00 76395 MHD 2001 02 20 12 00 1511-91 P co2 375.520 -999.990 ... L3 2001 03 21 08 36 53.3300 -9.9000 26.00 76396 MHD 2001 02 20 12 00 1512-91 P co2 375.500 -999.990 ... L3 2001 03 21 08 49 53.3300 -9.9000 26.00 76397 MHD 2001 03 08 14 55 229-91 P co2 375.650 -999.990 ... L3 2001 04 18 14 47 53.3300 -9.9000 26.00 76398 MHD 2001 03 08 14 55 230-91 P co2 375.620 -999.990 ... L3 2001 04 18 15 00 53.3300 -9.9000 26.00 76399 MHD 2001 03 20 10 40 391-91 P co2 379.320 -999.990 ... L3 2001 04 18 15 13 53.3300 -9.9000 26.00 76400 MHD 2001 03 20 10 40 392-91 P co2 379.380 -999.990 ... L3 2001 04 18 15 26 53.3300 -9.9000 26.00 76401 MHD 2001 03 28 12 00 751-91 P co2 378.310 -999.990 ... L3 2001 05 07 09 23 53.3300 -9.9000 26.00 76402 MHD 2001 03 28 12 00 752-91 P co2 378.170 -999.990 ... L3 2001 05 07 09 36 53.3300 -9.9000 26.00 76403 MHD 2001 04 02 13 40 4539-91 P co2 375.540 -999.990 ... L3 2001 05 07 10 15 53.3300 -9.9000 26.00 76404 MHD 2001 04 02 13 40 4540-91 P co2 375.630 -999.990 ... L3 2001 05 07 10 29 53.3300 -9.9000 26.00 76405 MHD 2001 04 09 09 40 4719-91 P co2 375.300 -999.990 ... L3 2001 05 31 09 38 53.3300 -9.9000 26.00 76406 MHD 2001 04 09 09 40 4720-91 P co2 375.290 -999.990 ... L3 2001 05 31 09 51 53.3300 -9.9000 26.00 76407 MHD 2001 04 17 09 40 1341-91 P co2 374.480 -999.990 ... L3 2001 05 31 09 12 53.3300 -9.9000 26.00 76408 MHD 2001 04 17 09 40 1342-91 P co2 374.390 -999.990 ... L3 2001 05 31 09 25 53.3300 -9.9000 26.00 76409 MHD 2001 04 27 08 00 293-91 P co2 376.000 -999.990 ... L3 2001 05 31 14 20 53.3300 -9.9000 26.00 76410 MHD 2001 04 27 08 00 294-91 P co2 375.910 -999.990 ... L3 2001 05 31 14 33 53.3300 -9.9000 26.00 76411 MHD 2001 05 01 14 15 1477-91 P co2 376.040 -999.990 ... L3 2001 05 31 13 54 53.3300 -9.9000 26.00 76412 MHD 2001 05 01 14 15 1478-91 P co2 375.980 -999.990 ... L3 2001 05 31 14 07 53.3300 -9.9000 26.00 76413 MHD 2001 05 16 11 10 4401-91 P co2 375.500 -999.990 ... L3 2001 07 03 12 20 53.3300 -9.9000 26.00 76414 MHD 2001 05 16 11 10 4402-91 P co2 375.370 -999.990 ... L3 2001 07 03 12 33 53.3300 -9.9000 26.00 76415 MHD 2001 05 24 10 15 4759-91 P co2 383.810 -999.990 .X. L3 2001 07 03 11 20 53.3300 -9.9000 26.00 76416 MHD 2001 05 24 10 15 4760-91 P co2 383.850 -999.990 .X. L3 2001 07 03 11 33 53.3300 -9.9000 26.00 76417 MHD 2001 05 28 10 20 4417-91 P co2 373.400 -999.990 ... L3 2001 07 30 13 20 53.3300 -9.9000 26.00 76418 MHD 2001 05 28 10 20 4418-91 P co2 373.380 -999.990 ... L3 2001 07 30 13 33 53.3300 -9.9000 26.00 76419 MHD 2001 06 05 14 00 4887-91 P co2 373.900 -999.990 ... L3 2001 07 30 12 54 53.3300 -9.9000 26.00 76420 MHD 2001 06 05 14 00 4888-91 P co2 373.900 -999.990 ... L3 2001 07 30 13 07 53.3300 -9.9000 26.00 76421 MHD 2001 06 19 10 15 309-99 P co2 372.150 -999.990 ... L3 2001 07 20 13 46 53.3300 -9.9000 26.00 76422 MHD 2001 06 19 10 15 310-99 P co2 372.020 -999.990 ... L3 2001 07 20 13 59 53.3300 -9.9000 26.00 76423 MHD 2001 06 29 09 20 311-99 P co2 368.490 -999.990 ... L3 2001 07 20 14 12 53.3300 -9.9000 26.00 76424 MHD 2001 06 29 09 20 312-99 P co2 368.450 -999.990 ... L3 2001 07 20 14 25 53.3300 -9.9000 26.00 76425 MHD 2001 07 02 15 15 4045-91 P co2 369.270 -999.990 ... L3 2001 08 01 12 46 53.3300 -9.9000 26.00 76426 MHD 2001 07 02 15 15 4046-91 P co2 369.360 -999.990 ... L3 2001 08 01 12 59 53.3300 -9.9000 26.00 76427 MHD 2001 07 10 13 40 127-91 P co2 368.140 -999.990 ... L3 2001 08 01 14 04 53.3300 -9.9000 26.00 76428 MHD 2001 07 10 13 40 128-91 P co2 368.190 -999.990 ... L3 2001 08 01 14 17 53.3300 -9.9000 26.00 76429 MHD 2001 07 23 13 05 161-99 P co2 365.130 -999.990 ... L3 2001 08 23 12 50 53.3300 -9.9000 26.00 76430 MHD 2001 07 23 13 05 162-99 P co2 365.160 -999.990 ... L3 2001 08 23 13 03 53.3300 -9.9000 26.00 76431 MHD 2001 07 30 09 45 205-99 P co2 365.230 -999.990 ... L3 2001 08 23 13 18 53.3300 -9.9000 26.00 76432 MHD 2001 07 30 09 45 206-99 P co2 365.250 -999.990 ... L3 2001 08 23 13 31 53.3300 -9.9000 26.00 76433 MHD 2001 08 07 17 05 338-99 P co2 362.720 -999.990 ... L3 2001 09 14 15 12 53.3300 -9.9000 26.00 76434 MHD 2001 08 07 17 05 4667-91 P co2 362.650 -999.990 ... L3 2001 09 14 14 59 53.3300 -9.9000 26.00 76435 MHD 2001 08 15 09 10 4517-91 P co2 361.610 -999.990 ... L3 2001 11 02 13 07 53.3300 -9.9000 26.00 76436 MHD 2001 08 15 09 10 4518-91 P co2 361.600 -999.990 ... L3 2001 11 02 13 20 53.3300 -9.9000 26.00 76437 MHD 2001 08 20 11 50 2033-91 P co2 360.700 -999.990 ... L3 2001 11 02 12 15 53.3300 -9.9000 26.00 76438 MHD 2001 08 20 11 50 2034-91 P co2 360.640 -999.990 ... L3 2001 11 02 12 28 53.3300 -9.9000 26.00 76439 MHD 2001 08 29 11 38 219-91 P co2 361.460 -999.990 ... L3 2001 09 21 14 37 53.3300 -9.9000 26.00 76440 MHD 2001 08 29 11 38 220-91 P co2 361.440 -999.990 ... L3 2001 09 21 14 50 53.3300 -9.9000 26.00 76441 MHD 2001 09 03 10 00 1665-91 P co2 360.810 -999.990 ... L3 2001 10 03 09 49 53.3300 -9.9000 26.00 76442 MHD 2001 09 03 10 00 1666-91 P co2 360.740 -999.990 ... L3 2001 10 03 10 02 53.3300 -9.9000 26.00 76443 MHD 2001 09 12 09 45 331-99 P co2 362.660 -999.990 ... L3 2001 10 03 10 15 53.3300 -9.9000 26.00 76444 MHD 2001 09 12 09 45 332-99 P co2 362.730 -999.990 ... L3 2001 10 03 10 28 53.3300 -9.9000 26.00 76445 MHD 2001 10 01 12 30 4869-91 P co2 365.830 -999.990 ... L3 2001 10 25 10 31 53.3300 -9.9000 26.00 76446 MHD 2001 10 01 12 30 4870-91 P co2 365.580 -999.990 ... L3 2001 10 25 10 44 53.3300 -9.9000 26.00 76447 MHD 2001 10 09 12 00 393-99 P co2 367.300 -999.990 ... L3 2002 04 01 15 31 53.3300 -9.9000 26.00 76448 MHD 2001 10 09 12 00 394-99 P co2 367.240 -999.990 ... L3 2002 04 01 15 44 53.3300 -9.9000 26.00 76449 MHD 2001 10 15 14 10 4117-91 P co2 367.610 -999.990 ... L3 2002 04 01 15 57 53.3300 -9.9000 26.00 76450 MHD 2001 10 15 14 10 4118-91 P co2 367.550 -999.990 ... L3 2002 04 01 16 10 53.3300 -9.9000 26.00 76451 MHD 2001 10 17 09 45 165-91 P co2 370.950 -999.990 ... L3 2002 02 04 10 24 53.3300 -9.9000 26.00 76452 MHD 2001 10 17 09 45 166-91 P co2 370.980 -999.990 ... L3 2002 02 04 10 37 53.3300 -9.9000 26.00 76453 MHD 2001 10 22 12 50 1389-91 P co2 374.030 -999.990 .X. L3 2002 02 04 10 50 53.3300 -9.9000 26.00 76454 MHD 2001 10 22 12 50 1390-91 P co2 374.120 -999.990 .X. L3 2002 02 04 11 03 53.3300 -9.9000 26.00 76455 MHD 2001 10 24 15 30 329-99 P co2 370.000 -999.990 ... L3 2002 01 28 16 37 53.3300 -9.9000 26.00 76456 MHD 2001 10 24 15 30 330-99 P co2 369.990 -999.990 ... L3 2002 01 28 16 50 53.3300 -9.9000 26.00 76457 MHD 2001 10 29 11 45 137-91 P co2 507.560 -999.990 -.. L3 2002 01 28 15 18 53.3300 -9.9000 26.00 76458 MHD 2001 10 29 11 45 138-91 P co2 512.480 -999.990 +.. L3 2002 01 28 15 31 53.3300 -9.9000 26.00 76459 MHD 2001 11 05 10 00 279-91 P co2 370.370 -999.990 ... L3 2002 01 28 09 32 53.3300 -9.9000 26.00 76460 MHD 2001 11 05 10 00 280-91 P co2 370.260 -999.990 ... L3 2002 01 28 09 45 53.3300 -9.9000 26.00 76461 MHD 2001 11 08 12 45 1293-91 P co2 371.170 -999.990 ... L3 2002 01 24 15 54 53.3300 -9.9000 26.00 76462 MHD 2001 11 08 12 45 1294-91 P co2 371.050 -999.990 ... L3 2002 01 24 16 07 53.3300 -9.9000 26.00 76463 MHD 2001 12 13 14 00 547-91 P co2 379.190 -999.990 ... L3 2002 02 04 13 06 53.3300 -9.9000 26.00 76464 MHD 2001 12 13 14 00 548-91 P co2 379.230 -999.990 ... L3 2002 02 04 13 19 53.3300 -9.9000 26.00 76465 MHD 2002 01 03 10 55 1631-91 P co2 381.450 -999.990 ... L3 2002 02 04 13 32 53.3300 -9.9000 26.00 76466 MHD 2002 01 03 10 55 1632-91 P co2 381.410 -999.990 ... L3 2002 02 04 13 45 53.3300 -9.9000 26.00 76467 MHD 2002 01 09 18 15 4711-91 P co2 379.630 -999.990 ... L3 2002 02 21 10 58 53.3300 -9.9000 26.00 76468 MHD 2002 01 09 18 15 4712-91 P co2 379.610 -999.990 ... L3 2002 02 21 11 11 53.3300 -9.9000 26.00 76469 MHD 2002 01 17 13 50 441-99 P co2 374.750 -999.990 ... L3 2002 02 21 10 31 53.3300 -9.9000 26.00 76470 MHD 2002 01 17 13 50 442-99 P co2 374.690 -999.990 ... L3 2002 02 21 10 44 53.3300 -9.9000 26.00 76471 MHD 2002 03 14 10 35 1695-91 P co2 377.730 -999.990 ... L3 2002 05 24 12 38 53.3300 -9.9000 26.00 76472 MHD 2002 03 14 10 35 1696-91 P co2 377.710 -999.990 ... L3 2002 05 24 12 51 53.3300 -9.9000 26.00 76473 MHD 2002 04 03 10 10 4033-91 P co2 377.880 -999.990 ... L3 2002 05 24 13 06 53.3300 -9.9000 26.00 76474 MHD 2002 04 03 10 10 4034-91 P co2 377.960 -999.990 ... L3 2002 05 24 13 19 53.3300 -9.9000 26.00 76475 MHD 2002 04 05 13 30 61-91 P co2 387.410 -999.990 .Z. L3 2002 06 03 15 28 53.3300 -9.9000 26.00 76476 MHD 2002 04 05 13 30 62-91 P co2 387.240 -999.990 .Z. L3 2002 06 03 15 41 53.3300 -9.9000 26.00 76477 MHD 2002 04 18 10 35 4911-91 P co2 378.150 -999.990 ... L3 2002 06 03 15 00 53.3300 -9.9000 26.00 76478 MHD 2002 04 18 10 35 4912-91 P co2 378.160 -999.990 ... L3 2002 06 03 15 13 53.3300 -9.9000 26.00 76479 MHD 2002 04 22 10 10 4963-91 P co2 376.890 -999.990 ... L3 2002 10 30 14 35 53.3300 -9.9000 26.00 76480 MHD 2002 04 22 10 10 4964-91 P co2 377.010 -999.990 ... L3 2002 10 30 14 48 53.3300 -9.9000 26.00 76481 MHD 2002 04 29 09 15 389-91 P co2 377.740 -999.990 ... L3 2002 10 30 14 09 53.3300 -9.9000 26.00 76482 MHD 2002 04 29 09 15 390-91 P co2 377.730 -999.990 ... L3 2002 10 30 14 22 53.3300 -9.9000 26.00 76483 MHD 2002 05 14 11 40 4047-91 P co2 376.300 -999.990 ... L3 2002 06 14 14 13 53.3300 -9.9000 26.00 76484 MHD 2002 05 14 11 40 4048-91 P co2 376.210 -999.990 ... L3 2002 06 14 14 26 53.3300 -9.9000 26.00 76485 MHD 2002 05 20 13 40 425-99 P co2 377.480 -999.990 ... L3 2002 06 17 14 52 53.3300 -9.9000 26.00 76486 MHD 2002 07 11 17 00 1039-91 P co2 369.570 -999.990 ... L3 2002 10 30 15 29 53.3300 -9.9000 26.00 76487 MHD 2002 07 11 17 00 1040-91 P co2 369.530 -999.990 ... L3 2002 10 30 15 42 53.3300 -9.9000 26.00 76488 MHD 2002 07 16 12 20 497-99 P co2 367.010 -999.990 ... L3 2002 10 30 15 55 53.3300 -9.9000 26.00 76489 MHD 2002 07 16 12 20 498-99 P co2 366.910 -999.990 ... L3 2002 10 30 16 08 53.3300 -9.9000 26.00 76490 MHD 2002 09 06 14 35 1355-91 P co2 363.980 -999.990 ... L3 2002 10 30 12 17 53.3300 -9.9000 26.00 76491 MHD 2002 09 06 14 35 1356-91 P co2 363.910 -999.990 ... L3 2002 10 30 12 30 53.3300 -9.9000 26.00 76492 MHD 2002 10 02 13 10 87-99 P co2 367.690 -999.990 ... L3 2002 10 30 13 09 53.3300 -9.9000 26.00 76493 MHD 2002 10 02 13 10 88-99 P co2 367.740 -999.990 ... L3 2002 10 30 13 22 53.3300 -9.9000 26.00 76494 MHD 2002 10 11 13 45 579-99 P co2 370.630 -999.990 ... L3 2002 10 30 13 43 53.3300 -9.9000 26.00 76495 MHD 2002 10 11 13 45 580-99 P co2 370.630 -999.990 ... L3 2002 10 30 13 56 53.3300 -9.9000 26.00 76496 MHD 2002 10 15 13 45 1267-91 P co2 376.150 -999.990 .X. L3 2002 10 30 15 01 53.3300 -9.9000 26.00 76497 MHD 2002 10 15 13 45 1268-91 P co2 376.200 -999.990 .X. L3 2002 10 30 15 14 53.3300 -9.9000 26.00 76498 MHD 2002 10 23 10 30 4497-91 P co2 371.110 -999.990 ... L3 2002 11 15 12 36 53.3300 -9.9000 26.00 76499 MHD 2002 10 23 10 30 4498-91 P co2 371.100 -999.990 ... L3 2002 11 15 12 49 53.3300 -9.9000 26.00 76500 MHD 2002 11 04 14 45 345-99 P co2 372.120 -999.990 ... L3 2002 11 14 11 35 53.3300 -9.9000 26.00 76501 MHD 2002 11 04 14 45 346-99 P co2 372.120 -999.990 ... L3 2002 11 14 11 48 53.3300 -9.9000 26.00 76502 MHD 2002 11 10 14 00 467-91 P co2 373.060 -999.990 ... L3 2002 12 05 13 09 53.3300 -9.9000 26.00 76503 MHD 2002 11 10 14 00 468-91 P co2 372.990 -999.990 ... L3 2002 12 05 14 44 53.3300 -9.9000 26.00 76504 MHD 2002 11 28 11 00 109-98 P co2 376.680 -999.990 ... L3 2002 12 05 14 14 53.3300 -9.9000 26.00 76505 MHD 2002 11 28 11 00 110-98 P co2 376.650 -999.990 ... L3 2002 12 05 14 27 53.3300 -9.9000 26.00 76506 MHD 2002 12 02 10 50 15-98 P co2 375.920 -999.990 ... L3 2002 12 23 15 05 53.3300 -9.9000 26.00 76507 MHD 2002 12 02 10 50 16-98 P co2 375.920 -999.990 ... L3 2002 12 23 15 18 53.3300 -9.9000 26.00 76508 MHD 2002 12 06 10 40 451-99 P co2 380.480 -999.990 ... L3 2002 12 23 13 46 53.3300 -9.9000 26.00 76509 MHD 2002 12 06 10 40 452-99 P co2 380.550 -999.990 ... L3 2002 12 23 13 59 53.3300 -9.9000 26.00 76510 MHD 2002 12 20 15 45 1947-91 P co2 396.890 -999.990 .Z. L3 2003 01 30 12 21 53.3300 -9.9000 26.00 76511 MHD 2002 12 20 15 45 1948-91 P co2 397.020 -999.990 .Z. L3 2003 01 30 12 34 53.3300 -9.9000 26.00 76512 MHD 2003 01 06 10 50 711-91 P co2 383.960 -999.990 ... L3 2003 01 30 10 26 53.3300 -9.9000 26.00 76513 MHD 2003 01 06 10 50 712-91 P co2 383.980 -999.990 ... L3 2003 01 30 10 39 53.3300 -9.9000 26.00 76514 MHD 2003 01 13 10 20 4121-91 P co2 377.720 -999.990 ... L3 2003 01 30 14 59 53.3300 -9.9000 26.00 76515 MHD 2003 01 13 10 20 4122-91 P co2 377.690 -999.990 ... L3 2003 01 30 15 12 53.3300 -9.9000 26.00 76516 MHD 2003 01 20 10 15 4081-91 P co2 377.570 -999.990 ... L3 2003 02 05 10 51 53.3300 -9.9000 26.00 76517 MHD 2003 01 20 10 15 4082-91 P co2 377.560 -999.990 ... L3 2003 02 05 11 04 53.3300 -9.9000 26.00 76518 MHD 2003 01 27 10 20 1967-91 P co2 375.990 -999.990 ... L3 2003 02 05 10 25 53.3300 -9.9000 26.00 76519 MHD 2003 01 27 10 20 1968-91 P co2 375.930 -999.990 ... L3 2003 02 05 10 38 53.3300 -9.9000 26.00 76520 MHD 2003 02 03 10 40 259-91 P co2 378.710 -999.990 ... L3 2003 02 21 15 33 53.3300 -9.9000 26.00 76521 MHD 2003 02 03 10 40 260-91 P co2 378.530 -999.990 ... L3 2003 02 21 15 46 53.3300 -9.9000 26.00 76522 MHD 2003 02 08 12 05 185-98 P co2 379.460 -999.990 ... L3 2003 02 21 15 07 53.3300 -9.9000 26.00 76523 MHD 2003 02 08 12 05 186-98 P co2 379.540 -999.990 ... L3 2003 02 21 15 20 53.3300 -9.9000 26.00 76524 MHD 2003 02 23 12 50 1487-91 P co2 378.720 -999.990 ... L3 2003 03 04 15 35 53.3300 -9.9000 26.00 76525 MHD 2003 02 23 12 50 1488-91 P co2 378.700 -999.990 ... L3 2003 03 04 15 48 53.3300 -9.9000 26.00 76526 MHD 2003 02 24 16 25 1727-91 P co2 380.230 -999.990 ... L3 2003 03 04 16 53 53.3300 -9.9000 26.00 76527 MHD 2003 02 24 16 25 1728-91 P co2 380.210 -999.990 ... L3 2003 03 04 17 06 53.3300 -9.9000 26.00 76528 MHD 2003 03 04 12 30 4955-91 P co2 378.680 -999.990 ... L3 2003 03 24 10 34 53.3300 -9.9000 26.00 76529 MHD 2003 03 04 12 30 4956-91 P co2 378.620 -999.990 ... L3 2003 03 24 10 47 53.3300 -9.9000 26.00 76530 MHD 2003 03 10 10 35 4797-91 P co2 379.530 -999.990 ... L3 2003 03 24 10 08 53.3300 -9.9000 26.00 76531 MHD 2003 03 10 10 35 4798-91 P co2 379.450 -999.990 ... L3 2003 03 24 10 21 53.3300 -9.9000 26.00 76532 MHD 2003 04 02 12 15 1095-99 P co2 380.750 -999.990 ... L3 2003 05 09 15 21 53.3300 -9.9000 26.00 76533 MHD 2003 04 02 12 15 1096-99 P co2 380.690 -999.990 ... L3 2003 05 09 15 34 53.3300 -9.9000 26.00 76534 MHD 2003 04 11 14 55 875-91 P co2 381.490 -999.990 ... L3 2003 05 09 14 55 53.3300 -9.9000 26.00 76535 MHD 2003 04 11 14 55 876-91 P co2 381.350 -999.990 ... L3 2003 05 09 15 08 53.3300 -9.9000 26.00 76536 MHD 2003 04 15 12 34 1181-99 P co2 380.520 -999.990 ... L3 2003 05 09 15 47 53.3300 -9.9000 26.00 76537 MHD 2003 04 15 12 34 1182-99 P co2 380.560 -999.990 ... L3 2003 05 09 16 00 53.3300 -9.9000 26.00 76538 MHD 2003 04 23 12 34 1183-99 P co2 389.370 -999.990 .Z. L3 2003 05 12 10 27 53.3300 -9.9000 26.00 76539 MHD 2003 04 23 12 34 1184-99 P co2 389.070 -999.990 .Z. L3 2003 05 12 10 40 53.3300 -9.9000 26.00 76540 MHD 2003 04 28 16 05 797-91 P co2 380.220 -999.990 ... L3 2003 05 21 10 02 53.3300 -9.9000 26.00 76541 MHD 2003 04 28 16 05 798-91 P co2 380.240 -999.990 ... L3 2003 05 21 10 16 53.3300 -9.9000 26.00 76542 MHD 2003 05 06 11 17 389-91 P co2 381.020 -999.990 ... L3 2003 05 21 09 36 53.3300 -9.9000 26.00 76543 MHD 2003 05 06 11 17 390-91 P co2 381.070 -999.990 ... L3 2003 05 21 09 49 53.3300 -9.9000 26.00 76544 MHD 2003 05 12 09 35 235-99 P co2 380.750 -999.990 ... L3 2003 06 10 09 30 53.3300 -9.9000 26.00 76545 MHD 2003 05 12 09 35 236-99 P co2 380.790 -999.990 ... L3 2003 06 10 09 43 53.3300 -9.9000 26.00 76546 MHD 2003 05 19 10 00 4476-91 P co2 380.160 -999.990 ... L3 2003 06 11 15 27 53.3300 -9.9000 26.00 76547 MHD 2003 05 27 08 20 1361-99 P co2 378.330 -999.990 ... L3 2003 06 20 15 20 53.3300 -9.9000 26.00 76548 MHD 2003 05 27 08 20 1362-99 P co2 378.290 -999.990 ... L3 2003 06 20 15 33 53.3300 -9.9000 26.00 76549 MHD 2003 05 30 09 00 1363-99 P co2 377.980 -999.990 ... L3 2003 06 20 14 54 53.3300 -9.9000 26.00 76550 MHD 2003 05 30 09 00 1364-99 P co2 377.810 -999.990 ... L3 2003 06 20 15 07 53.3300 -9.9000 26.00 76551 MHD 2003 06 10 11 00 1439-99 P co2 377.550 -999.990 -.. L3 2003 06 19 16 45 53.3300 -9.9000 26.00 76552 MHD 2003 06 10 11 00 1440-99 P co2 387.110 -999.990 +.. L3 2003 06 19 16 58 53.3300 -9.9000 26.00 76553 MHD 2003 06 17 12 34 71-99 P co2 377.610 -999.990 ... L3 2003 07 02 12 26 53.3300 -9.9000 26.00 76554 MHD 2003 06 17 12 34 72-99 P co2 377.550 -999.990 ... L3 2003 07 02 12 39 53.3300 -9.9000 26.00 76555 MHD 2003 06 23 10 00 473-99 P co2 376.950 -999.990 ... L3 2003 07 02 12 52 53.3300 -9.9000 26.00 76556 MHD 2003 06 23 10 00 474-99 P co2 376.990 -999.990 ... L3 2003 07 02 13 05 53.3300 -9.9000 26.00 76557 MHD 2003 07 02 11 30 1459-91 P co2 369.900 -999.990 .X. L3 2003 07 17 17 10 53.3300 -9.9000 26.00 76558 MHD 2003 07 02 11 30 1460-91 P co2 369.900 -999.990 .X. L3 2003 07 17 17 23 53.3300 -9.9000 26.00 76559 MHD 2003 07 07 11 00 1471-99 P co2 370.850 -999.990 ... L3 2003 07 21 11 04 53.3300 -9.9000 26.00 76560 MHD 2003 07 07 11 00 1472-99 P co2 370.830 -999.990 ... L3 2003 07 21 11 17 53.3300 -9.9000 26.00 76561 MHD 2003 07 17 09 40 1631-99 P co2 371.980 -999.990 ... L3 2003 08 06 13 00 53.3300 -9.9000 26.00 76562 MHD 2003 07 17 09 40 1632-99 P co2 371.970 -999.990 ... L3 2003 08 06 13 13 53.3300 -9.9000 26.00 76563 MHD 2003 07 23 13 45 1633-99 P co2 371.180 -999.990 ... L3 2003 08 06 13 26 53.3300 -9.9000 26.00 76564 MHD 2003 07 23 13 45 1634-99 P co2 371.290 -999.990 ... L3 2003 08 06 13 39 53.3300 -9.9000 26.00 76565 MHD 2003 07 28 12 25 1629-99 P co2 372.700 -999.990 ... L3 2003 08 18 16 41 53.3300 -9.9000 26.00 76566 MHD 2003 07 28 12 25 1630-99 P co2 372.680 -999.990 ... L3 2003 08 18 16 54 53.3300 -9.9000 26.00 76567 MHD 2003 08 12 12 15 1673-99 P co2 368.110 -999.990 ... L3 2003 08 22 09 43 53.3300 -9.9000 26.00 76568 MHD 2003 08 12 12 15 1674-99 P co2 368.060 -999.990 ... L3 2003 08 22 09 56 53.3300 -9.9000 26.00 76569 MHD 2003 08 18 12 20 1675-99 P co2 366.910 -999.990 ... L3 2003 08 22 09 17 53.3300 -9.9000 26.00 76570 MHD 2003 08 18 12 20 1676-99 P co2 366.860 -999.990 ... L3 2003 08 22 09 30 53.3300 -9.9000 26.00 76571 MHD 2003 08 25 12 45 841-91 P co2 374.620 -999.990 .X. L3 2003 09 08 11 07 53.3300 -9.9000 26.00 76572 MHD 2003 08 25 12 45 842-91 P co2 374.820 -999.990 .X. L3 2003 09 08 11 20 53.3300 -9.9000 26.00 76573 MHD 2003 09 01 11 45 4871-91 P co2 368.680 -999.990 ... L3 2003 09 08 11 33 53.3300 -9.9000 26.00 76574 MHD 2003 09 01 11 45 4872-91 P co2 368.640 -999.990 ... L3 2003 09 08 11 46 53.3300 -9.9000 26.00 76575 MHD 2003 09 09 17 30 1281-99 P co2 368.750 -999.990 ... L3 2003 09 24 18 45 53.3300 -9.9000 26.00 76576 MHD 2003 09 09 17 30 1282-99 P co2 368.770 -999.990 ... L3 2003 09 24 18 58 53.3300 -9.9000 26.00 76577 MHD 2003 09 16 11 15 1543-99 P co2 385.580 -999.990 .Z. L3 2003 09 24 19 13 53.3300 -9.9000 26.00 76578 MHD 2003 09 16 11 15 1544-99 P co2 385.800 -999.990 .Z. L3 2003 09 24 19 26 53.3300 -9.9000 26.00 76579 MHD 2003 09 19 10 50 645-99 P co2 370.260 -999.990 ... L3 2003 09 26 10 13 53.3300 -9.9000 26.00 76580 MHD 2003 09 19 10 50 646-99 P co2 370.330 -999.990 ... L3 2003 09 26 10 26 53.3300 -9.9000 26.00 76581 MHD 2003 09 23 11 00 1971-91 P co2 369.630 -999.990 ... L3 2003 10 07 12 48 53.3300 -9.9000 26.00 76582 MHD 2003 09 23 11 00 1972-91 P co2 369.540 -999.990 ... L3 2003 10 07 13 01 53.3300 -9.9000 26.00 76583 MHD 2003 09 29 11 00 679-91 P co2 370.870 -999.990 ... L3 2003 10 15 16 14 53.3300 -9.9000 26.00 76584 MHD 2003 09 29 11 00 680-91 P co2 370.760 -999.990 ... L3 2003 10 15 16 27 53.3300 -9.9000 26.00 76585 MHD 2003 10 06 15 55 4073-91 P co2 372.390 -999.990 ... L3 2003 10 15 16 40 53.3300 -9.9000 26.00 76586 MHD 2003 10 06 15 55 4074-91 P co2 372.360 -999.990 ... L3 2003 10 15 16 53 53.3300 -9.9000 26.00 76587 MHD 2003 10 15 13 30 6111-66 P co2 380.610 -999.990 .X. L3 2003 11 24 12 13 53.3300 -9.9000 26.00 76588 MHD 2003 10 15 13 30 6112-66 P co2 380.760 -999.990 .X. L3 2003 11 24 12 26 53.3300 -9.9000 26.00 76589 MHD 2003 10 20 15 15 2023-99 P co2 374.010 -999.990 ... L3 2003 11 24 10 55 53.3300 -9.9000 26.00 76590 MHD 2003 10 20 15 15 2024-99 P co2 373.970 -999.990 ... L3 2003 11 24 11 08 53.3300 -9.9000 26.00 76591 MHD 2003 11 11 17 15 6313-66 P co2 376.110 -999.990 ... L3 2003 12 02 13 25 53.3300 -9.9000 26.00 76592 MHD 2003 11 11 17 15 6314-66 P co2 375.830 -999.990 ... L3 2003 12 02 13 38 53.3300 -9.9000 26.00 76593 MHD 2003 11 17 10 40 6583-66 P co2 375.480 -999.990 ... L3 2003 12 02 13 51 53.3300 -9.9000 26.00 76594 MHD 2003 11 17 10 40 6584-66 P co2 375.520 -999.990 ... L3 2003 12 02 14 04 53.3300 -9.9000 26.00 76595 MHD 2003 11 24 11 15 189-99 P co2 378.060 -999.990 ... L3 2003 12 16 15 20 53.3300 -9.9000 26.00 76596 MHD 2003 11 24 11 15 190-99 P co2 378.010 -999.990 ... L3 2003 12 16 15 33 53.3300 -9.9000 26.00 76597 MHD 2003 12 03 10 00 1761-99 P co2 378.900 -999.990 ... L3 2003 12 16 14 54 53.3300 -9.9000 26.00 76598 MHD 2003 12 03 10 00 1762-99 P co2 378.840 -999.990 ... L3 2003 12 16 15 07 53.3300 -9.9000 26.00 76599 MHD 2003 12 10 10 00 1039-91 P co2 378.860 -999.990 ... L3 2004 01 06 12 32 53.3300 -9.9000 26.00 76600 MHD 2003 12 10 10 00 1040-91 P co2 378.820 -999.990 ... L3 2004 01 06 12 45 53.3300 -9.9000 26.00 76601 MHD 2003 12 18 13 30 1695-91 P co2 380.100 -999.990 ... L3 2004 01 06 12 05 53.3300 -9.9000 26.00 76602 MHD 2003 12 18 13 30 1696-91 P co2 380.090 -999.990 ... L3 2004 01 06 12 18 53.3300 -9.9000 26.00 76603 MHD 2003 12 22 12 10 2337-99 P co2 379.550 -999.990 ... L3 2004 01 14 12 22 53.3300 -9.9000 26.00 76604 MHD 2003 12 22 12 10 2338-99 P co2 379.590 -999.990 ... L3 2004 01 14 12 35 53.3300 -9.9000 26.00 76605 MHD 2004 01 05 12 10 2339-99 P co2 377.800 -999.990 ... L3 2004 01 14 10 08 53.3300 -9.9000 26.00 76606 MHD 2004 01 05 12 10 2340-99 P co2 377.890 -999.990 ... L3 2004 01 14 10 21 53.3300 -9.9000 26.00 76607 MHD 2004 01 12 12 10 4277-91 P co2 380.250 -999.990 ... L3 2004 01 27 11 27 53.3300 -9.9000 26.00 76608 MHD 2004 01 12 12 10 4278-91 P co2 380.150 -999.990 ... L3 2004 01 27 11 40 53.3300 -9.9000 26.00 76609 MHD 2004 01 19 11 55 385-99 P co2 378.680 -999.990 ... L3 2004 01 26 19 13 53.3300 -9.9000 26.00 76610 MHD 2004 01 19 11 55 386-99 P co2 378.730 -999.990 ... L3 2004 01 26 19 26 53.3300 -9.9000 26.00 76611 MHD 2004 01 27 11 00 1779-99 P co2 381.150 -999.990 ... L3 2004 02 10 12 43 53.3300 -9.9000 26.00 76612 MHD 2004 01 27 11 00 1780-99 P co2 381.240 -999.990 ... L3 2004 02 10 12 56 53.3300 -9.9000 26.00 76613 MHD 2004 02 02 11 30 1921-91 P co2 382.000 -999.990 ... L3 2004 02 10 13 11 53.3300 -9.9000 26.00 76614 MHD 2004 02 02 11 30 1922-91 P co2 381.980 -999.990 ... L3 2004 02 10 13 24 53.3300 -9.9000 26.00 76615 MHD 2004 02 16 10 15 1917-99 P co2 382.560 -999.990 ... L3 2004 03 01 14 03 53.3300 -9.9000 26.00 76616 MHD 2004 02 16 10 15 1918-99 P co2 382.530 -999.990 ... L3 2004 03 01 14 16 53.3300 -9.9000 26.00 76617 MHD 2004 02 23 12 50 1913-99 P co2 588.440 -999.990 N.. L3 2004 03 01 13 37 53.3300 -9.9000 26.00 76618 MHD 2004 02 23 12 50 1913-99 P co2 591.860 -999.990 N.. L3 2004 03 01 17 09 53.3300 -9.9000 26.00 76618 MHD 2004 02 23 12 50 1914-99 P co2 590.510 -999.990 N.. L3 2004 03 01 17 22 53.3300 -9.9000 26.00 76619 MHD 2004 02 23 12 50 1914-99 P co2 590.850 -999.990 N.. L3 2004 03 01 13 50 53.3300 -9.9000 26.00 76619 MHD 2004 03 03 12 35 2441-99 P co2 380.870 -999.990 ... L3 2004 03 17 13 28 53.3300 -9.9000 26.00 76620 MHD 2004 03 03 12 35 2442-99 P co2 380.920 -999.990 ... L3 2004 03 17 13 41 53.3300 -9.9000 26.00 76621 MHD 2004 03 10 10 05 2443-99 P co2 385.230 -999.990 ... L3 2004 03 17 13 54 53.3300 -9.9000 26.00 76622 MHD 2004 03 10 10 05 2444-99 P co2 385.030 -999.990 ... L3 2004 03 17 14 07 53.3300 -9.9000 26.00 76623 MHD 2004 03 15 11 15 1475-99 P co2 380.270 -999.990 ... L3 2004 03 29 14 54 53.3300 -9.9000 26.00 76624 MHD 2004 03 15 11 15 1476-99 P co2 380.170 -999.990 ... L3 2004 03 29 15 07 53.3300 -9.9000 26.00 76625 MHD 2004 03 22 10 20 1227-99 P co2 383.020 -999.990 ... L3 2004 03 25 17 58 53.3300 -9.9000 26.00 76626 MHD 2004 03 22 10 20 1228-99 P co2 382.920 -999.990 ... L3 2004 03 25 18 11 53.3300 -9.9000 26.00 76627 MHD 2004 04 02 15 30 317-91 P co2 380.820 -999.990 ... L3 2004 04 12 13 49 53.3300 -9.9000 26.00 76628 MHD 2004 04 02 15 30 318-91 P co2 380.810 -999.990 ... L3 2004 04 12 14 02 53.3300 -9.9000 26.00 76629 MHD 2004 04 05 10 35 1807-99 P co2 382.030 -999.990 ... L3 2004 04 12 12 31 53.3300 -9.9000 26.00 76630 MHD 2004 04 05 10 35 1808-99 P co2 382.040 -999.990 ... L3 2004 04 12 12 44 53.3300 -9.9000 26.00 76631 MHD 2004 04 13 10 00 3235-99 P co2 382.520 -999.990 ... L3 2004 04 26 11 34 53.3300 -9.9000 26.00 76632 MHD 2004 04 13 10 00 3236-99 P co2 382.770 -999.990 ... L3 2004 04 26 11 47 53.3300 -9.9000 26.00 76633 MHD 2004 04 19 09 30 3217-99 P co2 382.730 -999.990 ... L3 2004 04 26 11 08 53.3300 -9.9000 26.00 76634 MHD 2004 04 19 09 30 3218-99 P co2 382.830 -999.990 ... L3 2004 04 26 11 21 53.3300 -9.9000 26.00 76635 MHD 2004 04 26 09 50 905-99 P co2 382.220 -999.990 ... L3 2004 05 13 16 51 53.3300 -9.9000 26.00 76636 MHD 2004 04 26 09 50 906-99 P co2 382.190 -999.990 ... L3 2004 05 13 17 04 53.3300 -9.9000 26.00 76637 MHD 2004 05 04 09 30 1457-99 P co2 382.260 -999.990 ... L3 2004 05 13 16 25 53.3300 -9.9000 26.00 76638 MHD 2004 05 04 09 30 1458-99 P co2 382.250 -999.990 ... L3 2004 05 13 16 38 53.3300 -9.9000 26.00 76639 MHD 2004 05 13 09 30 305-99 P co2 381.250 -999.990 ... L3 2004 05 27 12 47 53.3300 -9.9000 26.00 76640 MHD 2004 05 13 09 30 306-99 P co2 381.140 -999.990 ... L3 2004 05 27 13 00 53.3300 -9.9000 26.00 76641 MHD 2004 05 17 09 10 1735-99 P co2 381.690 -999.990 ... L3 2004 05 27 12 21 53.3300 -9.9000 26.00 76642 MHD 2004 05 17 09 10 1736-99 P co2 381.720 -999.990 ... L3 2004 05 27 12 34 53.3300 -9.9000 26.00 76643 MHD 2004 06 09 11 25 1981-99 P co2 378.620 -999.990 ... L3 2004 06 24 12 38 53.3300 -9.9000 26.00 76644 MHD 2004 06 09 11 25 1982-99 P co2 378.650 -999.990 ... L3 2004 06 24 12 51 53.3300 -9.9000 26.00 76645 MHD 2004 06 15 12 45 2609-99 P co2 378.860 -999.990 ... L3 2004 06 24 12 10 53.3300 -9.9000 26.00 76646 MHD 2004 06 15 12 45 2610-99 P co2 378.820 -999.990 ... L3 2004 06 24 12 23 53.3300 -9.9000 26.00 76647 MHD 2004 06 22 11 35 1059-99 P co2 379.350 -999.990 ... L3 2004 07 13 11 22 53.3300 -9.9000 26.00 76648 MHD 2004 06 22 11 35 1060-99 P co2 379.360 -999.990 ... L3 2004 07 13 11 35 53.3300 -9.9000 26.00 76649 MHD 2004 06 28 10 40 3087-99 P co2 377.030 -999.990 ... L3 2004 07 13 11 48 53.3300 -9.9000 26.00 76650 MHD 2004 06 28 10 40 3088-99 P co2 377.020 -999.990 ... L3 2004 07 13 12 01 53.3300 -9.9000 26.00 76651 MHD 2004 07 06 11 30 3279-99 P co2 376.410 -999.990 ... L3 2004 07 30 14 40 53.3300 -9.9000 26.00 76652 MHD 2004 07 06 11 30 3280-99 P co2 376.270 -999.990 ... L3 2004 07 30 14 53 53.3300 -9.9000 26.00 76653 MHD 2004 07 14 11 55 191-99 P co2 373.830 -999.990 +.. L3 2004 07 30 14 12 53.3300 -9.9000 26.00 76654 MHD 2004 07 14 11 55 192-99 P co2 373.050 -999.990 -.. L3 2004 07 30 14 26 53.3300 -9.9000 26.00 76655 MHD 2004 07 22 10 35 67-99 P co2 373.050 -999.990 ... L3 2004 08 10 15 24 53.3300 -9.9000 26.00 76656 MHD 2004 07 22 10 35 68-99 P co2 373.150 -999.990 ... L3 2004 08 10 15 37 53.3300 -9.9000 26.00 76657 MHD 2004 07 26 11 05 1983-99 P co2 371.530 -999.990 ... L3 2004 08 10 14 58 53.3300 -9.9000 26.00 76658 MHD 2004 07 26 11 05 1984-99 P co2 371.530 -999.990 ... L3 2004 08 10 15 11 53.3300 -9.9000 26.00 76659 MHD 2004 08 12 16 30 717-99 P co2 380.010 -999.990 .X. L3 2004 08 26 12 22 53.3300 -9.9000 26.00 76660 MHD 2004 08 12 16 30 718-99 P co2 379.930 -999.990 .X. L3 2004 08 26 12 35 53.3300 -9.9000 26.00 76661 MHD 2004 08 17 08 55 2597-99 P co2 370.430 -999.990 ... L3 2004 08 26 12 48 53.3300 -9.9000 26.00 76662 MHD 2004 08 17 08 55 2598-99 P co2 370.450 -999.990 ... L3 2004 08 26 13 01 53.3300 -9.9000 26.00 76663 MHD 2004 08 26 09 40 3887-99 P co2 364.790 -999.990 .X. L3 2004 10 04 15 41 53.3100 -9.9000 26.00 188969 MHD 2004 08 26 09 40 3888-99 P co2 364.760 -999.990 .X. L3 2004 10 04 15 56 53.3100 -9.9000 26.00 188970 MHD 2004 09 02 08 50 3899-99 P co2 367.390 -999.990 ... L3 2004 10 04 16 10 53.3100 -9.9000 26.00 188971 MHD 2004 09 02 08 50 3900-99 P co2 367.310 -999.990 ... L3 2004 10 04 16 24 53.3100 -9.9000 26.00 188972 MHD 2004 09 08 10 00 1879-99 P co2 381.060 -999.990 .X. L3 2004 10 04 17 06 53.3100 -9.9000 26.00 189221 MHD 2004 09 08 10 00 1880-99 P co2 380.950 -999.990 .X. L3 2004 10 04 17 20 53.3100 -9.9000 26.00 189222 MHD 2004 09 13 11 00 3925-99 P co2 384.910 -999.990 +.. L3 2004 10 04 16 38 53.3100 -9.9000 26.00 189223 MHD 2004 09 13 11 00 3926-99 P co2 367.900 -999.990 -.. L3 2004 10 04 16 52 53.3100 -9.9000 26.00 189224 MHD 2004 09 20 10 10 3615-99 P co2 370.840 -999.990 ... L3 2004 10 13 14 33 53.3100 -9.9000 26.00 189716 MHD 2004 09 20 10 10 3616-99 P co2 370.820 -999.990 ... L3 2004 10 13 14 47 53.3100 -9.9000 26.00 189717 MHD 2004 09 27 10 00 2173-99 P co2 372.230 -999.990 ... L3 2004 10 13 14 04 53.3100 -9.9000 26.00 189714 MHD 2004 09 27 10 00 2174-99 P co2 372.090 -999.990 ... L3 2004 10 13 14 19 53.3100 -9.9000 26.00 189715 MHD 2004 10 04 09 25 6365-66 P co2 372.230 -999.990 ... L3 2004 11 01 12 43 53.3100 -9.9000 26.00 190534 MHD 2004 10 04 09 25 6366-66 P co2 372.120 -999.990 ... L3 2004 11 01 12 57 53.3100 -9.9000 26.00 190535 MHD 2004 10 11 10 45 169-99 P co2 379.770 -999.990 .X. L3 2004 11 01 13 11 53.3100 -9.9000 26.00 190532 MHD 2004 10 11 10 45 170-99 P co2 380.050 -999.990 .X. L3 2004 11 01 13 25 53.3100 -9.9000 26.00 190533 MHD 2004 10 19 10 00 6395-66 P co2 374.080 -999.990 ... L3 2004 11 02 20 01 53.3100 -9.9000 26.00 191257 MHD 2004 10 19 10 00 6396-66 P co2 374.080 -999.990 ... L3 2004 11 02 20 15 53.3100 -9.9000 26.00 191258 MHD 2004 10 26 16 45 2353-99 P co2 375.520 -999.990 ... L3 2004 11 02 19 33 53.3100 -9.9000 26.00 191255 MHD 2004 10 26 16 45 2354-99 P co2 375.490 -999.990 ... L3 2004 11 02 19 47 53.3100 -9.9000 26.00 191256 MHD 2004 11 04 10 05 2991-99 P co2 377.310 -999.990 ... L3 2004 11 17 12 40 53.3100 -9.9000 26.00 191887 MHD 2004 11 04 10 05 2992-99 P co2 377.190 -999.990 ... L3 2004 11 17 12 54 53.3100 -9.9000 26.00 191888 MHD 2004 11 11 10 25 3093-99 P co2 376.730 -999.990 ... L3 2004 11 17 12 12 53.3100 -9.9000 26.00 191889 MHD 2004 11 11 10 25 3094-99 P co2 376.730 -999.990 ... L3 2004 11 17 12 26 53.3100 -9.9000 26.00 191890 MHD 2004 11 22 11 35 3075-99 P co2 377.870 -999.990 ... L3 2004 12 02 15 49 53.3100 -9.9000 26.00 192471 MHD 2004 11 22 11 35 3076-99 P co2 377.750 -999.990 ... L3 2004 12 02 16 03 53.3100 -9.9000 26.00 192472 MHD 2004 11 28 15 40 3887-99 P co2 379.570 -999.990 ... L3 2004 12 02 16 17 53.3100 -9.9000 26.00 192473 MHD 2004 11 28 15 40 3888-99 P co2 379.510 -999.990 ... L3 2004 12 02 16 31 53.3100 -9.9000 26.00 192474 MHD 2004 12 05 16 15 3089-99 P co2 380.030 -999.990 ... L3 2004 12 21 16 08 53.3100 -9.9000 26.00 193256 MHD 2004 12 05 16 15 3090-99 P co2 380.040 -999.990 ... L3 2004 12 21 16 22 53.3100 -9.9000 26.00 193257 MHD 2004 12 15 12 45 3091-99 P co2 379.870 -999.990 ... L3 2004 12 21 15 39 53.3100 -9.9000 26.00 193258 MHD 2004 12 15 12 45 3092-99 P co2 379.930 -999.990 ... L3 2004 12 21 15 54 53.3100 -9.9000 26.00 193259 MHD 2004 12 20 11 20 2983-99 P co2 380.580 -999.990 ... L3 2005 01 12 09 22 53.3100 -9.9000 26.00 193745 MHD 2004 12 20 11 20 2984-99 P co2 380.560 -999.990 ... L3 2005 01 12 09 36 53.3100 -9.9000 26.00 193746 MHD 2004 12 27 14 15 3455-99 P co2 381.060 -999.990 ... L3 2005 01 12 11 46 53.3100 -9.9000 26.00 193743 MHD 2004 12 27 14 15 3456-99 P co2 381.240 -999.990 ... L3 2005 01 12 12 00 53.3100 -9.9000 26.00 193744 MHD 2005 01 03 13 20 2779-99 P co2 380.960 -999.990 ... L3 2005 01 21 09 32 53.3100 -9.9000 26.00 194201 MHD 2005 01 03 13 20 2780-99 P co2 380.950 -999.990 ... L3 2005 01 21 09 46 53.3100 -9.9000 26.00 194202 MHD 2005 01 10 12 00 2781-99 P co2 381.490 -999.990 ... L3 2005 01 21 09 04 53.3100 -9.9000 26.00 194203 MHD 2005 01 10 12 00 2782-99 P co2 381.460 -999.990 ... L3 2005 01 21 09 18 53.3100 -9.9000 26.00 194204 MHD 2005 01 17 10 10 207-99 P co2 381.740 -999.990 ..I L3 2005 03 22 15 43 53.3100 -9.9000 26.00 196795 MHD 2005 01 17 10 10 208-99 P co2 381.850 -999.990 ... L3 2005 03 22 15 57 53.3100 -9.9000 26.00 196796 MHD 2005 02 03 13 15 3997-99 P co2 380.890 -999.990 ... L3 2005 03 22 15 14 53.3100 -9.9000 26.00 196793 MHD 2005 02 03 13 15 3998-99 P co2 380.970 -999.990 ... L3 2005 03 22 15 28 53.3100 -9.9000 26.00 196794 MHD 2005 02 16 10 30 4049-99 P co2 380.680 -999.990 ..I L3 2005 03 30 14 00 53.3100 -9.9000 26.00 197101 MHD 2005 02 16 10 30 4050-99 P co2 380.770 -999.990 ... L3 2005 03 30 14 14 53.3100 -9.9000 26.00 197102 MHD 2005 02 23 12 50 2991-99 P co2 388.950 -999.990 .XI L3 2005 03 30 13 32 53.3100 -9.9000 26.00 197099 MHD 2005 02 23 12 50 2992-99 P co2 388.860 -999.990 .X. L3 2005 03 30 13 46 53.3100 -9.9000 26.00 197100 MHD 2005 02 28 13 00 2839-99 P co2 381.320 -999.990 ..I L3 2005 03 30 16 22 53.3100 -9.9000 26.00 197116 MHD 2005 02 28 13 00 2840-99 P co2 381.410 -999.990 ... L3 2005 03 30 16 36 53.3100 -9.9000 26.00 197117 MHD 2005 03 07 13 20 631-99 P co2 383.390 -999.990 +.I L3 2005 07 15 10 31 53.3100 -9.9000 26.00 201311 MHD 2005 03 07 13 20 632-99 P co2 382.300 -999.990 -.. L3 2005 07 15 10 45 53.3100 -9.9000 26.00 201312 MHD 2005 03 15 10 00 655-99 P co2 382.630 -999.990 ..I L3 2005 07 15 10 03 53.3100 -9.9000 26.00 201313 MHD 2005 03 15 10 00 656-99 P co2 382.750 -999.990 ... L3 2005 07 15 10 17 53.3100 -9.9000 26.00 201314 MHD 2005 03 22 13 55 173-99 P co2 382.930 -999.990 ..I L3 2005 07 15 11 28 53.3100 -9.9000 26.00 201315 MHD 2005 03 22 13 55 174-99 P co2 383.060 -999.990 ... L3 2005 07 15 11 42 53.3100 -9.9000 26.00 201316 MHD 2005 04 05 08 50 3379-99 P co2 459.650 -999.990 -.I L3 2005 07 15 11 00 53.3100 -9.9000 26.00 201317 MHD 2005 04 05 08 50 3380-99 P co2 466.090 -999.990 +.. L3 2005 07 15 11 14 53.3100 -9.9000 26.00 201318 MHD 2005 04 12 10 15 3217-99 P co2 509.150 -999.990 +.I L3 2005 09 22 14 46 53.3100 -9.9000 26.00 205642 MHD 2005 04 12 10 15 3218-99 P co2 481.520 -999.990 -.. L3 2005 09 22 15 00 53.3100 -9.9000 26.00 205643 MHD 2005 04 19 14 10 3233-99 P co2 395.970 -999.990 .XI L3 2005 09 22 14 18 53.3100 -9.9000 26.00 205640 MHD 2005 04 19 14 10 3234-99 P co2 395.990 -999.990 .X. L3 2005 09 22 14 32 53.3100 -9.9000 26.00 205641 MHD 2005 04 22 10 40 2759-99 P co2 385.980 -999.990 ..I L3 2005 09 14 10 22 53.3100 -9.9000 26.00 204926 MHD 2005 04 22 10 40 2760-99 P co2 385.830 -999.990 ... L3 2005 09 14 10 36 53.3100 -9.9000 26.00 204927 MHD 2005 04 26 12 30 3569-99 P co2 382.580 -999.990 -.I L3 2005 09 14 09 53 53.3100 -9.9000 26.00 204924 MHD 2005 04 26 12 30 3570-99 P co2 383.980 -999.990 +.. L3 2005 09 14 10 07 53.3100 -9.9000 26.00 204925 MHD 2005 05 05 09 35 1847-99 P co2 383.690 -999.990 ..I L3 2005 09 13 09 33 53.3100 -9.9000 26.00 204890 MHD 2005 05 05 09 35 1848-99 P co2 383.710 -999.990 ... L3 2005 09 13 09 47 53.3100 -9.9000 26.00 204891 MHD 2005 05 13 11 20 2473-99 P co2 382.590 -999.990 ..I L3 2005 09 13 09 04 53.3100 -9.9000 26.00 204888 MHD 2005 05 13 11 20 2474-99 P co2 382.370 -999.990 ... L3 2005 09 13 09 18 53.3100 -9.9000 26.00 204889 MHD 2005 05 19 10 15 3463-99 P co2 383.510 -999.990 ..I L3 2005 09 13 14 46 53.3100 -9.9000 26.00 204920 MHD 2005 05 19 10 15 3464-99 P co2 383.420 -999.990 ... L3 2005 09 13 15 00 53.3100 -9.9000 26.00 204921 MHD 2005 05 23 13 05 4091-99 P co2 385.400 -999.990 ..I L3 2005 09 14 09 25 53.3100 -9.9000 26.00 204922 MHD 2005 05 23 13 05 4092-99 P co2 385.270 -999.990 ... L3 2005 09 14 09 39 53.3100 -9.9000 26.00 204923 MHD 2005 06 01 11 10 1935-99 P co2 381.950 -999.990 ..I L3 2005 09 15 10 54 53.3100 -9.9000 26.00 204914 MHD 2005 06 01 11 10 1936-99 P co2 382.020 -999.990 ... L3 2005 09 15 11 08 53.3100 -9.9000 26.00 204915 MHD 2005 06 08 10 30 3181-99 P co2 396.390 -999.990 .XI L3 2005 09 15 10 25 53.3100 -9.9000 26.00 204912 MHD 2005 06 08 10 30 3182-99 P co2 396.490 -999.990 .X. L3 2005 09 15 10 40 53.3100 -9.9000 26.00 204913 MHD 2005 06 27 13 35 579-99 P co2 379.380 -999.990 ..I L3 2005 09 23 09 46 53.3100 -9.9000 26.00 205634 MHD 2005 06 27 13 35 580-99 P co2 379.130 -999.990 ... L3 2005 09 23 10 00 53.3100 -9.9000 26.00 205635 MHD 2005 07 04 09 08 2645-99 P co2 379.100 -999.990 ..I L3 2005 09 22 16 12 53.3100 -9.9000 26.00 205632 MHD 2005 07 04 09 08 2646-99 P co2 379.080 -999.990 ... L3 2005 09 22 16 26 53.3100 -9.9000 26.00 205633 MHD 2005 07 15 10 00 3631-99 P co2 375.330 -999.990 ..I L3 2005 09 22 13 21 53.3100 -9.9000 26.00 205636 MHD 2005 07 15 10 00 3632-99 P co2 375.330 -999.990 ... L3 2005 09 22 13 35 53.3100 -9.9000 26.00 205637 MHD 2005 07 18 09 40 1147-99 P co2 374.270 -999.990 ..I L3 2005 09 22 13 49 53.3100 -9.9000 26.00 205638 MHD 2005 07 18 09 40 1148-99 P co2 374.250 -999.990 ... L3 2005 09 22 14 03 53.3100 -9.9000 26.00 205639 MHD 2005 07 26 14 25 4095-99 P co2 370.900 -999.990 .XI L3 2005 09 22 15 43 53.3100 -9.9000 26.00 205630 MHD 2005 07 26 14 25 4096-99 P co2 370.850 -999.990 .X. L3 2005 09 22 15 57 53.3100 -9.9000 26.00 205631 MHD 2005 08 09 16 25 2311-99 P co2 375.230 -999.990 ..I L3 2005 09 22 15 15 53.3100 -9.9000 26.00 205628 MHD 2005 08 09 16 25 2312-99 P co2 375.250 -999.990 ... L3 2005 09 22 15 29 53.3100 -9.9000 26.00 205629 MHD 2005 08 27 16 00 2101-99 P co2 369.780 -999.990 -.. L3 2005 10 28 14 34 53.3100 -9.9000 26.00 207354 MHD 2005 08 27 16 00 2102-99 P co2 370.330 -999.990 +.. L3 2005 10 28 14 48 53.3100 -9.9000 26.00 207355 MHD 2005 09 01 08 45 2177-99 P co2 371.130 -999.990 ..I L3 2005 10 28 13 08 53.3100 -9.9000 26.00 207352 MHD 2005 09 01 08 45 2178-99 P co2 371.180 -999.990 ... L3 2005 10 28 13 22 53.3100 -9.9000 26.00 207353 MHD 2005 09 07 08 30 1453-99 P co2 374.260 -999.990 ..I L3 2005 10 28 14 05 53.3100 -9.9000 26.00 207350 MHD 2005 09 07 08 30 1454-99 P co2 374.210 -999.990 ... L3 2005 10 28 14 19 53.3100 -9.9000 26.00 207351 MHD 2005 09 14 08 40 4207-99 P co2 373.380 -999.990 ..I L3 2005 10 28 12 40 53.3100 -9.9000 26.00 207348 MHD 2005 09 14 08 40 4208-99 P co2 373.450 -999.990 ... L3 2005 10 28 12 54 53.3100 -9.9000 26.00 207349 MHD 2005 09 23 11 00 1141-99 P co2 371.960 -999.990 ..I L3 2006 01 12 15 06 53.3100 -9.9000 26.00 211020 MHD 2005 09 23 11 00 1142-99 P co2 371.990 -999.990 ... L3 2006 01 12 15 20 53.3100 -9.9000 26.00 211021 MHD 2005 09 26 10 40 307-99 P co2 375.170 -999.990 ..I L3 2006 01 13 08 56 53.3100 -9.9000 26.00 211024 MHD 2005 09 26 10 40 308-99 P co2 375.180 -999.990 ... L3 2006 01 13 09 10 53.3100 -9.9000 26.00 211025 MHD 2005 10 03 11 10 3901-99 P co2 374.560 -999.990 ..I L3 2006 01 12 12 15 53.3100 -9.9000 26.00 211002 MHD 2005 10 03 11 10 3902-99 P co2 374.680 -999.990 ... L3 2006 01 12 12 29 53.3100 -9.9000 26.00 211003 MHD 2005 10 05 15 50 3363-99 P co2 377.070 -999.990 ..I L3 2006 01 12 12 43 53.3100 -9.9000 26.00 211004 MHD 2005 10 05 15 50 3364-99 P co2 377.160 -999.990 ... L3 2006 01 12 12 58 53.3100 -9.9000 26.00 211005 MHD 2005 10 10 10 40 525-99 P co2 376.470 -999.990 ..I L3 2006 01 12 14 09 53.3100 -9.9000 26.00 211022 MHD 2005 10 10 10 40 526-99 P co2 376.570 -999.990 ... L3 2006 01 12 14 23 53.3100 -9.9000 26.00 211023 MHD 2005 10 18 09 00 2515-99 P co2 397.100 -999.990 .XI L3 2006 01 12 14 37 53.3100 -9.9000 26.00 211018 MHD 2005 10 18 09 00 2516-99 P co2 397.490 -999.990 .X. L3 2006 01 12 14 52 53.3100 -9.9000 26.00 211019 MHD 2005 10 20 09 00 323-99 P co2 376.080 -999.990 ..I L3 2006 01 17 13 38 53.3100 -9.9000 26.00 211012 MHD 2005 10 20 09 00 324-99 P co2 376.150 -999.990 ... L3 2006 01 17 13 53 53.3100 -9.9000 26.00 211013 MHD 2005 10 31 13 00 3373-99 P co2 378.530 -999.990 ..I L3 2006 01 17 13 10 53.3100 -9.9000 26.00 211016 MHD 2005 10 31 13 00 3374-99 P co2 378.800 -999.990 ... L3 2006 01 17 13 24 53.3100 -9.9000 26.00 211017 MHD 2005 11 08 10 20 1087-99 P co2 379.580 -999.990 ..I L3 2006 01 17 12 41 53.3100 -9.9000 26.00 211014 MHD 2005 11 08 10 20 1088-99 P co2 379.750 -999.990 ... L3 2006 01 17 12 56 53.3100 -9.9000 26.00 211015 MHD 2005 11 14 10 50 1089-99 P co2 381.050 -999.990 ..I L3 2006 01 17 12 13 53.3100 -9.9000 26.00 211010 MHD 2005 11 14 10 50 1090-99 P co2 380.920 -999.990 ... L3 2006 01 17 12 27 53.3100 -9.9000 26.00 211011 MHD 2005 11 21 13 30 2401-99 P co2 389.820 -999.990 .XI L3 2006 02 14 15 01 53.3100 -9.9000 26.00 212435 MHD 2005 11 21 13 30 2402-99 P co2 389.760 -999.990 .X. L3 2006 02 14 15 15 53.3100 -9.9000 26.00 212436 MHD 2005 11 28 16 10 4159-99 P co2 381.250 -999.990 ..I L3 2006 02 14 14 33 53.3100 -9.9000 26.00 212433 MHD 2005 11 28 16 10 4160-99 P co2 381.330 -999.990 ... L3 2006 02 14 14 47 53.3100 -9.9000 26.00 212434 MHD 2005 11 30 10 20 1651-99 P co2 380.800 -999.990 ..I L3 2006 02 14 10 30 53.3100 -9.9000 26.00 212457 MHD 2005 11 30 10 20 1652-99 P co2 380.910 -999.990 ... L3 2006 02 14 10 44 53.3100 -9.9000 26.00 212458 MHD 2005 12 16 11 00 2231-99 P co2 382.490 -999.990 ..I L3 2006 02 14 11 56 53.3100 -9.9000 26.00 212455 MHD 2005 12 16 11 00 2232-99 P co2 382.490 -999.990 ... L3 2006 02 14 12 10 53.3100 -9.9000 26.00 212456 MHD 2005 12 19 11 10 3469-99 P co2 384.010 -999.990 ..I L3 2006 02 14 12 26 53.3100 -9.9000 26.00 212461 MHD 2005 12 19 11 10 3470-99 P co2 384.220 -999.990 ... L3 2006 02 14 12 40 53.3100 -9.9000 26.00 212462 MHD 2005 12 29 14 55 1153-99 P co2 384.870 -999.990 ..I L3 2006 02 14 12 54 53.3100 -9.9000 26.00 212459 MHD 2005 12 29 14 55 1154-99 P co2 384.850 -999.990 ... L3 2006 02 14 13 09 53.3100 -9.9000 26.00 212460 MHD 2006 01 13 14 55 195-99 P co2 384.550 -999.990 ... L3 2006 04 10 14 19 53.3100 -9.9000 26.00 215122 MHD 2006 01 13 14 55 196-99 P co2 384.590 -999.990 ... L3 2006 04 10 14 33 53.3100 -9.9000 26.00 215123 MHD 2006 01 16 11 25 829-99 P co2 385.330 -999.990 ... L3 2006 04 10 13 51 53.3100 -9.9000 26.00 215124 MHD 2006 01 16 11 25 830-99 P co2 385.380 -999.990 ... L3 2006 04 10 14 05 53.3100 -9.9000 26.00 215125 MHD 2006 01 25 10 00 3495-99 P co2 389.430 -999.990 ..I L3 2006 03 10 11 49 53.3100 -9.9000 26.00 213669 MHD 2006 01 25 10 00 3496-99 P co2 389.630 -999.990 ... L3 2006 03 10 12 03 53.3100 -9.9000 26.00 213670 MHD 2006 02 02 14 05 3345-99 P co2 404.510 -999.990 .XI L3 2006 03 10 12 17 53.3100 -9.9000 26.00 213667 MHD 2006 02 02 14 05 3346-99 P co2 404.830 -999.990 .X. L3 2006 03 10 12 31 53.3100 -9.9000 26.00 213668 MHD 2006 02 07 16 45 3017-99 P co2 384.610 -999.990 ..I L3 2006 03 10 11 20 53.3100 -9.9000 26.00 213665 MHD 2006 02 07 16 45 3018-99 P co2 384.630 -999.990 ... L3 2006 03 10 11 34 53.3100 -9.9000 26.00 213666 MHD 2006 02 14 10 00 3521-99 P co2 386.080 -999.990 ..I L3 2006 03 10 10 52 53.3100 -9.9000 26.00 213663 MHD 2006 02 14 10 00 3522-99 P co2 386.120 -999.990 ... L3 2006 03 10 11 06 53.3100 -9.9000 26.00 213664 MHD 2006 02 24 11 20 3837-99 P co2 386.720 -999.990 ... L3 2006 04 11 12 23 53.3100 -9.9000 26.00 215140 MHD 2006 02 24 11 20 3838-99 P co2 386.720 -999.990 ... L3 2006 04 11 12 37 53.3100 -9.9000 26.00 215141 MHD 2006 02 27 11 35 2627-99 P co2 385.150 -999.990 ... L3 2006 04 11 12 51 53.3100 -9.9000 26.00 215138 MHD 2006 02 27 11 35 2628-99 P co2 385.150 -999.990 ... L3 2006 04 11 13 05 53.3100 -9.9000 26.00 215139 MHD 2006 03 07 10 00 1739-99 P co2 385.350 -999.990 ... L3 2006 04 11 13 20 53.3100 -9.9000 26.00 215142 MHD 2006 03 07 10 00 1740-99 P co2 385.460 -999.990 ... L3 2006 04 11 13 34 53.3100 -9.9000 26.00 215143 MHD 2006 03 13 11 00 4541-99 P co2 384.980 -999.990 ... L3 2006 04 11 13 48 53.3100 -9.9000 26.00 215144 MHD 2006 03 13 11 00 4542-99 P co2 384.910 -999.990 ... L3 2006 04 11 14 02 53.3100 -9.9000 26.00 215145 MHD 2006 03 21 10 30 2305-99 P co2 388.160 -999.990 ..I L3 2006 07 18 14 45 53.3100 -9.9000 26.00 219131 MHD 2006 03 21 10 30 2306-99 P co2 388.330 -999.990 ... L3 2006 07 18 15 00 53.3100 -9.9000 26.00 219132 MHD 2006 03 27 11 00 4521-99 P co2 385.830 -999.990 ..I L3 2006 07 18 15 14 53.3100 -9.9000 26.00 219129 MHD 2006 03 27 11 00 4522-99 P co2 385.780 -999.990 ... L3 2006 07 18 15 28 53.3100 -9.9000 26.00 219130 MHD 2006 04 03 11 30 1331-99 P co2 386.180 -999.990 ..I L3 2006 07 18 16 39 53.3100 -9.9000 26.00 219139 MHD 2006 04 03 11 30 1332-99 P co2 386.230 -999.990 ... L3 2006 07 18 16 54 53.3100 -9.9000 26.00 219140 MHD 2006 04 11 09 20 3187-99 P co2 386.830 -999.990 ..I L3 2006 07 19 08 42 53.3100 -9.9000 26.00 219137 MHD 2006 04 11 09 20 3188-99 P co2 386.830 -999.990 ... L3 2006 07 19 08 57 53.3100 -9.9000 26.00 219138 MHD 2006 04 18 09 30 781-99 P co2 386.270 -999.990 ..I L3 2006 07 18 14 16 53.3100 -9.9000 26.00 219125 MHD 2006 04 18 09 30 782-99 P co2 386.450 -999.990 ... L3 2006 07 18 14 30 53.3100 -9.9000 26.00 219126 MHD 2006 04 25 09 00 3029-99 P co2 386.030 -999.990 -.I L3 2006 07 18 13 48 53.3100 -9.9000 26.00 219127 MHD 2006 04 25 09 00 3030-99 P co2 386.970 -999.990 +.. L3 2006 07 18 14 02 53.3100 -9.9000 26.00 219128 MHD 2006 05 02 10 10 1395-99 P co2 386.480 -999.990 ..I L3 2006 07 18 13 19 53.3100 -9.9000 26.00 219068 MHD 2006 05 02 10 10 1396-99 P co2 386.550 -999.990 ... L3 2006 07 18 13 34 53.3100 -9.9000 26.00 219069 MHD 2006 05 28 12 05 3509-99 P co2 388.030 -999.990 ..I L3 2006 07 18 12 51 53.3100 -9.9000 26.00 219070 MHD 2006 05 28 12 05 3510-99 P co2 388.250 -999.990 ... L3 2006 07 18 13 05 53.3100 -9.9000 26.00 219071 MHD 2006 05 31 12 00 3939-99 P co2 386.770 -999.990 ..I L3 2006 07 18 15 42 53.3100 -9.9000 26.00 219135 MHD 2006 05 31 12 00 3940-99 P co2 386.910 -999.990 ... L3 2006 07 18 15 57 53.3100 -9.9000 26.00 219136 MHD 2006 06 19 14 50 4661-99 P co2 382.450 -999.990 ... L3 2006 07 18 16 11 53.3100 -9.9000 26.00 219133 MHD 2006 06 19 14 50 4662-99 P co2 382.650 -999.990 ... L3 2006 07 18 16 25 53.3100 -9.9000 26.00 219134 MHD 2006 06 29 12 50 4319-99 P co2 381.360 -999.990 ..I L3 2006 11 03 09 01 53.3100 -9.9000 26.00 224244 MHD 2006 06 29 12 50 4320-99 P co2 381.470 -999.990 ... L3 2006 11 03 09 16 53.3100 -9.9000 26.00 224245 MHD 2006 07 07 08 50 3001-99 P co2 379.540 -999.990 ..I L3 2006 11 03 09 30 53.3100 -9.9000 26.00 224242 MHD 2006 07 07 08 50 3002-99 P co2 379.540 -999.990 ... L3 2006 11 03 09 44 53.3100 -9.9000 26.00 224243 MHD 2006 07 27 13 00 2585-99 P co2 378.120 -999.990 ..I L3 2006 11 03 10 55 53.3100 -9.9000 26.00 224236 MHD 2006 07 27 13 00 2586-99 P co2 378.160 -999.990 ... L3 2006 11 03 11 09 53.3100 -9.9000 26.00 224237 MHD 2006 07 31 10 30 2181-99 P co2 376.380 -999.990 ..I L3 2006 11 03 11 24 53.3100 -9.9000 26.00 224234 MHD 2006 07 31 10 30 2182-99 P co2 376.470 -999.990 ... L3 2006 11 03 11 38 53.3100 -9.9000 26.00 224235 MHD 2006 08 09 11 05 2719-99 P co2 373.350 -999.990 ..I L3 2006 11 03 14 14 53.3100 -9.9000 26.00 224230 MHD 2006 08 09 11 05 2720-99 P co2 373.380 -999.990 ... L3 2006 11 03 14 29 53.3100 -9.9000 26.00 224231 MHD 2006 08 15 10 40 3769-99 P co2 373.570 -999.990 ..I L3 2006 11 03 14 43 53.3100 -9.9000 26.00 224232 MHD 2006 08 15 10 40 3770-99 P co2 373.390 -999.990 ... L3 2006 11 03 14 57 53.3100 -9.9000 26.00 224233 MHD 2006 08 23 12 20 3985-99 P co2 372.640 -999.990 ..I L3 2006 11 03 12 21 53.3100 -9.9000 26.00 224238 MHD 2006 08 23 12 20 3986-99 P co2 372.580 -999.990 ... L3 2006 11 03 12 35 53.3100 -9.9000 26.00 224239 MHD 2006 08 28 09 40 2273-99 P co2 371.610 -999.990 ..I L3 2006 11 03 11 52 53.3100 -9.9000 26.00 224240 MHD 2006 08 28 09 40 2274-99 P co2 371.500 -999.990 ... L3 2006 11 03 12 06 53.3100 -9.9000 26.00 224241 MHD 2006 09 05 12 50 3407-99 P co2 377.240 -999.990 .XI L3 2006 11 03 09 58 53.3100 -9.9000 26.00 224246 MHD 2006 09 05 12 50 3408-99 P co2 377.320 -999.990 .X. L3 2006 11 03 10 12 53.3100 -9.9000 26.00 224247 MHD 2006 09 13 09 00 275-99 P co2 374.410 -999.990 ..I L3 2006 11 03 10 27 53.3100 -9.9000 26.00 224248 MHD 2006 09 13 09 00 276-99 P co2 374.310 -999.990 ... L3 2006 11 03 10 41 53.3100 -9.9000 26.00 224249 MHD 2006 09 25 17 40 3413-99 P co2 375.240 -999.990 ..I L3 2007 01 04 12 05 53.3100 -9.9000 26.00 226537 MHD 2006 09 25 17 40 3414-99 P co2 375.190 -999.990 ... L3 2007 01 04 12 20 53.3100 -9.9000 26.00 226538 MHD 2006 10 04 10 40 327-99 P co2 377.890 -999.990 ..I L3 2007 01 04 12 34 53.3100 -9.9000 26.00 226539 MHD 2006 10 04 10 40 328-99 P co2 377.910 -999.990 ... L3 2007 01 04 12 48 53.3100 -9.9000 26.00 226540 MHD 2006 10 09 15 00 955-99 P co2 378.010 -999.990 ..I L3 2007 01 04 13 02 53.3100 -9.9000 26.00 226542 MHD 2006 10 09 15 00 956-99 P co2 377.900 -999.990 ... L3 2007 01 04 13 17 53.3100 -9.9000 26.00 226543 MHD 2006 10 13 11 00 3339-99 P co2 382.850 -999.990 .XI L3 2007 01 04 09 43 53.3100 -9.9000 26.00 226533 MHD 2006 10 13 11 00 3340-99 P co2 382.900 -999.990 .X. L3 2007 01 04 09 57 53.3100 -9.9000 26.00 226534 MHD 2006 10 17 12 00 3169-99 P co2 403.310 -999.990 .ZI L3 2007 01 04 13 31 53.3100 -9.9000 26.00 226541 MHD 2006 10 23 09 35 135-99 P co2 380.150 -999.990 ..I L3 2007 01 04 14 28 53.3100 -9.9000 26.00 226782 MHD 2006 10 23 09 35 136-99 P co2 379.880 -999.990 ... L3 2007 01 04 14 42 53.3100 -9.9000 26.00 226783 MHD 2006 10 31 10 10 3639-99 P co2 381.270 -999.990 ..I L3 2007 01 04 14 56 53.3100 -9.9000 26.00 226780 MHD 2006 10 31 10 10 3640-99 P co2 381.180 -999.990 ... L3 2007 01 04 15 11 53.3100 -9.9000 26.00 226781 MHD 2006 11 08 10 00 4135-99 P co2 382.190 -999.990 ..I L3 2007 01 04 09 15 53.3100 -9.9000 26.00 226535 MHD 2006 11 08 10 00 4136-99 P co2 382.230 -999.990 ... L3 2007 01 04 09 29 53.3100 -9.9000 26.00 226536 MHD 2006 11 20 11 00 583-99 P co2 384.010 -999.990 ..I L3 2007 03 14 15 59 53.3100 -9.9000 26.00 230533 MHD 2006 11 20 11 00 584-99 P co2 384.060 -999.990 ... L3 2007 03 14 16 13 53.3100 -9.9000 26.00 230534 MHD 2006 11 24 15 55 6593-66 P co2 384.520 -999.990 ..I L3 2007 03 14 14 34 53.3100 -9.9000 26.00 230531 MHD 2006 11 24 15 55 6594-66 P co2 384.180 -999.990 ... L3 2007 03 14 14 48 53.3100 -9.9000 26.00 230532 MHD 2006 12 04 12 45 3483-99 P co2 383.630 -999.990 ..I L3 2007 03 16 14 39 53.3100 -9.9000 26.00 230537 MHD 2006 12 04 12 45 3484-99 P co2 383.450 -999.990 ... L3 2007 03 16 14 53 53.3100 -9.9000 26.00 230538 MHD 2006 12 11 10 15 1281-99 P co2 385.100 -999.990 ..I L3 2007 03 16 14 11 53.3100 -9.9000 26.00 230535 MHD 2006 12 11 10 15 1282-99 P co2 385.040 -999.990 ... L3 2007 03 16 14 25 53.3100 -9.9000 26.00 230536 MHD 2006 12 21 11 00 6119-66 P co2 387.640 -999.990 ... L3 2007 04 06 12 28 53.3100 -9.9000 26.00 231653 MHD 2006 12 21 11 00 6120-66 P co2 387.500 -999.990 ... L3 2007 04 06 12 43 53.3100 -9.9000 26.00 231654 MHD 2007 01 03 15 40 4545-99 P co2 385.960 -999.990 ... L3 2007 04 06 12 57 53.3100 -9.9000 26.00 231651 MHD 2007 01 03 15 40 4546-99 P co2 385.990 -999.990 ... L3 2007 04 06 13 11 53.3100 -9.9000 26.00 231652 MHD 2007 01 10 13 00 4091-99 P co2 386.450 -999.990 ..I L3 2007 03 19 08 58 53.3100 -9.9000 26.00 230541 MHD 2007 01 10 13 00 4092-99 P co2 386.440 -999.990 ... L3 2007 03 19 09 12 53.3100 -9.9000 26.00 230542 MHD 2007 01 17 11 00 2541-99 P co2 386.300 -999.990 ..I L3 2007 03 19 09 26 53.3100 -9.9000 26.00 230539 MHD 2007 01 17 11 00 2542-99 P co2 386.360 -999.990 ... L3 2007 03 19 09 41 53.3100 -9.9000 26.00 230540 MHD 2007 01 22 16 50 1939-99 P co2 386.520 -999.990 ... L3 2007 05 08 15 02 53.3100 -9.9000 26.00 233679 MHD 2007 01 23 16 30 3167-99 P co2 388.170 -999.990 ..I L3 2007 05 29 10 51 53.3100 -9.9000 26.00 234668 MHD 2007 01 23 16 30 3168-99 P co2 387.810 -999.990 ... L3 2007 05 29 11 05 53.3100 -9.9000 26.00 234669 MHD 2007 01 31 12 00 1579-99 P co2 386.580 -999.990 ..I L3 2007 05 08 14 19 53.3100 -9.9000 26.00 233680 MHD 2007 01 31 12 00 1580-99 P co2 386.550 -999.990 ..I L3 2007 05 08 14 34 53.3100 -9.9000 26.00 233681 MHD 2007 02 13 15 20 1389-99 P co2 387.650 -999.990 ..I L3 2007 05 29 10 22 53.3100 -9.9000 26.00 234666 MHD 2007 02 13 15 20 1390-99 P co2 387.470 -999.990 ... L3 2007 05 29 10 37 53.3100 -9.9000 26.00 234667 MHD 2007 02 27 12 15 1607-99 P co2 387.290 -999.990 ..I L3 2007 05 25 10 20 53.3100 -9.9000 26.00 234643 MHD 2007 02 27 12 15 1608-99 P co2 386.940 -999.990 ... L3 2007 05 25 10 34 53.3100 -9.9000 26.00 234644 MHD 2007 03 06 10 00 2493-99 P co2 387.570 -999.990 ..I L3 2007 05 25 10 48 53.3100 -9.9000 26.00 234641 MHD 2007 03 06 10 00 2494-99 P co2 387.400 -999.990 ... L3 2007 05 25 11 02 53.3100 -9.9000 26.00 234642 MHD 2007 03 12 10 00 2039-99 P co2 388.390 -999.990 ..I L3 2007 05 08 13 23 53.3100 -9.9000 26.00 233675 MHD 2007 03 12 10 00 2040-99 P co2 388.450 -999.990 ... L3 2007 05 08 13 37 53.3100 -9.9000 26.00 233676 MHD 2007 03 21 15 15 4377-99 P co2 386.650 -999.990 ..I L3 2007 05 08 13 51 53.3100 -9.9000 26.00 233677 MHD 2007 03 21 15 15 4378-99 P co2 386.570 -999.990 ... L3 2007 05 08 14 05 53.3100 -9.9000 26.00 233678 MHD 2007 03 26 13 00 1787-99 P co2 397.820 -999.990 .ZI L8 2007 05 11 14 03 53.3100 -9.9000 26.00 233820 MHD 2007 03 26 13 00 1788-99 P co2 397.640 -999.990 .Z. L8 2007 05 11 14 17 53.3100 -9.9000 26.00 233821 MHD 2007 03 28 10 00 3435-99 P co2 389.060 -999.990 ... L8 2007 05 11 13 34 53.3100 -9.9000 26.00 233822 MHD 2007 03 28 10 00 3436-99 P co2 388.950 -999.990 ..I L8 2007 05 11 13 48 53.3100 -9.9000 26.00 233823 MHD 2007 04 10 11 00 1341-99 P co2 387.580 -999.990 +.I L3 2007 05 25 14 07 53.3100 -9.9000 26.00 234664 MHD 2007 04 10 11 00 1342-99 P co2 387.030 -999.990 -.. L3 2007 05 25 14 21 53.3100 -9.9000 26.00 234665 MHD 2007 04 16 12 20 697-99 P co2 389.130 -999.990 ..I L3 2007 05 25 14 36 53.3100 -9.9000 26.00 234662 MHD 2007 04 16 12 20 698-99 P co2 388.680 -999.990 ... L3 2007 05 25 14 50 53.3100 -9.9000 26.00 234663 MHD 2007 04 23 12 34 1811-99 P co2 386.660 -999.990 ..I L8 2007 06 26 12 58 53.3100 -9.9000 26.00 236424 MHD 2007 04 23 12 34 1812-99 P co2 386.400 -999.990 ... L8 2007 06 26 13 12 53.3100 -9.9000 26.00 236425 MHD 2007 05 07 12 45 4193-99 P co2 388.480 -999.990 ..I L8 2007 06 26 13 27 53.3100 -9.9000 26.00 236426 MHD 2007 05 07 12 45 4194-99 P co2 388.420 -999.990 ... L8 2007 06 26 13 41 53.3100 -9.9000 26.00 236427 MHD 2007 05 14 10 15 3213-99 P co2 388.090 -999.990 ..I L3 2007 06 27 10 17 53.3100 -9.9000 26.00 236880 MHD 2007 05 14 10 15 3214-99 P co2 387.850 -999.990 ... L3 2007 06 27 10 31 53.3100 -9.9000 26.00 236881 MHD 2007 05 21 12 20 2619-99 P co2 387.260 -999.990 ..I L3 2007 06 27 10 46 53.3100 -9.9000 26.00 236878 MHD 2007 05 21 12 20 2620-99 P co2 387.160 -999.990 ... L3 2007 06 27 11 00 53.3100 -9.9000 26.00 236879 MHD 2007 06 19 12 05 1999-99 P co2 382.400 -999.990 +.I L3 2007 08 31 11 00 53.3100 -9.9000 26.00 240633 MHD 2007 06 19 12 05 2000-99 P co2 381.880 -999.990 -.. L3 2007 08 31 11 14 53.3100 -9.9000 26.00 240634 MHD 2007 06 26 12 55 1695-99 P co2 383.960 -999.990 ..I L3 2007 08 31 11 29 53.3100 -9.9000 26.00 240631 MHD 2007 06 26 12 55 1696-99 P co2 383.600 -999.990 ... L3 2007 08 31 11 43 53.3100 -9.9000 26.00 240632 MHD 2007 07 02 10 15 2611-99 P co2 380.850 -999.990 ..I L3 2007 08 30 13 26 53.3100 -9.9000 26.00 240627 MHD 2007 07 02 10 15 2612-99 P co2 380.430 -999.990 ... L3 2007 08 30 13 40 53.3100 -9.9000 26.00 240628 MHD 2007 07 09 10 42 3153-99 P co2 380.710 -999.990 ..I L3 2007 08 30 13 54 53.3100 -9.9000 26.00 240629 MHD 2007 07 09 10 42 3154-99 P co2 380.560 -999.990 ... L3 2007 08 30 14 08 53.3100 -9.9000 26.00 240630 MHD 2007 07 17 14 45 1209-99 P co2 378.390 -999.990 ..I L3 2007 09 20 15 21 53.3100 -9.9000 26.00 241948 MHD 2007 07 17 14 45 1210-99 P co2 378.340 -999.990 ... L3 2007 09 20 15 36 53.3100 -9.9000 26.00 241949 MHD 2007 07 24 13 10 267-99 P co2 378.110 -999.990 ..I L3 2007 09 21 08 14 53.3100 -9.9000 26.00 241950 MHD 2007 07 24 13 10 268-99 P co2 378.020 -999.990 ... L3 2007 09 21 08 28 53.3100 -9.9000 26.00 241951 MHD 2007 08 02 10 45 1795-99 P co2 374.050 -999.990 ..I L3 2007 09 20 14 24 53.3100 -9.9000 26.00 241944 MHD 2007 08 02 10 45 1796-99 P co2 373.820 -999.990 ... L3 2007 09 20 14 39 53.3100 -9.9000 26.00 241945 MHD 2007 08 07 17 25 4005-99 P co2 374.330 -999.990 ..I L3 2007 09 20 13 56 53.3100 -9.9000 26.00 241946 MHD 2007 08 07 17 25 4006-99 P co2 374.170 -999.990 ... L3 2007 09 20 14 10 53.3100 -9.9000 26.00 241947 MHD 2007 08 16 12 50 2123-99 P co2 374.920 -999.990 ..I L3 2007 12 11 16 07 53.3100 -9.9000 26.00 245954 MHD 2007 08 16 12 50 2124-99 P co2 374.840 -999.990 ... L3 2007 12 11 16 21 53.3100 -9.9000 26.00 245955 MHD 2007 08 28 15 40 2713-99 P co2 373.700 -999.990 ..I L3 2007 12 11 16 35 53.3100 -9.9000 26.00 245956 MHD 2007 08 28 15 40 2714-99 P co2 373.720 -999.990 ... L3 2007 12 11 16 49 53.3100 -9.9000 26.00 245957 MHD 2007 09 04 14 45 243-99 P co2 377.890 -999.990 +.I L3 2007 10 15 16 18 53.3100 -9.9000 26.00 243261 MHD 2007 09 04 14 45 244-99 P co2 377.000 -999.990 -.. L3 2007 10 15 16 32 53.3100 -9.9000 26.00 243262 MHD 2007 09 14 10 00 4769-99 P co2 375.270 -999.990 ..I L3 2007 10 15 16 47 53.3100 -9.9000 26.00 243259 MHD 2007 09 14 10 00 4770-99 P co2 375.200 -999.990 ... L3 2007 10 15 17 01 53.3100 -9.9000 26.00 243260 MHD 2007 09 18 09 35 3659-99 P co2 375.910 -999.990 ..I L3 2007 12 11 15 38 53.3100 -9.9000 26.00 245950 MHD 2007 09 18 09 35 3660-99 P co2 375.730 -999.990 ... L3 2007 12 11 15 52 53.3100 -9.9000 26.00 245951 MHD 2007 09 24 11 00 1139-99 P co2 375.600 -999.990 ..I L3 2007 12 11 15 10 53.3100 -9.9000 26.00 245952 MHD 2007 09 24 11 00 1140-99 P co2 375.400 -999.990 ... L3 2007 12 11 15 24 53.3100 -9.9000 26.00 245953 MHD 2007 10 15 12 00 2203-99 P co2 381.620 -999.990 ..I L3 2007 12 11 18 01 53.3100 -9.9000 26.00 245942 MHD 2007 10 15 12 00 2204-99 P co2 381.480 -999.990 ... L3 2007 12 11 18 15 53.3100 -9.9000 26.00 245943 MHD 2007 10 22 11 00 4707-99 P co2 381.750 -999.990 ..I L3 2007 12 12 08 36 53.3100 -9.9000 26.00 245948 MHD 2007 10 22 11 00 4708-99 P co2 381.530 -999.990 ... L3 2007 12 12 08 50 53.3100 -9.9000 26.00 245949 MHD 2007 11 06 16 10 4399-99 P co2 384.140 -999.990 ..I L3 2008 01 16 12 39 53.3100 -9.9000 26.00 247547 MHD 2007 11 06 16 10 4400-99 P co2 384.140 -999.990 ... L3 2008 01 16 12 53 53.3100 -9.9000 26.00 247548 MHD 2007 11 14 11 50 3713-99 P co2 382.650 -999.990 ..I L3 2008 01 16 12 10 53.3100 -9.9000 26.00 247545 MHD 2007 11 14 11 50 3714-99 P co2 382.580 -999.990 ... L3 2008 01 16 12 25 53.3100 -9.9000 26.00 247546 MHD 2007 11 22 17 45 1808-99 P co2 386.460 -999.990 ... L8 2008 01 23 16 32 53.3100 -9.9000 26.00 247549 MHD 2007 11 27 13 40 2231-99 P co2 384.140 -999.990 ..I L3 2008 01 16 16 55 53.3100 -9.9000 26.00 247550 MHD 2007 11 27 13 40 2232-99 P co2 384.120 -999.990 ... L3 2008 01 16 17 09 53.3100 -9.9000 26.00 247551 MHD 2007 12 03 11 40 2369-99 P co2 386.600 -999.990 ..I L3 2008 01 17 09 24 53.3100 -9.9000 26.00 247552 MHD 2007 12 03 11 40 2370-99 P co2 386.360 -999.990 ... L3 2008 01 17 09 38 53.3100 -9.9000 26.00 247553 MHD 2007 12 10 16 45 1891-99 P co2 386.530 -999.990 ..I L3 2008 01 17 08 56 53.3100 -9.9000 26.00 247554 MHD 2007 12 10 16 45 1892-99 P co2 386.460 -999.990 ... L3 2008 01 17 09 10 53.3100 -9.9000 26.00 247555 MHD 2007 12 17 17 10 4137-99 P co2 392.680 -999.990 .XI L8 2008 03 18 15 36 53.3200 -9.9000 26.00 251056 MHD 2007 12 17 17 10 4138-99 P co2 392.640 -999.990 .X. L8 2008 03 18 15 52 53.3200 -9.9000 26.00 251057 MHD 2007 12 29 11 45 1511-99 P co2 387.750 -999.990 ..I L8 2008 03 18 16 07 53.3200 -9.9000 26.00 251058 MHD 2007 12 29 11 45 1512-99 P co2 387.640 -999.990 ... L8 2008 03 18 16 22 53.3200 -9.9000 26.00 251059 MHD 2008 01 07 11 00 4407-99 P co2 389.170 -999.990 ..I L8 2008 02 29 15 03 53.3200 -9.9000 26.00 250155 MHD 2008 01 07 11 00 4408-99 P co2 388.990 -999.990 ... L8 2008 02 29 15 18 53.3200 -9.9000 26.00 250156 MHD 2008 01 14 10 50 2375-99 P co2 390.170 -999.990 ..I L8 2008 02 29 14 32 53.3200 -9.9000 26.00 250153 MHD 2008 01 14 10 50 2376-99 P co2 390.040 -999.990 ... L8 2008 02 29 14 48 53.3200 -9.9000 26.00 250154 MHD 2008 01 21 10 00 4473-99 P co2 389.710 -999.990 ... L3 2008 04 28 15 04 53.3200 -9.9000 26.00 253112 MHD 2008 01 21 10 00 4474-99 P co2 390.090 -999.990 ... L3 2008 04 28 15 18 53.3200 -9.9000 26.00 253113 MHD 2008 01 29 17 25 6545-66 P co2 389.800 -999.990 ... L3 2008 04 28 14 36 53.3200 -9.9000 26.00 253110 MHD 2008 01 29 17 25 6546-66 P co2 389.890 -999.990 ... L3 2008 04 28 14 50 53.3200 -9.9000 26.00 253111 MHD 2008 02 04 11 00 119-99 P co2 390.050 -999.990 ... L3 2008 04 29 09 49 53.3200 -9.9000 26.00 253152 MHD 2008 02 04 11 00 120-99 P co2 390.040 -999.990 ... L3 2008 04 29 10 04 53.3200 -9.9000 26.00 253153 MHD 2008 02 12 12 00 2479-99 P co2 405.770 -999.990 .Z. L3 2008 04 29 10 46 53.3200 -9.9000 26.00 253150 MHD 2008 02 12 12 00 2480-99 P co2 405.720 -999.990 .Z. L3 2008 04 29 11 01 53.3200 -9.9000 26.00 253151 MHD 2008 02 20 17 15 2885-99 P co2 390.340 -999.990 ... L3 2008 04 25 13 28 53.3200 -9.9000 26.00 253081 MHD 2008 02 20 17 15 2886-99 P co2 390.390 -999.990 ... L3 2008 04 25 13 42 53.3200 -9.9000 26.00 253082 MHD 2008 02 28 11 30 2653-99 P co2 389.860 -999.990 ... L3 2008 04 25 13 56 53.3200 -9.9000 26.00 253079 MHD 2008 02 28 11 30 2654-99 P co2 390.090 -999.990 ... L3 2008 04 25 14 10 53.3200 -9.9000 26.00 253080 MHD 2008 03 07 10 45 2973-99 P co2 391.010 -999.990 ... L3 2008 04 28 11 16 53.3200 -9.9000 26.00 253077 MHD 2008 03 07 10 45 2974-99 P co2 390.890 -999.990 ... L3 2008 04 28 11 30 53.3200 -9.9000 26.00 253078 MHD 2008 03 11 10 30 3755-99 P co2 395.910 -999.990 .X. L3 2008 04 28 11 45 53.3200 -9.9000 26.00 253075 MHD 2008 03 11 10 30 3756-99 P co2 395.840 -999.990 .X. L3 2008 04 28 11 59 53.3200 -9.9000 26.00 253076 MHD 2008 03 20 11 40 3921-99 P co2 390.630 -999.990 ... L3 2008 04 28 10 19 53.3200 -9.9000 26.00 253073 MHD 2008 03 20 11 40 3922-99 P co2 390.580 -999.990 ... L3 2008 04 28 10 33 53.3200 -9.9000 26.00 253074 MHD 2008 03 25 11 15 2631-99 P co2 389.550 -999.990 ... L3 2008 04 28 10 48 53.3200 -9.9000 26.00 253071 MHD 2008 03 25 11 15 2632-99 P co2 389.610 -999.990 ... L3 2008 04 28 11 02 53.3200 -9.9000 26.00 253072 MHD 2008 04 01 10 00 1373-99 P co2 392.390 -999.990 ... L8 2008 05 30 12 22 53.3300 -9.9000 26.00 254817 MHD 2008 04 01 10 00 1374-99 P co2 392.360 -999.990 ... L8 2008 05 30 12 37 53.3300 -9.9000 26.00 254818 MHD 2008 04 10 12 00 4845-99 P co2 390.880 -999.990 ... L8 2008 05 30 12 53 53.3300 -9.9000 26.00 254819 MHD 2008 04 10 12 00 4846-99 P co2 390.920 -999.990 ... L8 2008 05 30 13 08 53.3300 -9.9000 26.00 254820 MHD 2008 04 14 13 35 231-99 P co2 391.810 -999.990 ... L8 2008 05 30 13 23 53.3300 -9.9000 26.00 254823 MHD 2008 04 14 13 35 232-99 P co2 391.780 -999.990 ... L8 2008 05 30 13 39 53.3300 -9.9000 26.00 254824 MHD 2008 04 18 15 20 2183-99 P co2 391.040 -999.990 ... L8 2008 05 30 13 54 53.3300 -9.9000 26.00 254821 MHD 2008 04 18 15 20 2184-99 P co2 391.080 -999.990 ... L8 2008 05 30 14 09 53.3300 -9.9000 26.00 254822 MHD 2008 04 24 13 55 1689-99 P co2 468.520 -999.990 +.. L3 2008 07 31 11 09 53.3300 -9.9000 26.00 258524 MHD 2008 04 24 13 55 1690-99 P co2 330.480 -999.990 -.. L3 2008 07 31 11 23 53.3300 -9.9000 26.00 258525 MHD 2008 04 24 14 00 3379-99 P co2 391.430 -999.990 ... L8 2008 07 31 11 36 53.3300 -9.9000 26.00 258526 MHD 2008 04 24 14 00 3380-99 P co2 391.400 -999.990 ... L8 2008 07 31 11 51 53.3300 -9.9000 26.00 258527 MHD 2008 04 30 14 40 3773-99 P co2 385.710 -999.990 .X. L8 2008 07 31 12 06 53.3300 -9.9000 26.00 258528 MHD 2008 04 30 14 40 3774-99 P co2 385.490 -999.990 .X. L8 2008 07 31 12 22 53.3300 -9.9000 26.00 258529 MHD 2008 06 03 11 45 6255-66 P co2 390.220 -999.990 ... L3 2008 07 31 11 37 53.3300 -9.9000 26.00 258530 MHD 2008 06 03 11 45 6256-66 P co2 390.160 -999.990 ... L3 2008 07 31 11 52 53.3300 -9.9000 26.00 258531 MHD 2008 06 09 10 55 1981-99 P co2 387.980 -999.990 ... L3 2008 12 23 14 26 53.3300 -9.9000 26.00 266049 MHD 2008 06 09 10 55 1982-99 P co2 387.950 -999.990 ... L3 2008 12 23 14 40 53.3300 -9.9000 26.00 266050 MHD 2008 06 16 09 32 3655-99 P co2 387.140 -999.990 ... L3 2008 12 23 13 57 53.3300 -9.9000 26.00 266047 MHD 2008 06 16 09 32 3656-99 P co2 386.930 -999.990 ... L3 2008 12 23 14 12 53.3300 -9.9000 26.00 266048 MHD 2008 06 25 12 15 2399-99 P co2 387.060 -999.990 ... L3 2008 10 07 16 39 53.3300 -9.9000 26.00 261940 MHD 2008 06 25 12 15 2400-99 P co2 387.040 -999.990 ... L3 2008 10 07 16 53 53.3300 -9.9000 26.00 261941 MHD 2008 07 08 12 55 3835-99 P co2 383.100 -999.990 ... L3 2008 10 07 15 42 53.3300 -9.9000 26.00 261938 MHD 2008 07 08 12 55 3836-99 P co2 382.970 -999.990 ... L3 2008 10 07 15 56 53.3300 -9.9000 26.00 261939 MHD 2008 07 14 14 15 2177-99 P co2 379.940 -999.990 ... L3 2008 10 07 17 08 53.3300 -9.9000 26.00 261942 MHD 2008 07 14 14 15 2178-99 P co2 379.900 -999.990 ... L3 2008 10 07 17 22 53.3300 -9.9000 26.00 261943 MHD 2008 07 21 09 35 1269-99 P co2 380.590 -999.990 ... L3 2008 10 07 16 11 53.3300 -9.9000 26.00 261944 MHD 2008 07 21 09 35 1270-99 P co2 380.570 -999.990 ... L3 2008 10 07 16 25 53.3300 -9.9000 26.00 261945 MHD 2008 07 30 12 30 3537-99 P co2 379.370 -999.990 ... L3 2008 12 30 12 25 53.3300 -9.9000 26.00 266668 MHD 2008 07 30 12 30 3538-99 P co2 379.450 -999.990 ... L3 2008 12 30 12 40 53.3300 -9.9000 26.00 266669 MHD 2008 08 07 12 00 2987-99 P co2 373.790 -999.990 .X. L3 2008 12 30 12 54 53.3300 -9.9000 26.00 266656 MHD 2008 08 07 12 00 2988-99 P co2 373.730 -999.990 .X. L3 2008 12 30 13 08 53.3300 -9.9000 26.00 266657 MHD 2008 08 11 11 10 1961-99 P co2 379.710 -999.990 ... L3 2008 10 08 10 16 53.3300 -9.9000 26.00 261927 MHD 2008 08 11 11 10 1962-99 P co2 379.730 -999.990 ... L3 2008 10 08 10 30 53.3300 -9.9000 26.00 261928 MHD 2008 08 19 09 35 639-99 P co2 378.110 -999.990 ... L3 2008 10 08 11 41 53.3300 -9.9000 26.00 261929 MHD 2008 08 19 09 35 640-99 P co2 377.990 -999.990 ... L3 2008 10 08 11 56 53.3300 -9.9000 26.00 261930 MHD 2008 08 25 09 30 2423-99 P co2 372.620 -999.990 .X. L3 2008 10 06 13 06 53.3300 -9.9000 26.00 261946 MHD 2008 08 25 09 30 2424-99 P co2 372.570 -999.990 .X. L3 2008 10 06 13 21 53.3300 -9.9000 26.00 261947 MHD 2008 09 01 10 15 5049-99 P co2 375.550 -999.990 ... L3 2008 10 06 15 29 53.3300 -9.9000 26.00 261948 MHD 2008 09 01 10 15 5050-99 P co2 375.530 -999.990 ... L3 2008 10 06 15 43 53.3300 -9.9000 26.00 261949 MHD 2008 09 09 17 25 517-99 P co2 377.410 -999.990 ... L8 2009 01 29 12 35 53.3300 -9.9000 26.00 268397 MHD 2008 09 09 17 25 518-99 P co2 377.360 -999.990 ... L8 2009 01 29 12 50 53.3300 -9.9000 26.00 268398 MHD 2008 09 23 10 10 1473-99 P co2 378.010 -999.990 ... L8 2009 01 29 15 40 53.3300 -9.9000 26.00 268393 MHD 2008 09 23 10 10 1474-99 P co2 377.940 -999.990 ... L8 2009 01 29 15 55 53.3300 -9.9000 26.00 268394 MHD 2008 10 16 11 30 3823-99 P co2 381.470 -999.990 ... L8 2009 01 29 13 36 53.3300 -9.9000 26.00 268405 MHD 2008 10 16 11 30 3824-99 P co2 381.650 -999.990 ... L8 2009 01 29 13 52 53.3300 -9.9000 26.00 268406 MHD 2008 10 20 09 00 2315-99 P co2 382.730 -999.990 ... L8 2009 01 29 13 21 53.3300 -9.9000 26.00 268401 MHD 2008 10 20 09 00 2316-99 P co2 382.670 -999.990 ... L8 2009 01 29 13 06 53.3300 -9.9000 26.00 268402 MHD 2008 10 29 10 45 3791-99 P co2 384.880 -999.990 ... L3 2009 02 02 13 12 53.3300 -9.9000 26.00 268367 MHD 2008 10 29 10 45 3792-99 P co2 385.060 -999.990 ... L3 2009 02 02 13 27 53.3300 -9.9000 26.00 268368 MHD 2008 11 06 11 00 4617-99 P co2 402.690 -999.990 .Z. L3 2009 02 02 13 41 53.3300 -9.9000 26.00 268365 MHD 2008 11 06 11 00 4618-99 P co2 402.610 -999.990 .Z. L3 2009 02 02 13 55 53.3300 -9.9000 26.00 268366 MHD 2008 11 07 12 30 3419-99 P co2 386.130 -999.990 ... L3 2008 12 30 11 57 53.3300 -9.9000 26.00 266654 MHD 2008 11 07 12 30 3420-99 P co2 386.120 -999.990 ... L3 2008 12 30 12 11 53.3300 -9.9000 26.00 266655 MHD 2008 11 11 11 30 4549-99 P co2 385.330 -999.990 ... L3 2008 12 30 11 28 53.3300 -9.9000 26.00 266652 MHD 2008 11 11 11 30 4550-99 P co2 385.130 -999.990 ... L3 2008 12 30 11 43 53.3300 -9.9000 26.00 266653 MHD 2008 11 17 12 00 3149-99 P co2 386.530 -999.990 ... L8 2009 01 29 14 38 53.3300 -9.9000 26.00 268391 MHD 2008 11 17 12 00 3150-99 P co2 386.450 -999.990 ... L8 2009 01 29 14 53 53.3300 -9.9000 26.00 268392 MHD 2008 11 26 10 05 4071-99 P co2 385.660 -999.990 ... L8 2009 01 29 15 09 53.3300 -9.9000 26.00 268389 MHD 2008 11 26 10 05 4072-99 P co2 385.560 -999.990 ... L8 2009 01 29 15 24 53.3300 -9.9000 26.00 268390 MHD 2008 12 04 11 00 731-99 P co2 391.210 -999.990 ... L3 2009 03 30 14 13 53.3300 -9.9000 26.00 272312 MHD 2008 12 04 11 00 732-99 P co2 391.080 -999.990 ... L3 2009 03 30 14 27 53.3300 -9.9000 26.00 272313 MHD 2008 12 10 12 05 231-99 P co2 387.700 -999.990 ... L3 2009 03 30 13 45 53.3300 -9.9000 26.00 272310 MHD 2008 12 10 12 05 232-99 P co2 387.700 -999.990 ... L3 2009 03 30 13 59 53.3300 -9.9000 26.00 272311 MHD 2008 12 15 12 05 3315-99 P co2 388.580 -999.990 ... L8 2009 03 31 13 08 53.3300 -9.9000 26.00 272290 MHD 2008 12 15 12 05 3316-99 P co2 388.460 -999.990 ... L8 2009 03 31 13 23 53.3300 -9.9000 26.00 272291 MHD 2008 12 19 10 50 4845-99 P co2 388.320 -999.990 ... L8 2009 03 31 13 39 53.3300 -9.9000 26.00 272292 MHD 2008 12 19 10 50 4846-99 P co2 388.350 -999.990 ... L8 2009 03 31 13 54 53.3300 -9.9000 26.00 272293 MHD 2008 12 29 12 00 1343-99 P co2 395.980 -999.990 .X. L8 2009 03 30 14 09 53.3300 -9.9000 26.00 272294 MHD 2008 12 29 12 00 1344-99 P co2 395.780 -999.990 .X. L8 2009 03 30 14 24 53.3300 -9.9000 26.00 272295 MHD 2009 01 12 10 50 3611-99 P co2 390.920 -999.990 ... L8 2009 03 30 15 10 53.3300 -9.9000 26.00 272296 MHD 2009 01 12 10 50 3612-99 P co2 390.870 -999.990 ... L8 2009 03 30 15 26 53.3300 -9.9000 26.00 272297 MHD 2009 01 19 10 55 3421-99 P co2 390.720 -999.990 ... L8 2009 03 31 12 06 53.3300 -9.9000 26.00 272286 MHD 2009 01 19 10 55 3422-99 P co2 390.500 -999.990 ... L8 2009 03 31 12 22 53.3300 -9.9000 26.00 272287 MHD 2009 01 27 11 40 3751-99 P co2 389.910 -999.990 ... L8 2009 03 31 12 37 53.3300 -9.9000 26.00 272288 MHD 2009 01 27 11 40 3752-99 P co2 389.840 -999.990 ... L8 2009 03 31 12 52 53.3300 -9.9000 26.00 272289 MHD 2009 02 10 15 20 2361-99 P co2 390.790 -999.990 ... L3 2009 05 15 15 01 53.3300 -9.9000 26.00 275308 MHD 2009 02 10 15 20 2362-99 P co2 390.730 -999.990 ... L3 2009 05 15 15 16 53.3300 -9.9000 26.00 275309 MHD 2009 02 19 12 40 4175-99 P co2 390.420 -999.990 ... L3 2009 05 15 14 33 53.3300 -9.9000 26.00 275306 MHD 2009 02 19 12 40 4176-99 P co2 390.310 -999.990 ... L3 2009 05 15 14 47 53.3300 -9.9000 26.00 275307 MHD 2009 02 24 10 42 4839-99 P co2 392.000 -999.990 ... L3 2009 05 15 15 58 53.3300 -9.9000 26.00 275312 MHD 2009 02 24 10 42 4840-99 P co2 391.890 -999.990 ... L3 2009 05 15 16 13 53.3300 -9.9000 26.00 275313 MHD 2009 03 03 11 45 1899-99 P co2 390.610 -999.990 ... L3 2009 05 15 15 30 53.3300 -9.9000 26.00 275310 MHD 2009 03 03 11 45 1900-99 P co2 390.570 -999.990 ... L3 2009 05 15 15 44 53.3300 -9.9000 26.00 275311 MHD 2009 03 09 10 00 1585-99 P co2 391.780 -999.990 ... L3 2009 08 12 13 05 53.3300 -9.9000 26.00 281112 MHD 2009 03 09 10 00 1586-99 P co2 391.760 -999.990 ... L3 2009 08 12 13 19 53.3300 -9.9000 26.00 281113 MHD 2009 03 24 11 20 197-99 P co2 391.910 -999.990 ... L3 2009 08 12 12 36 53.3300 -9.9000 26.00 281110 MHD 2009 03 24 11 20 198-99 P co2 391.850 -999.990 ... L3 2009 08 12 12 51 53.3300 -9.9000 26.00 281111 MHD 2009 03 31 10 10 1207-99 P co2 392.270 -999.990 ... L3 2009 07 29 16 30 53.3300 -9.9000 26.00 280237 MHD 2009 03 31 10 10 1208-99 P co2 392.280 -999.990 ... L3 2009 07 29 16 44 53.3300 -9.9000 26.00 280238 MHD 2009 04 06 13 30 3305-99 P co2 392.870 -999.990 ... L3 2009 07 29 16 01 53.3300 -9.9000 26.00 280239 MHD 2009 04 06 13 30 3306-99 P co2 392.960 -999.990 ... L3 2009 07 29 16 15 53.3300 -9.9000 26.00 280240 MHD 2009 04 22 11 40 157-99 P co2 392.320 -999.990 ... L3 2009 07 29 15 04 53.3300 -9.9000 26.00 280235 MHD 2009 04 22 11 40 158-99 P co2 392.300 -999.990 ... L3 2009 07 29 15 18 53.3300 -9.9000 26.00 280236 MHD 2009 05 01 10 01 689-99 P co2 393.620 -999.990 +.. L3 2009 07 29 15 33 53.3300 -9.9000 26.00 280233 MHD 2009 05 01 10 01 690-99 P co2 392.960 -999.990 -.. L3 2009 07 29 15 47 53.3300 -9.9000 26.00 280234 MHD 2009 05 05 12 20 1905-99 P co2 391.660 -999.990 ... L10 2009 12 04 15 46 53.3260 -9.8990 26.00 286919 MHD 2009 05 05 12 20 1906-99 P co2 391.660 -999.990 ... L10 2009 12 04 16 01 53.3260 -9.8990 26.00 286920 MHD 2009 05 12 10 00 1443-99 P co2 393.390 -999.990 ... L10 2009 12 04 16 17 53.3260 -9.8990 26.00 286921 MHD 2009 05 12 10 00 1444-99 P co2 393.390 -999.990 ... L10 2009 12 04 16 32 53.3260 -9.8990 26.00 286922 MHD 2009 05 25 09 40 2983-99 P co2 390.310 -999.990 ... L3 2009 08 12 16 53 53.3300 -9.9000 26.00 281120 MHD 2009 05 25 09 40 2984-99 P co2 390.310 -999.990 ... L3 2009 08 12 17 08 53.3300 -9.9000 26.00 281121 MHD 2009 06 05 10 30 3931-99 P co2 390.390 -999.990 ... L3 2009 08 12 16 25 53.3300 -9.9000 26.00 281118 MHD 2009 06 05 10 30 3932-99 P co2 390.290 -999.990 ... L3 2009 08 12 16 39 53.3300 -9.9000 26.00 281119 MHD 2009 06 11 11 40 475-99 P co2 391.000 -999.990 ... L10 2009 12 04 11 39 53.3260 -9.8990 26.00 286929 MHD 2009 06 11 11 40 476-99 P co2 391.140 -999.990 ... L10 2009 12 04 11 54 53.3260 -9.8990 26.00 286930 MHD 2009 06 17 10 37 4833-99 P co2 446.100 -999.990 +.. L10 2009 12 04 12 09 53.3260 -9.8990 26.00 286927 MHD 2009 06 17 10 37 4834-99 P co2 388.410 -999.990 -.. L10 2009 12 04 12 25 53.3260 -9.8990 26.00 286928 MHD 2009 06 22 15 40 1693-99 P co2 385.970 -999.990 ... L10 2009 12 05 10 52 53.3260 -9.8990 26.00 286925 MHD 2009 06 22 15 40 1694-99 P co2 386.000 -999.990 ... L10 2009 12 05 11 07 53.3260 -9.8990 26.00 286926 MHD 2009 06 27 09 55 2213-99 P co2 381.250 -999.990 .X. L10 2009 12 11 13 53 53.3260 -9.8990 26.00 287568 MHD 2009 06 27 09 55 2214-99 P co2 381.170 -999.990 .X. L10 2009 12 11 14 08 53.3260 -9.8990 26.00 287569 MHD 2009 07 07 09 20 2947-99 P co2 386.120 -999.990 ... L10 2009 12 04 16 47 53.3260 -9.8990 26.00 286923 MHD 2009 07 07 09 20 2948-99 P co2 385.980 -999.990 ... L10 2009 12 04 17 03 53.3260 -9.8990 26.00 286924 MHD 2009 07 13 14 37 3205-99 P co2 390.620 -999.990 +.. L10 2009 12 12 11 03 53.3260 -9.8990 26.00 287534 MHD 2009 07 13 14 37 3206-99 P co2 384.040 -999.990 -.. L10 2009 12 12 11 19 53.3260 -9.8990 26.00 287535 MHD 2009 07 20 10 20 1345-99 P co2 381.560 -999.990 ... L10 2009 12 11 18 30 53.3260 -9.8990 26.00 287532 MHD 2009 07 20 10 20 1346-99 P co2 381.460 -999.990 ... L10 2009 12 11 18 46 53.3260 -9.8990 26.00 287533 MHD 2009 08 04 10 05 3551-99 P co2 380.680 -999.990 +.. L10 2009 12 11 13 22 53.3260 -9.8990 26.00 287570 MHD 2009 08 04 10 05 3552-99 P co2 378.970 -999.990 -.. L10 2009 12 11 13 38 53.3260 -9.8990 26.00 287571 MHD 2009 08 10 09 40 2095-99 P co2 380.030 -999.990 ... L10 2009 12 12 11 34 53.3260 -9.8990 26.00 287536 MHD 2009 08 10 09 40 2096-99 P co2 380.050 -999.990 ... L10 2009 12 12 11 50 53.3260 -9.8990 26.00 287537 MHD 2009 09 01 11 13 3249-99 P co2 375.360 -999.990 ... L10 2009 12 12 12 05 53.3260 -9.8990 26.00 287538 MHD 2009 09 01 11 13 3250-99 P co2 375.300 -999.990 ... L10 2009 12 12 12 20 53.3260 -9.8990 26.00 287539 MHD 2009 09 08 10 30 577-99 P co2 377.590 -999.990 ... L10 2010 02 09 16 18 53.3260 -9.8990 26.00 289746 MHD 2009 09 08 10 30 578-99 P co2 377.510 -999.990 ... L10 2010 02 09 16 34 53.3260 -9.8990 26.00 289747 MHD 2009 09 18 15 55 529-99 P co2 380.900 -999.990 ... L10 2010 02 09 15 48 53.3260 -9.8990 26.00 289748 MHD 2009 09 18 15 55 530-99 P co2 380.910 -999.990 ... L10 2010 02 09 16 03 53.3260 -9.8990 26.00 289749 MHD 2009 10 13 14 30 3379-99 P co2 383.700 -999.990 ... L10 2010 02 09 14 47 53.3260 -9.8990 26.00 289742 MHD 2009 10 13 14 30 3380-99 P co2 383.630 -999.990 ... L10 2010 02 09 15 02 53.3260 -9.8990 26.00 289743 MHD 2009 10 19 13 50 4607-99 P co2 383.510 -999.990 ... L10 2010 02 09 15 17 53.3260 -9.8990 26.00 289744 MHD 2009 10 19 13 50 4608-99 P co2 383.480 -999.990 ... L10 2010 02 09 15 33 53.3260 -9.8990 26.00 289745 MHD 2009 11 12 11 40 3667-99 P co2 390.230 -999.990 ... L8 2010 04 12 10 58 53.3260 -9.8990 26.00 293495 MHD 2009 11 12 11 40 3668-99 P co2 390.230 -999.990 ... L8 2010 04 12 11 13 53.3260 -9.8990 26.00 293496 MHD 2009 11 16 15 20 1659-99 P co2 387.990 -999.990 ... L8 2010 04 12 11 28 53.3260 -9.8990 26.00 293497 MHD 2009 11 16 15 20 1660-99 P co2 387.930 -999.990 ... L8 2010 04 12 11 42 53.3260 -9.8990 26.00 293498 MHD 2009 11 23 12 25 3239-99 P co2 389.040 -999.990 ... L10 2010 04 12 10 30 53.3260 -9.8990 26.00 293487 MHD 2009 11 23 12 25 3240-99 P co2 388.980 -999.990 ... L10 2010 04 12 10 46 53.3260 -9.8990 26.00 293488 MHD 2009 12 03 11 20 435-99 P co2 388.900 -999.990 ... L10 2010 04 12 11 01 53.3260 -9.8990 26.00 293485 MHD 2009 12 03 11 20 436-99 P co2 389.010 -999.990 ... L10 2010 04 12 11 16 53.3260 -9.8990 26.00 293486 MHD 2009 12 07 11 50 3081-99 P co2 389.000 -999.990 ... L10 2010 04 19 16 55 53.3260 -9.8990 26.00 294878 MHD 2009 12 07 11 50 3082-99 P co2 389.020 -999.990 ... L10 2010 04 19 17 10 53.3260 -9.8990 26.00 294879 MHD 2009 12 29 13 00 2183-99 P co2 397.560 -999.990 .X. L10 2010 04 19 16 25 53.3260 -9.8990 26.00 294876 MHD 2009 12 29 13 00 2184-99 P co2 397.540 -999.990 .X. L10 2010 04 19 16 40 53.3260 -9.8990 26.00 294877 MHD 2010 01 04 13 33 3659-99 P co2 400.870 -999.990 .X. L10 2010 04 20 13 31 53.3260 -9.8990 26.00 294874 MHD 2010 01 04 13 33 3660-99 P co2 400.840 -999.990 .X. L10 2010 04 20 13 47 53.3260 -9.8990 26.00 294875 MHD 2010 01 07 14 00 871-99 P co2 390.870 -999.990 ... L10 2010 04 20 13 01 53.3260 -9.8990 26.00 294872 MHD 2010 01 07 14 00 872-99 P co2 390.810 -999.990 ... L10 2010 04 20 13 16 53.3260 -9.8990 26.00 294873 MHD 2010 01 27 10 50 451-99 P co2 391.190 -999.990 ... L10 2010 04 09 16 30 53.3260 -9.8990 26.00 293483 MHD 2010 01 27 10 50 452-99 P co2 391.140 -999.990 ... L10 2010 04 09 16 45 53.3260 -9.8990 26.00 293484 MHD 2010 02 01 10 40 6139-66 P co2 391.870 -999.990 ... L10 2010 04 09 15 59 53.3260 -9.8990 26.00 293481 MHD 2010 02 01 10 40 6140-66 P co2 391.770 -999.990 ... L10 2010 04 09 16 15 53.3260 -9.8990 26.00 293482 MHD 2010 02 08 12 15 4701-99 P co2 403.800 -999.990 .X. L10 2010 04 08 13 17 53.3260 -9.8990 26.00 293479 MHD 2010 02 08 12 15 4702-99 P co2 403.750 -999.990 .X. L10 2010 04 08 13 32 53.3260 -9.8990 26.00 293480 MHD 2010 02 15 11 00 3017-99 P co2 393.390 -999.990 ... L10 2010 04 20 11 29 53.3260 -9.8990 26.00 294884 MHD 2010 02 15 11 00 3018-99 P co2 393.210 -999.990 ... L10 2010 04 20 11 44 53.3260 -9.8990 26.00 294885 MHD 2010 02 23 16 35 5037-99 P co2 399.350 -999.990 .X. L10 2010 04 20 10 58 53.3260 -9.8990 26.00 294886 MHD 2010 02 23 16 35 5038-99 P co2 399.120 -999.990 .X. L10 2010 04 20 11 14 53.3260 -9.8990 26.00 294887 MHD 2010 03 02 16 50 3979-99 P co2 392.710 -999.990 ... L8 2010 04 20 12 47 53.3260 -9.8990 26.00 294868 MHD 2010 03 02 16 50 3980-99 P co2 392.580 -999.990 ... L8 2010 04 20 13 01 53.3260 -9.8990 26.00 294869 MHD 2010 03 08 11 05 4413-99 P co2 401.590 -999.990 .X. L8 2010 04 20 13 31 53.3260 -9.8990 26.00 294871 MHD 2010 03 08 11 05 949-99 P co2 401.150 -999.990 .X. L8 2010 04 20 13 16 53.3260 -9.8990 26.00 294870 MHD 2010 03 18 13 50 4947-99 P co2 393.170 -999.990 ... L8 2010 07 14 15 51 53.3260 -9.8990 26.00 300169 MHD 2010 03 18 13 50 4948-99 P co2 393.110 -999.990 ... L8 2010 07 14 16 05 53.3260 -9.8990 26.00 300170 MHD 2010 03 22 11 10 2627-99 P co2 394.510 -999.990 ... L8 2010 07 14 15 21 53.3260 -9.8990 26.00 300171 MHD 2010 03 22 11 10 2628-99 P co2 394.400 -999.990 ... L8 2010 07 14 15 36 53.3260 -9.8990 26.00 300172 MHD 2010 03 30 09 50 765-99 P co2 393.910 -999.990 ... L8 2010 07 14 16 49 53.3260 -9.8990 26.00 300163 MHD 2010 03 30 09 50 766-99 P co2 393.900 -999.990 ... L8 2010 07 14 17 04 53.3260 -9.8990 26.00 300164 MHD 2010 04 06 13 50 641-99 P co2 394.560 -999.990 ... L8 2010 07 14 16 20 53.3260 -9.8990 26.00 300161 MHD 2010 04 06 13 50 642-99 P co2 394.650 -999.990 ... L8 2010 07 14 16 35 53.3260 -9.8990 26.00 300162 MHD 2010 04 12 10 20 247-99 P co2 400.250 -999.990 .X. L10 2010 08 11 12 38 53.3260 -9.8990 26.00 301660 MHD 2010 04 12 10 20 248-99 P co2 400.170 -999.990 .X. L10 2010 08 11 12 53 53.3260 -9.8990 26.00 301661 MHD 2010 04 19 15 54 763-99 P co2 394.570 -999.990 ... L10 2010 08 11 13 08 53.3260 -9.8990 26.00 301662 MHD 2010 04 19 15 54 764-99 P co2 394.430 -999.990 ... L10 2010 08 11 13 24 53.3260 -9.8990 26.00 301663 MHD 2010 04 30 10 00 3069-99 P co2 393.870 -999.990 ... L10 2010 08 11 13 39 53.3260 -9.8990 26.00 301666 MHD 2010 04 30 10 00 3070-99 P co2 394.050 -999.990 ... L10 2010 08 11 13 54 53.3260 -9.8990 26.00 301667 MHD 2010 05 01 10 30 3565-99 P co2 391.440 -999.990 ... L8 2010 08 26 11 50 53.3260 -9.8990 26.00 302471 MHD 2010 05 01 10 30 3566-99 P co2 391.280 -999.990 ... L8 2010 08 26 12 05 53.3260 -9.8990 26.00 302472 MHD 2010 05 14 13 25 3995-99 P co2 392.370 -999.990 ... L10 2010 08 11 14 09 53.3260 -9.8990 26.00 301664 MHD 2010 05 14 13 25 3996-99 P co2 392.410 -999.990 ... L10 2010 08 11 14 25 53.3260 -9.8990 26.00 301665 MHD 2010 05 27 11 15 361-99 P co2 392.450 -999.990 ... L8 2010 08 26 12 19 53.3260 -9.8990 26.00 302473 MHD 2010 05 27 11 15 362-99 P co2 392.460 -999.990 ... L8 2010 08 26 12 34 53.3260 -9.8990 26.00 302474 MHD 2010 06 08 12 00 1793-99 P co2 390.780 -999.990 ... L8 2010 08 25 15 43 53.3260 -9.8990 26.00 302491 MHD 2010 06 08 12 00 1794-99 P co2 390.760 -999.990 ... L8 2010 08 25 15 57 53.3260 -9.8990 26.00 302492 MHD 2010 06 14 13 55 3025-99 P co2 389.310 -999.990 ... L8 2010 08 26 09 52 53.3260 -9.8990 26.00 302493 MHD 2010 06 14 13 55 3026-99 P co2 389.290 -999.990 ... L8 2010 08 26 10 07 53.3260 -9.8990 26.00 302494 MHD 2010 06 23 13 00 4631-99 P co2 387.020 -999.990 ... L10 2010 09 24 15 50 53.3260 -9.8990 26.00 304273 MHD 2010 06 23 13 00 4632-99 P co2 386.980 -999.990 ... L10 2010 09 24 16 05 53.3260 -9.8990 26.00 304274 MHD 2010 06 29 11 40 1283-99 P co2 388.670 -999.990 ... L10 2010 09 24 15 20 53.3260 -9.8990 26.00 304271 MHD 2010 06 29 11 40 1284-99 P co2 388.590 -999.990 ... L10 2010 09 24 15 35 53.3260 -9.8990 26.00 304272 MHD 2010 07 05 09 30 2643-99 P co2 387.420 -999.990 ... L10 2010 09 24 13 48 53.3260 -9.8990 26.00 304348 MHD 2010 07 05 09 30 2644-99 P co2 387.490 -999.990 ... L10 2010 09 24 14 03 53.3260 -9.8990 26.00 304349 MHD 2010 07 15 09 55 876-99 P co2 387.860 -999.990 ... L10 2010 09 30 15 02 53.3260 -9.8990 26.00 304347 MHD 2010 07 19 14 15 715-99 P co2 384.160 -999.990 ... L10 2010 09 24 16 21 53.3260 -9.8990 26.00 304323 MHD 2010 07 19 14 15 716-99 P co2 384.120 -999.990 ... L10 2010 09 24 16 36 53.3260 -9.8990 26.00 304324 MHD 2010 07 26 12 00 3205-99 P co2 387.510 -999.990 .X. L10 2010 09 24 16 51 53.3260 -9.8990 26.00 304325 MHD 2010 07 26 12 00 3206-99 P co2 387.490 -999.990 .X. L10 2010 09 24 17 06 53.3260 -9.8990 26.00 304326 MHD 2010 08 03 16 00 3645-99 P co2 382.630 -999.990 ... L10 2010 09 23 16 03 53.3260 -9.8990 26.00 304346 MHD 2010 08 03 16 00 3646-99 P co2 382.490 -999.990 ... L10 2010 09 23 16 18 53.3260 -9.8990 26.00 304345 MHD 2010 08 09 12 00 4181-99 P co2 380.450 -999.990 ... L8 2010 09 23 16 40 53.3260 -9.8990 26.00 304343 MHD 2010 08 09 12 00 4182-99 P co2 380.350 -999.990 ... L8 2010 09 23 16 55 53.3260 -9.8990 26.00 304344 MHD 2010 08 17 10 45 3837-99 P co2 380.360 -999.990 ... L8 2010 10 07 14 39 53.3260 -9.8990 26.00 305203 MHD 2010 08 17 10 45 3838-99 P co2 380.300 -999.990 ... L8 2010 10 07 14 53 53.3260 -9.8990 26.00 305204 MHD 2010 08 23 12 00 4491-99 P co2 379.560 -999.990 ... L8 2010 10 07 14 09 53.3260 -9.8990 26.00 305205 MHD 2010 08 23 12 00 4492-99 P co2 379.500 -999.990 ... L8 2010 10 07 14 24 53.3260 -9.8990 26.00 305206 MHD 2010 09 01 11 55 1154-99 P co2 379.180 -999.990 ... L10 2010 10 12 11 37 53.3260 -9.8990 26.00 305192 MHD 2010 09 06 14 30 4767-99 P co2 382.260 -999.990 ... L10 2010 10 08 10 47 53.3260 -9.8990 26.00 305193 MHD 2010 09 06 14 30 4768-99 P co2 382.250 -999.990 ... L10 2010 10 08 11 02 53.3260 -9.8990 26.00 305194 MHD 2010 09 13 10 20 4145-99 P co2 382.310 -999.990 ... L10 2010 12 08 09 20 53.3260 -9.8990 26.00 308458 MHD 2010 09 13 10 20 4146-99 P co2 382.240 -999.990 ... L10 2010 12 08 09 35 53.3260 -9.8990 26.00 308459 MHD 2010 10 05 12 35 3491-99 P co2 386.300 -999.990 ... L8 2010 12 07 15 50 53.3260 -9.8990 26.00 308460 MHD 2010 10 05 12 35 3492-99 P co2 386.080 -999.990 ... L8 2010 12 07 16 04 53.3260 -9.8990 26.00 308461 MHD 2010 10 21 10 45 2239-99 P co2 387.700 -999.990 ... L8 2010 12 08 11 35 53.3260 -9.8990 26.00 308548 MHD 2010 10 21 10 45 2240-99 P co2 387.680 -999.990 ... L8 2010 12 08 11 50 53.3260 -9.8990 26.00 308549 MHD 2010 10 26 10 00 4795-99 P co2 388.010 -999.990 ... L8 2010 12 08 11 06 53.3260 -9.8990 26.00 308546 MHD 2010 10 26 10 00 4796-99 P co2 387.980 -999.990 ... L8 2010 12 08 11 20 53.3260 -9.8990 26.00 308547 MHD 2010 11 01 10 00 421-99 P co2 389.020 -999.990 ... L8 2011 01 03 16 05 53.3260 -9.8990 26.00 310138 MHD 2010 11 01 10 00 422-99 P co2 389.030 -999.990 ... L8 2011 01 03 16 20 53.3260 -9.8990 26.00 310139 MHD 2010 11 08 10 50 685-99 P co2 391.580 -999.990 ... L8 2011 01 03 16 34 53.3260 -9.8990 26.00 310140 MHD 2010 11 08 10 50 686-99 P co2 391.570 -999.990 ... L8 2011 01 03 16 49 53.3260 -9.8990 26.00 310141 MHD 2010 11 15 12 00 3605-99 P co2 391.350 -999.990 ... L8 2011 01 03 14 37 53.3260 -9.8990 26.00 310128 MHD 2010 11 15 12 00 3606-99 P co2 391.440 -999.990 ... L8 2011 01 03 14 51 53.3260 -9.8990 26.00 310129 MHD 2010 11 29 15 35 3249-99 P co2 399.820 -999.990 .X. L8 2011 01 03 15 07 53.3260 -9.8990 26.00 310124 MHD 2010 11 29 15 35 3250-99 P co2 399.840 -999.990 .X. L8 2011 01 03 15 21 53.3260 -9.8990 26.00 310125 MHD 2010 12 03 12 00 1659-99 P co2 393.390 -999.990 ... L8 2011 01 03 13 38 53.3260 -9.8990 26.00 310126 MHD 2010 12 03 12 00 1660-99 P co2 393.350 -999.990 ... L8 2011 01 03 13 53 53.3260 -9.8990 26.00 310127 MHD 2010 12 06 12 05 2233-99 P co2 392.390 -999.990 ... L8 2011 01 03 14 07 53.3260 -9.8990 26.00 310122 MHD 2010 12 06 12 05 2234-99 P co2 392.340 -999.990 ... L8 2011 01 03 14 22 53.3260 -9.8990 26.00 310123 MHD 2010 12 13 12 30 4903-99 P co2 397.900 -999.990 .X. L10 2011 02 16 15 11 53.3260 -9.8990 26.00 312480 MHD 2010 12 13 12 30 4904-99 P co2 397.910 -999.990 .X. L10 2011 02 16 15 27 53.3260 -9.8990 26.00 312481 MHD 2010 12 28 12 00 373-99 P co2 394.240 -999.990 ... L10 2011 02 16 14 39 53.3260 -9.8990 26.00 312476 MHD 2010 12 28 12 00 374-99 P co2 394.320 -999.990 ... L10 2011 02 16 14 55 53.3260 -9.8990 26.00 312477