# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-21 15:19:31 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO2 (Individual Flasks) # Thomas J Conway # tel: (303) 497-6681 # email: Thomas.J.Conway@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Chugach McKinley" without whom these measurements # would not be possible. # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # site yr mo dy hr mn id me formula value unc flag inst ayr amo ady ahr amn lat lon masl evn SHM 1985 09 04 23 06 1587-82 P co2 334.570 -999.990 +.. U3 1985 09 29 10 32 52.7200 174.1000 40.00 116278 SHM 1985 09 04 23 06 1588-82 P co2 334.050 -999.990 -.. U3 1985 09 29 10 34 52.7200 174.1000 40.00 116279 SHM 1985 09 11 23 30 1333-82 P co2 337.300 -999.990 ... U3 1985 10 02 10 36 52.7200 174.1000 40.00 116280 SHM 1985 09 11 23 30 1334-82 P co2 337.360 -999.990 ... U3 1985 10 02 10 38 52.7200 174.1000 40.00 116281 SHM 1985 09 19 22 00 185-82 P co2 336.560 -999.990 .X. U3 1985 10 24 08 44 52.7200 174.1000 40.00 116282 SHM 1985 09 19 22 00 186-82 P co2 336.610 -999.990 .X. U3 1985 10 24 08 46 52.7200 174.1000 40.00 116283 SHM 1985 09 25 00 45 1149-82 P co2 342.170 -999.990 ... U3 1985 10 24 08 56 52.7200 174.1000 40.00 116284 SHM 1985 09 25 00 45 1150-82 P co2 342.050 -999.990 ... U3 1985 10 24 08 58 52.7200 174.1000 40.00 116285 SHM 1985 10 02 00 30 441-83 P co2 344.550 -999.990 ... U3 1985 10 29 10 52 52.7200 174.1000 40.00 116286 SHM 1985 10 02 00 30 442-83 P co2 344.620 -999.990 ... U3 1985 10 29 10 54 52.7200 174.1000 40.00 116287 SHM 1985 10 09 19 15 1607-82 P co2 345.350 -999.990 ... U3 1985 10 30 10 48 52.7200 174.1000 40.00 116288 SHM 1985 10 09 19 15 1608-82 P co2 345.500 -999.990 ... U3 1985 10 30 10 50 52.7200 174.1000 40.00 116289 SHM 1985 10 16 19 30 839-81 P co2 349.830 -999.990 .X. U3 1985 11 06 10 32 52.7200 174.1000 40.00 116290 SHM 1985 10 16 19 30 840-81 P co2 350.060 -999.990 .X. U3 1985 11 06 10 34 52.7200 174.1000 40.00 116291 SHM 1985 10 25 18 30 695-83 P co2 346.760 -999.990 ... U3 1985 11 06 10 36 52.7200 174.1000 40.00 116292 SHM 1985 10 25 18 30 696-83 P co2 346.800 -999.990 ... U3 1985 11 06 10 38 52.7200 174.1000 40.00 116293 SHM 1985 10 31 19 00 553-85 P co2 348.360 -999.990 -.. U3 1985 11 15 08 24 52.7200 174.1000 40.00 116294 SHM 1985 10 31 19 00 554-85 P co2 348.940 -999.990 +.. U3 1985 11 15 08 26 52.7200 174.1000 40.00 116295 SHM 1985 11 08 01 00 59-83 P co2 346.430 -999.990 ... U3 1985 11 15 08 56 52.7200 174.1000 40.00 116296 SHM 1985 11 08 01 00 60-83 P co2 346.420 -999.990 ... U3 1985 11 15 08 58 52.7200 174.1000 40.00 116297 SHM 1985 11 13 23 30 391-85 P co2 348.070 -999.990 ... U3 1985 12 19 10 04 52.7200 174.1000 40.00 116298 SHM 1985 11 13 23 30 392-85 P co2 347.920 -999.990 ... U3 1985 12 19 10 06 52.7200 174.1000 40.00 116299 SHM 1985 11 22 01 30 627-83 P co2 349.930 -999.990 ... U3 1985 12 19 10 00 52.7200 174.1000 40.00 116300 SHM 1985 11 22 01 30 628-83 P co2 349.860 -999.990 ... U3 1985 12 19 10 02 52.7200 174.1000 40.00 116301 SHM 1985 11 29 23 00 501-82 P co2 348.280 -999.990 -.. U3 1985 12 16 10 48 52.7200 174.1000 40.00 116302 SHM 1985 11 29 23 00 502-82 P co2 348.850 -999.990 +.. U3 1985 12 16 10 50 52.7200 174.1000 40.00 116303 SHM 1985 12 12 01 00 243-83 P co2 349.570 -999.990 -.. U3 1986 01 14 11 20 52.7200 174.1000 40.00 116304 SHM 1985 12 12 01 00 244-83 P co2 350.200 -999.990 +.. U3 1986 01 14 11 22 52.7200 174.1000 40.00 116305 SHM 1985 12 21 00 00 391-83 P co2 350.090 -999.990 ... U3 1986 01 06 10 36 52.7200 174.1000 40.00 116306 SHM 1985 12 21 00 00 392-83 P co2 350.150 -999.990 ... U3 1986 01 06 10 38 52.7200 174.1000 40.00 116307 SHM 1985 12 31 00 00 641-83 P co2 351.040 -999.990 -.. U3 1986 02 12 10 16 52.7200 174.1000 40.00 116308 SHM 1985 12 31 00 00 642-83 P co2 351.630 -999.990 +.. U3 1986 02 12 10 18 52.7200 174.1000 40.00 116309 SHM 1986 01 08 17 30 59-83 P co2 351.440 -999.990 ... U3 1986 02 12 10 04 52.7200 174.1000 40.00 116310 SHM 1986 01 08 17 30 60-83 P co2 351.570 -999.990 ... U3 1986 02 12 10 06 52.7200 174.1000 40.00 116311 SHM 1986 01 16 03 00 887-83 P co2 350.940 -999.990 ... U3 1986 02 25 09 28 52.7200 174.1000 40.00 116312 SHM 1986 01 16 03 00 888-83 P co2 351.120 -999.990 ... U3 1986 02 25 09 30 52.7200 174.1000 40.00 116313 SHM 1986 01 23 00 00 1525-82 P co2 349.870 -999.990 ... U3 1986 02 25 08 40 52.7200 174.1000 40.00 116314 SHM 1986 01 23 00 00 1526-82 P co2 350.070 -999.990 ... U3 1986 02 25 08 42 52.7200 174.1000 40.00 116315 SHM 1986 01 30 21 00 1161-82 P co2 351.030 -999.990 ... U3 1986 02 18 09 00 52.7200 174.1000 40.00 116316 SHM 1986 01 30 21 00 1162-82 P co2 351.070 -999.990 ... U3 1986 02 18 09 02 52.7200 174.1000 40.00 116317 SHM 1986 02 06 00 00 759-83 P co2 351.030 -999.990 ... U3 1986 02 18 09 48 52.7200 174.1000 40.00 116318 SHM 1986 02 06 00 00 760-83 P co2 351.310 -999.990 ... U3 1986 02 18 09 50 52.7200 174.1000 40.00 116319 SHM 1986 02 13 02 00 1203-82 P co2 351.800 -999.990 ... U3 1986 03 12 08 40 52.7200 174.1000 40.00 116320 SHM 1986 02 13 02 00 1204-82 P co2 351.760 -999.990 ... U3 1986 03 12 08 42 52.7200 174.1000 40.00 116321 SHM 1986 02 20 01 30 187-83 P co2 351.330 -999.990 ... U3 1986 03 12 09 44 52.7200 174.1000 40.00 116322 SHM 1986 02 20 01 30 188-83 P co2 351.210 -999.990 ... U3 1986 03 12 09 46 52.7200 174.1000 40.00 116323 SHM 1986 02 27 23 00 933-83 P co2 351.540 -999.990 ... U3 1986 03 25 10 20 52.7200 174.1000 40.00 116324 SHM 1986 02 27 23 00 934-83 P co2 351.740 -999.990 ... U3 1986 03 25 10 22 52.7200 174.1000 40.00 116325 SHM 1986 03 05 23 00 707-83 P co2 352.120 -999.990 ... U3 1986 03 25 10 16 52.7200 174.1000 40.00 116326 SHM 1986 03 05 23 00 708-83 P co2 352.000 -999.990 ... U3 1986 03 25 10 18 52.7200 174.1000 40.00 116327 SHM 1986 03 12 22 30 383-83 P co2 356.970 -999.990 .X. U3 1986 04 03 08 12 52.7200 174.1000 40.00 116328 SHM 1986 03 12 22 30 384-83 P co2 357.060 -999.990 .X. U3 1986 04 03 08 14 52.7200 174.1000 40.00 116329 SHM 1986 03 20 23 30 981-81 P co2 354.450 -999.990 ... U3 1986 04 03 08 24 52.7200 174.1000 40.00 116330 SHM 1986 03 20 23 30 982-81 P co2 354.300 -999.990 ... U3 1986 04 03 08 26 52.7200 174.1000 40.00 116331 SHM 1986 04 02 00 15 891-82 P co2 354.420 -999.990 ... U3 1986 05 06 11 24 52.7200 174.1000 40.00 116332 SHM 1986 04 02 00 15 892-82 P co2 354.390 -999.990 ... U3 1986 05 06 11 26 52.7200 174.1000 40.00 116333 SHM 1986 04 18 00 10 447-83 P co2 354.230 -999.990 ..L U3 1986 05 06 11 40 52.7200 174.1000 40.00 116334 SHM 1986 04 18 00 10 448-83 P co2 356.210 -999.990 +.. U3 1986 05 06 11 42 52.7200 174.1000 40.00 116335 SHM 1986 05 01 00 30 391-85 P co2 354.800 -999.990 ... U3 1986 08 05 11 20 52.7200 174.1000 40.00 116336 SHM 1986 05 01 00 30 392-85 P co2 354.590 -999.990 ... U3 1986 08 05 11 26 52.7200 174.1000 40.00 116337 SHM 1986 06 13 00 00 819-83 P co2 349.610 -999.990 ... U3 1986 07 31 11 52 52.7200 174.1000 40.00 116338 SHM 1986 06 13 00 00 820-83 P co2 349.890 -999.990 ... U3 1986 07 31 11 54 52.7200 174.1000 40.00 116339 SHM 1986 06 25 18 45 947-83 P co2 346.200 -999.990 ... U3 1986 07 31 11 04 52.7200 174.1000 40.00 116340 SHM 1986 06 25 18 45 948-83 P co2 346.230 -999.990 ... U3 1986 07 31 11 06 52.7200 174.1000 40.00 116341 SHM 1986 07 11 00 30 399-85 P co2 340.510 -999.990 ... U3 1986 07 31 11 56 52.7200 174.1000 40.00 116342 SHM 1986 07 11 00 30 400-85 P co2 340.610 -999.990 ... U3 1986 07 31 11 58 52.7200 174.1000 40.00 116343 SHM 1986 08 15 01 10 981-81 P co2 336.490 -999.990 ..L U3 1986 10 21 09 14 52.7200 174.1000 40.00 116344 SHM 1986 08 15 01 10 982-81 P co2 337.150 -999.990 +.. U3 1986 10 21 09 18 52.7200 174.1000 40.00 116345 SHM 1986 08 21 20 20 1151-82 P co2 340.150 -999.990 ... U3 1986 10 21 09 28 52.7200 174.1000 40.00 116346 SHM 1986 08 21 20 20 1152-82 P co2 340.110 -999.990 ... U3 1986 10 21 09 30 52.7200 174.1000 40.00 116347 SHM 1986 09 10 00 20 1-85 P co2 349.500 -999.990 +.. U3 1986 12 08 11 40 52.7200 174.1000 40.00 116348 SHM 1986 09 10 00 20 2-85 P co2 346.940 -999.990 -.. U3 1986 12 08 11 42 52.7200 174.1000 40.00 116349 SHM 1986 09 18 23 10 837-83 P co2 348.580 -999.990 N.. U3 1986 12 08 11 52 52.7200 174.1000 40.00 116350 SHM 1986 09 18 23 10 838-83 P co2 348.470 -999.990 N.. U3 1986 12 08 11 54 52.7200 174.1000 40.00 116351 SHM 1986 09 29 22 30 100-85 P co2 348.560 -999.990 N.. U3 1986 12 08 10 38 52.7200 174.1000 40.00 116352 SHM 1986 09 29 22 30 99-85 P co2 348.500 -999.990 N.. U3 1986 12 08 10 36 52.7200 174.1000 40.00 116353 SHM 1986 10 08 00 10 173-85 P co2 355.220 -999.990 +.. U3 1986 12 08 10 32 52.7200 174.1000 40.00 116354 SHM 1986 10 08 00 10 174-85 P co2 351.180 -999.990 -.. U3 1986 12 08 10 34 52.7200 174.1000 40.00 116355 SHM 1986 10 17 00 30 887-83 P co2 349.800 -999.990 N.. U3 1986 12 08 10 16 52.7200 174.1000 40.00 116356 SHM 1986 10 17 00 30 888-83 P co2 349.440 -999.990 N.. U3 1986 12 08 10 18 52.7200 174.1000 40.00 116357 SHM 1986 10 24 01 10 291-85 P co2 350.310 -999.990 +.. U3 1986 12 08 10 20 52.7200 174.1000 40.00 116358 SHM 1986 10 24 01 10 292-85 P co2 349.340 -999.990 -.. U3 1986 12 08 10 22 52.7200 174.1000 40.00 116359 SHM 1986 11 07 19 10 113-83 P co2 355.160 -999.990 +.. U3 1987 01 09 08 40 52.7200 174.1000 40.00 116360 SHM 1986 11 07 19 10 114-83 P co2 353.400 -999.990 ..L U3 1987 01 09 08 42 52.7200 174.1000 40.00 116361 SHM 1986 11 21 21 10 743-83 P co2 353.510 -999.990 ..L U3 1987 01 09 08 28 52.7200 174.1000 40.00 116362 SHM 1986 11 21 21 10 744-83 P co2 354.220 -999.990 +.. U3 1987 01 09 08 30 52.7200 174.1000 40.00 116363 SHM 1986 12 24 01 20 365-85 P co2 351.800 -999.990 ..L U3 1987 02 18 08 28 52.7200 174.1000 40.00 116364 SHM 1986 12 24 01 20 366-85 P co2 352.540 -999.990 +.. U3 1987 02 18 08 30 52.7200 174.1000 40.00 116365 SHM 1987 01 03 01 45 1217-82 P co2 353.530 -999.990 ... U3 1987 02 18 08 24 52.7200 174.1000 40.00 116366 SHM 1987 01 03 01 45 1218-82 P co2 353.460 -999.990 ... U3 1987 02 18 08 26 52.7200 174.1000 40.00 116367 SHM 1987 01 16 02 45 25-85 P co2 352.970 -999.990 ... U3 1987 03 04 08 40 52.7200 174.1000 40.00 116368 SHM 1987 01 16 02 45 26-85 P co2 353.370 -999.990 ... U3 1987 03 04 08 42 52.7200 174.1000 40.00 116369 SHM 1987 01 31 02 10 1667-82 P co2 354.530 -999.990 +.. U3 1987 02 19 10 04 52.7200 174.1000 40.00 116370 SHM 1987 01 31 02 10 1668-82 P co2 353.920 -999.990 ..L U3 1987 02 19 10 06 52.7200 174.1000 40.00 116371 SHM 1987 02 14 01 20 752-83 P co2 355.430 -999.990 ... U3 1987 04 23 10 02 52.7200 174.1000 40.00 116372 SHM 1987 03 06 20 35 1629-82 P co2 353.660 -999.990 ... U3 1987 04 06 08 44 52.7200 174.1000 40.00 116373 SHM 1987 03 06 20 35 1630-82 P co2 353.830 -999.990 ... U3 1987 04 06 08 46 52.7200 174.1000 40.00 116374 SHM 1987 03 13 02 15 891-83 P co2 357.390 -999.990 ... U3 1987 04 30 10 52 52.7200 174.1000 40.00 116375 SHM 1987 03 13 02 15 892-83 P co2 356.950 -999.990 ... U3 1987 04 30 10 54 52.7200 174.1000 40.00 116376 SHM 1987 03 21 01 40 515-83 P co2 353.880 -999.990 ... U3 1987 04 30 10 36 52.7200 174.1000 40.00 116377 SHM 1987 03 21 01 40 516-83 P co2 354.070 -999.990 ... U3 1987 04 30 10 38 52.7200 174.1000 40.00 116378 SHM 1987 04 18 23 00 191-83 P co2 357.580 -999.990 ... U3 1987 05 12 09 48 52.7200 174.1000 40.00 116379 SHM 1987 04 18 23 00 192-83 P co2 357.790 -999.990 ... U3 1987 05 12 09 50 52.7200 174.1000 40.00 116380 SHM 1987 04 27 01 15 7-83 P co2 358.240 -999.990 ..L U3 1987 05 12 09 44 52.7200 174.1000 40.00 116381 SHM 1987 04 27 01 15 8-83 P co2 358.820 -999.990 +.. U3 1987 05 12 09 46 52.7200 174.1000 40.00 116382 SHM 1987 05 04 05 45 1171-82 P co2 356.460 -999.990 +.. U3 1987 06 02 10 00 52.7200 174.1000 40.00 116383 SHM 1987 05 04 05 45 1172-82 P co2 355.940 -999.990 ..L U3 1987 06 02 10 02 52.7200 174.1000 40.00 116384 SHM 1987 05 19 01 30 513-83 P co2 356.370 -999.990 ... U3 1987 06 02 09 48 52.7200 174.1000 40.00 116385 SHM 1987 05 19 01 30 514-83 P co2 356.380 -999.990 ... U3 1987 06 02 09 50 52.7200 174.1000 40.00 116386 SHM 1987 05 31 01 00 661-85 P co2 355.000 -999.990 ... U3 1987 07 01 11 20 52.7200 174.1000 40.00 116387 SHM 1987 05 31 01 00 662-85 P co2 355.260 -999.990 ... U3 1987 07 01 11 22 52.7200 174.1000 40.00 116388 SHM 1987 06 15 00 00 657-85 P co2 354.320 -999.990 ... U3 1987 07 02 08 24 52.7200 174.1000 40.00 116389 SHM 1987 06 15 00 00 658-85 P co2 353.880 -999.990 ... U3 1987 07 02 08 26 52.7200 174.1000 40.00 116390 SHM 1987 06 28 23 10 619-85 P co2 350.570 -999.990 +.. U3 1987 08 03 09 00 52.7200 174.1000 40.00 116391 SHM 1987 06 28 23 10 620-85 P co2 348.360 -999.990 ..L U3 1987 08 03 09 02 52.7200 174.1000 40.00 116392 SHM 1987 07 12 23 05 623-85 P co2 343.400 -999.990 ... U3 1987 08 03 10 32 52.7200 174.1000 40.00 116393 SHM 1987 07 12 23 05 624-85 P co2 343.470 -999.990 ... U3 1987 08 03 10 34 52.7200 174.1000 40.00 116394 SHM 1987 07 19 23 10 603-85 P co2 348.190 -999.990 .X. S1 1987 11 11 10 04 52.7200 174.1000 40.00 116395 SHM 1987 07 19 23 10 604-85 P co2 348.520 -999.990 .X. S1 1987 11 11 10 06 52.7200 174.1000 40.00 116396 SHM 1987 07 27 02 00 621-83 P co2 345.170 -999.990 -.. S1 1987 11 10 11 24 52.7200 174.1000 40.00 116397 SHM 1987 07 27 02 00 622-83 P co2 348.160 -999.990 +.. S1 1987 11 10 11 26 52.7200 174.1000 40.00 116398 SHM 1987 08 03 04 00 1571-82 P co2 336.970 -999.990 ... U3 1987 09 09 11 52 52.7200 174.1000 40.00 116399 SHM 1987 08 03 04 00 1572-82 P co2 336.600 -999.990 ... U3 1987 09 09 11 54 52.7200 174.1000 40.00 116400 SHM 1987 08 10 01 00 527-85 P co2 336.270 -999.990 ... U3 1987 09 09 11 20 52.7200 174.1000 40.00 116401 SHM 1987 08 10 01 00 528-85 P co2 336.150 -999.990 ... U3 1987 09 09 11 22 52.7200 174.1000 40.00 116402 SHM 1987 08 16 02 45 71-85 P co2 341.600 -999.990 +.. S1 1987 11 11 09 44 52.7200 174.1000 40.00 116403 SHM 1987 08 16 02 45 72-85 P co2 339.770 -999.990 -.. S1 1987 11 11 09 46 52.7200 174.1000 40.00 116404 SHM 1987 08 23 01 00 63-85 P co2 343.380 -999.990 +.. S1 1987 11 11 09 28 52.7200 174.1000 40.00 116405 SHM 1987 08 23 01 00 64-85 P co2 342.870 -999.990 -.. S1 1987 11 11 09 30 52.7200 174.1000 40.00 116406 SHM 1987 08 31 02 40 585-85 P co2 338.470 -999.990 ... S1 1987 11 10 09 12 52.7200 174.1000 40.00 116407 SHM 1987 08 31 02 40 586-85 P co2 338.380 -999.990 ... S1 1987 11 10 09 16 52.7200 174.1000 40.00 116408 SHM 1987 09 07 04 10 41-85 P co2 340.680 -999.990 ... S1 1987 11 11 09 48 52.7200 174.1000 40.00 116409 SHM 1987 09 07 04 10 42-85 P co2 340.810 -999.990 ... S1 1987 11 11 09 50 52.7200 174.1000 40.00 116410 SHM 1987 09 13 21 27 641-83 P co2 343.350 -999.990 ..L S1 1987 11 10 11 20 52.7200 174.1000 40.00 116411 SHM 1987 09 13 21 27 642-83 P co2 343.950 -999.990 +.. S1 1987 11 10 11 22 52.7200 174.1000 40.00 116412 SHM 1987 09 21 00 30 759-83 P co2 330.330 -999.990 .X. S1 1987 11 11 10 00 52.7200 174.1000 40.00 116413 SHM 1987 09 21 00 30 760-83 P co2 330.170 -999.990 .X. S1 1987 11 11 10 02 52.7200 174.1000 40.00 116414 SHM 1987 10 19 00 47 127-85 P co2 348.710 -999.990 ... S1 1987 11 11 10 32 52.7200 174.1000 40.00 116415 SHM 1987 10 19 00 47 128-85 P co2 348.300 -999.990 ... S1 1987 11 11 10 34 52.7200 174.1000 40.00 116416 SHM 1987 10 25 23 00 627-85 P co2 349.180 -999.990 ... S1 1987 11 10 11 56 52.7200 174.1000 40.00 116417 SHM 1987 10 25 23 00 628-85 P co2 349.160 -999.990 ... S1 1987 11 10 11 58 52.7200 174.1000 40.00 116418 SHM 1987 11 01 23 00 579-85 P co2 355.890 -999.990 .X. S1 1987 11 19 09 00 52.7200 174.1000 40.00 116419 SHM 1987 11 01 23 00 580-85 P co2 356.160 -999.990 .X. S1 1987 11 19 09 02 52.7200 174.1000 40.00 116420 SHM 1987 11 08 10 30 615-85 P co2 336.700 -999.990 .X. S1 1987 11 18 10 18 52.7200 174.1000 40.00 116421 SHM 1987 11 08 10 30 616-85 P co2 336.450 -999.990 .X. S1 1987 11 18 10 22 52.7200 174.1000 40.00 116422 SHM 1987 11 15 23 00 335-85 P co2 351.310 -999.990 ..L S1 1987 12 16 08 56 52.7200 174.1000 40.00 116423 SHM 1987 11 15 23 00 336-85 P co2 351.960 -999.990 +.. S1 1987 12 16 08 58 52.7200 174.1000 40.00 116424 SHM 1987 11 22 00 11 541-85 P co2 351.100 -999.990 ... S1 1987 12 16 09 00 52.7200 174.1000 40.00 116425 SHM 1987 11 22 00 11 542-85 P co2 351.100 -999.990 ... S1 1987 12 16 09 02 52.7200 174.1000 40.00 116426 SHM 1987 11 29 23 20 149-85 P co2 351.980 -999.990 ... S1 1988 01 07 10 04 52.7200 174.1000 40.00 116427 SHM 1987 11 29 23 20 150-85 P co2 352.110 -999.990 ... S1 1988 01 07 10 06 52.7200 174.1000 40.00 116428 SHM 1987 12 06 23 00 163-85 P co2 358.580 -999.990 +.. S1 1988 01 07 09 00 52.7200 174.1000 40.00 116429 SHM 1987 12 06 23 00 164-85 P co2 354.450 -999.990 ..L S1 1988 01 07 09 02 52.7200 174.1000 40.00 116430 SHM 1987 12 10 23 30 283-87 P co2 355.250 -999.990 ... S1 1988 01 25 09 00 52.7200 174.1000 40.00 116431 SHM 1987 12 10 23 30 284-87 P co2 355.250 -999.990 ... S1 1988 01 25 09 02 52.7200 174.1000 40.00 116432 SHM 1987 12 13 23 50 13-85 P co2 353.690 -999.990 ..L S1 1988 01 25 10 48 52.7200 174.1000 40.00 116433 SHM 1987 12 13 23 50 14-85 P co2 357.880 -999.990 +.. S1 1988 01 25 10 54 52.7200 174.1000 40.00 116434 SHM 1987 12 20 22 55 29-85 P co2 353.440 -999.990 ... S1 1988 01 08 08 28 52.7200 174.1000 40.00 116435 SHM 1987 12 20 22 55 30-85 P co2 353.490 -999.990 ... S1 1988 01 08 08 30 52.7200 174.1000 40.00 116436 SHM 1987 12 28 04 00 357-85 P co2 355.100 -999.990 ... S1 1988 01 25 08 28 52.7200 174.1000 40.00 116437 SHM 1987 12 28 04 00 358-85 P co2 355.300 -999.990 ... S1 1988 01 25 08 30 52.7200 174.1000 40.00 116438 SHM 1988 02 01 00 00 545-87 P co2 356.000 -999.990 ... S1 1988 02 19 08 56 52.7200 174.1000 40.00 116439 SHM 1988 02 01 00 00 546-87 P co2 355.910 -999.990 ... S1 1988 02 19 08 58 52.7200 174.1000 40.00 116440 SHM 1988 02 08 00 20 129-85 P co2 356.760 -999.990 ... S1 1988 02 19 08 44 52.7200 174.1000 40.00 116441 SHM 1988 02 08 00 20 130-85 P co2 356.630 -999.990 ... S1 1988 02 19 08 46 52.7200 174.1000 40.00 116442 SHM 1988 02 14 23 30 397-86 P co2 356.000 -999.990 ... S1 1988 03 03 10 52 52.7200 174.1000 40.00 116443 SHM 1988 02 14 23 30 398-86 P co2 356.190 -999.990 ... S1 1988 03 03 10 54 52.7200 174.1000 40.00 116444 SHM 1988 02 22 04 00 369-85 P co2 357.330 -999.990 +.. S1 1988 02 29 09 00 52.7200 174.1000 40.00 116445 SHM 1988 02 22 04 00 370-85 P co2 356.630 -999.990 ..L S1 1988 02 29 11 54 52.7200 174.1000 40.00 116446 SHM 1988 03 07 00 30 547-87 P co2 356.430 -999.990 ... S1 1988 03 25 10 48 52.7200 174.1000 40.00 116447 SHM 1988 03 07 00 30 548-87 P co2 356.390 -999.990 ... S1 1988 03 25 10 50 52.7200 174.1000 40.00 116448 SHM 1988 03 13 23 30 841-85 P co2 357.010 -999.990 ... S1 1988 03 25 11 24 52.7200 174.1000 40.00 116449 SHM 1988 03 13 23 30 842-85 P co2 357.150 -999.990 ... S1 1988 03 25 11 26 52.7200 174.1000 40.00 116450 SHM 1988 03 20 23 15 117-87 P co2 357.150 -999.990 ... S1 1988 05 09 10 20 52.7200 174.1000 40.00 116451 SHM 1988 03 20 23 15 118-87 P co2 357.120 -999.990 ... S1 1988 05 09 10 22 52.7200 174.1000 40.00 116452 SHM 1988 04 17 13 30 353-86 P co2 360.280 -999.990 +.. S1 1988 05 09 10 32 52.7200 174.1000 40.00 116453 SHM 1988 04 17 13 30 354-86 P co2 358.960 -999.990 ..L S1 1988 05 09 10 34 52.7200 174.1000 40.00 116454 SHM 1988 04 24 22 50 417-85 P co2 358.440 -999.990 ... S1 1988 05 18 09 32 52.7200 174.1000 40.00 116455 SHM 1988 04 24 22 50 418-85 P co2 358.280 -999.990 ... S1 1988 05 18 09 34 52.7200 174.1000 40.00 116456 SHM 1988 05 01 23 04 297-87 P co2 359.460 -999.990 ... S1 1988 05 18 10 00 52.7200 174.1000 40.00 116457 SHM 1988 05 01 23 04 298-87 P co2 359.420 -999.990 ... S1 1988 05 18 10 02 52.7200 174.1000 40.00 116458 SHM 1988 05 09 01 45 105-85 P co2 358.050 -999.990 ... S1 1988 05 26 08 40 52.7200 174.1000 40.00 116459 SHM 1988 05 09 01 45 106-85 P co2 358.180 -999.990 ... S1 1988 05 26 08 42 52.7200 174.1000 40.00 116460 SHM 1988 05 15 23 55 331-86 P co2 358.260 -999.990 ... S1 1988 06 01 11 36 52.7200 174.1000 40.00 116461 SHM 1988 05 15 23 55 332-86 P co2 358.590 -999.990 ... S1 1988 06 01 11 38 52.7200 174.1000 40.00 116462 SHM 1988 05 22 23 30 677-85 P co2 357.230 -999.990 ... S1 1988 06 15 09 44 52.7200 174.1000 40.00 116463 SHM 1988 05 22 23 30 678-85 P co2 357.180 -999.990 ... S1 1988 06 15 09 46 52.7200 174.1000 40.00 116464 SHM 1988 05 29 23 00 269-86 P co2 356.560 -999.990 ... S1 1988 06 15 09 32 52.7200 174.1000 40.00 116465 SHM 1988 05 29 23 00 270-86 P co2 356.510 -999.990 ... S1 1988 06 15 09 34 52.7200 174.1000 40.00 116466 SHM 1988 06 06 06 29 595-87 P co2 358.430 -999.990 ... S1 1988 06 24 10 52 52.7200 174.1000 40.00 116467 SHM 1988 06 06 06 29 596-87 P co2 358.280 -999.990 ... S1 1988 06 24 10 54 52.7200 174.1000 40.00 116468 SHM 1988 06 13 00 30 225-86 P co2 355.010 -999.990 ... S1 1988 06 24 10 48 52.7200 174.1000 40.00 116469 SHM 1988 06 13 00 30 226-86 P co2 354.940 -999.990 ... S1 1988 06 24 10 50 52.7200 174.1000 40.00 116470 SHM 1988 06 20 22 55 351-86 P co2 353.570 -999.990 ... S1 1988 07 12 08 24 52.7200 174.1000 40.00 116471 SHM 1988 06 20 22 55 352-86 P co2 353.330 -999.990 ... S1 1988 07 12 08 26 52.7200 174.1000 40.00 116472 SHM 1988 06 27 01 00 91-87 P co2 354.780 -999.990 ... S1 1988 07 01 11 56 52.7200 174.1000 40.00 116473 SHM 1988 06 27 01 00 92-87 P co2 354.640 -999.990 ... S1 1988 07 01 11 58 52.7200 174.1000 40.00 116474 SHM 1988 07 03 12 15 249-85 P co2 349.780 -999.990 ... S1 1988 08 15 14 28 52.7200 174.1000 40.00 116475 SHM 1988 07 03 12 15 250-85 P co2 349.370 -999.990 ... S1 1988 08 15 14 30 52.7200 174.1000 40.00 116476 SHM 1988 07 10 22 50 313-86 P co2 347.500 -999.990 ... S1 1988 08 15 16 04 52.7200 174.1000 40.00 116477 SHM 1988 07 10 22 50 314-86 P co2 347.380 -999.990 ... S1 1988 08 15 16 06 52.7200 174.1000 40.00 116478 SHM 1988 07 17 23 30 413-86 P co2 340.490 -999.990 +.. S1 1988 08 15 16 00 52.7200 174.1000 40.00 116479 SHM 1988 07 17 23 30 414-86 P co2 332.890 -999.990 -.. S1 1988 08 15 16 02 52.7200 174.1000 40.00 116480 SHM 1988 07 24 23 00 841-85 P co2 345.850 -999.990 ... S1 1988 08 17 09 00 52.7200 174.1000 40.00 116481 SHM 1988 07 24 23 00 842-85 P co2 346.130 -999.990 ... S1 1988 08 17 09 02 52.7200 174.1000 40.00 116482 SHM 1988 08 08 02 17 535-87 P co2 341.610 -999.990 ... S1 1988 09 16 10 36 52.7200 174.1000 40.00 116483 SHM 1988 08 08 02 17 536-87 P co2 341.810 -999.990 ... S1 1988 09 16 10 38 52.7200 174.1000 40.00 116484 SHM 1988 08 15 02 10 301-87 P co2 340.450 -999.990 ... S1 1988 08 31 11 40 52.7200 174.1000 40.00 116485 SHM 1988 08 15 02 10 302-87 P co2 340.600 -999.990 ... S1 1988 08 31 11 42 52.7200 174.1000 40.00 116486 SHM 1988 08 21 23 00 247-87 P co2 -999.990 -999.990 *.. S1 1988 09 20 14 28 52.7200 174.1000 40.00 116487 SHM 1988 08 21 23 00 248-87 P co2 -999.990 -999.990 *.. S1 1988 09 20 14 30 52.7200 174.1000 40.00 116488 SHM 1988 09 05 04 30 495-85 P co2 342.160 -999.990 ... S1 1988 09 20 15 48 52.7200 174.1000 40.00 116489 SHM 1988 09 05 04 30 496-85 P co2 342.560 -999.990 ... S1 1988 09 20 15 50 52.7200 174.1000 40.00 116490 SHM 1988 09 12 00 00 171-85 P co2 344.860 -999.990 ... S1 1988 10 25 10 36 52.7200 174.1000 40.00 116491 SHM 1988 09 12 00 00 172-85 P co2 344.800 -999.990 ... S1 1988 10 25 10 38 52.7200 174.1000 40.00 116492 SHM 1988 09 19 00 30 167-85 P co2 346.300 -999.990 ... S1 1988 10 25 10 32 52.7200 174.1000 40.00 116493 SHM 1988 09 19 00 30 168-85 P co2 346.180 -999.990 ... S1 1988 10 25 10 34 52.7200 174.1000 40.00 116494 SHM 1988 09 25 13 30 119-87 P co2 346.950 -999.990 ..L S1 1988 10 25 11 08 52.7200 174.1000 40.00 116495 SHM 1988 09 25 13 30 120-87 P co2 347.640 -999.990 +.. S1 1988 10 25 11 10 52.7200 174.1000 40.00 116496 SHM 1988 10 03 00 00 455-85 P co2 349.070 -999.990 ... S1 1988 10 25 11 20 52.7200 174.1000 40.00 116497 SHM 1988 10 03 00 00 456-85 P co2 349.310 -999.990 ... S1 1988 10 25 11 22 52.7200 174.1000 40.00 116498 SHM 1988 10 10 00 00 409-86 P co2 349.300 -999.990 ... S1 1988 10 26 11 52 52.7200 174.1000 40.00 116499 SHM 1988 10 10 00 00 410-86 P co2 349.230 -999.990 ... S1 1988 10 26 11 54 52.7200 174.1000 40.00 116500 SHM 1988 10 17 03 00 401-86 P co2 355.650 -999.990 +.. S1 1988 10 26 10 48 52.7200 174.1000 40.00 116501 SHM 1988 10 17 03 00 402-86 P co2 354.940 -999.990 -.. S1 1988 10 26 10 50 52.7200 174.1000 40.00 116502 SHM 1988 11 14 03 00 791-85 P co2 355.770 -999.990 ... S1 1988 12 09 08 48 52.7200 174.1000 40.00 116503 SHM 1988 11 14 03 00 792-85 P co2 355.950 -999.990 ... S1 1988 12 09 08 50 52.7200 174.1000 40.00 116504 SHM 1988 11 20 02 00 85-87 P co2 353.860 -999.990 ... S1 1988 12 08 10 52 52.7200 174.1000 40.00 116505 SHM 1988 11 20 02 00 86-87 P co2 353.870 -999.990 ... S1 1988 12 08 11 10 52.7200 174.1000 40.00 116506 SHM 1988 12 04 22 25 241-87 P co2 355.330 -999.990 ... S1 1989 02 02 10 36 52.7200 174.1000 40.00 116507 SHM 1988 12 04 22 25 242-87 P co2 355.250 -999.990 ... S1 1989 02 02 10 38 52.7200 174.1000 40.00 116508 SHM 1988 12 18 01 30 69-85 P co2 358.030 -999.990 ... S1 1989 02 02 08 48 52.7200 174.1000 40.00 116509 SHM 1988 12 18 01 30 70-85 P co2 358.340 -999.990 ... S1 1989 02 02 08 50 52.7200 174.1000 40.00 116510 SHM 1989 01 08 23 50 37-81 P co2 362.640 -999.990 +.. S1 1989 02 07 09 52 52.7200 174.1000 40.00 116511 SHM 1989 01 08 23 50 38-81 P co2 361.720 -999.990 -.. S1 1989 02 07 09 54 52.7200 174.1000 40.00 116512 SHM 1989 01 15 23 30 39-81 P co2 360.330 -999.990 +.. S1 1989 02 07 09 48 52.7200 174.1000 40.00 116513 SHM 1989 01 15 23 30 40-81 P co2 359.550 -999.990 -.. S1 1989 02 07 09 50 52.7200 174.1000 40.00 116514 SHM 1989 01 22 22 48 403-81 P co2 -999.990 -999.990 *.. S1 1989 02 22 09 52 52.7200 174.1000 40.00 116515 SHM 1989 01 22 22 48 404-81 P co2 -999.990 -999.990 *.. S1 1989 02 22 09 54 52.7200 174.1000 40.00 116516 SHM 1989 02 05 21 50 406-81 P co2 -999.990 -999.990 *.. S1 1989 02 15 09 02 52.7200 174.1000 40.00 116517 SHM 1989 02 12 23 37 649-81 P co2 -999.990 -999.990 *.. S1 1989 03 16 09 20 52.7200 174.1000 40.00 116518 SHM 1989 02 12 23 37 650-81 P co2 -999.990 -999.990 *.. S1 1989 03 16 09 22 52.7200 174.1000 40.00 116519 SHM 1989 02 20 02 37 33-81 P co2 362.330 -999.990 +.. S1 1989 03 15 11 04 52.7200 174.1000 40.00 116520 SHM 1989 02 20 02 37 34-81 P co2 360.340 -999.990 -.. S1 1989 03 15 11 06 52.7200 174.1000 40.00 116521 SHM 1989 02 26 23 00 631-81 P co2 360.860 -999.990 +.. S1 1989 03 28 09 16 52.7200 174.1000 40.00 116522 SHM 1989 02 26 23 00 632-81 P co2 360.290 -999.990 -.. S1 1989 03 28 09 18 52.7200 174.1000 40.00 116523 SHM 1989 03 05 23 00 633-81 P co2 -999.990 -999.990 *.. S1 1989 03 28 08 12 52.7200 174.1000 40.00 116524 SHM 1989 03 05 23 00 634-81 P co2 358.930 -999.990 -.. S1 1989 03 28 08 14 52.7200 174.1000 40.00 116525 SHM 1989 03 13 22 45 593-81 P co2 358.650 -999.990 ... S1 1989 03 28 08 40 52.7200 174.1000 40.00 116526 SHM 1989 03 13 22 45 594-81 P co2 358.670 -999.990 ... S1 1989 03 28 08 42 52.7200 174.1000 40.00 116527 SHM 1989 03 20 00 00 507-81 P co2 358.760 -999.990 ... S1 1989 03 28 08 44 52.7200 174.1000 40.00 116528 SHM 1989 03 20 00 00 508-81 P co2 358.840 -999.990 ... S1 1989 03 28 08 46 52.7200 174.1000 40.00 116529 SHM 1989 04 03 03 40 51-81 P co2 359.700 -999.990 ... S1 1989 04 25 08 12 52.7200 174.1000 40.00 116530 SHM 1989 04 03 03 40 52-81 P co2 359.750 -999.990 ... S1 1989 04 25 08 14 52.7200 174.1000 40.00 116531 SHM 1989 04 09 23 30 617-81 P co2 360.790 -999.990 ... S1 1989 04 27 09 00 52.7200 174.1000 40.00 116532 SHM 1989 04 09 23 30 618-81 P co2 360.610 -999.990 ... S1 1989 04 27 09 02 52.7200 174.1000 40.00 116533 SHM 1989 04 16 12 34 79-81 P co2 -999.990 -999.990 *.. S1 1989 05 18 08 52 52.7200 174.1000 40.00 116534 SHM 1989 04 16 12 34 80-81 P co2 -999.990 -999.990 *.. S1 1989 05 18 08 54 52.7200 174.1000 40.00 116535 SHM 1989 05 03 14 00 10-81 P co2 -999.990 -999.990 *.. S1 1989 05 18 08 14 52.7200 174.1000 40.00 116536 SHM 1989 05 03 14 00 9-81 P co2 -999.990 -999.990 *.. S1 1989 05 18 08 12 52.7200 174.1000 40.00 116537 SHM 1989 05 14 23 22 335-81 P co2 359.780 -999.990 ... S1 1989 06 05 10 04 52.7200 174.1000 40.00 116538 SHM 1989 05 14 23 22 336-81 P co2 359.630 -999.990 ... S1 1989 06 05 10 06 52.7200 174.1000 40.00 116539 SHM 1989 05 22 00 10 333-81 P co2 360.220 -999.990 ... S1 1989 06 05 10 32 52.7200 174.1000 40.00 116540 SHM 1989 05 22 00 10 334-81 P co2 360.050 -999.990 ... S1 1989 06 05 10 34 52.7200 174.1000 40.00 116541 SHM 1989 05 28 23 45 387-81 P co2 366.390 -999.990 +.. S1 1989 06 27 09 44 52.7200 174.1000 40.00 116542 SHM 1989 05 28 23 45 388-81 P co2 364.610 -999.990 -.. S1 1989 06 27 09 46 52.7200 174.1000 40.00 116543 SHM 1989 06 04 23 25 385-81 P co2 358.390 -999.990 ... S1 1989 06 27 09 24 52.7200 174.1000 40.00 116544 SHM 1989 06 04 23 25 386-81 P co2 358.090 -999.990 ... S1 1989 06 27 09 26 52.7200 174.1000 40.00 116545 SHM 1989 06 11 21 20 943-81 P co2 355.650 -999.990 ... S1 1989 07 06 09 48 52.7200 174.1000 40.00 116546 SHM 1989 06 11 21 20 944-81 P co2 355.500 -999.990 ... S1 1989 07 06 09 50 52.7200 174.1000 40.00 116547 SHM 1989 06 18 23 20 431-81 P co2 355.950 -999.990 ... S1 1989 07 06 09 28 52.7200 174.1000 40.00 116548 SHM 1989 06 18 23 20 432-81 P co2 355.790 -999.990 ... S1 1989 07 06 09 30 52.7200 174.1000 40.00 116549 SHM 1989 06 25 21 25 1103-81 P co2 352.610 -999.990 ... S1 1989 07 21 10 36 52.7200 174.1000 40.00 116550 SHM 1989 06 25 21 25 1104-81 P co2 352.520 -999.990 ... S1 1989 07 21 10 38 52.7200 174.1000 40.00 116551 SHM 1989 07 02 23 40 325-81 P co2 350.620 -999.990 -.. S1 1989 07 20 09 24 52.7200 174.1000 40.00 116552 SHM 1989 07 02 23 40 326-81 P co2 351.760 -999.990 +.. S1 1989 07 20 09 26 52.7200 174.1000 40.00 116553 SHM 1989 07 09 23 35 319-85 P co2 344.280 -999.990 .X. S1 1989 08 03 08 48 52.7200 174.1000 40.00 116554 SHM 1989 07 09 23 35 320-85 P co2 344.050 -999.990 .X. S1 1989 08 03 08 50 52.7200 174.1000 40.00 116555 SHM 1989 07 16 23 45 251-87 P co2 345.110 -999.990 -.. S1 1989 08 03 08 40 52.7200 174.1000 40.00 116556 SHM 1989 07 16 23 45 252-87 P co2 345.660 -999.990 +.. S1 1989 08 03 08 42 52.7200 174.1000 40.00 116557 SHM 1989 07 24 23 15 151-81 P co2 344.170 -999.990 ... S1 1989 08 23 09 20 52.7200 174.1000 40.00 116558 SHM 1989 07 24 23 15 152-81 P co2 344.440 -999.990 ... S1 1989 08 23 09 22 52.7200 174.1000 40.00 116559 SHM 1989 07 30 23 16 679-81 P co2 344.450 -999.990 ... S1 1989 08 23 09 24 52.7200 174.1000 40.00 116560 SHM 1989 07 30 23 16 680-81 P co2 343.960 -999.990 ... S1 1989 08 23 09 26 52.7200 174.1000 40.00 116561 SHM 1989 08 07 00 15 357-81 P co2 341.110 -999.990 ... S1 1989 08 25 08 24 52.7200 174.1000 40.00 116562 SHM 1989 08 07 00 15 358-81 P co2 341.060 -999.990 ... S1 1989 08 25 08 26 52.7200 174.1000 40.00 116563 SHM 1989 08 14 00 15 23-81 P co2 342.070 -999.990 ... S1 1989 08 25 08 40 52.7200 174.1000 40.00 116564 SHM 1989 08 14 00 15 24-81 P co2 341.830 -999.990 ... S1 1989 08 25 08 42 52.7200 174.1000 40.00 116565 SHM 1989 08 21 03 35 353-81 P co2 343.200 -999.990 ... S1 1989 09 06 12 00 52.7200 174.1000 40.00 116566 SHM 1989 08 21 03 35 354-81 P co2 343.290 -999.990 ... S1 1989 09 06 12 02 52.7200 174.1000 40.00 116567 SHM 1989 08 27 12 34 645-81 P co2 343.370 -999.990 ... S1 1989 09 06 08 24 52.7200 174.1000 40.00 116568 SHM 1989 08 27 12 34 646-81 P co2 343.360 -999.990 ... S1 1989 09 06 08 26 52.7200 174.1000 40.00 116569 SHM 1989 09 03 22 15 565-81 P co2 344.500 -999.990 ... S1 1989 09 21 11 00 52.7200 174.1000 40.00 116570 SHM 1989 09 03 22 15 566-81 P co2 344.480 -999.990 ... S1 1989 09 21 11 02 52.7200 174.1000 40.00 116571 SHM 1989 09 10 22 30 667-81 P co2 346.160 -999.990 -.. S1 1989 09 21 10 52 52.7200 174.1000 40.00 116572 SHM 1989 09 10 22 30 668-81 P co2 346.750 -999.990 +.. S1 1989 09 21 10 54 52.7200 174.1000 40.00 116573 SHM 1989 09 18 00 35 1015-81 P co2 348.620 -999.990 +.. S1 1989 11 02 10 52 52.7200 174.1000 40.00 116574 SHM 1989 09 18 00 35 1016-81 P co2 348.040 -999.990 -.. S1 1989 11 02 10 54 52.7200 174.1000 40.00 116575 SHM 1989 09 24 22 30 43-81 P co2 347.140 -999.990 ... S1 1989 10 11 08 40 52.7200 174.1000 40.00 116576 SHM 1989 09 24 22 30 44-81 P co2 346.970 -999.990 ... S1 1989 10 11 08 42 52.7200 174.1000 40.00 116577 SHM 1989 10 01 21 30 969-81 P co2 354.380 -999.990 .X. S1 1989 10 11 10 36 52.7200 174.1000 40.00 116578 SHM 1989 10 01 21 30 970-81 P co2 354.610 -999.990 .X. S1 1989 10 11 10 38 52.7200 174.1000 40.00 116579 SHM 1989 10 08 21 12 1009-81 P co2 352.400 -999.990 ... S1 1989 11 07 15 52 52.7200 174.1000 40.00 116580 SHM 1989 10 08 21 12 1010-81 P co2 352.840 -999.990 ... S1 1989 11 07 15 54 52.7200 174.1000 40.00 116581 SHM 1989 10 15 22 45 617-81 P co2 352.470 -999.990 ... S1 1989 11 07 17 08 52.7200 174.1000 40.00 116582 SHM 1989 10 15 22 45 618-81 P co2 352.460 -999.990 ... S1 1989 11 07 17 10 52.7200 174.1000 40.00 116583 SHM 1989 10 22 21 26 447-81 P co2 355.010 -999.990 ... S1 1989 11 07 16 36 52.7200 174.1000 40.00 116584 SHM 1989 10 22 21 26 448-81 P co2 355.180 -999.990 ... S1 1989 11 07 16 38 52.7200 174.1000 40.00 116585 SHM 1989 10 29 23 30 125-81 P co2 356.300 -999.990 ... S1 1989 11 17 10 48 52.7200 174.1000 40.00 116586 SHM 1989 10 29 23 30 126-81 P co2 356.040 -999.990 ... S1 1989 11 17 10 50 52.7200 174.1000 40.00 116587 SHM 1989 11 05 21 20 100-81 P co2 358.690 -999.990 -.. S1 1989 11 17 11 10 52.7200 174.1000 40.00 116588 SHM 1989 11 05 21 20 99-81 P co2 360.040 -999.990 +.. S1 1989 11 17 11 08 52.7200 174.1000 40.00 116589 SHM 1989 11 12 00 10 857-81 P co2 355.750 -999.990 ... S1 1989 12 22 09 44 52.7200 174.1000 40.00 116590 SHM 1989 11 12 00 10 858-81 P co2 355.740 -999.990 ... S1 1989 12 22 09 46 52.7200 174.1000 40.00 116591 SHM 1989 11 19 00 03 651-81 P co2 356.520 -999.990 ... S1 1989 12 08 14 20 52.7200 174.1000 40.00 116592 SHM 1989 11 19 00 03 652-81 P co2 356.540 -999.990 ... S1 1989 12 08 14 22 52.7200 174.1000 40.00 116593 SHM 1989 11 26 21 00 375-81 P co2 358.490 -999.990 +.. S1 1990 01 09 09 24 52.7200 174.1000 40.00 116594 SHM 1989 11 26 21 00 376-81 P co2 357.860 -999.990 -.. S1 1990 01 09 09 26 52.7200 174.1000 40.00 116595 SHM 1989 12 03 23 50 503-81 P co2 355.960 -999.990 ... S1 1989 12 22 08 40 52.7200 174.1000 40.00 116596 SHM 1989 12 03 23 50 504-81 P co2 356.020 -999.990 ... S1 1989 12 22 08 42 52.7200 174.1000 40.00 116597 SHM 1989 12 10 22 10 565-81 P co2 357.050 -999.990 ... S1 1989 12 22 08 44 52.7200 174.1000 40.00 116598 SHM 1989 12 10 22 10 566-81 P co2 357.030 -999.990 ... S1 1989 12 22 08 46 52.7200 174.1000 40.00 116599 SHM 1989 12 17 22 45 575-81 P co2 357.650 -999.990 ... S1 1990 01 09 09 12 52.7200 174.1000 40.00 116600 SHM 1989 12 17 22 45 576-81 P co2 357.610 -999.990 ... S1 1990 01 09 09 14 52.7200 174.1000 40.00 116601 SHM 1989 12 24 22 05 965-81 P co2 358.110 -999.990 ... S1 1990 01 10 11 32 52.7200 174.1000 40.00 116602 SHM 1989 12 24 22 05 966-81 P co2 358.140 -999.990 ... S1 1990 01 10 11 34 52.7200 174.1000 40.00 116603 SHM 1990 01 01 22 00 569-81 P co2 359.930 -999.990 ... S1 1990 01 10 13 04 52.7200 174.1000 40.00 116604 SHM 1990 01 01 22 00 570-81 P co2 359.750 -999.990 ... S1 1990 01 10 13 06 52.7200 174.1000 40.00 116605 SHM 1990 01 07 22 20 613-81 P co2 362.560 -999.990 .X. S1 1990 01 31 09 52 52.7200 174.1000 40.00 116606 SHM 1990 01 07 22 20 614-81 P co2 362.520 -999.990 .X. S1 1990 01 31 09 54 52.7200 174.1000 40.00 116607 SHM 1990 01 14 23 20 71-81 P co2 359.950 -999.990 ... S1 1990 01 31 11 32 52.7200 174.1000 40.00 116608 SHM 1990 01 14 23 20 72-81 P co2 359.930 -999.990 ... S1 1990 01 31 11 34 52.7200 174.1000 40.00 116609 SHM 1990 01 21 22 10 199-81 P co2 358.730 -999.990 ... S1 1990 02 09 11 24 52.7200 174.1000 40.00 116610 SHM 1990 01 21 22 10 200-81 P co2 358.940 -999.990 ... S1 1990 02 09 11 26 52.7200 174.1000 40.00 116611 SHM 1990 01 28 22 51 89-81 P co2 360.560 -999.990 ... S1 1990 02 09 11 28 52.7200 174.1000 40.00 116612 SHM 1990 01 28 22 51 90-81 P co2 360.540 -999.990 ... S1 1990 02 09 11 30 52.7200 174.1000 40.00 116613 SHM 1990 02 04 21 55 947-81 P co2 361.150 -999.990 ... S1 1990 02 23 09 00 52.7200 174.1000 40.00 116614 SHM 1990 02 04 21 55 948-81 P co2 361.480 -999.990 ... S1 1990 02 23 09 02 52.7200 174.1000 40.00 116615 SHM 1990 02 11 22 15 449-81 P co2 361.260 -999.990 ... S1 1990 02 23 09 12 52.7200 174.1000 40.00 116616 SHM 1990 02 11 22 15 450-81 P co2 361.470 -999.990 ... S1 1990 02 23 09 14 52.7200 174.1000 40.00 116617 SHM 1990 02 18 23 44 1459-81 P co2 -999.990 -999.990 *.. S1 1990 03 06 10 52 52.7200 174.1000 40.00 116618 SHM 1990 02 18 23 44 1460-81 P co2 -999.990 -999.990 *.. S1 1990 03 06 10 54 52.7200 174.1000 40.00 116619 SHM 1990 02 25 23 00 363-81 P co2 361.670 -999.990 ... S1 1990 03 06 10 56 52.7200 174.1000 40.00 116620 SHM 1990 02 25 23 00 364-81 P co2 361.670 -999.990 ... S1 1990 03 06 10 58 52.7200 174.1000 40.00 116621 SHM 1990 03 04 23 30 689-81 P co2 359.890 -999.990 ... S1 1990 03 21 11 56 52.7200 174.1000 40.00 116622 SHM 1990 03 04 23 30 690-81 P co2 359.900 -999.990 ... S1 1990 03 21 11 58 52.7200 174.1000 40.00 116623 SHM 1990 03 11 23 30 547-81 P co2 359.620 -999.990 ... S1 1990 03 21 12 04 52.7200 174.1000 40.00 116624 SHM 1990 03 11 23 30 548-81 P co2 359.500 -999.990 ... S1 1990 03 21 12 06 52.7200 174.1000 40.00 116625 SHM 1990 03 18 23 55 987-81 P co2 363.800 -999.990 +.. S1 1990 06 21 15 56 52.7200 174.1000 40.00 116626 SHM 1990 03 18 23 55 988-81 P co2 362.200 -999.990 -.. S1 1990 06 21 15 58 52.7200 174.1000 40.00 116627 SHM 1990 03 25 23 00 593-81 P co2 360.100 -999.990 ... S1 1990 04 20 08 28 52.7200 174.1000 40.00 116628 SHM 1990 03 25 23 00 594-81 P co2 360.110 -999.990 ... S1 1990 04 20 08 30 52.7200 174.1000 40.00 116629 SHM 1990 04 08 00 00 5-81 P co2 361.530 -999.990 ... S1 1990 04 20 08 20 52.7200 174.1000 40.00 116630 SHM 1990 04 08 00 00 6-81 P co2 361.750 -999.990 ... S1 1990 04 20 08 22 52.7200 174.1000 40.00 116631 SHM 1990 04 15 01 00 1463-81 P co2 360.100 -999.990 ... S1 1990 04 27 09 24 52.7200 174.1000 40.00 116632 SHM 1990 04 15 01 00 1464-81 P co2 360.070 -999.990 ... S1 1990 04 27 09 26 52.7200 174.1000 40.00 116633 SHM 1990 04 22 02 10 51-81 P co2 361.020 -999.990 ... S1 1990 04 27 09 32 52.7200 174.1000 40.00 116634 SHM 1990 04 22 02 10 52-81 P co2 361.000 -999.990 ... S1 1990 04 27 09 34 52.7200 174.1000 40.00 116635 SHM 1990 05 01 23 45 571-81 P co2 364.610 -999.990 -.. S1 1990 06 21 08 20 52.7200 174.1000 40.00 116636 SHM 1990 05 01 23 45 572-81 P co2 365.420 -999.990 +.. S1 1990 06 21 08 22 52.7200 174.1000 40.00 116637 SHM 1990 05 06 23 45 867-81 P co2 364.050 -999.990 .X. S1 1990 06 21 08 40 52.7200 174.1000 40.00 116638 SHM 1990 05 06 23 45 868-81 P co2 364.100 -999.990 .X. S1 1990 06 21 08 42 52.7200 174.1000 40.00 116639 SHM 1990 05 14 03 10 903-81 P co2 360.530 -999.990 ... S1 1990 06 21 15 44 52.7200 174.1000 40.00 116640 SHM 1990 05 14 03 10 904-81 P co2 360.090 -999.990 ... S1 1990 06 21 15 46 52.7200 174.1000 40.00 116641 SHM 1990 05 20 00 00 825-81 P co2 361.200 -999.990 +.. S1 1990 06 20 10 24 52.7200 174.1000 40.00 116642 SHM 1990 05 20 00 00 826-81 P co2 360.650 -999.990 -.. S1 1990 06 20 10 26 52.7200 174.1000 40.00 116643 SHM 1990 05 28 23 00 839-81 P co2 357.300 -999.990 ... S1 1990 06 21 08 24 52.7200 174.1000 40.00 116644 SHM 1990 05 28 23 00 840-81 P co2 357.360 -999.990 ... S1 1990 06 21 08 26 52.7200 174.1000 40.00 116645 SHM 1990 07 08 23 00 865-81 P co2 -999.990 -999.990 *.. S1 1990 08 09 09 28 52.7200 174.1000 40.00 116646 SHM 1990 07 08 23 00 866-81 P co2 -999.990 -999.990 *.. S1 1990 08 09 09 30 52.7200 174.1000 40.00 116647 SHM 1990 07 24 12 34 1001-81 P co2 345.500 -999.990 -.. S1 1990 08 14 11 04 52.7200 174.1000 40.00 116648 SHM 1990 07 24 12 34 1002-81 P co2 346.030 -999.990 +.. S1 1990 08 14 11 06 52.7200 174.1000 40.00 116649 SHM 1990 07 30 23 00 305-81 P co2 342.880 -999.990 ... S1 1990 09 20 08 24 52.7200 174.1000 40.00 116650 SHM 1990 07 30 23 00 306-81 P co2 342.940 -999.990 ... S1 1990 09 20 08 26 52.7200 174.1000 40.00 116651 SHM 1990 08 05 23 00 673-81 P co2 343.270 -999.990 -.. S1 1990 09 20 10 04 52.7200 174.1000 40.00 116652 SHM 1990 08 05 23 00 674-81 P co2 343.840 -999.990 +.. S1 1990 09 20 10 06 52.7200 174.1000 40.00 116653 SHM 1990 08 20 23 30 599-81 P co2 348.420 -999.990 -.. S1 1990 09 20 08 16 52.7200 174.1000 40.00 116654 SHM 1990 08 20 23 30 600-81 P co2 349.230 -999.990 +.. S1 1990 09 20 08 18 52.7200 174.1000 40.00 116655 SHM 1990 08 26 01 00 311-81 P co2 351.020 -999.990 -.. S1 1990 09 20 09 56 52.7200 174.1000 40.00 116656 SHM 1990 08 26 01 00 312-81 P co2 356.130 -999.990 +.. S1 1990 09 20 09 58 52.7200 174.1000 40.00 116657 SHM 1990 09 02 23 30 895-81 P co2 378.870 -999.990 .Z. S1 1990 09 20 09 00 52.7200 174.1000 40.00 116658 SHM 1990 09 02 23 30 896-81 P co2 378.460 -999.990 .Z. S1 1990 09 20 09 02 52.7200 174.1000 40.00 116659 SHM 1990 09 10 00 00 907-81 P co2 346.850 -999.990 +.. S1 1990 09 28 09 28 52.7200 174.1000 40.00 116660 SHM 1990 09 10 00 00 908-81 P co2 345.880 -999.990 -.. S1 1990 09 28 09 30 52.7200 174.1000 40.00 116661 SHM 1990 09 16 00 00 603-81 P co2 -999.990 -999.990 *.. S1 1990 09 28 09 32 52.7200 174.1000 40.00 116662 SHM 1990 09 16 00 00 604-81 P co2 379.780 -999.990 -.. S1 1990 09 28 09 34 52.7200 174.1000 40.00 116663 SHM 1990 09 23 23 31 837-81 P co2 359.890 -999.990 -.. S1 1990 10 15 09 16 52.7200 174.1000 40.00 116664 SHM 1990 09 23 23 31 838-81 P co2 362.730 -999.990 +.. S1 1990 10 15 09 18 52.7200 174.1000 40.00 116665 SHM 1990 09 30 01 40 1009-81 P co2 350.200 -999.990 ... S1 1990 10 15 08 56 52.7200 174.1000 40.00 116666 SHM 1990 09 30 01 40 1010-81 P co2 350.290 -999.990 ... S1 1990 10 15 08 58 52.7200 174.1000 40.00 116667 SHM 1990 10 07 22 30 33-81 P co2 352.690 -999.990 +.. S1 1990 10 30 10 04 52.7200 174.1000 40.00 116668 SHM 1990 10 07 22 30 34-81 P co2 351.870 -999.990 -.. S1 1990 10 30 10 06 52.7200 174.1000 40.00 116669 SHM 1990 10 14 23 15 1149-81 P co2 355.490 -999.990 -.. S1 1990 10 30 10 00 52.7200 174.1000 40.00 116670 SHM 1990 10 14 23 15 1150-81 P co2 -999.990 -999.990 *.. S1 1990 10 30 10 02 52.7200 174.1000 40.00 116671 SHM 1990 10 21 23 58 1479-81 P co2 355.400 -999.990 ... S1 1990 11 14 08 20 52.7200 174.1000 40.00 116672 SHM 1990 10 21 23 58 1480-81 P co2 355.370 -999.990 ... S1 1990 11 14 08 22 52.7200 174.1000 40.00 116673 SHM 1990 10 29 01 00 153-81 P co2 356.340 -999.990 ... S1 1990 12 07 08 56 52.7200 174.1000 40.00 116674 SHM 1990 10 29 01 00 154-81 P co2 356.730 -999.990 ... S1 1990 12 07 08 58 52.7200 174.1000 40.00 116675 SHM 1990 11 04 23 45 1477-81 P co2 356.270 -999.990 ... S1 1990 11 14 08 16 52.7200 174.1000 40.00 116676 SHM 1990 11 04 23 45 1478-81 P co2 355.870 -999.990 ... S1 1990 11 14 08 18 52.7200 174.1000 40.00 116677 SHM 1990 11 12 01 30 575-81 P co2 355.010 -999.990 ... S1 1990 11 30 09 56 52.7200 174.1000 40.00 116678 SHM 1990 11 12 01 30 576-81 P co2 355.000 -999.990 ... S1 1990 11 30 09 58 52.7200 174.1000 40.00 116679 SHM 1990 12 04 00 30 43-81 P co2 359.600 -999.990 ... S1 1991 01 11 10 00 52.7200 174.1000 40.00 116680 SHM 1990 12 04 00 30 44-81 P co2 359.570 -999.990 ... S1 1991 01 11 10 02 52.7200 174.1000 40.00 116681 SHM 1990 12 18 01 00 867-81 P co2 361.450 -999.990 ... S1 1991 01 16 08 16 52.7200 174.1000 40.00 116682 SHM 1990 12 18 01 00 868-81 P co2 361.120 -999.990 ... S1 1991 01 16 08 18 52.7200 174.1000 40.00 116683 SHM 1990 12 23 23 12 1057-81 P co2 360.180 -999.990 -.. S1 1991 01 16 08 20 52.7200 174.1000 40.00 116684 SHM 1990 12 23 23 12 1058-81 P co2 360.760 -999.990 +.. S1 1991 01 16 08 22 52.7200 174.1000 40.00 116685 SHM 1990 12 30 22 10 1093-81 P co2 361.190 -999.990 ... S1 1991 01 11 10 16 52.7200 174.1000 40.00 116686 SHM 1990 12 30 22 10 1094-81 P co2 361.100 -999.990 ... S1 1991 01 11 10 18 52.7200 174.1000 40.00 116687 SHM 1991 01 13 23 00 63-81 P co2 360.320 -999.990 ... S1 1991 02 13 11 08 52.7200 174.1000 40.00 116688 SHM 1991 01 13 23 00 64-81 P co2 360.350 -999.990 ... S1 1991 02 13 11 10 52.7200 174.1000 40.00 116689 SHM 1991 01 25 20 30 485-81 P co2 361.120 -999.990 ... S1 1991 02 13 11 32 52.7200 174.1000 40.00 116690 SHM 1991 01 25 20 30 486-81 P co2 361.440 -999.990 ... S1 1991 02 13 11 34 52.7200 174.1000 40.00 116691 SHM 1991 02 03 23 00 651-81 P co2 360.240 -999.990 ... S1 1991 02 22 09 20 52.7200 174.1000 40.00 116692 SHM 1991 02 03 23 00 652-81 P co2 360.180 -999.990 ... S1 1991 02 22 09 22 52.7200 174.1000 40.00 116693 SHM 1991 02 11 00 00 1249-81 P co2 360.340 -999.990 ... S1 1991 02 22 09 16 52.7200 174.1000 40.00 116694 SHM 1991 02 11 00 00 1250-81 P co2 360.320 -999.990 ... S1 1991 02 22 09 18 52.7200 174.1000 40.00 116695 SHM 1991 02 17 01 30 763-81 P co2 359.460 -999.990 ... S1 1991 03 13 10 20 52.7200 174.1000 40.00 116696 SHM 1991 02 17 01 30 764-81 P co2 359.460 -999.990 ... S1 1991 03 13 10 22 52.7200 174.1000 40.00 116697 SHM 1991 02 24 23 15 285-81 P co2 361.570 -999.990 ... S1 1991 03 13 10 16 52.7200 174.1000 40.00 116698 SHM 1991 02 24 23 15 286-81 P co2 361.370 -999.990 ... S1 1991 03 13 10 18 52.7200 174.1000 40.00 116699 SHM 1991 03 03 22 20 543-81 P co2 362.520 -999.990 ... S1 1991 03 29 08 56 52.7200 174.1000 40.00 116700 SHM 1991 03 03 22 20 544-81 P co2 362.790 -999.990 ... S1 1991 03 29 08 58 52.7200 174.1000 40.00 116701 SHM 1991 03 11 00 20 279-81 P co2 362.230 -999.990 ... S1 1991 03 22 10 36 52.7200 174.1000 40.00 116702 SHM 1991 03 11 00 20 280-81 P co2 362.520 -999.990 ... S1 1991 03 22 10 38 52.7200 174.1000 40.00 116703 SHM 1991 03 17 23 30 745-81 P co2 361.850 -999.990 ... S1 1991 04 05 08 28 52.7200 174.1000 40.00 116704 SHM 1991 03 17 23 30 746-81 P co2 361.880 -999.990 ... S1 1991 04 05 08 30 52.7200 174.1000 40.00 116705 SHM 1991 03 24 01 30 801-81 P co2 362.210 -999.990 ... S1 1991 04 05 09 56 52.7200 174.1000 40.00 116706 SHM 1991 03 24 01 30 802-81 P co2 362.300 -999.990 ... S1 1991 04 05 09 58 52.7200 174.1000 40.00 116707 SHM 1991 04 01 00 30 785-81 P co2 362.310 -999.990 ... S1 1991 04 30 08 24 52.7200 174.1000 40.00 116708 SHM 1991 04 01 00 30 786-81 P co2 362.790 -999.990 ... S1 1991 04 30 08 26 52.7200 174.1000 40.00 116709 SHM 1991 04 07 23 55 1221-81 P co2 361.970 -999.990 ... S1 1991 04 18 10 20 52.7200 174.1000 40.00 116710 SHM 1991 04 07 23 55 1222-81 P co2 361.890 -999.990 ... S1 1991 04 18 10 22 52.7200 174.1000 40.00 116711 SHM 1991 04 14 01 30 313-81 P co2 362.870 -999.990 ... S1 1991 05 10 09 24 52.7200 174.1000 40.00 116712 SHM 1991 04 14 01 30 314-81 P co2 363.190 -999.990 ... S1 1991 05 10 09 26 52.7200 174.1000 40.00 116713 SHM 1991 04 21 23 15 735-81 P co2 363.760 -999.990 ... S1 1991 05 10 09 20 52.7200 174.1000 40.00 116714 SHM 1991 04 21 23 15 736-81 P co2 363.640 -999.990 ... S1 1991 05 10 09 22 52.7200 174.1000 40.00 116715 SHM 1991 04 28 23 15 761-81 P co2 363.930 -999.990 -.. S1 1991 05 24 20 56 52.7200 174.1000 40.00 116716 SHM 1991 04 28 23 15 762-81 P co2 365.790 -999.990 +.. S1 1991 05 24 20 58 52.7200 174.1000 40.00 116717 SHM 1991 05 05 02 15 457-81 P co2 364.260 -999.990 +.. S1 1991 05 24 21 00 52.7200 174.1000 40.00 116718 SHM 1991 05 05 02 15 458-81 P co2 362.500 -999.990 -.. S1 1991 05 24 21 02 52.7200 174.1000 40.00 116719 SHM 1991 05 12 23 20 159-81 P co2 363.670 -999.990 -.. S1 1991 05 31 08 12 52.7200 174.1000 40.00 116720 SHM 1991 05 12 23 20 160-81 P co2 366.370 -999.990 +.. S1 1991 05 31 08 14 52.7200 174.1000 40.00 116721 SHM 1991 05 19 01 40 1453-81 P co2 364.240 -999.990 ... S1 1991 05 31 10 52 52.7200 174.1000 40.00 116722 SHM 1991 05 19 01 40 1454-81 P co2 363.980 -999.990 ... S1 1991 05 31 10 54 52.7200 174.1000 40.00 116723 SHM 1991 05 26 23 10 709-81 P co2 361.640 -999.990 ... S1 1991 06 24 08 24 52.7200 174.1000 40.00 116724 SHM 1991 05 26 23 10 710-81 P co2 361.790 -999.990 ... S1 1991 06 24 08 26 52.7200 174.1000 40.00 116725 SHM 1991 06 02 02 50 209-81 P co2 359.340 -999.990 ... S1 1991 06 24 08 44 52.7200 174.1000 40.00 116726 SHM 1991 06 02 02 50 210-81 P co2 359.210 -999.990 ... S1 1991 06 24 08 46 52.7200 174.1000 40.00 116727 SHM 1991 06 09 22 25 137-81 P co2 359.390 -999.990 ... S1 1991 07 05 09 52 52.7200 174.1000 40.00 116728 SHM 1991 06 09 22 25 138-81 P co2 359.510 -999.990 ... S1 1991 07 05 09 54 52.7200 174.1000 40.00 116729 SHM 1991 06 16 22 15 1561-81 P co2 357.240 -999.990 ... S1 1991 07 03 08 48 52.7200 174.1000 40.00 116730 SHM 1991 06 16 22 15 1562-81 P co2 357.030 -999.990 ... S1 1991 07 03 08 50 52.7200 174.1000 40.00 116731 SHM 1991 06 23 01 00 603-81 P co2 354.770 -999.990 ... S1 1991 07 18 10 16 52.7200 174.1000 40.00 116732 SHM 1991 06 23 01 00 604-81 P co2 354.860 -999.990 ... S1 1991 07 18 10 18 52.7200 174.1000 40.00 116733 SHM 1991 06 30 23 10 279-81 P co2 355.280 -999.990 ... S1 1991 07 18 09 12 52.7200 174.1000 40.00 116734 SHM 1991 06 30 23 10 280-81 P co2 354.960 -999.990 ... S1 1991 07 18 09 14 52.7200 174.1000 40.00 116735 SHM 1991 07 07 23 30 481-81 P co2 353.880 -999.990 .X. S1 1991 08 06 09 24 52.7200 174.1000 40.00 116736 SHM 1991 07 07 23 30 482-81 P co2 354.090 -999.990 .X. S1 1991 08 06 09 26 52.7200 174.1000 40.00 116737 SHM 1991 07 14 22 30 817-81 P co2 351.630 -999.990 -.. S1 1991 08 06 10 32 52.7200 174.1000 40.00 116738 SHM 1991 07 14 22 30 818-81 P co2 352.640 -999.990 +.. S1 1991 08 06 10 34 52.7200 174.1000 40.00 116739 SHM 1991 07 21 23 00 937-81 P co2 345.580 -999.990 ... S1 1991 08 22 10 36 52.7200 174.1000 40.00 116740 SHM 1991 07 21 23 00 938-81 P co2 345.770 -999.990 ... S1 1991 08 22 10 38 52.7200 174.1000 40.00 116741 SHM 1991 07 28 22 00 1263-81 P co2 344.280 -999.990 -.. S1 1991 09 13 10 24 52.7200 174.1000 40.00 116742 SHM 1991 07 28 22 00 1264-81 P co2 345.170 -999.990 +.. S1 1991 09 13 10 26 52.7200 174.1000 40.00 116743 SHM 1991 08 05 00 00 983-81 P co2 364.050 -999.990 +.. S1 1991 08 20 11 24 52.7200 174.1000 40.00 116744 SHM 1991 08 05 00 00 984-81 P co2 360.790 -999.990 -.. S1 1991 08 20 11 26 52.7200 174.1000 40.00 116745 SHM 1991 08 11 01 00 4-81 P co2 343.130 -999.990 ... S1 1991 08 20 11 22 52.7200 174.1000 40.00 116746 SHM 1991 08 18 22 00 1347-81 P co2 344.280 -999.990 ... S1 1991 09 18 08 48 52.7200 174.1000 40.00 116747 SHM 1991 08 18 22 00 1348-81 P co2 343.880 -999.990 ... S1 1991 09 18 08 50 52.7200 174.1000 40.00 116748 SHM 1991 08 25 01 00 447-81 P co2 346.400 -999.990 ... S1 1991 09 18 09 12 52.7200 174.1000 40.00 116749 SHM 1991 08 25 01 00 448-81 P co2 346.300 -999.990 ... S1 1991 09 18 09 14 52.7200 174.1000 40.00 116750 SHM 1991 09 01 23 15 51-81 P co2 350.330 -999.990 .X. S1 1991 09 18 09 00 52.7200 174.1000 40.00 116751 SHM 1991 09 01 23 15 52-81 P co2 350.000 -999.990 .X. S1 1991 09 18 09 02 52.7200 174.1000 40.00 116752 SHM 1991 09 08 01 15 1325-81 P co2 347.050 -999.990 ... S1 1991 09 18 08 24 52.7200 174.1000 40.00 116753 SHM 1991 09 08 01 15 1326-81 P co2 347.240 -999.990 ... S1 1991 09 18 08 26 52.7200 174.1000 40.00 116754 SHM 1991 09 15 23 50 717-81 P co2 346.230 -999.990 -.. S1 1991 10 24 10 32 52.7200 174.1000 40.00 116755 SHM 1991 09 15 23 50 718-81 P co2 347.160 -999.990 +.. S1 1991 10 24 10 34 52.7200 174.1000 40.00 116756 SHM 1991 09 23 01 14 641-81 P co2 349.890 -999.990 ... S1 1991 10 24 10 28 52.7200 174.1000 40.00 116757 SHM 1991 09 23 01 14 642-81 P co2 349.850 -999.990 ... S1 1991 10 24 10 30 52.7200 174.1000 40.00 116758 SHM 1991 09 29 23 05 223-81 P co2 350.860 -999.990 -.. S1 1991 10 21 08 44 52.7200 174.1000 40.00 116759 SHM 1991 09 29 23 05 224-81 P co2 352.570 -999.990 +.. S1 1991 10 21 08 46 52.7200 174.1000 40.00 116760 SHM 1991 10 06 22 00 667-81 P co2 353.290 -999.990 +.. S1 1991 10 24 09 48 52.7200 174.1000 40.00 116761 SHM 1991 10 06 22 00 668-81 P co2 334.740 -999.990 -.. S1 1991 10 24 09 50 52.7200 174.1000 40.00 116762 SHM 1991 10 13 01 15 567-81 P co2 355.450 -999.990 ... S1 1991 11 01 10 16 52.7200 174.1000 40.00 116763 SHM 1991 10 13 01 15 568-81 P co2 355.410 -999.990 ... S1 1991 11 01 10 18 52.7200 174.1000 40.00 116764 SHM 1991 10 20 23 45 651-81 P co2 355.800 -999.990 ... S1 1991 11 01 08 52 52.7200 174.1000 40.00 116765 SHM 1991 10 20 23 45 652-81 P co2 355.530 -999.990 ... S1 1991 11 01 08 54 52.7200 174.1000 40.00 116766 SHM 1991 10 27 23 30 351-81 P co2 358.630 -999.990 -.. S1 1991 11 14 09 44 52.7200 174.1000 40.00 116767 SHM 1991 10 27 23 30 352-81 P co2 -999.990 -999.990 *.. S1 1991 11 14 09 46 52.7200 174.1000 40.00 116768 SHM 1991 11 03 23 30 231-81 P co2 345.630 -999.990 -.. S1 1991 11 14 09 48 52.7200 174.1000 40.00 116769 SHM 1991 11 03 23 30 232-81 P co2 360.790 -999.990 +.. S1 1991 11 14 09 50 52.7200 174.1000 40.00 116770 SHM 1991 11 11 01 30 575-81 P co2 360.620 -999.990 +.. S1 1991 12 05 20 00 52.7200 174.1000 40.00 116771 SHM 1991 11 11 01 30 576-81 P co2 358.360 -999.990 -.. S1 1991 12 05 20 02 52.7200 174.1000 40.00 116772 SHM 1991 11 17 01 30 829-81 P co2 360.990 -999.990 +.. S1 1991 12 05 20 12 52.7200 174.1000 40.00 116773 SHM 1991 11 17 01 30 830-81 P co2 360.020 -999.990 -.. S1 1991 12 05 20 14 52.7200 174.1000 40.00 116774 SHM 1991 11 24 01 00 381-81 P co2 331.670 -999.990 N.. S1 1991 12 18 11 04 52.7200 174.1000 40.00 116775 SHM 1991 12 01 01 00 1125-81 P co2 363.700 -999.990 +.. S1 1991 12 18 09 52 52.7200 174.1000 40.00 116776 SHM 1991 12 01 01 00 1126-81 P co2 358.950 -999.990 -.. S1 1991 12 18 09 54 52.7200 174.1000 40.00 116777 SHM 1991 12 08 23 30 73-81 P co2 331.160 -999.990 N.. S1 1992 02 13 08 44 52.7200 174.1000 40.00 116778 SHM 1991 12 08 23 30 74-81 P co2 331.220 -999.990 N.. S1 1992 02 13 08 46 52.7200 174.1000 40.00 116779 SHM 1991 12 15 23 15 443-81 P co2 362.800 -999.990 +.. S1 1992 02 13 08 52 52.7200 174.1000 40.00 116780 SHM 1991 12 15 23 15 444-81 P co2 361.710 -999.990 -.. S1 1992 02 13 08 54 52.7200 174.1000 40.00 116781 SHM 1991 12 22 23 30 117-81 P co2 -999.990 -999.990 *.. S1 1992 02 13 08 56 52.7200 174.1000 40.00 116782 SHM 1991 12 22 23 30 118-81 P co2 -999.990 -999.990 *.. S1 1992 02 13 08 58 52.7200 174.1000 40.00 116783 SHM 1991 12 29 23 30 387-81 P co2 -999.990 -999.990 *.. S1 1992 02 13 08 48 52.7200 174.1000 40.00 116784 SHM 1991 12 29 23 30 388-81 P co2 -999.990 -999.990 *.. S1 1992 02 13 08 50 52.7200 174.1000 40.00 116785 SHM 1992 01 12 23 00 599-81 P co2 361.620 -999.990 -.. S1 1992 02 13 08 28 52.7200 174.1000 40.00 116786 SHM 1992 01 12 23 00 600-81 P co2 364.950 -999.990 +.. S1 1992 02 13 08 30 52.7200 174.1000 40.00 116787 SHM 1992 01 19 23 05 355-81 P co2 361.320 -999.990 ... S1 1992 02 13 08 24 52.7200 174.1000 40.00 116788 SHM 1992 01 19 23 05 356-81 P co2 361.330 -999.990 ... S1 1992 02 13 08 26 52.7200 174.1000 40.00 116789 SHM 1992 01 26 22 30 181-81 P co2 361.680 -999.990 ... S1 1992 02 25 14 20 52.7200 174.1000 40.00 116790 SHM 1992 01 26 22 30 182-81 P co2 361.730 -999.990 ... S1 1992 02 25 14 22 52.7200 174.1000 40.00 116791 SHM 1992 02 02 23 00 1339-81 P co2 361.650 -999.990 ... S1 1992 02 25 14 16 52.7200 174.1000 40.00 116792 SHM 1992 02 02 23 00 1340-81 P co2 361.790 -999.990 ... S1 1992 02 25 14 18 52.7200 174.1000 40.00 116793 SHM 1992 02 09 22 05 803-81 P co2 361.340 -999.990 ... S1 1992 03 06 12 28 52.7200 174.1000 40.00 116794 SHM 1992 02 09 22 05 804-81 P co2 361.400 -999.990 ... S1 1992 03 06 12 30 52.7200 174.1000 40.00 116795 SHM 1992 02 16 01 00 1033-81 P co2 362.600 -999.990 ... S1 1992 03 06 12 36 52.7200 174.1000 40.00 116796 SHM 1992 02 16 01 00 1034-81 P co2 362.760 -999.990 ... S1 1992 03 06 12 38 52.7200 174.1000 40.00 116797 SHM 1992 02 23 23 55 323-81 P co2 361.530 -999.990 ... S1 1992 03 20 08 52 52.7200 174.1000 40.00 116798 SHM 1992 02 23 23 55 324-81 P co2 361.500 -999.990 ... S1 1992 03 20 08 54 52.7200 174.1000 40.00 116799 SHM 1992 03 01 00 25 931-81 P co2 361.500 -999.990 ... S1 1992 03 20 08 56 52.7200 174.1000 40.00 116800 SHM 1992 03 01 00 25 932-81 P co2 361.510 -999.990 ... S1 1992 03 20 08 58 52.7200 174.1000 40.00 116801 SHM 1992 03 08 23 05 525-81 P co2 361.570 -999.990 ... S1 1992 03 26 10 04 52.7200 174.1000 40.00 116802 SHM 1992 03 08 23 05 526-81 P co2 361.630 -999.990 ... S1 1992 03 26 10 06 52.7200 174.1000 40.00 116803 SHM 1992 03 15 01 40 839-81 P co2 362.200 -999.990 ... S1 1992 03 26 10 00 52.7200 174.1000 40.00 116804 SHM 1992 03 15 01 40 840-81 P co2 362.330 -999.990 ... S1 1992 03 26 10 02 52.7200 174.1000 40.00 116805 SHM 1992 03 22 01 00 6617-66 P co2 362.210 -999.990 ... S1 1992 04 28 09 12 52.7200 174.1000 40.00 116806 SHM 1992 03 22 01 00 6618-66 P co2 362.390 -999.990 ... S1 1992 04 28 09 14 52.7200 174.1000 40.00 116807 SHM 1992 03 29 23 45 6311-66 P co2 363.210 -999.990 ... S1 1992 04 28 09 32 52.7200 174.1000 40.00 116808 SHM 1992 03 29 23 45 6312-66 P co2 363.220 -999.990 ... S1 1992 04 28 09 34 52.7200 174.1000 40.00 116809 SHM 1992 04 05 01 35 6134-66 P co2 362.800 -999.990 ... S1 1992 05 22 09 28 52.7200 174.1000 40.00 116810 SHM 1992 04 05 01 35 6211-66 P co2 362.820 -999.990 ... S1 1992 05 22 09 30 52.7200 174.1000 40.00 116811 SHM 1992 04 12 02 30 6133-66 P co2 362.520 -999.990 ... S1 1992 05 22 09 44 52.7200 174.1000 40.00 116812 SHM 1992 04 12 02 30 6212-66 P co2 362.500 -999.990 ... S1 1992 05 22 09 46 52.7200 174.1000 40.00 116813 SHM 1992 04 26 23 35 6249-66 P co2 364.140 -999.990 ... S1 1992 05 22 11 00 52.7200 174.1000 40.00 116814 SHM 1992 04 26 23 35 6250-66 P co2 364.160 -999.990 ... S1 1992 05 22 11 02 52.7200 174.1000 40.00 116815 SHM 1992 05 03 00 40 6289-66 P co2 362.670 -999.990 ... S1 1992 05 22 11 04 52.7200 174.1000 40.00 116816 SHM 1992 05 03 00 40 6290-66 P co2 362.690 -999.990 ... S1 1992 05 22 11 06 52.7200 174.1000 40.00 116817 SHM 1992 05 11 02 40 6771-66 P co2 358.250 -999.990 -.. S1 1992 06 09 09 00 52.7200 174.1000 40.00 116818 SHM 1992 05 11 02 40 6772-66 P co2 362.430 -999.990 +.. S1 1992 06 09 09 02 52.7200 174.1000 40.00 116819 SHM 1992 05 18 08 50 6773-66 P co2 361.740 -999.990 ... S1 1992 06 09 09 12 52.7200 174.1000 40.00 116820 SHM 1992 05 18 08 50 6774-66 P co2 361.970 -999.990 ... S1 1992 06 09 09 14 52.7200 174.1000 40.00 116821 SHM 1992 05 24 22 15 6111-66 P co2 -999.990 -999.990 *.. S1 1992 07 24 08 44 52.7200 174.1000 40.00 116822 SHM 1992 05 24 22 15 6112-66 P co2 -999.990 -999.990 *.. S1 1992 07 24 08 46 52.7200 174.1000 40.00 116823 SHM 1992 05 31 00 40 6263-66 P co2 362.070 -999.990 +.. S1 1992 07 24 08 40 52.7200 174.1000 40.00 116824 SHM 1992 05 31 00 40 6264-66 P co2 361.010 -999.990 -.. S1 1992 07 24 08 42 52.7200 174.1000 40.00 116825 SHM 1992 06 07 01 30 357-81 P co2 360.480 -999.990 ... S1 1992 07 07 11 08 52.7200 174.1000 40.00 116826 SHM 1992 06 07 01 30 358-81 P co2 360.320 -999.990 ... S1 1992 07 07 11 10 52.7200 174.1000 40.00 116827 SHM 1992 06 14 00 30 719-81 P co2 356.530 -999.990 ... S1 1992 07 07 11 04 52.7200 174.1000 40.00 116828 SHM 1992 06 14 00 30 720-81 P co2 356.640 -999.990 ... S1 1992 07 07 11 06 52.7200 174.1000 40.00 116829 SHM 1992 06 21 00 45 6321-66 P co2 356.560 -999.990 ... S1 1992 08 11 09 32 52.7200 174.1000 40.00 116830 SHM 1992 06 21 00 45 6322-66 P co2 356.490 -999.990 ... S1 1992 08 11 09 34 52.7200 174.1000 40.00 116831 SHM 1992 07 05 00 10 6509-66 P co2 353.270 -999.990 ... S1 1992 08 11 09 52 52.7200 174.1000 40.00 116832 SHM 1992 07 05 00 10 6510-66 P co2 353.160 -999.990 ... S1 1992 08 11 09 54 52.7200 174.1000 40.00 116833 SHM 1992 07 12 20 25 6009-66 P co2 352.660 -999.990 ... S1 1992 08 05 11 36 52.7200 174.1000 40.00 116834 SHM 1992 07 12 20 25 6010-66 P co2 352.870 -999.990 ... S1 1992 08 05 11 38 52.7200 174.1000 40.00 116835 SHM 1992 07 19 20 10 6515-66 P co2 348.850 -999.990 ... S1 1992 08 25 08 52 52.7200 174.1000 40.00 116836 SHM 1992 07 19 20 10 6516-66 P co2 348.710 -999.990 ... S1 1992 08 25 08 54 52.7200 174.1000 40.00 116837 SHM 1992 07 26 00 55 6537-66 P co2 348.360 -999.990 +.. S1 1992 08 25 08 56 52.7200 174.1000 40.00 116838 SHM 1992 07 26 00 55 6538-66 P co2 347.450 -999.990 -.. S1 1992 08 25 08 58 52.7200 174.1000 40.00 116839 SHM 1992 08 02 18 30 6769-66 P co2 350.620 -999.990 +.. S1 1992 09 09 08 52 52.7200 174.1000 40.00 116840 SHM 1992 08 02 18 30 6770-66 P co2 349.770 -999.990 -.. S1 1992 09 09 08 54 52.7200 174.1000 40.00 116841 SHM 1992 08 10 07 11 6768-66 P co2 345.040 -999.990 ... S1 1992 09 17 09 30 52.7200 174.1000 40.00 116842 SHM 1992 08 10 07 15 6617-66 P co2 347.020 -999.990 ... S1 1992 09 03 09 16 52.7200 174.1000 40.00 116843 SHM 1992 08 10 07 15 6618-66 P co2 347.310 -999.990 ... S1 1992 09 03 09 18 52.7200 174.1000 40.00 116844 SHM 1992 08 16 23 30 6727-66 P co2 345.490 -999.990 ... S1 1992 09 17 09 00 52.7200 174.1000 40.00 116845 SHM 1992 08 16 23 30 6728-66 P co2 345.840 -999.990 ... S1 1992 09 17 09 02 52.7200 174.1000 40.00 116846 SHM 1992 08 23 03 10 6231-66 P co2 347.480 -999.990 ... S1 1992 10 09 09 12 52.7200 174.1000 40.00 116847 SHM 1992 08 23 03 10 6232-66 P co2 347.590 -999.990 ... S1 1992 10 09 09 14 52.7200 174.1000 40.00 116848 SHM 1992 08 30 19 45 6007-66 P co2 346.770 -999.990 +.. S1 1992 10 09 08 56 52.7200 174.1000 40.00 116849 SHM 1992 08 30 19 45 6008-66 P co2 333.990 -999.990 -.. S1 1992 10 09 08 58 52.7200 174.1000 40.00 116850 SHM 1992 09 06 14 30 6083-66 P co2 333.360 -999.990 N.. S1 1992 10 06 12 04 52.7200 174.1000 40.00 116851 SHM 1992 09 06 14 30 6084-66 P co2 333.400 -999.990 N.. S1 1992 10 06 12 06 52.7200 174.1000 40.00 116852 SHM 1992 09 13 04 35 6427-66 P co2 349.120 -999.990 ... S1 1992 10 06 12 08 52.7200 174.1000 40.00 116853 SHM 1992 09 13 04 35 6428-66 P co2 349.050 -999.990 ... S1 1992 10 06 12 10 52.7200 174.1000 40.00 116854 SHM 1992 09 20 04 00 6327-66 P co2 348.190 -999.990 ... S1 1992 10 23 09 20 52.7200 174.1000 40.00 116855 SHM 1992 09 20 04 00 6328-66 P co2 348.240 -999.990 ... S1 1992 10 23 09 22 52.7200 174.1000 40.00 116856 SHM 1992 09 27 22 05 6393-66 P co2 347.720 -999.990 .X. S1 1992 10 23 11 28 52.7200 174.1000 40.00 116857 SHM 1992 09 27 22 05 6394-66 P co2 348.040 -999.990 .X. S1 1992 10 23 11 30 52.7200 174.1000 40.00 116858 SHM 1992 10 03 12 00 6269-66 P co2 357.690 -999.990 .X. S1 1992 11 17 12 28 52.7200 174.1000 40.00 116859 SHM 1992 10 03 12 00 6270-66 P co2 357.750 -999.990 .X. S1 1992 11 17 12 30 52.7200 174.1000 40.00 116860 SHM 1992 10 10 23 00 6399-66 P co2 354.160 -999.990 ... S1 1992 11 17 11 36 52.7200 174.1000 40.00 116861 SHM 1992 10 10 23 00 6400-66 P co2 354.160 -999.990 ... S1 1992 11 17 11 38 52.7200 174.1000 40.00 116862 SHM 1992 10 19 09 30 6781-66 P co2 356.780 -999.990 ... S1 1992 11 17 11 32 52.7200 174.1000 40.00 116863 SHM 1992 10 19 09 30 6782-66 P co2 357.060 -999.990 ... S1 1992 11 17 11 34 52.7200 174.1000 40.00 116864 SHM 1992 11 01 00 15 6721-66 P co2 357.070 -999.990 ... S1 1993 01 06 10 20 52.7200 174.1000 40.00 116865 SHM 1992 11 01 00 15 6722-66 P co2 356.970 -999.990 ... S1 1993 01 06 10 22 52.7200 174.1000 40.00 116866 SHM 1992 11 08 00 40 6371-66 P co2 357.880 -999.990 ... S1 1993 01 06 11 04 52.7200 174.1000 40.00 116867 SHM 1992 11 08 00 40 6372-66 P co2 357.730 -999.990 ... S1 1993 01 06 11 06 52.7200 174.1000 40.00 116868 SHM 1992 11 17 23 50 6545-66 P co2 361.450 -999.990 ... S1 1992 12 18 09 44 52.7200 174.1000 40.00 116869 SHM 1992 11 17 23 50 6546-66 P co2 361.640 -999.990 ... S1 1992 12 18 09 46 52.7200 174.1000 40.00 116870 SHM 1992 11 23 01 00 6725-66 P co2 358.160 -999.990 ... S1 1993 01 13 10 00 52.7200 174.1000 40.00 116871 SHM 1992 11 23 01 00 6726-66 P co2 358.300 -999.990 ... S1 1993 01 13 10 02 52.7200 174.1000 40.00 116872 SHM 1992 11 29 23 22 6099-66 P co2 359.610 -999.990 ... S1 1993 01 13 10 04 52.7200 174.1000 40.00 116873 SHM 1992 11 29 23 22 6100-66 P co2 359.500 -999.990 ... S1 1993 01 13 10 06 52.7200 174.1000 40.00 116874 SHM 1992 12 06 23 21 6835-66 P co2 360.090 -999.990 ... S1 1993 01 20 09 44 52.7200 174.1000 40.00 116875 SHM 1992 12 06 23 21 6836-66 P co2 359.930 -999.990 ... S1 1993 01 20 09 46 52.7200 174.1000 40.00 116876 SHM 1992 12 13 00 15 6849-66 P co2 -999.990 -999.990 *.. S1 1993 01 20 09 32 52.7200 174.1000 40.00 116877 SHM 1992 12 13 00 15 6850-66 P co2 -999.990 -999.990 *.. S1 1993 01 20 09 34 52.7200 174.1000 40.00 116878 SHM 1992 12 20 23 00 6671-66 P co2 360.700 -999.990 ... S1 1993 02 04 12 04 52.7200 174.1000 40.00 116879 SHM 1992 12 20 23 00 6672-66 P co2 360.750 -999.990 ... S1 1993 02 04 12 06 52.7200 174.1000 40.00 116880 SHM 1992 12 27 01 00 6614-66 P co2 360.290 -999.990 ... S1 1993 02 04 11 54 52.7200 174.1000 40.00 116881 SHM 1993 01 03 23 10 6391-66 P co2 360.530 -999.990 ... S1 1993 02 10 09 44 52.7200 174.1000 40.00 116882 SHM 1993 01 03 23 10 6392-66 P co2 360.560 -999.990 ... S1 1993 02 10 09 46 52.7200 174.1000 40.00 116883 SHM 1993 01 10 23 25 6329-66 P co2 362.730 -999.990 ... S1 1993 02 10 09 24 52.7200 174.1000 40.00 116884 SHM 1993 01 10 23 25 6330-66 P co2 362.400 -999.990 ... S1 1993 02 10 09 26 52.7200 174.1000 40.00 116885 SHM 1993 01 17 23 30 6057-66 P co2 362.000 -999.990 ... S1 1993 02 17 09 16 52.7200 174.1000 40.00 116886 SHM 1993 01 17 23 30 6058-66 P co2 361.930 -999.990 ... S1 1993 02 17 09 18 52.7200 174.1000 40.00 116887 SHM 1993 01 24 23 20 6499-66 P co2 361.920 -999.990 ... S1 1993 03 18 12 40 52.7200 174.1000 40.00 116888 SHM 1993 01 24 23 20 6500-66 P co2 361.760 -999.990 ... S1 1993 03 18 12 42 52.7200 174.1000 40.00 116889 SHM 1993 01 31 23 45 6643-66 P co2 364.040 -999.990 +.. S1 1993 03 18 10 04 52.7200 174.1000 40.00 116890 SHM 1993 01 31 23 45 6644-66 P co2 337.180 -999.990 -.. S1 1993 03 18 10 06 52.7200 174.1000 40.00 116891 SHM 1993 02 07 23 15 6675-66 P co2 339.560 -999.990 N.. S1 1993 03 29 08 16 52.7200 174.1000 40.00 116892 SHM 1993 02 07 23 15 6676-66 P co2 339.560 -999.990 N.. S1 1993 03 29 08 18 52.7200 174.1000 40.00 116893 SHM 1993 02 14 23 00 6155-66 P co2 361.990 -999.990 ... S1 1993 03 25 08 16 52.7200 174.1000 40.00 116894 SHM 1993 02 14 23 00 6156-66 P co2 361.940 -999.990 ... S1 1993 03 25 08 18 52.7200 174.1000 40.00 116895 SHM 1993 02 21 11 30 6479-66 P co2 361.490 -999.990 ... S1 1993 03 25 08 24 52.7200 174.1000 40.00 116896 SHM 1993 02 21 11 30 6480-66 P co2 361.380 -999.990 ... S1 1993 03 25 08 26 52.7200 174.1000 40.00 116897 SHM 1993 02 28 22 55 6277-66 P co2 362.600 -999.990 ... S1 1993 03 25 08 20 52.7200 174.1000 40.00 116898 SHM 1993 02 28 22 55 6278-66 P co2 362.560 -999.990 ... S1 1993 03 25 08 22 52.7200 174.1000 40.00 116899 SHM 1993 03 07 00 10 6311-66 P co2 362.520 -999.990 ... S1 1993 04 29 08 16 52.7200 174.1000 40.00 116900 SHM 1993 03 07 00 10 6312-66 P co2 362.440 -999.990 ... S1 1993 04 29 08 18 52.7200 174.1000 40.00 116901 SHM 1993 03 14 11 05 6725-66 P co2 362.140 -999.990 ... S1 1993 04 29 10 16 52.7200 174.1000 40.00 116902 SHM 1993 03 14 11 05 6726-66 P co2 362.100 -999.990 ... S1 1993 04 29 10 18 52.7200 174.1000 40.00 116903 SHM 1993 03 28 00 00 6391-66 P co2 362.550 -999.990 ... S1 1993 04 29 09 56 52.7200 174.1000 40.00 116904 SHM 1993 03 28 00 00 6392-66 P co2 362.550 -999.990 ... S1 1993 04 29 09 58 52.7200 174.1000 40.00 116905 SHM 1993 04 04 23 00 6329-66 P co2 362.780 -999.990 ... S1 1993 04 29 09 52 52.7200 174.1000 40.00 116906 SHM 1993 04 04 23 00 6330-66 P co2 362.710 -999.990 ... S1 1993 04 29 09 54 52.7200 174.1000 40.00 116907 SHM 1993 04 11 23 30 6253-66 P co2 362.630 -999.990 ... S1 1993 04 30 10 32 52.7200 174.1000 40.00 116908 SHM 1993 04 11 23 30 6254-66 P co2 362.570 -999.990 ... S1 1993 04 30 10 34 52.7200 174.1000 40.00 116909 SHM 1993 04 18 23 00 6233-66 P co2 354.830 -999.990 +.. S1 1993 04 30 10 36 52.7200 174.1000 40.00 116910 SHM 1993 04 18 23 00 6234-66 P co2 344.620 -999.990 -.. S1 1993 04 30 10 38 52.7200 174.1000 40.00 116911 SHM 1993 04 25 23 00 6165-66 P co2 363.600 -999.990 ... S1 1993 05 19 09 20 52.7200 174.1000 40.00 116912 SHM 1993 04 25 23 00 6166-66 P co2 363.600 -999.990 ... S1 1993 05 19 09 22 52.7200 174.1000 40.00 116913 SHM 1993 05 02 01 15 6273-66 P co2 362.310 -999.990 ... S1 1993 05 19 09 56 52.7200 174.1000 40.00 116914 SHM 1993 05 02 01 15 6274-66 P co2 362.250 -999.990 ... S1 1993 05 19 09 58 52.7200 174.1000 40.00 116915 SHM 1993 05 09 23 30 6923-66 P co2 363.020 -999.990 ... S1 1993 06 04 09 16 52.7200 174.1000 40.00 116916 SHM 1993 05 09 23 30 6924-66 P co2 363.080 -999.990 ... S1 1993 06 04 09 18 52.7200 174.1000 40.00 116917 SHM 1993 05 17 00 18 6917-66 P co2 364.470 -999.990 ... S1 1993 06 04 09 24 52.7200 174.1000 40.00 116918 SHM 1993 05 17 00 18 6918-66 P co2 364.480 -999.990 ... S1 1993 06 04 09 26 52.7200 174.1000 40.00 116919 SHM 1993 05 23 12 00 6621-66 P co2 363.710 -999.990 ... S1 1993 06 18 09 20 52.7200 174.1000 40.00 116920 SHM 1993 05 23 12 00 6622-66 P co2 363.770 -999.990 ... S1 1993 06 18 09 22 52.7200 174.1000 40.00 116921 SHM 1993 05 30 00 15 6187-66 P co2 361.800 -999.990 ... S1 1993 06 18 09 24 52.7200 174.1000 40.00 116922 SHM 1993 05 30 00 15 6188-66 P co2 361.800 -999.990 ... S1 1993 06 18 09 26 52.7200 174.1000 40.00 116923 SHM 1993 06 06 23 24 6907-66 P co2 361.010 -999.990 ... S1 1993 06 18 09 16 52.7200 174.1000 40.00 116924 SHM 1993 06 06 23 24 6908-66 P co2 361.030 -999.990 ... S1 1993 06 18 09 18 52.7200 174.1000 40.00 116925 SHM 1993 06 13 12 34 6268-66 P co2 342.220 -999.990 N.. S1 1993 07 16 09 14 52.7200 174.1000 40.00 116928 SHM 1993 06 13 22 30 6861-66 P co2 360.590 -999.990 ... S1 1993 07 16 08 52 52.7200 174.1000 40.00 116926 SHM 1993 06 13 22 30 6862-66 P co2 360.780 -999.990 ... S1 1993 07 16 08 54 52.7200 174.1000 40.00 116927 SHM 1993 06 21 01 25 6063-66 P co2 357.880 -999.990 ... S1 1993 07 16 08 12 52.7200 174.1000 40.00 116929 SHM 1993 06 21 01 25 6064-66 P co2 357.940 -999.990 ... S1 1993 07 16 08 14 52.7200 174.1000 40.00 116930 SHM 1993 06 28 20 45 6727-66 P co2 355.910 -999.990 ... S1 1993 07 16 08 16 52.7200 174.1000 40.00 116931 SHM 1993 06 28 20 45 6728-66 P co2 355.770 -999.990 ... S1 1993 07 16 08 18 52.7200 174.1000 40.00 116932 SHM 1993 07 01 22 45 6166-66 P co2 348.330 -999.990 N.. S1 1993 08 12 08 22 52.7200 174.1000 40.00 116933 SHM 1993 07 06 23 45 6695-66 P co2 353.210 -999.990 ... S1 1993 08 11 09 52 52.7200 174.1000 40.00 116934 SHM 1993 07 06 23 45 6696-66 P co2 352.920 -999.990 ... S1 1993 08 11 09 54 52.7200 174.1000 40.00 116935 SHM 1993 07 13 23 30 6857-66 P co2 347.920 -999.990 ... S1 1993 08 11 09 56 52.7200 174.1000 40.00 116936 SHM 1993 07 13 23 30 6858-66 P co2 347.780 -999.990 ... S1 1993 08 11 09 58 52.7200 174.1000 40.00 116937 SHM 1993 07 18 23 55 6899-66 P co2 347.300 -999.990 ... S1 1993 08 12 09 28 52.7200 174.1000 40.00 116938 SHM 1993 07 18 23 55 6900-66 P co2 347.660 -999.990 ... S1 1993 08 12 09 30 52.7200 174.1000 40.00 116939 SHM 1993 07 25 23 55 6277-66 P co2 341.850 -999.990 .X. S1 1993 08 12 09 24 52.7200 174.1000 40.00 116940 SHM 1993 07 25 23 55 6278-66 P co2 341.860 -999.990 .X. S1 1993 08 12 09 26 52.7200 174.1000 40.00 116941 SHM 1993 08 01 23 05 6105-66 P co2 348.220 -999.990 ... S1 1993 08 11 10 36 52.7200 174.1000 40.00 116942 SHM 1993 08 01 23 05 6106-66 P co2 348.360 -999.990 ... S1 1993 08 11 10 38 52.7200 174.1000 40.00 116943 SHM 1993 08 08 23 00 6827-66 P co2 344.080 -999.990 -.. S1 1993 09 10 11 40 52.7200 174.1000 40.00 116944 SHM 1993 08 08 23 00 6828-66 P co2 344.830 -999.990 +.. S1 1993 09 10 11 42 52.7200 174.1000 40.00 116945 SHM 1993 08 15 23 25 6275-66 P co2 344.450 -999.990 ... S1 1993 09 10 11 36 52.7200 174.1000 40.00 116946 SHM 1993 08 15 23 25 6276-66 P co2 344.410 -999.990 ... S1 1993 09 10 11 38 52.7200 174.1000 40.00 116947 SHM 1993 08 23 00 30 6226-66 P co2 353.530 -999.990 N.. S1 1993 09 08 09 46 52.7200 174.1000 40.00 116949 SHM 1993 08 30 13 50 6121-66 P co2 349.500 -999.990 ... S1 1993 09 08 09 20 52.7200 174.1000 40.00 116950 SHM 1993 08 30 13 50 6122-66 P co2 349.360 -999.990 ... S1 1993 09 08 09 22 52.7200 174.1000 40.00 116951 SHM 1993 09 05 23 40 6903-66 P co2 346.820 -999.990 ... S1 1993 10 28 08 20 52.7200 174.1000 40.00 116952 SHM 1993 09 05 23 40 6904-66 P co2 346.860 -999.990 ... S1 1993 10 28 08 22 52.7200 174.1000 40.00 116953 SHM 1993 09 12 22 50 6783-66 P co2 349.930 -999.990 ... S1 1993 10 28 08 16 52.7200 174.1000 40.00 116954 SHM 1993 09 12 22 50 6784-66 P co2 349.920 -999.990 ... S1 1993 10 28 08 18 52.7200 174.1000 40.00 116955 SHM 1993 09 19 22 45 6007-66 P co2 350.030 -999.990 ... S1 1993 10 08 14 28 52.7200 174.1000 40.00 116956 SHM 1993 09 19 22 45 6008-66 P co2 350.080 -999.990 ... S1 1993 10 08 14 30 52.7200 174.1000 40.00 116957 SHM 1993 09 26 23 30 6035-66 P co2 352.770 -999.990 +.. S1 1993 10 08 15 00 52.7200 174.1000 40.00 116958 SHM 1993 09 26 23 30 6036-66 P co2 337.520 -999.990 -.. S1 1993 10 08 15 02 52.7200 174.1000 40.00 116959 SHM 1993 10 03 23 00 6813-66 P co2 352.520 -999.990 ... S1 1993 11 16 10 16 52.7200 174.1000 40.00 116960 SHM 1993 10 03 23 00 6814-66 P co2 352.060 -999.990 ... S1 1993 11 16 10 18 52.7200 174.1000 40.00 116961 SHM 1993 10 10 22 50 6403-66 P co2 355.420 -999.990 ... S1 1993 11 16 10 28 52.7200 174.1000 40.00 116962 SHM 1993 10 10 22 50 6404-66 P co2 355.360 -999.990 ... S1 1993 11 16 10 30 52.7200 174.1000 40.00 116963 SHM 1993 10 18 22 00 6267-66 P co2 356.220 -999.990 ... S1 1993 11 16 09 56 52.7200 174.1000 40.00 116964 SHM 1993 10 18 22 00 6268-66 P co2 356.280 -999.990 ... S1 1993 11 16 09 58 52.7200 174.1000 40.00 116965 SHM 1993 10 24 11 00 6349-66 P co2 365.020 -999.990 .X. S1 1993 11 16 09 52 52.7200 174.1000 40.00 116966 SHM 1993 10 24 11 00 6350-66 P co2 365.290 -999.990 .X. S1 1993 11 16 09 54 52.7200 174.1000 40.00 116967 SHM 1993 10 31 23 25 6305-66 P co2 357.260 -999.990 ... S1 1993 11 30 08 52 52.7200 174.1000 40.00 116968 SHM 1993 10 31 23 25 6306-66 P co2 357.600 -999.990 ... S1 1993 11 30 08 54 52.7200 174.1000 40.00 116969 SHM 1993 11 07 22 00 6739-66 P co2 359.320 -999.990 ... S1 1993 11 30 08 48 52.7200 174.1000 40.00 116970 SHM 1993 11 07 22 00 6740-66 P co2 358.990 -999.990 ... S1 1993 11 30 08 50 52.7200 174.1000 40.00 116971 SHM 1993 11 14 22 55 6905-66 P co2 358.150 -999.990 ... S1 1993 12 17 08 44 52.7200 174.1000 40.00 116972 SHM 1993 11 14 22 55 6906-66 P co2 358.110 -999.990 ... S1 1993 12 17 08 46 52.7200 174.1000 40.00 116973 SHM 1993 11 22 12 00 6385-66 P co2 359.980 -999.990 ... S1 1993 12 17 08 40 52.7200 174.1000 40.00 116974 SHM 1993 11 22 12 00 6386-66 P co2 359.990 -999.990 ... S1 1993 12 17 08 42 52.7200 174.1000 40.00 116975 SHM 1993 12 07 13 50 6154-66 P co2 361.440 -999.990 ... S1 1994 02 22 09 34 52.7200 174.1000 40.00 116976 SHM 1993 12 14 11 50 6779-66 P co2 360.670 -999.990 ... S1 1994 01 25 08 48 52.7200 174.1000 40.00 116977 SHM 1993 12 14 11 50 6780-66 P co2 360.570 -999.990 ... S1 1994 01 25 08 50 52.7200 174.1000 40.00 116978 SHM 1993 12 20 01 50 6865-66 P co2 360.660 -999.990 ... S1 1994 01 13 12 04 52.7200 174.1000 40.00 116979 SHM 1993 12 20 01 50 6866-66 P co2 360.480 -999.990 ... S1 1994 01 13 12 06 52.7200 174.1000 40.00 116980 SHM 1993 12 27 15 45 6351-66 P co2 361.720 -999.990 ... S1 1994 01 13 11 56 52.7200 174.1000 40.00 116981 SHM 1993 12 27 15 45 6352-66 P co2 361.650 -999.990 ... S1 1994 01 13 11 58 52.7200 174.1000 40.00 116982 SHM 1994 01 03 13 55 6693-66 P co2 362.940 -999.990 -.. S1 1994 01 28 08 12 52.7200 174.1000 40.00 116983 SHM 1994 01 03 13 55 6694-66 P co2 363.710 -999.990 +.. S1 1994 01 28 08 14 52.7200 174.1000 40.00 116984 SHM 1994 01 10 01 00 6931-66 P co2 361.470 -999.990 ... S1 1994 01 28 08 16 52.7200 174.1000 40.00 116985 SHM 1994 01 10 01 00 6932-66 P co2 361.430 -999.990 ... S1 1994 01 28 08 18 52.7200 174.1000 40.00 116986 SHM 1994 01 17 14 50 6557-66 P co2 364.520 -999.990 ... S1 1994 02 22 10 24 52.7200 174.1000 40.00 116987 SHM 1994 01 17 14 50 6558-66 P co2 364.300 -999.990 ... S1 1994 02 22 10 26 52.7200 174.1000 40.00 116988 SHM 1994 01 26 12 40 6851-66 P co2 363.640 -999.990 ... S1 1994 02 22 10 20 52.7200 174.1000 40.00 116989 SHM 1994 01 26 12 40 6852-66 P co2 363.580 -999.990 ... S1 1994 02 22 10 22 52.7200 174.1000 40.00 116990 SHM 1994 01 30 14 25 6333-66 P co2 362.850 -999.990 ... S1 1994 02 22 10 04 52.7200 174.1000 40.00 116991 SHM 1994 01 30 14 25 6334-66 P co2 362.640 -999.990 ... S1 1994 02 22 10 06 52.7200 174.1000 40.00 116992 SHM 1994 02 07 02 00 6283-66 P co2 363.190 -999.990 ... S1 1994 02 25 14 56 52.7200 174.1000 40.00 116993 SHM 1994 02 07 02 00 6284-66 P co2 363.100 -999.990 ... S1 1994 02 25 14 58 52.7200 174.1000 40.00 116994 SHM 1994 02 13 01 25 6281-66 P co2 363.600 -999.990 ... S1 1994 02 25 15 48 52.7200 174.1000 40.00 116995 SHM 1994 02 13 01 25 6282-66 P co2 363.600 -999.990 ... S1 1994 02 25 15 50 52.7200 174.1000 40.00 116996 SHM 1994 02 21 00 15 6349-66 P co2 363.260 -999.990 ... S1 1994 03 11 09 24 52.7200 174.1000 40.00 116997 SHM 1994 02 21 00 15 6350-66 P co2 363.330 -999.990 ... S1 1994 03 11 09 26 52.7200 174.1000 40.00 116998 SHM 1994 02 28 14 15 6519-66 P co2 362.960 -999.990 ... S1 1994 03 11 09 20 52.7200 174.1000 40.00 116999 SHM 1994 02 28 14 15 6520-66 P co2 362.870 -999.990 ... S1 1994 03 11 09 22 52.7200 174.1000 40.00 117000 SHM 1994 03 08 13 40 6189-66 P co2 363.920 -999.990 ... S1 1994 03 30 11 56 52.7200 174.1000 40.00 117001 SHM 1994 03 08 13 40 6190-66 P co2 364.060 -999.990 ... S1 1994 03 30 11 58 52.7200 174.1000 40.00 117002 SHM 1994 03 17 00 30 6301-66 P co2 363.660 -999.990 ... S1 1994 03 30 11 52 52.7200 174.1000 40.00 117003 SHM 1994 03 17 00 30 6302-66 P co2 363.620 -999.990 ... S1 1994 03 30 11 54 52.7200 174.1000 40.00 117004 SHM 1994 03 20 01 15 6379-66 P co2 364.000 -999.990 +.. S1 1994 06 09 09 52 52.7200 174.1000 40.00 117005 SHM 1994 03 20 01 15 6380-66 P co2 363.280 -999.990 -.. S1 1994 06 09 09 54 52.7200 174.1000 40.00 117006 SHM 1994 03 27 00 30 6595-66 P co2 364.420 -999.990 ... S1 1994 06 09 09 56 52.7200 174.1000 40.00 117007 SHM 1994 03 27 00 30 6596-66 P co2 364.340 -999.990 ... S1 1994 06 09 09 58 52.7200 174.1000 40.00 117008 SHM 1994 04 03 23 15 6171-66 P co2 362.280 -999.990 -.. S1 1994 10 21 09 12 52.7200 174.1000 40.00 117009 SHM 1994 04 03 23 15 6172-66 P co2 364.030 -999.990 +.. S1 1994 10 21 09 14 52.7200 174.1000 40.00 117010 SHM 1994 04 17 23 50 6893-66 P co2 366.160 -999.990 ... S1 1994 10 21 08 56 52.7200 174.1000 40.00 117011 SHM 1994 04 17 23 50 6894-66 P co2 366.300 -999.990 ... S1 1994 10 21 08 58 52.7200 174.1000 40.00 117012 SHM 1994 05 02 09 50 6075-66 P co2 366.270 -999.990 ... S1 1994 06 09 10 28 52.7200 174.1000 40.00 117013 SHM 1994 05 02 09 50 6076-66 P co2 366.090 -999.990 ... S1 1994 06 09 10 30 52.7200 174.1000 40.00 117014 SHM 1994 05 18 01 10 6841-66 P co2 365.890 -999.990 ... S1 1994 06 09 10 54 52.7200 174.1000 40.00 117015 SHM 1994 05 18 02 00 6763-66 P co2 365.500 -999.990 ... S1 1994 06 09 08 28 52.7200 174.1000 40.00 117016 SHM 1994 05 18 02 00 6764-66 P co2 365.640 -999.990 ... S1 1994 06 09 08 30 52.7200 174.1000 40.00 117017 SHM 1994 05 23 00 58 6297-66 P co2 365.920 -999.990 ... S1 1994 06 09 10 52 52.7200 174.1000 40.00 117018 SHM 1994 05 29 11 55 6299-66 P co2 364.930 -999.990 ... S1 1994 06 30 09 48 52.7200 174.1000 40.00 117019 SHM 1994 05 29 11 55 6300-66 P co2 365.020 -999.990 ... S1 1994 06 30 09 50 52.7200 174.1000 40.00 117020 SHM 1994 06 19 23 05 6313-66 P co2 359.390 -999.990 ... S1 1994 06 30 09 44 52.7200 174.1000 40.00 117021 SHM 1994 06 20 23 04 6903-66 P co2 359.830 -999.990 ... S1 1994 07 20 11 20 52.7200 174.1000 40.00 117022 SHM 1994 06 20 23 04 6904-66 P co2 359.950 -999.990 ... S1 1994 07 20 11 22 52.7200 174.1000 40.00 117023 SHM 1994 07 03 22 05 6709-66 P co2 355.550 -999.990 -.. S1 1994 07 20 11 24 52.7200 174.1000 40.00 117024 SHM 1994 07 03 22 05 6710-66 P co2 356.410 -999.990 +.. S1 1994 07 20 11 26 52.7200 174.1000 40.00 117025 SHM 1994 07 10 23 15 6371-66 P co2 357.250 -999.990 ... S1 1994 07 26 09 32 52.7200 174.1000 40.00 117026 SHM 1994 07 10 23 15 6372-66 P co2 357.400 -999.990 ... S1 1994 07 26 09 34 52.7200 174.1000 40.00 117027 SHM 1994 07 17 23 15 6449-66 P co2 349.820 -999.990 -.. S1 1994 08 23 09 12 52.7200 174.1000 40.00 117028 SHM 1994 07 17 23 15 6450-66 P co2 350.510 -999.990 +.. S1 1994 08 23 09 14 52.7200 174.1000 40.00 117029 SHM 1994 07 24 00 37 6719-66 P co2 353.160 -999.990 ... S1 1994 08 19 10 00 52.7200 174.1000 40.00 117030 SHM 1994 07 24 00 37 6720-66 P co2 353.470 -999.990 ... S1 1994 08 19 10 02 52.7200 174.1000 40.00 117031 SHM 1994 07 31 23 20 6443-66 P co2 348.540 -999.990 +.. S1 1994 08 23 09 00 52.7200 174.1000 40.00 117032 SHM 1994 07 31 23 20 6444-66 P co2 336.310 -999.990 -.. S1 1994 08 23 09 02 52.7200 174.1000 40.00 117033 SHM 1994 08 07 14 27 6607-66 P co2 345.600 -999.990 .X. S1 1994 08 23 08 56 52.7200 174.1000 40.00 117034 SHM 1994 08 07 14 27 6608-66 P co2 345.700 -999.990 .X. S1 1994 08 23 08 58 52.7200 174.1000 40.00 117035 SHM 1994 08 15 00 30 6259-66 P co2 351.050 -999.990 ... S1 1994 10 03 08 28 52.7200 174.1000 40.00 117036 SHM 1994 08 15 00 30 6260-66 P co2 351.160 -999.990 ... S1 1994 10 03 08 30 52.7200 174.1000 40.00 117037 SHM 1994 08 21 23 50 6497-66 P co2 345.670 -999.990 .X. S1 1994 10 03 08 44 52.7200 174.1000 40.00 117038 SHM 1994 08 21 23 50 6498-66 P co2 345.560 -999.990 .X. S1 1994 10 03 08 46 52.7200 174.1000 40.00 117039 SHM 1994 08 31 00 29 6707-66 P co2 350.090 -999.990 ... S1 1994 12 21 11 24 52.7200 174.1000 40.00 117040 SHM 1994 08 31 00 29 6708-66 P co2 350.140 -999.990 ... S1 1994 12 21 11 26 52.7200 174.1000 40.00 117041 SHM 1994 10 02 22 30 6051-66 P co2 356.340 -999.990 -.. S1 1994 12 19 08 40 52.7200 174.1000 40.00 117042 SHM 1994 10 02 22 30 6052-66 P co2 357.980 -999.990 +.. S1 1994 12 19 08 42 52.7200 174.1000 40.00 117043 SHM 1994 11 06 16 00 6828-66 P co2 361.130 -999.990 ... S1 1994 12 21 11 10 52.7200 174.1000 40.00 117044 SHM 1994 11 12 19 30 6650-66 P co2 359.840 -999.990 ... S1 1994 12 01 09 26 52.7200 174.1000 40.00 117045 SHM 1994 11 12 19 30 6727-66 P co2 359.940 -999.990 ... S1 1994 12 01 09 24 52.7200 174.1000 40.00 117046 SHM 1994 11 20 11 46 6261-66 P co2 361.560 -999.990 ... S1 1994 12 21 11 08 52.7200 174.1000 40.00 117047 SHM 1994 11 20 21 46 6903-66 P co2 361.550 -999.990 ... S1 1994 12 30 08 12 52.7200 174.1000 40.00 117048 SHM 1994 11 20 21 46 6904-66 P co2 361.500 -999.990 ... S1 1994 12 30 08 14 52.7200 174.1000 40.00 117049 SHM 1994 12 05 12 34 6053-66 P co2 361.940 -999.990 N.. S1 1994 12 30 08 26 52.7200 174.1000 40.00 117052 SHM 1994 12 05 22 51 6487-66 P co2 365.630 -999.990 ... S1 1995 01 05 10 52 52.7200 174.1000 40.00 117050 SHM 1994 12 05 22 51 6488-66 P co2 365.400 -999.990 ... S1 1995 01 05 10 54 52.7200 174.1000 40.00 117051 SHM 1994 12 12 01 20 6260-66 P co2 330.460 -999.990 N.. S1 1995 01 10 08 30 52.7200 174.1000 40.00 117053 SHM 1995 01 08 22 30 6710-66 P co2 371.420 -999.990 N.. S1 1995 01 27 08 54 52.7200 174.1000 40.00 117054 SHM 1995 01 08 22 45 6649-66 P co2 371.290 -999.990 -.. S1 1995 01 25 08 20 52.7200 174.1000 40.00 117055 SHM 1995 01 08 22 45 6650-66 P co2 372.710 -999.990 +.. S1 1995 01 25 08 22 52.7200 174.1000 40.00 117056 SHM 1995 01 17 05 50 6363-66 P co2 364.830 -999.990 ... S1 1995 02 24 10 22 52.7200 174.1000 40.00 117057 SHM 1995 02 03 02 00 6809-66 P co2 365.860 -999.990 +.. S1 1995 02 24 10 04 52.7200 174.1000 40.00 117058 SHM 1995 02 03 02 00 6810-66 P co2 364.940 -999.990 -.. S1 1995 02 24 10 06 52.7200 174.1000 40.00 117059 SHM 1995 02 07 01 15 6647-66 P co2 345.910 -999.990 +.. S1 1995 03 16 09 24 52.7200 174.1000 40.00 117060 SHM 1995 02 07 01 15 6648-66 P co2 340.690 -999.990 -.. S1 1995 03 16 09 26 52.7200 174.1000 40.00 117061 SHM 1995 02 20 03 53 6779-66 P co2 363.810 -999.990 ... S1 1995 03 16 09 48 52.7200 174.1000 40.00 117062 SHM 1995 02 20 03 53 6780-66 P co2 363.750 -999.990 ... S1 1995 03 16 09 50 52.7200 174.1000 40.00 117063 SHM 1995 02 27 01 30 6845-66 P co2 365.740 -999.990 ... S1 1995 04 05 09 50 52.7200 174.1000 40.00 117064 SHM 1995 02 27 01 30 6846-66 P co2 365.540 -999.990 ... S1 1995 04 05 09 48 52.7200 174.1000 40.00 117065 SHM 1995 03 11 22 55 6727-66 P co2 364.170 -999.990 ... S1 1995 04 05 09 44 52.7200 174.1000 40.00 117066 SHM 1995 03 11 22 55 6728-66 P co2 364.100 -999.990 ... S1 1995 04 05 09 46 52.7200 174.1000 40.00 117067 SHM 1995 03 19 23 11 6519-66 P co2 366.950 -999.990 -.. S1 1995 04 14 08 20 52.7200 174.1000 40.00 117068 SHM 1995 03 19 23 11 6520-66 P co2 368.200 -999.990 +.. S1 1995 04 14 08 22 52.7200 174.1000 40.00 117069 SHM 1995 03 26 23 08 6788-66 P co2 366.180 -999.990 ... S1 1995 04 19 10 04 52.7200 174.1000 40.00 117070 SHM 1995 04 02 23 40 6340-66 P co2 365.860 -999.990 ... S1 1995 04 28 09 48 52.7200 174.1000 40.00 117071 SHM 1995 04 02 23 40 6719-66 P co2 365.860 -999.990 ... S1 1995 04 28 09 50 52.7200 174.1000 40.00 117072 SHM 1995 04 10 00 30 6339-66 P co2 365.770 -999.990 ... S1 1995 04 28 09 32 52.7200 174.1000 40.00 117073 SHM 1995 04 10 00 30 6720-66 P co2 366.070 -999.990 ... S1 1995 04 28 09 34 52.7200 174.1000 40.00 117074 SHM 1995 04 16 12 34 6707-66 P co2 365.920 -999.990 ... S1 1995 05 05 09 32 52.7200 174.1000 40.00 117075 SHM 1995 04 16 12 34 6708-66 P co2 366.100 -999.990 ... S1 1995 05 05 09 34 52.7200 174.1000 40.00 117076 SHM 1995 04 17 03 30 6493-66 P co2 365.380 -999.990 -.. S1 1995 05 05 09 28 52.7200 174.1000 40.00 117077 SHM 1995 04 17 03 30 6494-66 P co2 368.250 -999.990 +.. S1 1995 05 05 09 30 52.7200 174.1000 40.00 117078 SHM 1995 05 01 01 38 6151-66 P co2 373.260 -999.990 -.. S1 1995 05 19 09 44 52.7200 174.1000 40.00 117079 SHM 1995 05 01 01 38 6152-66 P co2 383.820 -999.990 +.. S1 1995 05 19 09 46 52.7200 174.1000 40.00 117080 SHM 1995 05 08 00 14 6825-66 P co2 372.420 -999.990 -.. S1 1995 05 19 09 52 52.7200 174.1000 40.00 117081 SHM 1995 05 08 00 14 6826-66 P co2 387.980 -999.990 +.. S1 1995 05 19 09 54 52.7200 174.1000 40.00 117082 SHM 1995 05 14 23 15 6725-66 P co2 366.780 -999.990 -.. S1 1995 06 15 09 56 52.7200 174.1000 40.00 117083 SHM 1995 05 14 23 15 6726-66 P co2 369.740 -999.990 +.. S1 1995 06 15 09 58 52.7200 174.1000 40.00 117084 SHM 1995 05 21 23 15 6263-66 P co2 365.080 -999.990 ... S1 1995 06 15 10 00 52.7200 174.1000 40.00 117085 SHM 1995 05 21 23 15 6264-66 P co2 365.050 -999.990 ... S1 1995 06 15 10 02 52.7200 174.1000 40.00 117086 SHM 1995 05 28 23 15 6273-66 P co2 366.740 -999.990 ... S1 1995 06 15 08 56 52.7200 174.1000 40.00 117087 SHM 1995 05 28 23 15 6274-66 P co2 366.350 -999.990 ... S1 1995 06 15 08 58 52.7200 174.1000 40.00 117088 SHM 1995 06 04 23 10 6157-66 P co2 364.600 -999.990 ... S1 1995 06 15 08 52 52.7200 174.1000 40.00 117089 SHM 1995 06 04 23 10 6158-66 P co2 364.560 -999.990 ... S1 1995 06 15 08 54 52.7200 174.1000 40.00 117090 SHM 1995 06 18 11 00 6611-66 P co2 365.100 -999.990 +.. S1 1995 08 22 08 48 52.7200 174.1000 40.00 117091 SHM 1995 06 18 11 00 6800-66 P co2 364.240 -999.990 -.. S1 1995 08 22 08 50 52.7200 174.1000 40.00 117092 SHM 1995 06 25 11 00 6612-66 P co2 359.750 -999.990 -.. S1 1995 08 18 10 22 52.7200 174.1000 40.00 117093 SHM 1995 06 25 11 00 6799-66 P co2 362.030 -999.990 +.. S1 1995 08 18 10 20 52.7200 174.1000 40.00 117094 SHM 1995 07 02 23 10 6059-66 P co2 358.570 -999.990 ... S1 1995 07 28 08 56 52.7200 174.1000 40.00 117095 SHM 1995 07 02 23 10 6060-66 P co2 358.810 -999.990 ... S1 1995 07 28 08 58 52.7200 174.1000 40.00 117096 SHM 1995 07 09 23 25 6129-66 P co2 355.730 -999.990 ... S1 1995 08 02 11 00 52.7200 174.1000 40.00 117097 SHM 1995 07 09 23 25 6130-66 P co2 355.890 -999.990 ... S1 1995 08 02 11 02 52.7200 174.1000 40.00 117098 SHM 1995 07 16 23 15 6255-66 P co2 349.380 -999.990 N.. S1 1995 08 14 10 04 52.7200 174.1000 40.00 117099 SHM 1995 07 23 23 15 6579-66 P co2 353.110 -999.990 ... S1 1995 08 14 08 52 52.7200 174.1000 40.00 117100 SHM 1995 07 23 23 15 6580-66 P co2 353.060 -999.990 ... S1 1995 08 14 08 54 52.7200 174.1000 40.00 117101 SHM 1995 07 30 23 15 6325-66 P co2 351.380 -999.990 ... S1 1995 08 22 09 16 52.7200 174.1000 40.00 117102 SHM 1995 07 30 23 15 6326-66 P co2 351.690 -999.990 ... S1 1995 08 22 09 18 52.7200 174.1000 40.00 117103 SHM 1995 08 06 23 15 6577-66 P co2 350.440 -999.990 ... S1 1995 08 22 09 12 52.7200 174.1000 40.00 117104 SHM 1995 08 06 23 15 6578-66 P co2 350.480 -999.990 ... S1 1995 08 22 09 14 52.7200 174.1000 40.00 117105 SHM 1995 08 13 23 15 6571-66 P co2 348.680 -999.990 ... S1 1995 09 11 08 40 52.7200 174.1000 40.00 117106 SHM 1995 08 13 23 15 6572-66 P co2 348.810 -999.990 ... S1 1995 09 11 08 42 52.7200 174.1000 40.00 117107 SHM 1995 08 20 23 10 6742-66 P co2 356.530 -999.990 N.. S1 1995 09 07 09 30 52.7200 174.1000 40.00 117108 SHM 1995 08 27 23 10 537-91 P co2 349.830 -999.990 ... S1 1995 09 25 09 56 52.7200 174.1000 40.00 117109 SHM 1995 08 27 23 10 538-91 P co2 349.810 -999.990 ... S1 1995 09 25 09 58 52.7200 174.1000 40.00 117110 SHM 1995 09 03 23 10 217-91 P co2 350.820 -999.990 ... S1 1995 09 21 08 24 52.7200 174.1000 40.00 117111 SHM 1995 09 03 23 10 218-91 P co2 350.670 -999.990 ... S1 1995 09 21 08 26 52.7200 174.1000 40.00 117112 SHM 1995 09 10 23 10 821-91 P co2 352.090 -999.990 ... S1 1995 10 10 09 32 52.7200 174.1000 40.00 117113 SHM 1995 09 10 23 10 822-91 P co2 352.060 -999.990 ... S1 1995 10 10 09 34 52.7200 174.1000 40.00 117114 SHM 1995 09 17 23 10 207-91 P co2 352.130 -999.990 ... S1 1995 10 10 09 44 52.7200 174.1000 40.00 117115 SHM 1995 09 17 23 10 208-91 P co2 352.250 -999.990 ... S1 1995 10 10 09 46 52.7200 174.1000 40.00 117116 SHM 1995 09 24 23 15 6091-66 P co2 357.060 -999.990 ... S1 1995 10 10 11 28 52.7200 174.1000 40.00 117117 SHM 1995 09 24 23 15 6092-66 P co2 356.980 -999.990 ... S1 1995 10 10 11 30 52.7200 174.1000 40.00 117118 SHM 1995 10 01 23 10 643-91 P co2 358.210 -999.990 ... S1 1995 10 19 11 04 52.7200 174.1000 40.00 117119 SHM 1995 10 01 23 10 644-91 P co2 358.310 -999.990 ... S1 1995 10 19 11 06 52.7200 174.1000 40.00 117120 SHM 1995 10 08 23 10 465-91 P co2 359.070 -999.990 ... S1 1995 10 19 11 08 52.7200 174.1000 40.00 117121 SHM 1995 10 08 23 10 466-91 P co2 358.580 -999.990 ... S1 1995 10 19 11 10 52.7200 174.1000 40.00 117122 SHM 1995 10 15 23 15 443-91 P co2 362.140 -999.990 ... S1 1995 11 06 09 16 52.7200 174.1000 40.00 117123 SHM 1995 10 15 23 15 444-91 P co2 362.230 -999.990 ... S1 1995 11 06 09 18 52.7200 174.1000 40.00 117124 SHM 1995 10 22 23 10 235-91 P co2 360.510 -999.990 ... S1 1995 11 06 09 12 52.7200 174.1000 40.00 117125 SHM 1995 10 22 23 10 236-91 P co2 360.450 -999.990 ... S1 1995 11 06 09 14 52.7200 174.1000 40.00 117126 SHM 1995 10 29 23 15 491-91 P co2 361.050 -999.990 ... S1 1995 12 06 10 52 52.7200 174.1000 40.00 117127 SHM 1995 10 29 23 15 492-91 P co2 361.120 -999.990 ... S1 1995 12 06 10 54 52.7200 174.1000 40.00 117128 SHM 1995 11 05 23 25 6527-66 P co2 361.230 -999.990 ... S1 1995 11 30 08 28 52.7200 174.1000 40.00 117129 SHM 1995 11 05 23 25 6528-66 P co2 361.150 -999.990 ... S1 1995 11 30 08 30 52.7200 174.1000 40.00 117130 SHM 1995 11 12 22 58 6445-66 P co2 366.450 -999.990 .X. S1 1995 11 30 12 00 52.7200 174.1000 40.00 117131 SHM 1995 11 12 22 58 6446-66 P co2 366.450 -999.990 .X. S1 1995 11 30 12 02 52.7200 174.1000 40.00 117132 SHM 1995 12 04 00 20 6637-66 P co2 363.400 -999.990 ... S1 1996 01 05 08 48 52.7200 174.1000 40.00 117133 SHM 1995 12 04 00 20 6638-66 P co2 363.360 -999.990 ... S1 1996 01 05 08 50 52.7200 174.1000 40.00 117134 SHM 1995 12 11 00 04 6537-66 P co2 364.320 -999.990 ... S1 1996 01 05 08 28 52.7200 174.1000 40.00 117135 SHM 1995 12 11 00 04 6538-66 P co2 364.280 -999.990 ... S1 1996 01 05 08 30 52.7200 174.1000 40.00 117136 SHM 1995 12 18 00 42 441-91 P co2 364.950 -999.990 ... S1 1996 01 22 10 20 52.7200 174.1000 40.00 117137 SHM 1995 12 18 00 42 442-91 P co2 364.910 -999.990 ... S1 1996 01 22 10 22 52.7200 174.1000 40.00 117138 SHM 1995 12 25 00 40 105-91 P co2 364.380 -999.990 ... S1 1996 01 22 10 56 52.7200 174.1000 40.00 117139 SHM 1995 12 25 00 40 106-91 P co2 364.380 -999.990 ... S1 1996 01 22 10 58 52.7200 174.1000 40.00 117140 SHM 1996 01 01 00 47 6397-66 P co2 365.270 -999.990 +.. S1 1996 01 24 09 32 52.7200 174.1000 40.00 117141 SHM 1996 01 01 00 47 6398-66 P co2 363.020 -999.990 -.. S1 1996 01 24 09 34 52.7200 174.1000 40.00 117142 SHM 1996 01 07 23 36 6461-66 P co2 365.060 -999.990 ... S1 1996 01 24 09 20 52.7200 174.1000 40.00 117143 SHM 1996 01 07 23 36 6462-66 P co2 364.750 -999.990 ... S1 1996 01 24 09 22 52.7200 174.1000 40.00 117144 SHM 1996 01 15 00 40 715-91 P co2 364.520 -999.990 ... S1 1996 02 09 08 28 52.7200 174.1000 40.00 117145 SHM 1996 01 15 00 40 716-91 P co2 364.500 -999.990 ... S1 1996 02 09 08 30 52.7200 174.1000 40.00 117146 SHM 1996 01 22 00 48 103-91 P co2 366.910 -999.990 ... S1 1996 02 13 08 24 52.7200 174.1000 40.00 117147 SHM 1996 01 22 00 48 104-91 P co2 367.400 -999.990 ... S1 1996 02 13 08 26 52.7200 174.1000 40.00 117148 SHM 1996 01 29 00 10 141-91 P co2 367.940 -999.990 ... S1 1996 02 28 08 48 52.7200 174.1000 40.00 117149 SHM 1996 01 29 00 10 142-91 P co2 367.810 -999.990 ... S1 1996 02 28 08 50 52.7200 174.1000 40.00 117150 SHM 1996 02 06 14 34 1251-91 P co2 366.590 -999.990 ... S1 1996 02 28 08 44 52.7200 174.1000 40.00 117151 SHM 1996 02 06 14 34 1252-91 P co2 366.430 -999.990 ... S1 1996 02 28 08 46 52.7200 174.1000 40.00 117152 SHM 1996 02 11 21 42 1513-91 P co2 366.810 -999.990 ... S1 1996 03 14 16 00 52.7200 174.1000 40.00 117153 SHM 1996 02 11 21 42 1514-91 P co2 366.710 -999.990 ... S1 1996 03 14 16 02 52.7200 174.1000 40.00 117154 SHM 1996 02 18 21 05 1507-91 P co2 369.730 -999.990 +.. S1 1996 03 14 14 56 52.7200 174.1000 40.00 117155 SHM 1996 02 18 21 05 1508-91 P co2 368.870 -999.990 -.. S1 1996 03 14 14 58 52.7200 174.1000 40.00 117156 SHM 1996 02 25 23 20 6841-66 P co2 368.010 -999.990 ... S1 1996 03 28 08 40 52.7200 174.1000 40.00 117157 SHM 1996 02 25 23 20 6842-66 P co2 368.000 -999.990 ... S1 1996 03 28 08 42 52.7200 174.1000 40.00 117158 SHM 1996 03 05 13 30 6721-66 P co2 366.920 -999.990 ... S1 1996 03 26 15 12 52.7200 174.1000 40.00 117159 SHM 1996 03 10 23 35 6369-66 P co2 366.550 -999.990 ... S1 1996 04 08 09 20 52.7200 174.1000 40.00 117160 SHM 1996 03 10 23 35 6370-66 P co2 366.480 -999.990 ... S1 1996 04 08 09 22 52.7200 174.1000 40.00 117161 SHM 1996 03 19 13 35 6081-66 P co2 369.620 -999.990 ... S1 1996 04 08 09 32 52.7200 174.1000 40.00 117162 SHM 1996 03 19 13 35 6082-66 P co2 369.750 -999.990 ... S1 1996 04 08 09 34 52.7200 174.1000 40.00 117163 SHM 1996 03 25 01 50 6807-66 P co2 367.670 -999.990 ... S1 1996 04 10 11 08 52.7200 174.1000 40.00 117164 SHM 1996 03 25 01 50 6808-66 P co2 367.760 -999.990 ... S1 1996 04 10 11 10 52.7200 174.1000 40.00 117165 SHM 1996 04 01 00 30 6719-66 P co2 366.950 -999.990 ... S1 1996 04 25 08 12 52.7200 174.1000 40.00 117166 SHM 1996 04 01 00 30 6720-66 P co2 366.840 -999.990 ... S1 1996 04 25 08 14 52.7200 174.1000 40.00 117167 SHM 1996 04 08 00 26 555-91 P co2 367.610 -999.990 ... S1 1996 04 25 10 04 52.7200 174.1000 40.00 117168 SHM 1996 04 08 00 26 556-91 P co2 367.590 -999.990 ... S1 1996 04 25 10 06 52.7200 174.1000 40.00 117169 SHM 1996 04 14 23 50 1431-91 P co2 368.750 -999.990 ... S1 1996 04 25 09 52 52.7200 174.1000 40.00 117170 SHM 1996 04 14 23 50 1432-91 P co2 368.830 -999.990 ... S1 1996 04 25 09 54 52.7200 174.1000 40.00 117171 SHM 1996 04 21 20 35 6093-66 P co2 367.650 -999.990 ... S1 1996 05 08 11 56 52.7200 174.1000 40.00 117172 SHM 1996 04 21 20 35 6094-66 P co2 367.740 -999.990 ... S1 1996 05 08 11 58 52.7200 174.1000 40.00 117173 SHM 1996 04 28 00 10 629-91 P co2 367.400 -999.990 ... S1 1996 05 23 08 20 52.7200 174.1000 40.00 117174 SHM 1996 04 28 00 10 630-91 P co2 367.400 -999.990 ... S1 1996 05 23 08 22 52.7200 174.1000 40.00 117175 SHM 1996 04 28 22 14 6729-66 P co2 367.290 -999.990 ... S1 1996 05 08 11 52 52.7200 174.1000 40.00 117176 SHM 1996 04 28 22 14 6730-66 P co2 367.380 -999.990 ... S1 1996 05 08 11 54 52.7200 174.1000 40.00 117177 SHM 1996 05 05 23 41 571-91 P co2 -999.990 -999.990 *.. S1 1996 05 23 08 16 52.7200 174.1000 40.00 117178 SHM 1996 05 05 23 41 572-91 P co2 -999.990 -999.990 *.. S1 1996 05 23 08 18 52.7200 174.1000 40.00 117179 SHM 1996 05 12 23 53 1119-91 P co2 368.530 -999.990 ... S1 1996 05 31 14 28 52.7200 174.1000 40.00 117180 SHM 1996 05 12 23 53 1120-91 P co2 368.480 -999.990 ... S1 1996 05 31 14 30 52.7200 174.1000 40.00 117181 SHM 1996 05 19 23 58 1799-91 P co2 368.720 -999.990 ... S1 1996 06 04 09 16 52.7200 174.1000 40.00 117182 SHM 1996 05 27 00 34 1557-91 P co2 367.900 -999.990 ... S1 1996 06 18 16 48 52.7200 174.1000 40.00 117183 SHM 1996 05 27 00 34 1558-91 P co2 367.880 -999.990 ... S1 1996 06 18 16 50 52.7200 174.1000 40.00 117184 SHM 1996 06 04 12 39 1559-91 P co2 367.000 -999.990 ... S1 1996 06 18 16 36 52.7200 174.1000 40.00 117185 SHM 1996 06 04 12 39 1560-91 P co2 367.010 -999.990 ... S1 1996 06 18 16 38 52.7200 174.1000 40.00 117186 SHM 1996 06 10 00 55 1341-91 P co2 363.840 -999.990 ... S1 1996 06 28 11 04 52.7200 174.1000 40.00 117187 SHM 1996 06 10 00 55 1342-91 P co2 363.800 -999.990 ... S1 1996 06 28 11 06 52.7200 174.1000 40.00 117188 SHM 1996 06 17 01 18 1343-91 P co2 363.990 -999.990 ... S1 1996 06 28 08 12 52.7200 174.1000 40.00 117189 SHM 1996 06 17 01 18 1344-91 P co2 364.090 -999.990 ... S1 1996 06 28 08 14 52.7200 174.1000 40.00 117190 SHM 1996 06 24 00 50 167-91 P co2 365.330 -999.990 ... S1 1996 07 18 09 56 52.7200 174.1000 40.00 117191 SHM 1996 06 24 00 50 168-91 P co2 365.590 -999.990 ... S1 1996 07 18 09 58 52.7200 174.1000 40.00 117192 SHM 1996 07 01 01 36 859-91 P co2 362.550 -999.990 ... S1 1996 07 18 09 52 52.7200 174.1000 40.00 117193 SHM 1996 07 01 01 36 860-91 P co2 362.620 -999.990 ... S1 1996 07 18 09 54 52.7200 174.1000 40.00 117194 SHM 1996 07 08 00 25 315-91 P co2 361.360 -999.990 ... S1 1996 07 24 09 28 52.7200 174.1000 40.00 117195 SHM 1996 07 08 00 25 316-91 P co2 361.270 -999.990 ... S1 1996 07 24 09 30 52.7200 174.1000 40.00 117196 SHM 1996 07 15 00 05 257-91 P co2 358.980 -999.990 ... S1 1996 07 24 09 24 52.7200 174.1000 40.00 117197 SHM 1996 07 15 00 05 258-91 P co2 358.910 -999.990 ... S1 1996 07 24 09 26 52.7200 174.1000 40.00 117198 SHM 1996 07 21 23 00 1357-91 P co2 360.940 -999.990 .X. S1 1996 08 13 10 28 52.7200 174.1000 40.00 117199 SHM 1996 07 21 23 00 1358-91 P co2 360.980 -999.990 .X. S1 1996 08 13 10 30 52.7200 174.1000 40.00 117200 SHM 1996 07 28 23 05 1359-91 P co2 356.620 -999.990 ... S1 1996 08 13 10 52 52.7200 174.1000 40.00 117201 SHM 1996 08 04 23 05 67-91 P co2 353.140 -999.990 ... S1 1996 08 21 08 52 52.7200 174.1000 40.00 117202 SHM 1996 08 04 23 05 68-91 P co2 353.270 -999.990 ... S1 1996 08 21 08 54 52.7200 174.1000 40.00 117203 SHM 1996 08 08 23 05 341-91 P co2 353.370 -999.990 ... S1 1996 09 24 09 24 52.7200 174.1000 40.00 117204 SHM 1996 08 08 23 05 342-91 P co2 353.100 -999.990 ... S1 1996 09 24 09 26 52.7200 174.1000 40.00 117205 SHM 1996 08 12 00 00 1191-91 P co2 359.140 -999.990 .X. S1 1996 08 21 08 48 52.7200 174.1000 40.00 117206 SHM 1996 08 12 00 00 1192-91 P co2 359.170 -999.990 .X. S1 1996 08 21 08 50 52.7200 174.1000 40.00 117207 SHM 1996 08 18 12 34 1047-91 P co2 353.080 -999.990 ... S1 1996 09 06 08 56 52.7200 174.1000 40.00 117208 SHM 1996 08 18 12 34 1048-91 P co2 353.260 -999.990 ... S1 1996 09 06 08 58 52.7200 174.1000 40.00 117209 SHM 1996 08 26 00 00 375-91 P co2 353.860 -999.990 ... S1 1996 09 04 08 48 52.7200 174.1000 40.00 117210 SHM 1996 08 26 00 00 376-91 P co2 353.670 -999.990 ... S1 1996 09 04 08 50 52.7200 174.1000 40.00 117211 SHM 1996 09 02 00 30 123-91 P co2 352.330 -999.990 ... S1 1996 09 20 14 56 52.7200 174.1000 40.00 117212 SHM 1996 09 02 00 30 124-91 P co2 352.190 -999.990 ... S1 1996 09 20 14 58 52.7200 174.1000 40.00 117213 SHM 1996 09 16 00 05 1331-91 P co2 353.660 -999.990 ... S1 1996 10 02 08 12 52.7200 174.1000 40.00 117214 SHM 1996 09 16 00 05 1332-91 P co2 353.440 -999.990 ... S1 1996 10 02 08 14 52.7200 174.1000 40.00 117215 SHM 1996 09 22 22 45 87-91 P co2 357.560 -999.990 ... S1 1996 10 22 14 15 52.7200 174.1000 40.00 117216 SHM 1996 09 22 22 45 88-91 P co2 357.640 -999.990 ... S1 1996 10 22 14 16 52.7200 174.1000 40.00 117217 SHM 1996 09 27 00 10 275-91 P co2 356.220 -999.990 ... S1 1996 10 18 17 29 52.7200 174.1000 40.00 117218 SHM 1996 09 27 00 10 276-91 P co2 355.930 -999.990 ... S1 1996 10 18 17 30 52.7200 174.1000 40.00 117219 SHM 1996 10 06 23 30 1777-91 P co2 359.600 -999.990 ... S1 1996 10 18 17 31 52.7200 174.1000 40.00 117220 SHM 1996 10 06 23 30 1778-91 P co2 359.580 -999.990 ... S1 1996 10 18 17 32 52.7200 174.1000 40.00 117221 SHM 1996 10 12 23 00 91-91 P co2 359.860 -999.990 +.. S1 1996 10 30 16 12 52.7200 174.1000 40.00 117222 SHM 1996 10 12 23 00 92-91 P co2 357.770 -999.990 -.. S1 1996 10 30 16 13 52.7200 174.1000 40.00 117223 SHM 1996 10 20 23 56 73-91 P co2 359.980 -999.990 -.. S1 1996 10 30 16 09 52.7200 174.1000 40.00 117224 SHM 1996 10 20 23 56 74-91 P co2 361.080 -999.990 +.. S1 1996 10 30 16 11 52.7200 174.1000 40.00 117225 SHM 1996 10 31 02 17 1727-91 P co2 362.160 -999.990 ... S1 1996 11 19 16 51 52.7200 174.1000 40.00 117226 SHM 1996 10 31 02 17 1728-91 P co2 362.190 -999.990 ... S1 1996 11 19 16 52 52.7200 174.1000 40.00 117227 SHM 1996 11 03 23 22 1489-91 P co2 364.030 -999.990 ... S1 1996 11 19 16 49 52.7200 174.1000 40.00 117228 SHM 1996 11 03 23 22 1490-91 P co2 364.010 -999.990 ... S1 1996 11 19 16 50 52.7200 174.1000 40.00 117229 SHM 1996 11 12 00 13 675-91 P co2 366.270 -999.990 -.. S1 1996 12 27 16 44 52.7200 174.1000 40.00 117230 SHM 1996 11 12 00 13 676-91 P co2 367.030 -999.990 +.. S1 1996 12 27 16 45 52.7200 174.1000 40.00 117231 SHM 1996 11 18 01 15 237-91 P co2 365.580 -999.990 ... S1 1996 12 27 16 46 52.7200 174.1000 40.00 117232 SHM 1996 11 18 01 15 238-91 P co2 365.430 -999.990 ... S1 1996 12 27 16 47 52.7200 174.1000 40.00 117233 SHM 1996 11 24 23 05 151-91 P co2 365.090 -999.990 ... S1 1996 12 24 12 37 52.7200 174.1000 40.00 117234 SHM 1996 11 24 23 05 152-91 P co2 364.970 -999.990 ... S1 1996 12 24 12 38 52.7200 174.1000 40.00 117235 SHM 1996 12 01 23 10 4207-91 P co2 366.100 -999.990 ... S1 1996 12 24 12 35 52.7200 174.1000 40.00 117236 SHM 1996 12 01 23 10 4208-91 P co2 365.840 -999.990 ... S1 1996 12 24 12 36 52.7200 174.1000 40.00 117237 SHM 1996 12 08 23 10 261-91 P co2 368.020 -999.990 ... S1 1997 01 08 08 28 52.7200 174.1000 40.00 117238 SHM 1996 12 08 23 10 262-91 P co2 367.780 -999.990 ... S1 1997 01 08 08 30 52.7200 174.1000 40.00 117239 SHM 1996 12 17 11 14 1061-91 P co2 371.050 -999.990 +.. S1 1997 01 08 09 48 52.7200 174.1000 40.00 117240 SHM 1996 12 17 11 14 1062-91 P co2 367.550 -999.990 -.. S1 1997 01 08 09 50 52.7200 174.1000 40.00 117241 SHM 1996 12 22 23 10 183-91 P co2 368.950 -999.990 ... S1 1997 01 16 15 40 52.7200 174.1000 40.00 117242 SHM 1996 12 22 23 10 184-91 P co2 369.060 -999.990 ... S1 1997 01 16 15 41 52.7200 174.1000 40.00 117243 SHM 1996 12 29 23 07 1123-91 P co2 365.830 -999.990 ... S1 1997 01 16 15 18 52.7200 174.1000 40.00 117244 SHM 1996 12 29 23 07 1124-91 P co2 365.770 -999.990 ... S1 1997 01 16 15 19 52.7200 174.1000 40.00 117245 SHM 1997 01 05 23 15 855-91 P co2 365.680 -999.990 ... S1 1997 02 11 15 05 52.7200 174.1000 40.00 117246 SHM 1997 01 05 23 15 856-91 P co2 365.680 -999.990 ... S1 1997 02 11 15 06 52.7200 174.1000 40.00 117247 SHM 1997 01 19 23 33 1857-91 P co2 367.480 -999.990 ... S1 1997 02 11 15 00 52.7200 174.1000 40.00 117248 SHM 1997 01 19 23 33 1858-91 P co2 367.490 -999.990 ... S1 1997 02 11 15 01 52.7200 174.1000 40.00 117249 SHM 1997 01 28 23 54 1981-91 P co2 371.210 -999.990 +.. S1 1997 03 05 16 16 52.7200 174.1000 40.00 117250 SHM 1997 01 28 23 54 1982-91 P co2 369.820 -999.990 -.. S1 1997 03 05 16 17 52.7200 174.1000 40.00 117251 SHM 1997 02 04 14 44 1985-91 P co2 367.730 -999.990 ... S1 1997 03 05 16 51 52.7200 174.1000 40.00 117252 SHM 1997 02 04 14 44 1986-91 P co2 367.740 -999.990 ... S1 1997 03 05 16 52 52.7200 174.1000 40.00 117253 SHM 1997 02 11 15 14 71-91 P co2 370.120 -999.990 ... S1 1997 03 20 14 43 52.7200 174.1000 40.00 117254 SHM 1997 02 11 15 14 72-91 P co2 370.070 -999.990 ... S1 1997 03 20 14 44 52.7200 174.1000 40.00 117255 SHM 1997 02 17 01 36 657-91 P co2 368.590 -999.990 ... S1 1997 03 05 17 16 52.7200 174.1000 40.00 117256 SHM 1997 02 17 01 36 658-91 P co2 368.670 -999.990 ... S1 1997 03 05 17 18 52.7200 174.1000 40.00 117257 SHM 1997 02 25 16 30 4151-91 P co2 368.050 -999.990 ... S1 1997 03 17 14 36 52.7200 174.1000 40.00 117258 SHM 1997 02 25 16 30 4152-91 P co2 368.090 -999.990 ... S1 1997 03 17 14 37 52.7200 174.1000 40.00 117259 SHM 1997 03 05 14 40 4149-91 P co2 369.070 -999.990 ... S1 1997 03 20 16 33 52.7200 174.1000 40.00 117260 SHM 1997 03 10 00 26 4025-91 P co2 367.790 -999.990 ... S1 1997 04 03 14 42 52.7200 174.1000 40.00 117261 SHM 1997 03 10 00 26 4026-91 P co2 367.780 -999.990 ... S1 1997 04 03 14 43 52.7200 174.1000 40.00 117262 SHM 1997 03 16 23 20 4033-91 P co2 367.250 -999.990 ... S1 1997 04 03 14 44 52.7200 174.1000 40.00 117263 SHM 1997 03 16 23 20 4034-91 P co2 367.280 -999.990 ... S1 1997 04 03 14 45 52.7200 174.1000 40.00 117264 SHM 1997 03 30 23 22 539-91 P co2 405.590 -999.990 +.. S1 1997 05 09 14 40 52.7200 174.1000 40.00 117265 SHM 1997 03 30 23 22 540-91 P co2 376.700 -999.990 -.. S1 1997 05 09 14 41 52.7200 174.1000 40.00 117266 SHM 1997 04 06 23 07 927-91 P co2 371.880 -999.990 ... S1 1997 05 09 14 38 52.7200 174.1000 40.00 117267 SHM 1997 04 06 23 07 928-91 P co2 371.990 -999.990 ... S1 1997 05 09 14 39 52.7200 174.1000 40.00 117268 SHM 1997 04 14 00 05 2053-91 P co2 369.540 -999.990 ... S1 1997 05 01 13 56 52.7200 174.1000 40.00 117269 SHM 1997 04 14 00 05 2054-91 P co2 369.490 -999.990 ... S1 1997 05 01 13 57 52.7200 174.1000 40.00 117270 SHM 1997 04 20 23 25 1655-91 P co2 370.340 -999.990 ... S1 1997 05 05 14 09 52.7200 174.1000 40.00 117271 SHM 1997 04 20 23 25 1656-91 P co2 370.320 -999.990 ... S1 1997 05 05 14 10 52.7200 174.1000 40.00 117272 SHM 1997 04 27 23 05 153-91 P co2 376.310 -999.990 -.. S1 1997 06 05 11 52 52.7200 174.1000 40.00 117273 SHM 1997 04 27 23 05 154-91 P co2 377.840 -999.990 +.. S1 1997 06 05 11 53 52.7200 174.1000 40.00 117274 SHM 1997 05 04 23 22 77-91 P co2 370.390 -999.990 -.. S1 1997 06 05 11 50 52.7200 174.1000 40.00 117275 SHM 1997 05 04 23 22 78-91 P co2 370.930 -999.990 +.. S1 1997 06 05 11 51 52.7200 174.1000 40.00 117276 SHM 1997 05 11 23 26 4289-91 P co2 369.790 -999.990 ... S1 1997 06 11 15 25 52.7200 174.1000 40.00 117277 SHM 1997 05 11 23 26 4290-91 P co2 369.950 -999.990 ... S1 1997 06 11 15 26 52.7200 174.1000 40.00 117278 SHM 1997 05 18 23 00 4287-91 P co2 373.460 -999.990 +.. S1 1997 06 11 15 27 52.7200 174.1000 40.00 117279 SHM 1997 05 18 23 00 4288-91 P co2 372.800 -999.990 -.. S1 1997 06 11 15 28 52.7200 174.1000 40.00 117280 SHM 1997 05 27 23 12 4022-91 P co2 368.100 -999.990 ... S1 1997 06 17 15 34 52.7200 174.1000 40.00 117281 SHM 1997 05 27 23 12 4303-91 P co2 368.120 -999.990 ... S1 1997 06 17 15 33 52.7200 174.1000 40.00 117282 SHM 1997 06 01 23 20 4021-91 P co2 364.830 -999.990 ... S1 1997 06 17 15 11 52.7200 174.1000 40.00 117283 SHM 1997 06 01 23 20 4304-91 P co2 364.790 -999.990 ... S1 1997 06 17 15 12 52.7200 174.1000 40.00 117284 SHM 1997 06 08 23 21 1357-91 P co2 371.380 -999.990 -.. S1 1997 07 10 16 17 52.7200 174.1000 40.00 117285 SHM 1997 06 08 23 21 1358-91 P co2 371.910 -999.990 +.. S1 1997 07 10 16 18 52.7200 174.1000 40.00 117286 SHM 1997 06 15 23 24 523-91 P co2 365.940 -999.990 -.. S1 1997 07 10 16 15 52.7200 174.1000 40.00 117287 SHM 1997 06 15 23 24 524-91 P co2 366.650 -999.990 +.. S1 1997 07 10 16 16 52.7200 174.1000 40.00 117288 SHM 1997 06 29 23 08 357-91 P co2 359.890 -999.990 +.. S1 1997 07 24 14 54 52.7200 174.1000 40.00 117289 SHM 1997 06 29 23 08 4004-91 P co2 359.340 -999.990 -.. S1 1997 07 24 14 55 52.7200 174.1000 40.00 117290 SHM 1997 07 06 23 07 358-91 P co2 359.410 -999.990 -.. S1 1997 07 24 14 57 52.7200 174.1000 40.00 117291 SHM 1997 07 06 23 07 4003-91 P co2 360.010 -999.990 +.. S1 1997 07 24 14 56 52.7200 174.1000 40.00 117292 SHM 1997 07 13 22 49 1717-91 P co2 358.170 -999.990 ... S1 1997 08 01 16 32 52.7200 174.1000 40.00 117293 SHM 1997 07 13 22 49 1718-91 P co2 358.090 -999.990 ... S1 1997 08 01 16 33 52.7200 174.1000 40.00 117294 SHM 1997 07 20 23 15 721-91 P co2 355.170 -999.990 ... S1 1997 08 01 16 34 52.7200 174.1000 40.00 117295 SHM 1997 07 20 23 15 722-91 P co2 355.220 -999.990 ... S1 1997 08 01 16 35 52.7200 174.1000 40.00 117296 SHM 1997 07 27 22 58 4177-91 P co2 354.810 -999.990 +.. L3 1997 08 13 10 25 52.7200 174.1000 40.00 117297 SHM 1997 07 27 22 58 4178-91 P co2 353.820 -999.990 -.. L3 1997 08 13 10 39 52.7200 174.1000 40.00 117298 SHM 1997 08 03 22 30 137-91 P co2 352.460 -999.990 ... L3 1997 08 13 10 53 52.7200 174.1000 40.00 117299 SHM 1997 08 03 22 30 138-91 P co2 352.300 -999.990 ... L3 1997 08 13 11 06 52.7200 174.1000 40.00 117300 SHM 1997 08 10 23 38 265-91 P co2 352.890 -999.990 ... L3 1997 09 22 09 53 52.7200 174.1000 40.00 117301 SHM 1997 08 10 23 38 266-91 P co2 352.780 -999.990 ... L3 1997 09 22 10 06 52.7200 174.1000 40.00 117302 SHM 1997 08 19 04 05 835-91 P co2 352.930 -999.990 ... L3 1997 09 22 08 59 52.7200 174.1000 40.00 117303 SHM 1997 08 19 04 05 836-91 P co2 352.750 -999.990 ... L3 1997 09 22 09 12 52.7200 174.1000 40.00 117304 SHM 1997 08 25 23 45 1921-91 P co2 350.900 -999.990 -.. L3 1997 09 10 13 54 52.7200 174.1000 40.00 117305 SHM 1997 08 25 23 45 1922-91 P co2 351.810 -999.990 +.. L3 1997 09 10 14 08 52.7200 174.1000 40.00 117306 SHM 1997 08 31 00 22 123-91 P co2 351.350 -999.990 ... L3 1997 09 10 13 26 52.7200 174.1000 40.00 117307 SHM 1997 08 31 00 22 124-91 P co2 351.100 -999.990 ... L3 1997 09 10 13 40 52.7200 174.1000 40.00 117308 SHM 1997 09 07 23 33 465-91 P co2 354.730 -999.990 ... L3 1997 10 09 13 21 52.7200 174.1000 40.00 117309 SHM 1997 09 07 23 33 466-91 P co2 354.770 -999.990 ... L3 1997 10 09 13 34 52.7200 174.1000 40.00 117310 SHM 1997 09 15 00 00 4007-91 P co2 355.240 -999.990 ... L3 1997 10 09 13 58 52.7200 174.1000 40.00 117311 SHM 1997 09 15 00 00 4008-91 P co2 355.440 -999.990 ... L3 1997 10 09 14 11 52.7200 174.1000 40.00 117312 SHM 1997 09 28 23 10 1715-91 P co2 357.720 -999.990 ... L3 1997 11 10 12 34 52.7200 174.1000 40.00 117313 SHM 1997 09 28 23 10 1716-91 P co2 357.900 -999.990 ... L3 1997 11 10 12 47 52.7200 174.1000 40.00 117314 SHM 1997 10 05 23 08 1193-91 P co2 361.210 -999.990 ... L3 1997 11 10 09 51 52.7200 174.1000 40.00 117315 SHM 1997 10 05 23 08 1194-91 P co2 361.270 -999.990 ... L3 1997 11 10 10 05 52.7200 174.1000 40.00 117316 SHM 1997 10 20 00 47 1367-91 P co2 361.930 -999.990 ... L3 1997 11 20 16 48 52.7200 174.1000 40.00 117317 SHM 1997 10 20 00 47 1368-91 P co2 361.980 -999.990 ... L3 1997 11 20 17 01 52.7200 174.1000 40.00 117318 SHM 1997 11 10 00 17 643-91 P co2 366.160 -999.990 -.. L3 1997 11 21 10 54 52.7200 174.1000 40.00 117319 SHM 1997 11 10 00 17 644-91 P co2 366.900 -999.990 +.. L3 1997 11 21 11 08 52.7200 174.1000 40.00 117320 SHM 1997 11 24 01 06 721-91 P co2 364.940 -999.990 ... L3 1998 01 13 10 22 52.7200 174.1000 40.00 117321 SHM 1997 11 24 01 06 722-91 P co2 364.880 -999.990 ... L3 1998 01 13 10 35 52.7200 174.1000 40.00 117322 SHM 1997 12 08 00 00 1717-91 P co2 367.160 -999.990 ... L3 1998 01 13 09 54 52.7200 174.1000 40.00 117323 SHM 1997 12 08 00 00 1718-91 P co2 367.210 -999.990 ... L3 1998 01 13 10 08 52.7200 174.1000 40.00 117324 SHM 1997 12 19 12 00 627-91 P co2 368.550 -999.990 -.. L3 1998 01 21 15 56 52.7200 174.1000 40.00 117325 SHM 1997 12 19 12 00 628-91 P co2 369.540 -999.990 +.. L3 1998 01 21 16 09 52.7200 174.1000 40.00 117326 SHM 1997 12 21 23 53 133-91 P co2 367.760 -999.990 ... L3 1998 01 21 16 23 52.7200 174.1000 40.00 117327 SHM 1997 12 21 23 53 134-91 P co2 367.680 -999.990 ... L3 1998 01 21 16 37 52.7200 174.1000 40.00 117328 SHM 1997 12 31 07 15 483-91 P co2 367.970 -999.990 ... L3 1998 02 02 13 46 52.7200 174.1000 40.00 117329 SHM 1997 12 31 07 15 484-91 P co2 367.980 -999.990 ... L3 1998 02 02 14 00 52.7200 174.1000 40.00 117330 SHM 1998 01 19 01 52 1389-91 P co2 370.160 -999.990 ... L3 1998 02 02 12 22 52.7200 174.1000 40.00 117331 SHM 1998 01 19 01 52 1390-91 P co2 370.230 -999.990 ... L3 1998 02 02 12 36 52.7200 174.1000 40.00 117332 SHM 1998 01 26 00 06 4605-91 P co2 369.980 -999.990 -.. L3 1998 02 24 16 26 52.7200 174.1000 40.00 117333 SHM 1998 01 26 00 06 4606-91 P co2 371.100 -999.990 +.. L3 1998 02 24 16 39 52.7200 174.1000 40.00 117334 SHM 1998 02 08 23 58 1249-91 P co2 369.900 -999.990 ... L3 1998 02 24 15 58 52.7200 174.1000 40.00 117335 SHM 1998 02 08 23 58 1250-91 P co2 369.960 -999.990 ... L3 1998 02 24 16 12 52.7200 174.1000 40.00 117336 SHM 1998 02 23 00 05 1437-91 P co2 370.800 -999.990 ... L3 1998 03 09 15 39 52.7200 174.1000 40.00 117337 SHM 1998 02 23 00 05 1438-91 P co2 370.900 -999.990 ... L3 1998 03 09 15 52 52.7200 174.1000 40.00 117338 SHM 1998 03 01 23 48 859-91 P co2 370.680 -999.990 ... L3 1998 03 09 15 11 52.7200 174.1000 40.00 117339 SHM 1998 03 01 23 48 860-91 P co2 370.680 -999.990 ... L3 1998 03 09 15 25 52.7200 174.1000 40.00 117340 SHM 1998 03 08 23 32 445-91 P co2 374.100 -999.990 .X. L3 1998 03 24 15 09 52.7200 174.1000 40.00 117341 SHM 1998 03 08 23 32 446-91 P co2 373.830 -999.990 .X. L3 1998 03 24 15 23 52.7200 174.1000 40.00 117342 SHM 1998 03 15 23 40 1143-91 P co2 369.620 -999.990 ... L3 1998 03 24 15 37 52.7200 174.1000 40.00 117343 SHM 1998 03 15 23 40 1144-91 P co2 369.640 -999.990 ... L3 1998 03 24 15 50 52.7200 174.1000 40.00 117344 SHM 1998 03 23 00 07 4391-91 P co2 371.510 -999.990 ... L3 1998 04 07 15 40 52.7200 174.1000 40.00 117345 SHM 1998 03 23 00 07 4392-91 P co2 371.500 -999.990 ... L3 1998 04 07 15 54 52.7200 174.1000 40.00 117346 SHM 1998 03 30 00 38 4675-91 P co2 370.880 -999.990 ... L3 1998 04 07 16 08 52.7200 174.1000 40.00 117347 SHM 1998 03 30 00 38 4676-91 P co2 370.900 -999.990 ... L3 1998 04 07 16 21 52.7200 174.1000 40.00 117348 SHM 1998 04 05 23 51 143-91 P co2 370.550 -999.990 ... L3 1998 04 24 11 43 52.7200 174.1000 40.00 117349 SHM 1998 04 05 23 51 144-91 P co2 370.530 -999.990 ... L3 1998 04 24 11 56 52.7200 174.1000 40.00 117350 SHM 1998 04 12 23 33 1555-91 P co2 372.790 -999.990 ... L3 1998 04 24 11 15 52.7200 174.1000 40.00 117351 SHM 1998 04 12 23 33 1556-91 P co2 373.250 -999.990 ... L3 1998 04 24 11 29 52.7200 174.1000 40.00 117352 SHM 1998 04 19 23 32 1009-91 P co2 371.910 -999.990 ... L3 1998 05 07 11 50 52.7200 174.1000 40.00 117353 SHM 1998 04 19 23 32 1010-91 P co2 371.900 -999.990 ... L3 1998 05 07 12 04 52.7200 174.1000 40.00 117354 SHM 1998 04 26 23 48 1241-91 P co2 371.520 -999.990 ... L3 1998 05 07 11 23 52.7200 174.1000 40.00 117355 SHM 1998 04 26 23 48 1242-91 P co2 371.330 -999.990 ... L3 1998 05 07 11 37 52.7200 174.1000 40.00 117356 SHM 1998 05 17 23 15 1361-91 P co2 372.070 -999.990 ... L3 1998 06 23 15 23 52.7200 174.1000 40.00 117357 SHM 1998 05 17 23 15 1362-91 P co2 372.000 -999.990 ... L3 1998 06 23 15 37 52.7200 174.1000 40.00 117358 SHM 1998 06 01 00 04 1763-91 P co2 370.770 -999.990 ... L3 1998 06 24 09 47 52.7200 174.1000 40.00 117359 SHM 1998 06 01 00 04 1764-91 P co2 370.710 -999.990 ... L3 1998 06 24 10 01 52.7200 174.1000 40.00 117360 SHM 1998 06 08 00 14 757-91 P co2 370.540 -999.990 ... L3 1998 06 24 14 25 52.7200 174.1000 40.00 117361 SHM 1998 06 08 00 14 758-91 P co2 370.630 -999.990 ... L3 1998 06 24 14 39 52.7200 174.1000 40.00 117362 SHM 1998 06 14 23 42 77-91 P co2 367.320 -999.990 ... L3 1998 06 24 14 54 52.7200 174.1000 40.00 117363 SHM 1998 06 14 23 42 78-91 P co2 367.230 -999.990 ... L3 1998 06 24 15 08 52.7200 174.1000 40.00 117364 SHM 1998 06 22 00 02 453-91 P co2 366.820 -999.990 ... L3 1998 07 13 16 24 52.7200 174.1000 40.00 117365 SHM 1998 06 28 23 38 1175-91 P co2 363.420 -999.990 ... L3 1998 07 13 14 20 52.7200 174.1000 40.00 117366 SHM 1998 06 28 23 38 1176-91 P co2 363.470 -999.990 ... L3 1998 07 13 14 33 52.7200 174.1000 40.00 117367 SHM 1998 07 05 23 19 1625-91 P co2 363.550 -999.990 ... L3 1998 07 31 13 43 52.7200 174.1000 40.00 117368 SHM 1998 07 05 23 19 1626-91 P co2 363.470 -999.990 ... L3 1998 07 31 13 56 52.7200 174.1000 40.00 117369 SHM 1998 07 15 04 05 45-91 P co2 360.350 -999.990 ... L3 1998 07 31 13 15 52.7200 174.1000 40.00 117370 SHM 1998 07 15 04 05 46-91 P co2 360.310 -999.990 ... L3 1998 07 31 13 29 52.7200 174.1000 40.00 117371 SHM 1998 07 19 23 42 239-91 P co2 358.420 -999.990 ... L3 1998 08 12 13 33 52.7200 174.1000 40.00 117372 SHM 1998 07 19 23 42 240-91 P co2 358.480 -999.990 ... L3 1998 08 12 13 46 52.7200 174.1000 40.00 117373 SHM 1998 07 26 23 35 4713-91 P co2 353.920 -999.990 .X. L3 1998 08 12 13 05 52.7200 174.1000 40.00 117374 SHM 1998 07 26 23 35 4714-91 P co2 353.640 -999.990 .X. L3 1998 08 12 13 19 52.7200 174.1000 40.00 117375 SHM 1998 08 02 23 55 1491-91 P co2 357.610 -999.990 ... L3 1998 08 21 11 49 52.7200 174.1000 40.00 117376 SHM 1998 08 02 23 55 1492-91 P co2 357.730 -999.990 ... L3 1998 08 21 12 03 52.7200 174.1000 40.00 117377 SHM 1998 08 10 00 11 1065-91 P co2 354.990 -999.990 ... L3 1998 08 21 11 22 52.7200 174.1000 40.00 117378 SHM 1998 08 10 00 11 1066-91 P co2 354.730 -999.990 ... L3 1998 08 21 11 35 52.7200 174.1000 40.00 117379 SHM 1998 08 16 23 38 495-91 P co2 354.320 -999.990 ... L3 1998 09 02 15 12 52.7200 174.1000 40.00 117380 SHM 1998 08 16 23 38 496-91 P co2 354.410 -999.990 ... L3 1998 09 02 15 26 52.7200 174.1000 40.00 117381 SHM 1998 08 24 00 11 1865-91 P co2 357.860 -999.990 ... L3 1998 09 02 15 39 52.7200 174.1000 40.00 117382 SHM 1998 08 24 00 11 1866-91 P co2 357.830 -999.990 ... L3 1998 09 02 15 53 52.7200 174.1000 40.00 117383 SHM 1998 08 31 00 03 4281-91 P co2 355.810 -999.990 ... L3 1998 09 10 10 58 52.7200 174.1000 40.00 117384 SHM 1998 08 31 00 03 4282-91 P co2 355.900 -999.990 ... L3 1998 09 10 11 12 52.7200 174.1000 40.00 117385 SHM 1998 09 07 00 10 43-98 P co2 358.330 -999.990 ... L3 1998 09 28 14 24 52.7200 174.1000 40.00 117386 SHM 1998 09 13 23 50 1931-91 P co2 360.350 -999.990 ... L3 1998 09 28 12 05 52.7200 174.1000 40.00 117387 SHM 1998 09 13 23 50 2035-91 P co2 360.240 -999.990 ... L3 1998 09 28 12 19 52.7200 174.1000 40.00 117388 SHM 1998 09 20 23 52 669-91 P co2 362.250 -999.990 ... L3 1998 10 08 13 55 52.7200 174.1000 40.00 117389 SHM 1998 09 20 23 52 670-91 P co2 361.920 -999.990 ... L3 1998 10 08 14 09 52.7200 174.1000 40.00 117390 SHM 1998 09 27 23 46 1475-91 P co2 361.300 -999.990 ... L3 1998 10 08 14 50 52.7200 174.1000 40.00 117391 SHM 1998 09 27 23 46 1476-91 P co2 361.210 -999.990 ... L3 1998 10 08 15 03 52.7200 174.1000 40.00 117392 SHM 1998 10 04 21 10 379-91 P co2 366.340 -999.990 ... L3 1998 11 02 12 46 52.7200 174.1000 40.00 117393 SHM 1998 10 04 21 10 380-91 P co2 366.360 -999.990 ... L3 1998 11 02 12 59 52.7200 174.1000 40.00 117394 SHM 1998 10 12 00 07 1819-91 P co2 366.480 -999.990 ... L3 1998 11 02 12 17 52.7200 174.1000 40.00 117395 SHM 1998 10 12 00 07 1820-91 P co2 366.520 -999.990 ... L3 1998 11 02 12 30 52.7200 174.1000 40.00 117396 SHM 1998 10 18 23 05 373-91 P co2 366.800 -999.990 ... L3 1998 11 10 14 45 52.7200 174.1000 40.00 117397 SHM 1998 10 18 23 05 374-91 P co2 366.730 -999.990 ... L3 1998 11 10 14 59 52.7200 174.1000 40.00 117398 SHM 1998 10 26 00 07 1789-91 P co2 368.820 -999.990 ... L3 1998 11 10 14 18 52.7200 174.1000 40.00 117399 SHM 1998 10 26 00 07 1790-91 P co2 368.840 -999.990 ... L3 1998 11 10 14 32 52.7200 174.1000 40.00 117400 SHM 1998 11 02 00 05 433-91 P co2 369.740 -999.990 +.. L3 1998 11 30 12 39 52.7200 174.1000 40.00 117401 SHM 1998 11 02 00 05 434-91 P co2 368.940 -999.990 -.. L3 1998 11 30 12 53 52.7200 174.1000 40.00 117402 SHM 1998 11 08 23 36 1629-91 P co2 368.440 -999.990 ... L3 1998 11 30 13 06 52.7200 174.1000 40.00 117403 SHM 1998 11 08 23 36 1630-91 P co2 368.450 -999.990 ... L3 1998 11 30 13 20 52.7200 174.1000 40.00 117404 SHM 1998 11 15 23 53 4517-91 P co2 370.960 -999.990 ... L3 1998 12 18 10 38 52.7200 174.1000 40.00 117405 SHM 1998 11 15 23 53 4518-91 P co2 370.990 -999.990 ... L3 1998 12 18 10 52 52.7200 174.1000 40.00 117406 SHM 1998 11 22 23 51 403-91 P co2 370.360 -999.990 ... L3 1998 12 18 15 33 52.7200 174.1000 40.00 117407 SHM 1998 11 22 23 51 404-91 P co2 370.320 -999.990 ... L3 1998 12 18 15 47 52.7200 174.1000 40.00 117408 SHM 1998 11 30 00 21 1971-91 P co2 373.000 -999.990 +.. L3 1998 12 18 12 48 52.7200 174.1000 40.00 117409 SHM 1998 11 30 00 21 1972-91 P co2 371.690 -999.990 -.. L3 1998 12 18 13 02 52.7200 174.1000 40.00 117410 SHM 1998 12 06 23 40 4169-91 P co2 370.360 -999.990 ... L3 1998 12 18 13 15 52.7200 174.1000 40.00 117411 SHM 1998 12 06 23 40 4170-91 P co2 370.410 -999.990 ... L3 1998 12 18 13 29 52.7200 174.1000 40.00 117412 SHM 1998 12 13 23 40 215-91 P co2 371.900 -999.990 ... L3 1999 01 15 16 16 52.7200 174.1000 40.00 117413 SHM 1998 12 13 23 40 216-91 P co2 372.080 -999.990 ... L3 1999 01 15 16 29 52.7200 174.1000 40.00 117414 SHM 1998 12 27 23 55 1563-91 P co2 371.080 -999.990 ... L3 1999 01 15 15 48 52.7200 174.1000 40.00 117415 SHM 1998 12 27 23 55 1564-91 P co2 371.070 -999.990 ... L3 1999 01 15 16 02 52.7200 174.1000 40.00 117416 SHM 1999 01 03 00 17 4001-91 P co2 372.770 -999.990 ... L3 1999 01 25 10 42 52.7200 174.1000 40.00 117417 SHM 1999 01 03 00 17 4002-91 P co2 372.790 -999.990 ... L3 1999 01 25 10 56 52.7200 174.1000 40.00 117418 SHM 1999 01 11 01 15 103-91 P co2 372.920 -999.990 -.. L3 1999 01 25 11 09 52.7200 174.1000 40.00 117419 SHM 1999 01 11 01 15 104-91 P co2 374.020 -999.990 +.. L3 1999 01 25 11 23 52.7200 174.1000 40.00 117420 SHM 1999 01 18 01 09 527-91 P co2 372.120 -999.990 ... L3 1999 02 05 09 24 52.7200 174.1000 40.00 117421 SHM 1999 01 18 01 09 528-91 P co2 371.970 -999.990 ... L3 1999 02 05 09 37 52.7200 174.1000 40.00 117422 SHM 1999 01 25 01 05 131-98 P co2 372.570 -999.990 ... L3 1999 02 05 10 47 52.7200 174.1000 40.00 117423 SHM 1999 01 25 01 05 132-98 P co2 372.550 -999.990 ... L3 1999 02 05 11 01 52.7200 174.1000 40.00 117424 SHM 1999 02 01 01 16 4667-91 P co2 375.850 -999.990 ... L3 1999 02 18 15 25 52.7200 174.1000 40.00 117425 SHM 1999 02 01 01 16 4668-91 P co2 375.930 -999.990 ... L3 1999 02 18 15 39 52.7200 174.1000 40.00 117426 SHM 1999 02 08 01 02 273-91 P co2 373.260 -999.990 ... L3 1999 02 18 15 53 52.7200 174.1000 40.00 117427 SHM 1999 02 08 01 02 274-91 P co2 373.010 -999.990 ... L3 1999 02 18 16 06 52.7200 174.1000 40.00 117428 SHM 1999 02 15 01 25 1935-91 P co2 373.440 -999.990 ... L3 1999 03 02 11 22 52.7200 174.1000 40.00 117429 SHM 1999 02 15 01 25 1936-91 P co2 373.410 -999.990 ... L3 1999 03 02 11 36 52.7200 174.1000 40.00 117430 SHM 1999 02 22 00 00 1951-91 P co2 373.650 -999.990 ... L3 1999 03 02 11 49 52.7200 174.1000 40.00 117431 SHM 1999 02 22 00 00 1952-91 P co2 373.640 -999.990 ... L3 1999 03 02 12 03 52.7200 174.1000 40.00 117432 SHM 1999 03 02 02 05 1927-91 P co2 375.550 -999.990 ... L3 1999 03 22 13 34 52.7200 174.1000 40.00 117433 SHM 1999 03 02 02 05 1928-91 P co2 375.450 -999.990 ... L3 1999 03 22 13 47 52.7200 174.1000 40.00 117434 SHM 1999 03 08 01 08 197-98 P co2 374.550 -999.990 ... L3 1999 03 22 14 56 52.7200 174.1000 40.00 117435 SHM 1999 03 08 01 08 198-98 P co2 359.840 -999.990 N.. L3 1999 03 22 15 09 52.7200 174.1000 40.00 117436 SHM 1999 03 08 01 08 198-98 P co2 374.570 -999.990 ... L3 1999 03 22 16 46 52.7200 174.1000 40.00 117436 SHM 1999 03 15 01 06 87-91 P co2 375.640 -999.990 ... L3 1999 04 05 14 03 52.7200 174.1000 40.00 117437 SHM 1999 03 15 01 06 88-91 P co2 375.230 -999.990 ... L3 1999 04 05 14 17 52.7200 174.1000 40.00 117438 SHM 1999 03 25 23 30 487-91 P co2 376.890 -999.990 ... L3 1999 04 05 13 36 52.7200 174.1000 40.00 117439 SHM 1999 03 25 23 30 488-91 P co2 376.960 -999.990 ... L3 1999 04 05 13 50 52.7200 174.1000 40.00 117440 SHM 1999 03 29 01 14 4415-91 P co2 375.690 -999.990 ... L3 1999 04 14 12 39 52.7200 174.1000 40.00 117441 SHM 1999 03 29 01 14 4416-91 P co2 375.740 -999.990 ... L3 1999 04 14 12 52 52.7200 174.1000 40.00 117442 SHM 1999 04 06 02 03 4559-91 P co2 374.250 -999.990 ... L3 1999 04 14 12 11 52.7200 174.1000 40.00 117443 SHM 1999 04 06 02 03 4560-91 P co2 374.270 -999.990 ... L3 1999 04 14 12 25 52.7200 174.1000 40.00 117444 SHM 1999 04 15 01 00 1217-91 P co2 374.650 -999.990 ... L3 1999 04 30 13 08 52.7200 174.1000 40.00 117445 SHM 1999 04 15 01 00 1218-91 P co2 374.690 -999.990 ... L3 1999 04 30 13 22 52.7200 174.1000 40.00 117446 SHM 1999 04 18 23 40 1809-91 P co2 375.670 -999.990 -.. L3 1999 04 30 13 36 52.7200 174.1000 40.00 117447 SHM 1999 04 18 23 40 1810-91 P co2 376.290 -999.990 +.. L3 1999 04 30 13 49 52.7200 174.1000 40.00 117448 SHM 1999 04 25 23 25 1571-91 P co2 374.700 -999.990 ... L3 1999 05 18 10 32 52.7200 174.1000 40.00 117449 SHM 1999 04 25 23 25 1572-91 P co2 374.730 -999.990 ... L3 1999 05 18 10 45 52.7200 174.1000 40.00 117450 SHM 1999 05 02 23 31 4283-91 P co2 376.730 -999.990 ... L3 1999 05 18 10 03 52.7200 174.1000 40.00 117451 SHM 1999 05 02 23 31 4284-91 P co2 376.750 -999.990 ... L3 1999 05 18 10 16 52.7200 174.1000 40.00 117452 SHM 1999 05 09 23 45 100-91 P co2 375.460 -999.990 ... L3 1999 06 01 16 07 52.7200 174.1000 40.00 117453 SHM 1999 05 09 23 45 99-91 P co2 375.470 -999.990 ... L3 1999 06 01 15 54 52.7200 174.1000 40.00 117454 SHM 1999 05 16 23 55 5-98 P co2 374.690 -999.990 ... L3 1999 06 01 15 25 52.7200 174.1000 40.00 117455 SHM 1999 05 16 23 55 6-98 P co2 374.710 -999.990 ... L3 1999 06 01 15 38 52.7200 174.1000 40.00 117456 SHM 1999 05 22 23 45 135-98 P co2 373.420 -999.990 ... L3 1999 06 21 09 36 52.7200 174.1000 40.00 117457 SHM 1999 05 22 23 45 136-98 P co2 373.400 -999.990 ... L3 1999 06 21 09 49 52.7200 174.1000 40.00 117458 SHM 1999 05 30 23 45 1429-91 P co2 372.770 -999.990 ... L3 1999 06 21 11 03 52.7200 174.1000 40.00 117459 SHM 1999 05 30 23 45 1430-91 P co2 372.790 -999.990 ... L3 1999 06 21 11 17 52.7200 174.1000 40.00 117460 SHM 1999 06 13 23 50 283-91 P co2 369.380 -999.990 ... L3 1999 07 06 14 37 52.7200 174.1000 40.00 117461 SHM 1999 06 13 23 50 284-91 P co2 369.380 -999.990 ... L3 1999 07 06 14 50 52.7200 174.1000 40.00 117462 SHM 1999 06 20 23 48 581-91 P co2 444.160 -999.990 +.. L3 1999 07 06 14 08 52.7200 174.1000 40.00 117463 SHM 1999 06 20 23 48 582-91 P co2 369.560 -999.990 -.. L3 1999 07 06 14 21 52.7200 174.1000 40.00 117464 SHM 1999 06 27 23 55 503-91 P co2 369.660 -999.990 +.. L3 1999 07 28 09 16 52.7200 174.1000 40.00 117465 SHM 1999 06 27 23 55 504-91 P co2 368.690 -999.990 -.. L3 1999 07 28 09 29 52.7200 174.1000 40.00 117466 SHM 1999 07 04 23 55 1435-91 P co2 365.150 -999.990 ... L3 1999 07 28 09 43 52.7200 174.1000 40.00 117467 SHM 1999 07 04 23 55 1436-91 P co2 365.200 -999.990 ... L3 1999 07 28 09 57 52.7200 174.1000 40.00 117468 SHM 1999 07 11 23 45 259-91 P co2 363.070 -999.990 ... L3 1999 08 05 10 00 52.7200 174.1000 40.00 117469 SHM 1999 07 11 23 45 260-91 P co2 363.160 -999.990 ... L3 1999 08 05 10 13 52.7200 174.1000 40.00 117470 SHM 1999 07 18 23 44 1741-91 P co2 363.760 -999.990 .X. L3 1999 08 05 10 27 52.7200 174.1000 40.00 117471 SHM 1999 07 18 23 44 1742-91 P co2 364.230 -999.990 .X. L3 1999 08 05 10 41 52.7200 174.1000 40.00 117472 SHM 1999 07 25 23 57 655-91 P co2 356.650 -999.990 ... L3 1999 08 20 12 20 52.7200 174.1000 40.00 117473 SHM 1999 07 25 23 57 656-91 P co2 356.540 -999.990 ... L3 1999 08 20 12 33 52.7200 174.1000 40.00 117474 SHM 1999 08 02 00 00 4745-91 P co2 357.630 -999.990 ... L3 1999 08 20 12 47 52.7200 174.1000 40.00 117475 SHM 1999 08 02 00 00 4746-91 P co2 357.700 -999.990 ... L3 1999 08 20 13 01 52.7200 174.1000 40.00 117476 SHM 1999 08 09 00 10 5-91 P co2 355.330 -999.990 ... L3 1999 08 27 12 20 52.7200 174.1000 40.00 117477 SHM 1999 08 09 00 10 6-91 P co2 355.140 -999.990 ... L3 1999 08 27 12 34 52.7200 174.1000 40.00 117478 SHM 1999 08 16 00 22 529-91 P co2 357.100 -999.990 -.. L3 1999 08 30 14 28 52.7200 174.1000 40.00 117479 SHM 1999 08 16 00 22 530-91 P co2 357.690 -999.990 +.. L3 1999 08 30 14 41 52.7200 174.1000 40.00 117480 SHM 1999 08 23 00 06 1353-91 P co2 355.750 -999.990 ... L3 1999 08 30 14 55 52.7200 174.1000 40.00 117481 SHM 1999 08 23 00 06 1354-91 P co2 355.610 -999.990 ... L3 1999 08 30 15 09 52.7200 174.1000 40.00 117482 SHM 1999 08 29 23 56 2049-91 P co2 357.090 -999.990 ... L3 1999 09 22 11 49 52.7200 174.1000 40.00 117483 SHM 1999 08 29 23 56 2050-91 P co2 357.160 -999.990 ... L3 1999 09 22 12 02 52.7200 174.1000 40.00 117484 SHM 1999 09 05 23 41 4669-91 P co2 357.000 -999.990 ... L3 1999 09 22 12 16 52.7200 174.1000 40.00 117485 SHM 1999 09 05 23 41 4670-91 P co2 356.930 -999.990 ... L3 1999 09 22 12 30 52.7200 174.1000 40.00 117486 SHM 1999 09 12 23 52 373-91 P co2 362.930 -999.990 .X. L3 1999 09 30 09 27 52.7200 174.1000 40.00 117487 SHM 1999 09 12 23 52 374-91 P co2 362.730 -999.990 .X. L3 1999 09 30 09 41 52.7200 174.1000 40.00 117488 SHM 1999 09 19 23 52 555-91 P co2 361.740 -999.990 ... L3 1999 09 30 09 00 52.7200 174.1000 40.00 117489 SHM 1999 09 19 23 52 556-91 P co2 361.290 -999.990 ... L3 1999 09 30 09 13 52.7200 174.1000 40.00 117490 SHM 1999 09 27 21 20 1269-91 P co2 362.920 -999.990 ... L3 1999 10 12 11 21 52.7200 174.1000 40.00 117491 SHM 1999 09 27 21 20 1270-91 P co2 363.010 -999.990 ... L3 1999 10 12 11 34 52.7200 174.1000 40.00 117492 SHM 1999 10 04 00 22 4009-91 P co2 364.210 -999.990 ... L3 1999 10 12 11 48 52.7200 174.1000 40.00 117493 SHM 1999 10 04 00 22 4010-91 P co2 364.230 -999.990 ... L3 1999 10 12 12 02 52.7200 174.1000 40.00 117494 SHM 1999 10 10 23 54 1593-91 P co2 364.810 -999.990 ... L3 1999 10 28 11 55 52.7200 174.1000 40.00 117495 SHM 1999 10 10 23 54 1594-91 P co2 364.990 -999.990 ... L3 1999 10 28 12 08 52.7200 174.1000 40.00 117496 SHM 1999 10 17 23 45 1639-91 P co2 370.290 -999.990 ... L3 1999 10 28 12 22 52.7200 174.1000 40.00 117497 SHM 1999 10 17 23 45 1640-91 P co2 370.210 -999.990 ... L3 1999 10 28 12 36 52.7200 174.1000 40.00 117498 SHM 1999 10 24 23 40 1407-91 P co2 368.830 -999.990 ... L3 1999 11 10 09 41 52.7200 174.1000 40.00 117499 SHM 1999 10 24 23 40 1408-91 P co2 368.830 -999.990 ... L3 1999 11 10 09 54 52.7200 174.1000 40.00 117500 SHM 1999 10 31 23 30 4735-91 P co2 369.060 -999.990 ... L3 1999 11 10 09 14 52.7200 174.1000 40.00 117501 SHM 1999 10 31 23 30 4736-91 P co2 369.350 -999.990 ... L3 1999 11 10 09 27 52.7200 174.1000 40.00 117502 SHM 1999 11 07 23 35 265-91 P co2 369.610 -999.990 ... L3 1999 12 02 10 24 52.7200 174.1000 40.00 117503 SHM 1999 11 07 23 35 266-91 P co2 369.560 -999.990 ... L3 1999 12 02 10 38 52.7200 174.1000 40.00 117504 SHM 1999 11 15 22 20 1129-91 P co2 371.000 -999.990 +.. L3 1999 12 02 11 19 52.7200 174.1000 40.00 117505 SHM 1999 11 15 22 20 1130-91 P co2 370.320 -999.990 -.. L3 1999 12 02 11 32 52.7200 174.1000 40.00 117506 SHM 1999 11 22 01 48 655-91 P co2 372.400 -999.990 ... L3 1999 12 08 13 35 52.7200 174.1000 40.00 117507 SHM 1999 11 22 01 48 656-91 P co2 372.340 -999.990 ... L3 1999 12 08 13 49 52.7200 174.1000 40.00 117508 SHM 1999 11 29 00 38 4745-91 P co2 371.900 -999.990 ... L3 1999 12 08 14 03 52.7200 174.1000 40.00 117509 SHM 1999 11 29 00 38 4746-91 P co2 371.920 -999.990 ... L3 1999 12 08 14 16 52.7200 174.1000 40.00 117510 SHM 1999 12 05 23 54 317-91 P co2 374.760 -999.990 +.. L3 1999 12 28 09 10 52.7200 174.1000 40.00 117511 SHM 1999 12 05 23 54 318-91 P co2 373.550 -999.990 -.. L3 1999 12 28 09 24 52.7200 174.1000 40.00 117512 SHM 1999 12 13 01 18 109-98 P co2 371.220 -999.990 ... L3 1999 12 28 10 04 52.7200 174.1000 40.00 117513 SHM 1999 12 13 01 18 110-98 P co2 371.180 -999.990 ... L3 1999 12 28 10 18 52.7200 174.1000 40.00 117514 SHM 1999 12 20 01 04 4685-91 P co2 372.430 -999.990 ... L3 2000 01 11 14 36 52.7200 174.1000 40.00 117515 SHM 1999 12 20 01 04 4686-91 P co2 372.520 -999.990 ... L3 2000 01 11 14 50 52.7200 174.1000 40.00 117516 SHM 1999 12 27 00 46 12-98 P co2 371.710 -999.990 ... L3 2000 01 12 14 05 52.7200 174.1000 40.00 117517 SHM 2000 01 03 01 07 1065-91 P co2 372.380 -999.990 ... L3 2000 01 25 11 48 52.7200 174.1000 40.00 117518 SHM 2000 01 03 01 07 1066-91 P co2 372.430 -999.990 ... L3 2000 01 25 12 01 52.7200 174.1000 40.00 117519 SHM 2000 01 10 00 59 1865-91 P co2 371.700 -999.990 ... L3 2000 01 25 11 20 52.7200 174.1000 40.00 117520 SHM 2000 01 10 00 59 1866-91 P co2 371.680 -999.990 ... L3 2000 01 25 11 34 52.7200 174.1000 40.00 117521 SHM 2000 01 17 00 49 1125-91 P co2 371.690 -999.990 ... L3 2000 02 01 13 17 52.7200 174.1000 40.00 117522 SHM 2000 01 17 00 49 1126-91 P co2 371.700 -999.990 ... L3 2000 02 01 13 31 52.7200 174.1000 40.00 117523 SHM 2000 01 24 00 40 543-91 P co2 376.180 -999.990 ... L3 2000 02 01 11 43 52.7200 174.1000 40.00 117524 SHM 2000 01 24 00 40 544-91 P co2 376.050 -999.990 ... L3 2000 02 01 11 56 52.7200 174.1000 40.00 117525 SHM 2000 01 31 00 33 1939-91 P co2 374.310 -999.990 ... L3 2000 02 17 14 20 52.7200 174.1000 40.00 117526 SHM 2000 01 31 00 33 1940-91 P co2 374.390 -999.990 ... L3 2000 02 17 14 33 52.7200 174.1000 40.00 117527 SHM 2000 02 07 00 28 4069-91 P co2 375.170 -999.990 ... L3 2000 02 17 13 52 52.7200 174.1000 40.00 117528 SHM 2000 02 07 00 28 4070-91 P co2 375.080 -999.990 ... L3 2000 02 17 14 06 52.7200 174.1000 40.00 117529 SHM 2000 02 13 23 40 1027-91 P co2 374.710 -999.990 ... L3 2000 03 07 15 45 52.7200 174.1000 40.00 117530 SHM 2000 02 13 23 40 1028-91 P co2 374.690 -999.990 ... L3 2000 03 07 15 59 52.7200 174.1000 40.00 117531 SHM 2000 02 20 23 35 617-91 P co2 374.430 -999.990 ... L3 2000 03 07 15 18 52.7200 174.1000 40.00 117532 SHM 2000 02 20 23 35 618-91 P co2 374.380 -999.990 ... L3 2000 03 07 15 32 52.7200 174.1000 40.00 117533 SHM 2000 02 27 23 50 1697-91 P co2 376.130 -999.990 ... L3 2000 03 24 12 41 52.7200 174.1000 40.00 117534 SHM 2000 02 27 23 50 1698-91 P co2 375.910 -999.990 ... L3 2000 03 24 12 54 52.7200 174.1000 40.00 117535 SHM 2000 03 06 01 10 4773-91 P co2 375.060 -999.990 ... L3 2000 03 24 13 59 52.7200 174.1000 40.00 117536 SHM 2000 03 06 01 10 4774-91 P co2 375.120 -999.990 ... L3 2000 03 24 14 12 52.7200 174.1000 40.00 117537 SHM 2000 03 13 01 00 27-91 P co2 375.710 -999.990 ... L3 2000 03 28 15 07 52.7200 174.1000 40.00 117538 SHM 2000 03 13 01 00 28-91 P co2 375.320 -999.990 ... L3 2000 03 28 15 20 52.7200 174.1000 40.00 117539 SHM 2000 03 20 01 10 1815-91 P co2 377.600 -999.990 ... L3 2000 03 28 13 47 52.7200 174.1000 40.00 117540 SHM 2000 03 20 01 10 1816-91 P co2 377.560 -999.990 ... L3 2000 03 28 14 00 52.7200 174.1000 40.00 117541 SHM 2000 03 27 01 00 1219-91 P co2 375.670 -999.990 ... L3 2000 04 07 14 33 52.7200 174.1000 40.00 117542 SHM 2000 03 27 01 00 1220-91 P co2 375.670 -999.990 ... L3 2000 04 07 14 46 52.7200 174.1000 40.00 117543 SHM 2000 04 02 23 46 1573-91 P co2 376.350 -999.990 ... L3 2000 04 07 14 07 52.7200 174.1000 40.00 117544 SHM 2000 04 02 23 46 1574-91 P co2 376.420 -999.990 ... L3 2000 04 07 14 20 52.7200 174.1000 40.00 117545 SHM 2000 04 09 23 53 163-98 P co2 375.500 -999.990 ... L3 2000 04 27 12 29 52.7200 174.1000 40.00 117546 SHM 2000 04 09 23 53 164-98 P co2 375.510 -999.990 ... L3 2000 04 27 12 42 52.7200 174.1000 40.00 117547 SHM 2000 04 16 23 49 1935-91 P co2 375.890 -999.990 ... L3 2000 04 27 11 37 52.7200 174.1000 40.00 117548 SHM 2000 04 16 23 49 1936-91 P co2 375.830 -999.990 ... L3 2000 04 27 11 50 52.7200 174.1000 40.00 117549 SHM 2000 04 23 23 54 393-91 P co2 376.990 -999.990 -.. L3 2000 05 12 14 25 52.7200 174.1000 40.00 117550 SHM 2000 04 23 23 54 394-91 P co2 377.550 -999.990 +.. L3 2000 05 12 14 38 52.7200 174.1000 40.00 117551 SHM 2000 04 30 23 50 1239-91 P co2 380.260 -999.990 +.. L3 2000 05 12 13 05 52.7200 174.1000 40.00 117552 SHM 2000 04 30 23 50 1240-91 P co2 379.740 -999.990 -.. L3 2000 05 12 13 18 52.7200 174.1000 40.00 117553 SHM 2000 05 07 23 53 1179-91 P co2 376.390 -999.990 ... L3 2000 06 01 12 08 52.7200 174.1000 40.00 117554 SHM 2000 05 07 23 53 1180-91 P co2 376.350 -999.990 ... L3 2000 06 01 12 21 52.7200 174.1000 40.00 117555 SHM 2000 05 15 23 28 4559-91 P co2 374.920 -999.990 ... L3 2000 06 01 11 42 52.7200 174.1000 40.00 117556 SHM 2000 05 15 23 28 4560-91 P co2 374.930 -999.990 ... L3 2000 06 01 11 55 52.7200 174.1000 40.00 117557 SHM 2000 05 22 21 51 679-91 P co2 375.190 -999.990 ... L3 2000 06 22 14 59 52.7200 174.1000 40.00 117558 SHM 2000 05 22 21 51 680-91 P co2 375.270 -999.990 ... L3 2000 06 22 15 12 52.7200 174.1000 40.00 117559 SHM 2000 05 29 23 05 49-98 P co2 374.360 -999.990 ... L3 2000 06 22 13 39 52.7200 174.1000 40.00 117560 SHM 2000 05 29 23 05 50-98 P co2 374.440 -999.990 ... L3 2000 06 22 13 52 52.7200 174.1000 40.00 117561 SHM 2000 06 04 23 38 1057-91 P co2 373.530 -999.990 ... L3 2000 06 27 14 31 52.7200 174.1000 40.00 117562 SHM 2000 06 04 23 38 1058-91 P co2 373.040 -999.990 ... L3 2000 06 27 14 44 52.7200 174.1000 40.00 117563 SHM 2000 06 11 23 35 23-98 P co2 370.760 -999.990 ... L3 2000 06 27 14 05 52.7200 174.1000 40.00 117564 SHM 2000 06 11 23 35 24-98 P co2 370.800 -999.990 ... L3 2000 06 27 14 18 52.7200 174.1000 40.00 117565 SHM 2000 06 18 23 25 369-91 P co2 370.210 -999.990 ... L3 2000 06 30 12 55 52.7200 174.1000 40.00 117566 SHM 2000 06 18 23 25 370-91 P co2 370.310 -999.990 ... L3 2000 06 30 13 08 52.7200 174.1000 40.00 117567 SHM 2000 06 25 23 40 993-91 P co2 368.490 -999.990 ... L3 2000 06 30 12 29 52.7200 174.1000 40.00 117568 SHM 2000 06 25 23 40 994-91 P co2 368.430 -999.990 ... L3 2000 06 30 12 42 52.7200 174.1000 40.00 117569 SHM 2000 07 03 23 30 4573-91 P co2 368.240 -999.990 ... L3 2000 07 18 15 04 52.7200 174.1000 40.00 117570 SHM 2000 07 03 23 30 4574-91 P co2 367.880 -999.990 ... L3 2000 07 18 15 17 52.7200 174.1000 40.00 117571 SHM 2000 07 09 23 43 4163-91 P co2 365.800 -999.990 ... L3 2000 07 18 14 38 52.7200 174.1000 40.00 117572 SHM 2000 07 09 23 43 4164-91 P co2 365.630 -999.990 ... L3 2000 07 18 14 51 52.7200 174.1000 40.00 117573 SHM 2000 07 16 23 48 63-91 P co2 360.890 -999.990 ... L3 2000 08 09 12 42 52.7200 174.1000 40.00 117574 SHM 2000 07 16 23 48 64-91 P co2 360.820 -999.990 ... L3 2000 08 09 12 55 52.7200 174.1000 40.00 117575 SHM 2000 07 23 23 40 4449-91 P co2 359.720 -999.990 ... L3 2000 08 10 09 19 52.7200 174.1000 40.00 117576 SHM 2000 07 23 23 40 4450-91 P co2 359.430 -999.990 ... L3 2000 08 10 09 32 52.7200 174.1000 40.00 117577 SHM 2000 07 30 23 48 349-91 P co2 361.250 -999.990 ... L3 2000 08 21 09 37 52.7200 174.1000 40.00 117578 SHM 2000 07 30 23 48 350-91 P co2 360.890 -999.990 ... L3 2000 08 21 09 50 52.7200 174.1000 40.00 117579 SHM 2000 08 06 23 29 11-98 P co2 360.460 -999.990 ... L3 2000 08 21 08 45 52.7200 174.1000 40.00 117580 SHM 2000 08 06 23 29 12-98 P co2 360.480 -999.990 ... L3 2000 08 21 08 58 52.7200 174.1000 40.00 117581 SHM 2000 08 13 23 50 59-91 P co2 363.990 -999.990 +.. L3 2000 09 05 13 05 52.7200 174.1000 40.00 117582 SHM 2000 08 13 23 50 60-91 P co2 362.870 -999.990 -.. L3 2000 09 05 13 18 52.7200 174.1000 40.00 117583 SHM 2000 08 20 23 50 4531-91 P co2 365.720 -999.990 .X. L3 2000 09 05 12 39 52.7200 174.1000 40.00 117584 SHM 2000 08 20 23 50 4532-91 P co2 365.720 -999.990 .X. L3 2000 09 05 12 52 52.7200 174.1000 40.00 117585 SHM 2000 08 27 23 44 1087-91 P co2 359.270 -999.990 ... L3 2000 09 19 09 05 52.7200 174.1000 40.00 117586 SHM 2000 08 27 23 44 1088-91 P co2 359.320 -999.990 ... L3 2000 09 19 09 18 52.7200 174.1000 40.00 117587 SHM 2000 09 03 22 04 4967-91 P co2 359.310 -999.990 ... L3 2000 09 19 09 31 52.7200 174.1000 40.00 117588 SHM 2000 09 03 22 04 4968-91 P co2 359.160 -999.990 ... L3 2000 09 19 09 44 52.7200 174.1000 40.00 117589 SHM 2000 09 11 00 00 763-91 P co2 361.480 -999.990 -.. L3 2000 09 28 11 36 52.7200 174.1000 40.00 117590 SHM 2000 09 11 00 00 764-91 P co2 362.180 -999.990 +.. L3 2000 09 28 11 49 52.7200 174.1000 40.00 117591 SHM 2000 09 17 23 35 1865-91 P co2 362.770 -999.990 ... L3 2000 09 28 13 12 52.7200 174.1000 40.00 117592 SHM 2000 09 17 23 35 1866-91 P co2 362.750 -999.990 ... L3 2000 09 28 13 25 52.7200 174.1000 40.00 117593 SHM 2000 09 23 23 32 4215-91 P co2 363.680 -999.990 ... L3 2000 10 11 10 25 52.7200 174.1000 40.00 117594 SHM 2000 09 23 23 32 4216-91 P co2 363.760 -999.990 ... L3 2000 10 11 10 38 52.7200 174.1000 40.00 117595 SHM 2000 10 02 23 40 4681-91 P co2 366.280 -999.990 ... L3 2000 10 11 10 51 52.7200 174.1000 40.00 117596 SHM 2000 10 02 23 40 4682-91 P co2 366.260 -999.990 ... L3 2000 10 11 11 04 52.7200 174.1000 40.00 117597 SHM 2000 10 08 23 35 673-91 P co2 369.690 -999.990 -.. L3 2000 10 24 08 44 52.7200 174.1000 40.00 117598 SHM 2000 10 08 23 35 674-91 P co2 370.310 -999.990 +.. L3 2000 10 24 08 57 52.7200 174.1000 40.00 117599 SHM 2000 10 15 23 40 4061-91 P co2 367.340 -999.990 ... L3 2000 10 24 09 10 52.7200 174.1000 40.00 117600 SHM 2000 10 15 23 40 4062-91 P co2 367.140 -999.990 ... L3 2000 10 24 09 23 52.7200 174.1000 40.00 117601 SHM 2000 10 22 23 25 4623-91 P co2 369.130 -999.990 ... L3 2000 11 07 14 11 52.7200 174.1000 40.00 117602 SHM 2000 10 22 23 25 4624-91 P co2 369.130 -999.990 ... L3 2000 11 07 14 24 52.7200 174.1000 40.00 117603 SHM 2000 10 29 23 22 4589-91 P co2 375.820 -999.990 .X. L3 2000 11 07 14 37 52.7200 174.1000 40.00 117604 SHM 2000 10 29 23 22 4590-91 P co2 375.750 -999.990 .X. L3 2000 11 07 14 50 52.7200 174.1000 40.00 117605 SHM 2000 11 05 23 09 1139-91 P co2 374.830 -999.990 ... L3 2000 11 27 13 32 52.7200 174.1000 40.00 117606 SHM 2000 11 05 23 09 1140-91 P co2 374.810 -999.990 ... L3 2000 11 27 13 45 52.7200 174.1000 40.00 117607 SHM 2000 11 11 23 25 185-98 P co2 372.890 -999.990 ... L3 2000 11 27 13 59 52.7200 174.1000 40.00 117608 SHM 2000 11 11 23 25 186-98 P co2 372.850 -999.990 ... L3 2000 11 27 14 12 52.7200 174.1000 40.00 117609 SHM 2000 11 19 23 25 1007-91 P co2 373.190 -999.990 ... L3 2000 12 06 09 56 52.7200 174.1000 40.00 117610 SHM 2000 11 19 23 25 1008-91 P co2 372.990 -999.990 ... L3 2000 12 06 10 09 52.7200 174.1000 40.00 117611 SHM 2000 11 26 23 20 1699-91 P co2 374.350 -999.990 -.. L3 2000 12 06 10 22 52.7200 174.1000 40.00 117612 SHM 2000 11 26 23 20 1700-91 P co2 375.930 -999.990 +.. L3 2000 12 06 10 35 52.7200 174.1000 40.00 117613 SHM 2000 12 03 23 25 93-91 P co2 375.760 -999.990 +.. L3 2000 12 22 09 10 52.7200 174.1000 40.00 117614 SHM 2000 12 03 23 25 94-91 P co2 374.760 -999.990 -.. L3 2000 12 22 09 23 52.7200 174.1000 40.00 117615 SHM 2000 12 11 00 00 4123-91 P co2 373.100 -999.990 ... L3 2000 12 22 09 38 52.7200 174.1000 40.00 117616 SHM 2000 12 11 00 00 4124-91 P co2 373.090 -999.990 ... L3 2000 12 22 09 51 52.7200 174.1000 40.00 117617 SHM 2000 12 17 23 30 1863-91 P co2 374.370 -999.990 ... L3 2001 05 23 15 03 52.7200 174.1000 40.00 117618 SHM 2000 12 17 23 30 1864-91 P co2 374.320 -999.990 ... L3 2001 05 23 15 16 52.7200 174.1000 40.00 117619 SHM 2000 12 23 23 30 1327-91 P co2 331.570 -999.990 N.. L3 2001 05 31 11 53 52.7200 174.1000 40.00 117620 SHM 2000 12 23 23 45 4733-91 P co2 374.250 -999.990 ... L3 2001 01 11 13 25 52.7200 174.1000 40.00 117621 SHM 2000 12 23 23 45 4734-91 P co2 374.290 -999.990 ... L3 2001 01 11 13 38 52.7200 174.1000 40.00 117622 SHM 2000 12 31 23 30 1403-91 P co2 376.730 -999.990 ... L3 2001 01 11 14 43 52.7200 174.1000 40.00 117623 SHM 2000 12 31 23 30 1404-91 P co2 377.000 -999.990 ... L3 2001 01 11 14 57 52.7200 174.1000 40.00 117624 SHM 2001 01 07 23 30 4401-91 P co2 374.010 -999.990 ... L3 2001 01 26 11 15 52.7200 174.1000 40.00 117625 SHM 2001 01 07 23 30 4402-91 P co2 373.850 -999.990 ... L3 2001 01 26 11 28 52.7200 174.1000 40.00 117626 SHM 2001 01 14 22 15 529-91 P co2 374.860 -999.990 ... L3 2001 01 26 11 41 52.7200 174.1000 40.00 117627 SHM 2001 01 14 22 15 530-91 P co2 374.760 -999.990 ... L3 2001 01 26 11 54 52.7200 174.1000 40.00 117628 SHM 2001 01 22 00 10 4778-91 P co2 375.960 -999.990 ... L3 2001 02 09 11 25 52.7200 174.1000 40.00 117629 SHM 2001 01 28 23 50 4589-91 P co2 376.570 -999.990 ... L3 2001 02 08 13 54 52.7200 174.1000 40.00 117630 SHM 2001 01 28 23 50 4590-91 P co2 376.660 -999.990 ... L3 2001 02 08 14 07 52.7200 174.1000 40.00 117631 SHM 2001 02 05 00 20 4163-91 P co2 377.300 -999.990 ... L3 2001 02 15 09 10 52.7200 174.1000 40.00 117632 SHM 2001 02 05 00 20 4164-91 P co2 377.150 -999.990 ... L3 2001 02 15 09 23 52.7200 174.1000 40.00 117633 SHM 2001 02 18 23 35 927-91 P co2 378.460 -999.990 ... L3 2001 03 07 13 40 52.7200 174.1000 40.00 117634 SHM 2001 02 18 23 35 928-91 P co2 378.330 -999.990 ... L3 2001 03 07 13 54 52.7200 174.1000 40.00 117635 SHM 2001 02 26 00 00 4045-91 P co2 376.850 -999.990 ... L3 2001 03 07 13 14 52.7200 174.1000 40.00 117636 SHM 2001 02 26 00 00 4046-91 P co2 376.920 -999.990 ... L3 2001 03 07 13 27 52.7200 174.1000 40.00 117637 SHM 2001 03 04 23 30 4437-91 P co2 376.720 -999.990 ... L3 2001 03 22 13 57 52.7200 174.1000 40.00 117638 SHM 2001 03 04 23 30 4438-91 P co2 376.320 -999.990 ... L3 2001 03 22 14 10 52.7200 174.1000 40.00 117639 SHM 2001 03 11 23 37 1789-91 P co2 377.550 -999.990 ... L3 2001 03 23 10 28 52.7200 174.1000 40.00 117640 SHM 2001 03 11 23 37 1790-91 P co2 377.370 -999.990 ... L3 2001 03 23 10 41 52.7200 174.1000 40.00 117641 SHM 2001 03 18 23 35 2019-91 P co2 381.250 -999.990 .X. L3 2001 04 18 13 54 52.7200 174.1000 40.00 117642 SHM 2001 03 18 23 35 2020-91 P co2 381.240 -999.990 .X. L3 2001 04 18 14 07 52.7200 174.1000 40.00 117643 SHM 2001 03 25 23 35 1627-91 P co2 378.850 -999.990 ... L3 2001 04 18 14 20 52.7200 174.1000 40.00 117644 SHM 2001 03 25 23 35 1628-91 P co2 378.800 -999.990 ... L3 2001 04 18 14 33 52.7200 174.1000 40.00 117645 SHM 2001 04 01 23 32 4353-91 P co2 378.760 -999.990 ... L3 2001 04 26 11 54 52.7200 174.1000 40.00 117646 SHM 2001 04 01 23 32 4354-91 P co2 378.700 -999.990 ... L3 2001 04 26 12 07 52.7200 174.1000 40.00 117647 SHM 2001 04 08 23 36 4145-91 P co2 377.150 -999.990 ... L3 2001 04 26 12 46 52.7200 174.1000 40.00 117648 SHM 2001 04 08 23 36 4146-91 P co2 377.310 -999.990 ... L3 2001 04 26 12 59 52.7200 174.1000 40.00 117649 SHM 2001 04 15 23 40 4757-91 P co2 380.230 -999.990 ... L3 2001 05 23 13 17 52.7200 174.1000 40.00 117650 SHM 2001 04 15 23 40 4758-91 P co2 380.140 -999.990 ... L3 2001 05 23 13 30 52.7200 174.1000 40.00 117651 SHM 2001 04 22 23 45 1057-91 P co2 379.230 -999.990 ... L3 2001 05 23 14 37 52.7200 174.1000 40.00 117652 SHM 2001 04 22 23 45 1058-91 P co2 379.160 -999.990 ... L3 2001 05 23 14 50 52.7200 174.1000 40.00 117653 SHM 2001 04 29 23 20 1753-91 P co2 377.850 -999.990 ... L3 2001 05 18 11 59 52.7200 174.1000 40.00 117654 SHM 2001 04 29 23 20 1754-91 P co2 377.610 -999.990 ... L3 2001 05 18 12 12 52.7200 174.1000 40.00 117655 SHM 2001 05 06 23 30 193-91 P co2 377.210 -999.990 ... L3 2001 05 18 13 31 52.7200 174.1000 40.00 117656 SHM 2001 05 06 23 30 194-91 P co2 377.250 -999.990 ... L3 2001 05 18 13 44 52.7200 174.1000 40.00 117657 SHM 2001 05 13 23 30 1391-91 P co2 377.590 -999.990 ... L3 2001 06 04 09 57 52.7200 174.1000 40.00 117658 SHM 2001 05 13 23 30 1392-91 P co2 377.650 -999.990 ... L3 2001 06 04 10 10 52.7200 174.1000 40.00 117659 SHM 2001 05 20 23 34 4427-91 P co2 376.710 -999.990 ... L3 2001 06 01 15 20 52.7200 174.1000 40.00 117660 SHM 2001 05 20 23 34 4428-91 P co2 376.670 -999.990 ... L3 2001 06 01 15 33 52.7200 174.1000 40.00 117661 SHM 2001 05 27 23 45 1655-91 P co2 376.150 -999.990 ... L3 2001 06 25 15 10 52.7200 174.1000 40.00 117662 SHM 2001 05 27 23 45 1656-91 P co2 376.270 -999.990 ... L3 2001 06 25 15 23 52.7200 174.1000 40.00 117663 SHM 2001 06 03 23 35 673-91 P co2 374.990 -999.990 ... L3 2001 06 25 14 42 52.7200 174.1000 40.00 117664 SHM 2001 06 03 23 35 674-91 P co2 374.980 -999.990 ... L3 2001 06 25 14 55 52.7200 174.1000 40.00 117665 SHM 2001 06 17 23 30 1807-91 P co2 370.880 -999.990 ... L3 2001 07 16 13 28 52.7200 174.1000 40.00 117666 SHM 2001 06 17 23 30 1808-91 P co2 370.840 -999.990 ... L3 2001 07 16 13 41 52.7200 174.1000 40.00 117667 SHM 2001 06 27 23 32 4489-91 P co2 367.410 -999.990 ... L3 2001 07 16 13 02 52.7200 174.1000 40.00 117668 SHM 2001 06 27 23 32 4490-91 P co2 367.380 -999.990 ... L3 2001 07 16 13 15 52.7200 174.1000 40.00 117669 SHM 2001 07 04 23 39 1681-91 P co2 366.080 -999.990 ... L3 2001 08 14 10 46 52.7200 174.1000 40.00 117670 SHM 2001 07 04 23 39 1682-91 P co2 366.110 -999.990 ... L3 2001 08 14 10 59 52.7200 174.1000 40.00 117671 SHM 2001 07 09 00 00 427-91 P co2 366.080 -999.990 ... L3 2001 08 14 11 12 52.7200 174.1000 40.00 117672 SHM 2001 07 09 00 00 428-91 P co2 365.860 -999.990 ... L3 2001 08 14 11 25 52.7200 174.1000 40.00 117673 SHM 2001 07 14 23 27 75-91 P co2 365.000 -999.990 ... L3 2001 08 09 15 51 52.7200 174.1000 40.00 117674 SHM 2001 07 14 23 27 76-91 P co2 364.850 -999.990 ... L3 2001 08 09 16 04 52.7200 174.1000 40.00 117675 SHM 2001 07 22 23 30 4321-91 P co2 362.240 -999.990 ... L3 2001 08 09 15 24 52.7200 174.1000 40.00 117676 SHM 2001 07 22 23 30 4322-91 P co2 362.120 -999.990 ... L3 2001 08 09 15 37 52.7200 174.1000 40.00 117677 SHM 2001 07 29 23 30 501-91 P co2 359.830 -999.990 ... L3 2001 08 21 09 27 52.7200 174.1000 40.00 117678 SHM 2001 07 29 23 30 502-91 P co2 359.870 -999.990 ... L3 2001 08 21 09 40 52.7200 174.1000 40.00 117679 SHM 2001 08 05 23 40 4439-91 P co2 360.090 -999.990 ... L3 2001 08 21 09 53 52.7200 174.1000 40.00 117680 SHM 2001 08 05 23 40 4440-91 P co2 360.080 -999.990 ... L3 2001 08 21 10 06 52.7200 174.1000 40.00 117681 SHM 2001 08 12 22 58 1245-91 P co2 358.710 -999.990 ... L3 2001 08 30 10 58 52.7200 174.1000 40.00 117682 SHM 2001 08 12 22 58 1246-91 P co2 358.920 -999.990 ... L3 2001 08 30 11 11 52.7200 174.1000 40.00 117683 SHM 2001 08 19 23 30 1313-91 P co2 359.050 -999.990 ... L3 2001 08 30 11 24 52.7200 174.1000 40.00 117684 SHM 2001 08 19 23 30 1314-91 P co2 358.800 -999.990 ... L3 2001 08 30 11 37 52.7200 174.1000 40.00 117685 SHM 2001 08 26 23 30 4429-91 P co2 361.980 -999.990 ... L3 2001 09 25 17 02 52.7200 174.1000 40.00 117686 SHM 2001 08 26 23 30 4430-91 P co2 362.110 -999.990 ... L3 2001 09 25 17 15 52.7200 174.1000 40.00 117687 SHM 2001 09 02 23 20 1426-91 P co2 362.400 -999.990 ... L3 2001 09 25 16 46 52.7200 174.1000 40.00 117688 SHM 2001 09 09 23 30 4751-91 P co2 363.690 -999.990 ... L3 2001 09 26 12 50 52.7200 174.1000 40.00 117689 SHM 2001 09 09 23 30 4752-91 P co2 363.610 -999.990 ... L3 2001 09 26 13 03 52.7200 174.1000 40.00 117690 SHM 2001 09 16 23 21 4645-91 P co2 363.580 -999.990 ... L3 2001 09 26 13 19 52.7200 174.1000 40.00 117691 SHM 2001 09 16 23 21 4646-91 P co2 363.380 -999.990 ... L3 2001 09 26 13 32 52.7200 174.1000 40.00 117692 SHM 2001 09 24 00 00 349-99 P co2 365.950 -999.990 ... L3 2001 10 22 10 55 52.7200 174.1000 40.00 117693 SHM 2001 09 24 00 00 350-99 P co2 366.000 -999.990 ... L3 2001 10 22 11 08 52.7200 174.1000 40.00 117694 SHM 2001 09 30 23 38 225-99 P co2 367.830 -999.990 ... L3 2001 10 22 11 21 52.7200 174.1000 40.00 117695 SHM 2001 09 30 23 38 226-99 P co2 367.920 -999.990 ... L3 2001 10 22 11 34 52.7200 174.1000 40.00 117696 SHM 2001 10 07 23 31 1093-91 P co2 369.130 -999.990 ... L3 2001 11 02 10 26 52.7200 174.1000 40.00 117697 SHM 2001 10 07 23 31 1094-91 P co2 369.030 -999.990 ... L3 2001 11 02 10 39 52.7200 174.1000 40.00 117698 SHM 2001 10 15 03 02 449-99 P co2 369.030 -999.990 ... L3 2001 11 02 10 00 52.7200 174.1000 40.00 117699 SHM 2001 10 15 03 02 450-99 P co2 369.080 -999.990 ... L3 2001 11 02 10 13 52.7200 174.1000 40.00 117700 SHM 2001 10 21 23 25 965-91 P co2 371.720 -999.990 ... L3 2001 11 14 12 26 52.7200 174.1000 40.00 117701 SHM 2001 10 21 23 25 966-91 P co2 371.650 -999.990 ... L3 2001 11 14 12 39 52.7200 174.1000 40.00 117702 SHM 2001 10 28 23 35 499-91 P co2 375.810 -999.990 ... L3 2001 11 14 12 00 52.7200 174.1000 40.00 117703 SHM 2001 10 28 23 35 500-91 P co2 375.740 -999.990 ... L3 2001 11 14 12 13 52.7200 174.1000 40.00 117704 SHM 2001 11 06 22 45 479-99 P co2 375.150 -999.990 ... L3 2001 12 06 11 22 52.7200 174.1000 40.00 117705 SHM 2001 11 06 22 45 480-99 P co2 375.150 -999.990 ... L3 2001 12 06 11 36 52.7200 174.1000 40.00 117706 SHM 2001 11 12 23 45 481-99 P co2 372.640 -999.990 ... L3 2001 12 06 11 49 52.7200 174.1000 40.00 117707 SHM 2001 11 12 23 45 482-99 P co2 372.550 -999.990 ... L3 2001 12 06 12 02 52.7200 174.1000 40.00 117708 SHM 2001 11 18 23 46 853-91 P co2 375.290 -999.990 ... L3 2001 12 18 12 25 52.7200 174.1000 40.00 117709 SHM 2001 11 18 23 46 854-91 P co2 375.270 -999.990 ... L3 2001 12 18 12 38 52.7200 174.1000 40.00 117710 SHM 2001 11 25 23 27 1919-91 P co2 377.540 -999.990 +.. L3 2001 12 14 16 07 52.7200 174.1000 40.00 117711 SHM 2001 11 25 23 27 1920-91 P co2 376.070 -999.990 -.. L3 2001 12 14 16 20 52.7200 174.1000 40.00 117712 SHM 2001 12 06 00 20 1083-91 P co2 375.440 -999.990 ... L3 2001 12 28 13 20 52.7200 174.1000 40.00 117713 SHM 2001 12 06 00 20 1084-91 P co2 375.440 -999.990 ... L3 2001 12 28 13 33 52.7200 174.1000 40.00 117714 SHM 2001 12 09 23 30 4339-91 P co2 375.210 -999.990 ... L3 2001 12 28 13 46 52.7200 174.1000 40.00 117715 SHM 2001 12 09 23 30 4340-91 P co2 375.150 -999.990 ... L3 2001 12 28 13 59 52.7200 174.1000 40.00 117716 SHM 2001 12 17 23 55 1629-91 P co2 376.500 -999.990 ... L3 2002 01 17 15 55 52.7200 174.1000 40.00 117717 SHM 2001 12 17 23 55 1630-91 P co2 376.650 -999.990 ... L3 2002 01 17 16 08 52.7200 174.1000 40.00 117718 SHM 2001 12 24 23 30 215-91 P co2 376.370 -999.990 ... L3 2002 01 17 15 17 52.7200 174.1000 40.00 117719 SHM 2001 12 24 23 30 216-91 P co2 376.660 -999.990 ... L3 2002 01 17 15 30 52.7200 174.1000 40.00 117720 SHM 2001 12 30 23 00 4141-91 P co2 378.280 -999.990 +.. L3 2002 01 22 17 13 52.7200 174.1000 40.00 117721 SHM 2001 12 30 23 00 4142-91 P co2 377.030 -999.990 -.. L3 2002 01 22 17 26 52.7200 174.1000 40.00 117722 SHM 2002 01 06 23 20 111-91 P co2 376.930 -999.990 ... L3 2002 01 24 09 56 52.7200 174.1000 40.00 117723 SHM 2002 01 06 23 20 112-91 P co2 377.320 -999.990 ... L3 2002 01 24 10 09 52.7200 174.1000 40.00 117724 SHM 2002 01 13 23 18 577-91 P co2 376.860 -999.990 ... L3 2002 01 24 14 34 52.7200 174.1000 40.00 117725 SHM 2002 01 13 23 18 578-91 P co2 376.830 -999.990 ... L3 2002 01 24 14 47 52.7200 174.1000 40.00 117726 SHM 2002 01 20 23 21 2023-91 P co2 376.590 -999.990 ... L3 2002 02 20 11 14 52.7200 174.1000 40.00 117727 SHM 2002 01 20 23 21 2024-91 P co2 376.610 -999.990 ... L3 2002 02 20 11 27 52.7200 174.1000 40.00 117728 SHM 2002 01 26 23 23 4399-91 P co2 377.950 -999.990 ... L3 2002 02 20 12 34 52.7200 174.1000 40.00 117729 SHM 2002 01 26 23 23 4400-91 P co2 377.970 -999.990 ... L3 2002 02 20 12 47 52.7200 174.1000 40.00 117730 SHM 2002 02 03 23 40 1245-91 P co2 377.980 -999.990 ... L3 2002 03 19 12 17 52.7200 174.1000 40.00 117731 SHM 2002 02 03 23 40 1246-91 P co2 377.830 -999.990 ... L3 2002 03 19 12 30 52.7200 174.1000 40.00 117732 SHM 2002 02 17 23 35 485-91 P co2 377.100 -999.990 ... L3 2002 03 25 13 00 52.7200 174.1000 40.00 117733 SHM 2002 02 17 23 35 486-91 P co2 377.240 -999.990 ... L3 2002 03 25 13 13 52.7200 174.1000 40.00 117734 SHM 2002 02 25 00 01 2047-91 P co2 377.850 -999.990 ... L3 2002 03 25 11 32 52.7200 174.1000 40.00 117735 SHM 2002 03 10 12 34 4169-91 P co2 379.060 -999.990 ... L3 2002 03 27 15 05 52.7200 174.1000 40.00 117736 SHM 2002 03 10 12 34 4170-91 P co2 379.190 -999.990 ... L3 2002 03 27 15 18 52.7200 174.1000 40.00 117737 SHM 2002 03 18 22 20 625-91 P co2 381.590 -999.990 ... L3 2002 03 27 13 47 52.7200 174.1000 40.00 117738 SHM 2002 03 18 22 20 626-91 P co2 381.420 -999.990 ... L3 2002 03 27 14 00 52.7200 174.1000 40.00 117739 SHM 2002 04 01 00 01 4031-91 P co2 379.490 -999.990 ... L3 2002 04 19 14 04 52.7200 174.1000 40.00 117740 SHM 2002 04 01 00 01 4032-91 P co2 379.560 -999.990 ... L3 2002 04 19 14 17 52.7200 174.1000 40.00 117741 SHM 2002 04 08 01 20 1467-91 P co2 379.950 -999.990 ... L3 2002 04 19 14 32 52.7200 174.1000 40.00 117742 SHM 2002 04 08 01 20 1468-91 P co2 379.920 -999.990 ... L3 2002 04 19 14 45 52.7200 174.1000 40.00 117743 SHM 2002 04 15 00 40 1577-91 P co2 381.370 -999.990 ... L3 2002 05 13 10 18 52.7200 174.1000 40.00 117744 SHM 2002 04 15 00 40 1578-91 P co2 381.560 -999.990 ... L3 2002 05 13 10 31 52.7200 174.1000 40.00 117745 SHM 2002 04 23 00 30 4159-91 P co2 380.800 -999.990 +.. L3 2002 05 09 16 43 52.7200 174.1000 40.00 117746 SHM 2002 04 23 00 30 4160-91 P co2 379.940 -999.990 -.. L3 2002 05 09 16 56 52.7200 174.1000 40.00 117747 SHM 2002 04 28 23 30 1217-91 P co2 379.690 -999.990 ... L3 2002 05 23 14 45 52.7200 174.1000 40.00 117748 SHM 2002 04 28 23 30 1218-91 P co2 379.630 -999.990 ... L3 2002 05 23 14 58 52.7200 174.1000 40.00 117749 SHM 2002 05 05 23 30 4281-91 P co2 379.550 -999.990 ... L3 2002 05 23 16 03 52.7200 174.1000 40.00 117750 SHM 2002 05 05 23 30 4282-91 P co2 379.580 -999.990 ... L3 2002 05 23 16 16 52.7200 174.1000 40.00 117751 SHM 2002 05 13 00 01 1711-91 P co2 384.550 -999.990 .X. L3 2002 05 31 12 52 52.7200 174.1000 40.00 117752 SHM 2002 05 13 00 01 1712-91 P co2 384.300 -999.990 .X. L3 2002 05 31 13 05 52.7200 174.1000 40.00 117753 SHM 2002 05 20 00 28 285-99 P co2 378.060 -999.990 ... L3 2002 05 31 13 37 52.7200 174.1000 40.00 117754 SHM 2002 05 20 00 28 286-99 P co2 378.210 -999.990 ... L3 2002 05 31 13 50 52.7200 174.1000 40.00 117755 SHM 2002 06 02 23 30 1483-91 P co2 376.780 -999.990 ... L3 2002 07 01 16 17 52.7200 174.1000 40.00 117756 SHM 2002 06 02 23 30 1484-91 P co2 376.630 -999.990 ... L3 2002 07 01 16 30 52.7200 174.1000 40.00 117757 SHM 2002 06 09 23 15 571-99 P co2 376.360 -999.990 +.. L3 2002 07 01 15 51 52.7200 174.1000 40.00 117758 SHM 2002 06 09 23 15 572-99 P co2 375.630 -999.990 -.. L3 2002 07 01 16 04 52.7200 174.1000 40.00 117759 SHM 2002 06 16 23 21 4059-91 P co2 371.630 -999.990 ... L3 2002 07 08 10 23 52.7200 174.1000 40.00 117760 SHM 2002 06 23 23 20 4337-91 P co2 372.280 -999.990 ... L3 2002 07 05 14 14 52.7200 174.1000 40.00 117761 SHM 2002 06 23 23 20 4338-91 P co2 371.930 -999.990 ... L3 2002 07 05 14 27 52.7200 174.1000 40.00 117762 SHM 2002 06 30 23 30 1569-91 P co2 368.600 -999.990 ... L3 2002 07 10 11 39 52.7200 174.1000 40.00 117763 SHM 2002 06 30 23 30 1570-91 P co2 368.600 -999.990 ... L3 2002 07 10 11 52 52.7200 174.1000 40.00 117764 SHM 2002 07 07 22 31 63-91 P co2 369.120 -999.990 ... L3 2002 07 26 13 54 52.7200 174.1000 40.00 117765 SHM 2002 07 07 22 31 64-91 P co2 368.970 -999.990 ... L3 2002 07 26 14 07 52.7200 174.1000 40.00 117766 SHM 2002 07 14 23 20 4389-91 P co2 368.490 -999.990 ... L3 2002 07 26 14 20 52.7200 174.1000 40.00 117767 SHM 2002 07 14 23 20 4390-91 P co2 368.330 -999.990 ... L3 2002 07 26 14 33 52.7200 174.1000 40.00 117768 SHM 2002 07 21 23 25 1860-91 P co2 363.890 -999.990 ... L3 2002 08 06 10 14 52.7200 174.1000 40.00 117769 SHM 2002 07 21 23 25 581-99 P co2 364.000 -999.990 ... L3 2002 08 06 10 01 52.7200 174.1000 40.00 117770 SHM 2002 07 28 23 25 1859-91 P co2 367.020 -999.990 ... L3 2002 08 06 09 35 52.7200 174.1000 40.00 117771 SHM 2002 07 28 23 25 582-99 P co2 366.860 -999.990 ... L3 2002 08 06 09 48 52.7200 174.1000 40.00 117772 SHM 2002 08 04 23 30 61-99 P co2 362.140 -999.990 ... L3 2002 08 20 15 30 52.7200 174.1000 40.00 117773 SHM 2002 08 04 23 30 62-99 P co2 362.060 -999.990 ... L3 2002 08 20 15 43 52.7200 174.1000 40.00 117774 SHM 2002 08 11 23 30 263-99 P co2 364.220 -999.990 ... L3 2002 08 20 16 03 52.7200 174.1000 40.00 117775 SHM 2002 08 11 23 30 264-99 P co2 364.070 -999.990 ... L3 2002 08 20 16 17 52.7200 174.1000 40.00 117776 SHM 2002 08 18 23 35 587-99 P co2 369.030 -999.990 .X. L3 2002 09 09 13 40 52.7200 174.1000 40.00 117777 SHM 2002 08 18 23 35 588-99 P co2 368.800 -999.990 .X. L3 2002 09 09 13 53 52.7200 174.1000 40.00 117778 SHM 2002 08 20 23 30 171-98 P co2 363.160 -999.990 ... L3 2002 09 09 14 06 52.7200 174.1000 40.00 117779 SHM 2002 08 20 23 30 172-98 P co2 363.090 -999.990 ... L3 2002 09 09 14 19 52.7200 174.1000 40.00 117780 SHM 2002 09 01 23 35 767-91 P co2 363.550 -999.990 ... L3 2002 09 20 14 39 52.7200 174.1000 40.00 117781 SHM 2002 09 01 23 35 768-91 P co2 363.440 -999.990 ... L3 2002 09 20 14 52 52.7200 174.1000 40.00 117782 SHM 2002 09 08 23 45 2039-91 P co2 362.520 -999.990 .X. L3 2002 09 20 14 13 52.7200 174.1000 40.00 117783 SHM 2002 09 08 23 45 2040-91 P co2 362.660 -999.990 .X. L3 2002 09 20 14 26 52.7200 174.1000 40.00 117784 SHM 2002 09 18 00 00 269-91 P co2 368.390 -999.990 ... L3 2002 10 01 11 47 52.7200 174.1000 40.00 117785 SHM 2002 09 18 00 00 270-91 P co2 368.440 -999.990 ... L3 2002 10 01 12 00 52.7200 174.1000 40.00 117786 SHM 2002 09 22 23 25 549-91 P co2 370.810 -999.990 ... L3 2002 10 01 12 13 52.7200 174.1000 40.00 117787 SHM 2002 09 22 23 25 550-91 P co2 370.580 -999.990 ... L3 2002 10 01 12 26 52.7200 174.1000 40.00 117788 SHM 2002 09 29 23 20 409-91 P co2 373.230 -999.990 .X. L3 2002 10 23 11 37 52.7200 174.1000 40.00 117789 SHM 2002 09 29 23 20 410-91 P co2 373.260 -999.990 .X. L3 2002 10 23 11 50 52.7200 174.1000 40.00 117790 SHM 2002 10 06 23 25 233-99 P co2 370.260 -999.990 ... L3 2002 10 23 12 03 52.7200 174.1000 40.00 117791 SHM 2002 10 06 23 25 234-99 P co2 370.220 -999.990 ... L3 2002 10 23 12 16 52.7200 174.1000 40.00 117792 SHM 2002 10 13 23 30 369-99 P co2 373.480 -999.990 ... L3 2002 10 29 14 25 52.7200 174.1000 40.00 117793 SHM 2002 10 13 23 30 370-99 P co2 373.500 -999.990 ... L3 2002 10 29 14 38 52.7200 174.1000 40.00 117794 SHM 2002 10 20 23 30 25-91 P co2 371.540 -999.990 ... L3 2002 10 29 15 43 52.7200 174.1000 40.00 117795 SHM 2002 10 20 23 30 26-91 P co2 371.680 -999.990 ... L3 2002 10 29 15 56 52.7200 174.1000 40.00 117796 SHM 2002 10 27 23 41 421-91 P co2 373.180 -999.990 ... L3 2002 11 18 11 52 52.7200 174.1000 40.00 117797 SHM 2002 10 27 23 41 422-91 P co2 373.400 -999.990 ... L3 2002 11 18 12 05 52.7200 174.1000 40.00 117798 SHM 2002 11 03 23 33 1407-91 P co2 375.970 -999.990 ... L3 2002 11 18 14 31 52.7200 174.1000 40.00 117799 SHM 2002 11 03 23 33 1408-91 P co2 375.960 -999.990 ... L3 2002 11 18 14 44 52.7200 174.1000 40.00 117800 SHM 2002 11 10 23 30 353-99 P co2 333.150 -999.990 N.. L3 2002 11 27 14 56 52.7200 174.1000 40.00 117801 SHM 2002 11 10 23 30 4277-91 P co2 376.770 -999.990 +.. L3 2002 11 27 13 21 52.7200 174.1000 40.00 117802 SHM 2002 11 10 23 30 4278-91 P co2 376.670 -999.990 ... L3 2002 11 27 13 34 52.7200 174.1000 40.00 117803 SHM 2002 11 18 00 25 515-99 P co2 376.030 -999.990 -.. L3 2002 12 03 13 28 52.7200 174.1000 40.00 117804 SHM 2002 11 18 00 25 516-99 P co2 376.860 -999.990 +.. L3 2002 12 03 13 41 52.7200 174.1000 40.00 117805 SHM 2002 11 24 23 30 311-91 P co2 374.450 -999.990 ... L3 2002 12 03 13 54 52.7200 174.1000 40.00 117806 SHM 2002 11 24 23 30 312-91 P co2 374.590 -999.990 ... L3 2002 12 03 14 08 52.7200 174.1000 40.00 117807 SHM 2002 12 02 23 30 219-99 P co2 376.190 -999.990 ... L3 2003 01 06 12 20 52.7200 174.1000 40.00 117808 SHM 2002 12 02 23 30 220-99 P co2 376.260 -999.990 ... L3 2003 01 06 12 33 52.7200 174.1000 40.00 117809 SHM 2002 12 08 23 25 4795-91 P co2 379.140 -999.990 ... L3 2003 01 06 14 32 52.7200 174.1000 40.00 117810 SHM 2002 12 08 23 25 4796-91 P co2 378.870 -999.990 ... L3 2003 01 06 14 45 52.7200 174.1000 40.00 117811 SHM 2002 12 15 23 30 191-91 P co2 378.910 -999.990 +.. L3 2003 01 29 15 30 52.7200 174.1000 40.00 117812 SHM 2002 12 15 23 30 192-91 P co2 377.720 -999.990 -.. L3 2003 01 29 15 43 52.7200 174.1000 40.00 117813 SHM 2002 12 22 23 30 1681-91 P co2 377.450 -999.990 ... L3 2003 01 29 14 12 52.7200 174.1000 40.00 117814 SHM 2002 12 22 23 30 1682-91 P co2 377.460 -999.990 ... L3 2003 01 29 14 25 52.7200 174.1000 40.00 117815 SHM 2002 12 29 23 30 1711-91 P co2 378.450 -999.990 ... L3 2003 02 06 13 19 52.7200 174.1000 40.00 117816 SHM 2002 12 29 23 30 1712-91 P co2 378.460 -999.990 ... L3 2003 02 06 13 32 52.7200 174.1000 40.00 117817 SHM 2003 01 06 23 30 247-99 P co2 378.610 -999.990 +.. L3 2003 02 06 14 39 52.7200 174.1000 40.00 117818 SHM 2003 01 06 23 30 248-99 P co2 377.690 -999.990 -.. L3 2003 02 06 14 52 52.7200 174.1000 40.00 117819 SHM 2003 01 12 23 50 605-99 P co2 380.390 -999.990 ... L3 2003 02 06 15 05 52.7200 174.1000 40.00 117820 SHM 2003 01 12 23 50 606-99 P co2 380.410 -999.990 ... L3 2003 02 06 15 18 52.7200 174.1000 40.00 117821 SHM 2003 01 19 23 58 29-91 P co2 379.090 -999.990 ... L3 2003 02 06 14 13 52.7200 174.1000 40.00 117822 SHM 2003 01 19 23 58 30-91 P co2 378.620 -999.990 ... L3 2003 02 06 14 26 52.7200 174.1000 40.00 117823 SHM 2003 01 26 23 40 579-99 P co2 378.790 -999.990 ... L3 2003 03 04 12 14 52.7200 174.1000 40.00 117824 SHM 2003 01 26 23 40 580-99 P co2 378.910 -999.990 ... L3 2003 03 04 12 27 52.7200 174.1000 40.00 117825 SHM 2003 02 03 23 30 87-99 P co2 379.940 -999.990 -.. L3 2003 03 04 12 41 52.7200 174.1000 40.00 117826 SHM 2003 02 03 23 30 88-99 P co2 380.450 -999.990 +.. L3 2003 03 04 12 54 52.7200 174.1000 40.00 117827 SHM 2003 02 09 23 59 653-99 P co2 380.880 -999.990 ... L3 2003 03 17 12 32 52.7200 174.1000 40.00 117828 SHM 2003 02 09 23 59 654-99 P co2 380.630 -999.990 ... L3 2003 03 17 12 45 52.7200 174.1000 40.00 117829 SHM 2003 02 17 23 45 1949-91 P co2 380.200 -999.990 ... L3 2003 03 17 14 48 52.7200 174.1000 40.00 117830 SHM 2003 02 17 23 45 1950-91 P co2 380.300 -999.990 ... L3 2003 03 17 15 01 52.7200 174.1000 40.00 117831 SHM 2003 02 24 23 00 850-99 P co2 383.070 -999.990 ... L3 2003 03 21 15 28 52.7200 174.1000 40.00 117832 SHM 2003 02 24 23 00 851-99 P co2 383.000 -999.990 ... L3 2003 03 21 15 41 52.7200 174.1000 40.00 117833 SHM 2003 03 02 23 00 849-99 P co2 381.300 -999.990 ... L3 2003 03 21 15 15 52.7200 174.1000 40.00 117834 SHM 2003 03 02 23 00 852-99 P co2 380.870 -999.990 ... L3 2003 03 21 15 02 52.7200 174.1000 40.00 117835 SHM 2003 03 10 00 00 1113-99 P co2 381.330 -999.990 ... L3 2003 04 02 16 55 52.7200 174.1000 40.00 117836 SHM 2003 03 10 00 00 1114-99 P co2 381.350 -999.990 ... L3 2003 04 02 17 08 52.7200 174.1000 40.00 117837 SHM 2003 03 16 23 30 479-99 P co2 380.000 -999.990 ... L3 2003 04 03 09 48 52.7200 174.1000 40.00 117838 SHM 2003 03 16 23 30 480-99 P co2 379.870 -999.990 ... L3 2003 04 03 10 01 52.7200 174.1000 40.00 117839 SHM 2003 03 23 23 30 4881-91 P co2 380.620 -999.990 ... L3 2003 04 17 17 10 52.7200 174.1000 40.00 117840 SHM 2003 03 31 00 00 91-91 P co2 382.110 -999.990 ... L3 2003 04 15 13 02 52.7200 174.1000 40.00 117841 SHM 2003 03 31 00 00 92-91 P co2 382.180 -999.990 ... L3 2003 04 15 13 15 52.7200 174.1000 40.00 117842 SHM 2003 04 08 23 30 1797-91 P co2 383.310 -999.990 ... L3 2003 05 06 16 04 52.7200 174.1000 40.00 117843 SHM 2003 04 08 23 30 1798-91 P co2 383.140 -999.990 ... L3 2003 05 06 16 17 52.7200 174.1000 40.00 117844 SHM 2003 04 13 23 30 1753-91 P co2 383.330 -999.990 ... L3 2003 05 07 08 33 52.7200 174.1000 40.00 117845 SHM 2003 04 13 23 30 1754-91 P co2 383.380 -999.990 ... L3 2003 05 07 08 46 52.7200 174.1000 40.00 117846 SHM 2003 04 20 23 05 1343-91 P co2 382.370 -999.990 ... L3 2003 05 15 14 15 52.7200 174.1000 40.00 117847 SHM 2003 04 20 23 05 1344-91 P co2 382.110 -999.990 ... L3 2003 05 15 14 28 52.7200 174.1000 40.00 117848 SHM 2003 04 27 23 34 49-98 P co2 384.550 -999.990 ... L3 2003 05 15 14 41 52.7200 174.1000 40.00 117849 SHM 2003 04 27 23 34 50-98 P co2 384.590 -999.990 ... L3 2003 05 15 14 54 52.7200 174.1000 40.00 117850 SHM 2003 05 06 00 20 1029-99 P co2 383.310 -999.990 ... L3 2003 06 10 14 00 52.7200 174.1000 40.00 117851 SHM 2003 05 06 00 20 1030-99 P co2 383.360 -999.990 ... L3 2003 06 10 14 13 52.7200 174.1000 40.00 117852 SHM 2003 05 12 00 00 93-99 P co2 383.800 -999.990 -.. L3 2003 06 10 14 26 52.7200 174.1000 40.00 117853 SHM 2003 05 12 00 00 94-99 P co2 388.240 -999.990 +.. L3 2003 06 10 14 39 52.7200 174.1000 40.00 117854 SHM 2003 05 19 00 25 1383-99 P co2 382.280 -999.990 ... L3 2003 06 11 15 01 52.7200 174.1000 40.00 117855 SHM 2003 05 19 00 25 1384-99 P co2 382.170 -999.990 ... L3 2003 06 11 15 14 52.7200 174.1000 40.00 117856 SHM 2003 05 25 23 40 1385-99 P co2 381.850 -999.990 ... L3 2003 06 11 15 50 52.7200 174.1000 40.00 117857 SHM 2003 05 25 23 40 1386-99 P co2 382.220 -999.990 ... L3 2003 06 11 16 03 52.7200 174.1000 40.00 117858 SHM 2003 06 02 23 59 1175-99 P co2 381.700 -999.990 +.. L3 2003 07 03 09 15 52.7200 174.1000 40.00 117859 SHM 2003 06 02 23 59 1176-99 P co2 380.040 -999.990 -.. L3 2003 07 03 09 28 52.7200 174.1000 40.00 117860 SHM 2003 06 08 23 00 1177-99 P co2 378.670 -999.990 ... L3 2003 07 03 09 41 52.7200 174.1000 40.00 117861 SHM 2003 06 08 23 00 1178-99 P co2 378.800 -999.990 ... L3 2003 07 03 09 54 52.7200 174.1000 40.00 117862 SHM 2003 06 15 23 25 4203-91 P co2 376.380 -999.990 -.. L3 2003 07 30 11 42 52.7200 174.1000 40.00 117863 SHM 2003 06 15 23 25 4204-91 P co2 377.090 -999.990 +.. L3 2003 07 30 11 55 52.7200 174.1000 40.00 117864 SHM 2003 06 23 01 00 4605-91 P co2 376.800 -999.990 ... L3 2003 07 30 12 09 52.7200 174.1000 40.00 117865 SHM 2003 06 23 01 00 4606-91 P co2 376.840 -999.990 ... L3 2003 07 30 12 22 52.7200 174.1000 40.00 117866 SHM 2003 06 29 23 59 1503-99 P co2 372.920 -999.990 +.. L3 2003 07 31 12 49 52.7200 174.1000 40.00 117867 SHM 2003 06 29 23 59 1504-99 P co2 372.250 -999.990 -.. L3 2003 07 31 13 02 52.7200 174.1000 40.00 117868 SHM 2003 07 06 23 45 1505-99 P co2 371.270 -999.990 ... L3 2003 07 31 12 21 52.7200 174.1000 40.00 117869 SHM 2003 07 06 23 45 1506-99 P co2 371.200 -999.990 ... L3 2003 07 31 12 34 52.7200 174.1000 40.00 117870 SHM 2003 07 13 23 59 1509-99 P co2 369.370 -999.990 ... L3 2003 08 22 15 59 52.7200 174.1000 40.00 117871 SHM 2003 07 20 23 45 1507-99 P co2 368.620 -999.990 ... L3 2003 08 20 11 19 52.7200 174.1000 40.00 117872 SHM 2003 07 20 23 45 1508-99 P co2 368.550 -999.990 ... L3 2003 08 20 11 32 52.7200 174.1000 40.00 117873 SHM 2003 07 28 00 39 6797-66 P co2 367.190 -999.990 ... L3 2003 08 19 16 03 52.7200 174.1000 40.00 117874 SHM 2003 07 29 12 16 6249-66 P co2 370.370 -999.990 +.. L3 2003 08 19 10 07 52.7200 174.1000 40.00 117875 SHM 2003 07 29 12 16 6250-66 P co2 368.550 -999.990 -.. L3 2003 08 19 10 20 52.7200 174.1000 40.00 117876 SHM 2003 08 03 23 59 269-99 P co2 367.930 -999.990 ... L3 2003 09 23 13 21 52.7200 174.1000 40.00 117877 SHM 2003 08 03 23 59 270-99 P co2 367.820 -999.990 ... L3 2003 09 23 13 34 52.7200 174.1000 40.00 117878 SHM 2003 08 12 12 15 525-91 P co2 371.090 -999.990 +.. L3 2003 09 17 19 06 52.7200 174.1000 40.00 117879 SHM 2003 08 12 12 15 526-91 P co2 370.360 -999.990 -.. L3 2003 09 17 19 19 52.7200 174.1000 40.00 117880 SHM 2003 08 17 23 59 237-91 P co2 364.910 -999.990 ... L3 2003 09 15 18 14 52.7200 174.1000 40.00 117881 SHM 2003 08 17 23 59 238-91 P co2 364.740 -999.990 ... L3 2003 09 15 18 27 52.7200 174.1000 40.00 117882 SHM 2003 08 25 00 05 119-91 P co2 365.110 -999.990 ... L3 2003 09 15 17 48 52.7200 174.1000 40.00 117883 SHM 2003 08 25 00 05 120-91 P co2 364.820 -999.990 ... L3 2003 09 15 18 01 52.7200 174.1000 40.00 117884 SHM 2003 09 01 01 50 4775-91 P co2 366.360 -999.990 ... L3 2003 10 06 16 23 52.7200 174.1000 40.00 117885 SHM 2003 09 01 01 50 4776-91 P co2 366.360 -999.990 ... L3 2003 10 06 16 36 52.7200 174.1000 40.00 117886 SHM 2003 09 10 05 00 4815-91 P co2 366.340 -999.990 ... L3 2003 10 06 15 29 52.7200 174.1000 40.00 117887 SHM 2003 09 10 05 00 4816-91 P co2 366.280 -999.990 ... L3 2003 10 06 15 42 52.7200 174.1000 40.00 117888 SHM 2003 09 18 05 00 229-91 P co2 370.890 -999.990 ... L3 2003 10 27 16 33 52.7200 174.1000 40.00 117889 SHM 2003 09 18 05 00 230-91 P co2 370.950 -999.990 ... L3 2003 10 27 16 46 52.7200 174.1000 40.00 117890 SHM 2003 09 23 03 00 1809-91 P co2 374.060 -999.990 +.. L3 2003 10 27 15 41 52.7200 174.1000 40.00 117891 SHM 2003 09 23 03 00 1810-91 P co2 371.450 -999.990 -.. L3 2003 10 27 15 54 52.7200 174.1000 40.00 117892 SHM 2003 10 06 01 15 1529-99 P co2 378.520 -999.990 +.. L3 2003 12 05 17 02 52.7200 174.1000 40.00 117893 SHM 2003 10 06 01 15 1530-99 P co2 375.350 -999.990 -.. L3 2003 12 05 17 15 52.7200 174.1000 40.00 117894 SHM 2003 10 13 23 30 1527-99 P co2 373.450 -999.990 ... L3 2003 12 05 16 35 52.7200 174.1000 40.00 117895 SHM 2003 10 13 23 30 1528-99 P co2 373.600 -999.990 ... L3 2003 12 05 16 49 52.7200 174.1000 40.00 117896 SHM 2003 10 20 03 30 1399-99 P co2 382.310 -999.990 .X. L3 2003 12 31 09 45 52.7200 174.1000 40.00 117897 SHM 2003 10 20 03 30 1400-99 P co2 382.110 -999.990 .X. L3 2003 12 31 09 58 52.7200 174.1000 40.00 117898 SHM 2003 10 26 23 30 315-99 P co2 378.030 -999.990 ... L3 2003 12 31 09 19 52.7200 174.1000 40.00 117899 SHM 2003 10 26 23 30 316-99 P co2 377.980 -999.990 ... L3 2003 12 31 09 32 52.7200 174.1000 40.00 117900 SHM 2003 11 03 01 09 483-99 P co2 377.100 -999.990 ... L3 2003 12 04 15 14 52.7200 174.1000 40.00 117901 SHM 2003 11 03 01 09 484-99 P co2 377.120 -999.990 ... L3 2003 12 04 15 27 52.7200 174.1000 40.00 117902 SHM 2003 11 10 06 15 545-99 P co2 379.890 -999.990 ... L3 2003 12 04 15 40 52.7200 174.1000 40.00 117903 SHM 2003 11 10 06 15 546-99 P co2 379.900 -999.990 ... L3 2003 12 04 15 53 52.7200 174.1000 40.00 117904 SHM 2003 11 19 06 15 61-91 P co2 378.520 -999.990 ... L3 2003 12 30 16 33 52.7200 174.1000 40.00 117905 SHM 2003 11 19 06 15 62-91 P co2 378.210 -999.990 ... L3 2003 12 30 16 46 52.7200 174.1000 40.00 117906 SHM 2003 11 25 04 35 165-91 P co2 380.180 -999.990 ... L3 2003 12 30 16 07 52.7200 174.1000 40.00 117907 SHM 2003 11 25 04 35 166-91 P co2 379.880 -999.990 ... L3 2003 12 30 16 20 52.7200 174.1000 40.00 117908 SHM 2003 12 01 02 15 1809-91 P co2 379.960 -999.990 ... L3 2004 01 12 12 02 52.7200 174.1000 40.00 117909 SHM 2003 12 01 02 15 1810-91 P co2 379.920 -999.990 ... L3 2004 01 12 12 15 52.7200 174.1000 40.00 117910 SHM 2003 12 10 03 10 1155-91 P co2 381.700 -999.990 ... L3 2004 01 12 11 36 52.7200 174.1000 40.00 117911 SHM 2003 12 10 03 10 1156-91 P co2 381.650 -999.990 ... L3 2004 01 12 11 49 52.7200 174.1000 40.00 117912 SHM 2003 12 18 21 30 2017-91 P co2 380.260 -999.990 ... L3 2004 01 09 14 10 52.7200 174.1000 40.00 117913 SHM 2003 12 18 21 30 2018-91 P co2 380.490 -999.990 ... L3 2004 01 09 14 23 52.7200 174.1000 40.00 117914 SHM 2003 12 23 03 00 1463-99 P co2 380.490 -999.990 ... L3 2004 01 09 13 42 52.7200 174.1000 40.00 117915 SHM 2003 12 23 03 00 1464-99 P co2 380.450 -999.990 ... L3 2004 01 09 13 55 52.7200 174.1000 40.00 117916 SHM 2003 12 28 23 30 2352-99 P co2 381.530 -999.990 ... L3 2004 02 06 11 06 52.7200 174.1000 40.00 117917 SHM 2003 12 28 23 30 2353-99 P co2 381.660 -999.990 ... L3 2004 02 06 11 19 52.7200 174.1000 40.00 117918 SHM 2004 01 07 23 30 2351-99 P co2 382.180 -999.990 ... L3 2004 02 06 10 40 52.7200 174.1000 40.00 117919 SHM 2004 01 07 23 30 2354-99 P co2 381.940 -999.990 ... L3 2004 02 06 10 53 52.7200 174.1000 40.00 117920 SHM 2004 01 14 23 30 2460-99 P co2 384.620 -999.990 ... L3 2004 02 20 18 11 52.7200 174.1000 40.00 117921 SHM 2004 01 14 23 30 2471-99 P co2 384.630 -999.990 ... L3 2004 02 20 17 58 52.7200 174.1000 40.00 117922 SHM 2004 01 21 23 45 2459-99 P co2 382.730 -999.990 +.. L3 2004 02 20 17 31 52.7200 174.1000 40.00 117923 SHM 2004 01 21 23 45 2472-99 P co2 381.640 -999.990 -.. L3 2004 02 20 17 44 52.7200 174.1000 40.00 117924 SHM 2004 01 25 11 30 6187-66 P co2 383.710 -999.990 ... L3 2004 02 20 11 47 52.7200 174.1000 40.00 117925 SHM 2004 01 25 11 30 6188-66 P co2 383.520 -999.990 ... L3 2004 02 20 12 00 52.7200 174.1000 40.00 117926 SHM 2004 02 01 11 39 2609-99 P co2 381.430 -999.990 ... L3 2004 02 20 11 21 52.7200 174.1000 40.00 117927 SHM 2004 02 01 11 39 2610-99 P co2 381.230 -999.990 ... L3 2004 02 20 11 34 52.7200 174.1000 40.00 117928 SHM 2004 02 08 13 30 1253-99 P co2 382.880 -999.990 ... L3 2004 03 23 16 55 52.7200 174.1000 40.00 117929 SHM 2004 02 08 13 30 1254-99 P co2 382.750 -999.990 ... L3 2004 03 23 17 08 52.7200 174.1000 40.00 117930 SHM 2004 02 17 03 30 1179-99 P co2 389.560 -999.990 .X. L3 2004 03 23 16 29 52.7200 174.1000 40.00 117931 SHM 2004 02 17 03 30 1180-99 P co2 389.670 -999.990 .X. L3 2004 03 23 16 42 52.7200 174.1000 40.00 117932 SHM 2004 02 23 06 45 6734-66 P co2 387.300 -999.990 ... L3 2004 04 01 12 22 52.7200 174.1000 40.00 117933 SHM 2004 02 23 07 00 2465-99 P co2 383.170 -999.990 ... L3 2004 03 30 12 11 52.7200 174.1000 40.00 117934 SHM 2004 02 23 07 00 2466-99 P co2 383.180 -999.990 ... L3 2004 03 30 12 24 52.7200 174.1000 40.00 117935 SHM 2004 03 01 07 30 2867-99 P co2 385.200 -999.990 +.. L3 2004 03 31 13 36 52.7200 174.1000 40.00 117936 SHM 2004 03 01 07 30 2868-99 P co2 383.330 -999.990 -.. L3 2004 03 31 13 49 52.7200 174.1000 40.00 117937 SHM 2004 03 09 06 00 2869-99 P co2 385.100 -999.990 ... L3 2004 03 30 14 25 52.7200 174.1000 40.00 117938 SHM 2004 03 09 06 00 2870-99 P co2 385.440 -999.990 ... L3 2004 03 30 14 38 52.7200 174.1000 40.00 117939 SHM 2004 03 15 09 20 1017-99 P co2 388.940 -999.990 .X. L3 2004 04 20 16 51 52.7200 174.1000 40.00 117940 SHM 2004 03 15 09 20 1018-99 P co2 388.870 -999.990 .X. L3 2004 04 20 17 04 52.7200 174.1000 40.00 117941 SHM 2004 03 22 12 10 2979-99 P co2 385.160 -999.990 -.. L3 2004 04 20 17 18 52.7200 174.1000 40.00 117942 SHM 2004 03 22 12 10 2980-99 P co2 385.670 -999.990 +.. L3 2004 04 20 17 31 52.7200 174.1000 40.00 117943 SHM 2004 03 28 23 45 2989-99 P co2 399.760 -999.990 +.. L3 2004 04 20 16 25 52.7200 174.1000 40.00 117944 SHM 2004 03 28 23 45 2990-99 P co2 385.150 -999.990 -.. L3 2004 04 20 16 38 52.7200 174.1000 40.00 117945 SHM 2004 04 04 12 15 6621-66 P co2 383.630 -999.990 ... L3 2004 04 20 15 59 52.7200 174.1000 40.00 117946 SHM 2004 04 04 12 15 6622-66 P co2 383.570 -999.990 ... L3 2004 04 20 16 12 52.7200 174.1000 40.00 117947 SHM 2004 04 14 00 00 3299-99 P co2 386.410 -999.990 ... L3 2004 05 12 13 09 52.7200 174.1000 40.00 117948 SHM 2004 04 14 00 00 3302-99 P co2 386.410 -999.990 ... L3 2004 05 12 13 22 52.7200 174.1000 40.00 117949 SHM 2004 04 20 01 00 3300-99 P co2 387.030 -999.990 +.. L3 2004 05 12 12 43 52.7200 174.1000 40.00 117950 SHM 2004 04 20 01 00 3301-99 P co2 386.430 -999.990 -.. L3 2004 05 12 12 56 52.7200 174.1000 40.00 117951 SHM 2004 04 28 23 00 1173-99 P co2 384.040 -999.990 ... L3 2004 06 09 13 23 52.7200 174.1000 40.00 117952 SHM 2004 04 28 23 00 1174-99 P co2 384.010 -999.990 ... L3 2004 06 09 13 36 52.7200 174.1000 40.00 117953 SHM 2004 05 04 23 00 1109-99 P co2 384.610 -999.990 ... L3 2004 06 09 12 57 52.7200 174.1000 40.00 117954 SHM 2004 05 04 23 00 1110-99 P co2 384.610 -999.990 ... L3 2004 06 09 13 10 52.7200 174.1000 40.00 117955 SHM 2004 05 10 12 00 3523-99 P co2 385.150 -999.990 ... L3 2004 06 09 10 09 52.7200 174.1000 40.00 117956 SHM 2004 05 10 12 00 3524-99 P co2 385.090 -999.990 ... L3 2004 06 09 10 22 52.7200 174.1000 40.00 117957 SHM 2004 05 17 12 15 3521-99 P co2 384.470 -999.990 ... L3 2004 06 09 10 35 52.7200 174.1000 40.00 117958 SHM 2004 05 17 12 15 3522-99 P co2 384.410 -999.990 ... L3 2004 06 09 10 48 52.7200 174.1000 40.00 117959 SHM 2004 05 23 23 30 1389-99 P co2 385.900 -999.990 ... L3 2004 06 15 15 12 52.7200 174.1000 40.00 117960 SHM 2004 05 23 23 30 1390-99 P co2 385.480 -999.990 ... L3 2004 06 15 15 25 52.7200 174.1000 40.00 117961 SHM 2004 05 30 23 55 1451-99 P co2 382.420 -999.990 ... L3 2004 06 16 09 31 52.7200 174.1000 40.00 117962 SHM 2004 05 30 23 55 1452-99 P co2 382.260 -999.990 ... L3 2004 06 16 09 44 52.7200 174.1000 40.00 117963 SHM 2004 06 06 23 30 3519-99 P co2 382.640 -999.990 ... L3 2004 07 21 10 56 52.7200 174.1000 40.00 117964 SHM 2004 06 06 23 30 3520-99 P co2 382.500 -999.990 ... L3 2004 07 21 11 10 52.7200 174.1000 40.00 117965 SHM 2004 06 14 12 00 3533-99 P co2 381.990 -999.990 ... L3 2004 07 21 10 30 52.7200 174.1000 40.00 117966 SHM 2004 06 14 12 00 3534-99 P co2 382.170 -999.990 ... L3 2004 07 21 10 43 52.7200 174.1000 40.00 117967 SHM 2004 06 22 12 15 1095-99 P co2 381.170 -999.990 -.. L3 2004 08 02 16 58 52.7200 174.1000 40.00 117968 SHM 2004 06 22 12 15 1096-99 P co2 383.250 -999.990 +.. L3 2004 08 02 17 12 52.7200 174.1000 40.00 117969 SHM 2004 06 27 23 35 6231-66 P co2 377.350 -999.990 +.. L3 2004 08 02 16 32 52.7200 174.1000 40.00 117970 SHM 2004 06 27 23 35 6232-66 P co2 376.200 -999.990 -.. L3 2004 08 02 16 45 52.7200 174.1000 40.00 117971 SHM 2004 07 04 23 55 1781-99 P co2 374.950 -999.990 ... L3 2004 08 20 15 38 52.7200 174.1000 40.00 117972 SHM 2004 07 04 23 55 1782-99 P co2 374.950 -999.990 ... L3 2004 08 20 15 51 52.7200 174.1000 40.00 117973 SHM 2004 07 12 12 30 2855-99 P co2 378.040 -999.990 .X. L3 2004 08 20 16 04 52.7100 174.1000 40.00 117974 SHM 2004 07 12 12 30 2856-99 P co2 378.180 -999.990 .X. L3 2004 08 20 16 17 52.7100 174.1000 40.00 117975 SHM 2004 07 18 23 55 2973-99 P co2 372.840 -999.990 ... L3 2004 08 25 12 45 52.7200 174.1000 40.00 117976 SHM 2004 07 18 23 55 2974-99 P co2 372.820 -999.990 ... L3 2004 08 25 12 58 52.7200 174.1000 40.00 117977 SHM 2004 07 26 12 00 6217-66 P co2 369.330 -999.990 ... L3 2004 08 25 12 19 52.7200 174.1000 40.00 117978 SHM 2004 07 26 12 00 6218-66 P co2 369.390 -999.990 ... L3 2004 08 25 12 32 52.7200 174.1000 40.00 117979 SHM 2004 08 01 23 55 1535-99 P co2 369.230 -999.990 ... L3 2004 09 29 17 45 52.7100 174.0800 40.00 188951 SHM 2004 08 01 23 55 1536-99 P co2 369.200 -999.990 ... L3 2004 09 29 17 59 52.7100 174.0800 40.00 188952 SHM 2004 08 10 01 00 3067-99 P co2 368.080 -999.990 ... L3 2004 09 29 17 17 52.7100 174.0800 40.00 188953 SHM 2004 08 10 01 00 3068-99 P co2 368.040 -999.990 ... L3 2004 09 29 17 31 52.7100 174.0800 40.00 188954 SHM 2004 08 20 01 00 2261-99 P co2 373.260 -999.990 .X. L3 2004 10 05 15 16 52.7100 174.0800 40.00 189113 SHM 2004 08 20 01 00 2262-99 P co2 373.280 -999.990 .X. L3 2004 10 05 15 30 52.7100 174.0800 40.00 189114 SHM 2004 08 22 23 30 2595-99 P co2 372.400 -999.990 -.. L3 2004 10 05 14 47 52.7100 174.0800 40.00 189115 SHM 2004 08 22 23 30 2596-99 P co2 374.350 -999.990 +.. L3 2004 10 05 15 01 52.7100 174.0800 40.00 189116 SHM 2004 09 05 23 30 3614-99 P co2 367.560 -999.990 ... L3 2004 10 05 15 44 52.7100 174.0800 40.00 189237 SHM 2004 09 05 23 52 41-99 P co2 366.280 -999.990 ... L3 2004 10 05 16 40 52.7100 174.0800 40.00 189238 SHM 2004 09 05 23 52 42-99 P co2 366.390 -999.990 ... L3 2004 10 05 16 54 52.7100 174.0800 40.00 189239 SHM 2004 09 13 23 35 2379-99 P co2 370.920 -999.990 ... L3 2004 11 01 14 07 52.7100 174.0800 40.00 190707 SHM 2004 09 13 23 35 2380-99 P co2 371.090 -999.990 ... L3 2004 11 01 14 22 52.7100 174.0800 40.00 190708 SHM 2004 09 19 23 30 3867-99 P co2 368.790 -999.990 ... L3 2004 11 01 14 36 52.7100 174.0800 40.00 190709 SHM 2004 09 19 23 30 3868-99 P co2 368.830 -999.990 ... L3 2004 11 01 14 50 52.7100 174.0800 40.00 190710 SHM 2004 09 26 23 45 1607-99 P co2 387.910 -999.990 +.. L3 2004 11 03 18 56 52.7100 174.0800 40.00 191261 SHM 2004 09 26 23 45 1608-99 P co2 380.050 -999.990 -.. L3 2004 11 03 19 10 52.7100 174.0800 40.00 191262 SHM 2004 10 04 11 20 1181-99 P co2 379.980 -999.990 .X. L3 2004 11 03 19 24 52.7100 174.0800 40.00 191259 SHM 2004 10 04 11 20 1182-99 P co2 379.970 -999.990 .X. L3 2004 11 03 19 38 52.7100 174.0800 40.00 191260 SHM 2004 10 10 23 50 443-99 P co2 375.300 -999.990 +.. L3 2004 11 16 15 58 52.7100 174.0800 40.00 191754 SHM 2004 10 10 23 50 444-99 P co2 374.550 -999.990 -.. L3 2004 11 16 16 12 52.7100 174.0800 40.00 191755 SHM 2004 10 17 23 35 1259-99 P co2 376.930 -999.990 ... L3 2004 11 16 16 27 52.7100 174.0800 40.00 191752 SHM 2004 10 17 23 35 1260-99 P co2 376.840 -999.990 ... L3 2004 11 16 16 41 52.7100 174.0800 40.00 191753 SHM 2004 11 01 00 01 1912-99 P co2 379.140 -999.990 ... L3 2004 12 14 13 57 52.7100 174.0800 40.00 192880 SHM 2004 11 07 23 45 895-99 P co2 381.180 -999.990 ... L3 2004 12 14 14 11 52.7100 174.0800 40.00 192881 SHM 2004 11 07 23 45 896-99 P co2 381.340 -999.990 ... L3 2004 12 14 14 25 52.7100 174.0800 40.00 192882 SHM 2004 11 21 23 59 3477-99 P co2 382.840 -999.990 ... L3 2005 02 07 12 07 52.7100 174.0800 40.00 194701 SHM 2004 11 21 23 59 3478-99 P co2 382.480 -999.990 ... L3 2005 02 07 12 21 52.7100 174.0800 40.00 194702 SHM 2004 12 05 13 00 3529-99 P co2 383.440 -999.990 ... L3 2005 02 07 12 35 52.7100 174.0800 40.00 194705 SHM 2004 12 05 13 00 3530-99 P co2 383.630 -999.990 ... L3 2005 02 07 12 49 52.7100 174.0800 40.00 194706 SHM 2004 12 12 23 59 1629-99 P co2 382.260 -999.990 ... L3 2005 02 07 11 39 52.7100 174.0800 40.00 194703 SHM 2004 12 12 23 59 1630-99 P co2 382.290 -999.990 ... L3 2005 02 07 11 53 52.7100 174.0800 40.00 194704 SHM 2004 12 26 23 45 3403-99 P co2 382.870 -999.990 ... L3 2005 02 07 11 10 52.7100 174.0800 40.00 194699 SHM 2004 12 26 23 45 3404-99 P co2 382.940 -999.990 ... L3 2005 02 07 11 24 52.7100 174.0800 40.00 194700 SHM 2005 01 09 23 59 4075-99 P co2 381.640 -999.990 ... L3 2005 02 08 11 22 52.7100 174.0800 40.00 194717 SHM 2005 01 09 23 59 4076-99 P co2 381.850 -999.990 ... L3 2005 02 08 11 36 52.7100 174.0800 40.00 194718 SHM 2005 01 16 23 50 287-99 P co2 383.620 -999.990 ... L3 2005 02 08 11 50 52.7100 174.0800 40.00 194715 SHM 2005 01 16 23 50 288-99 P co2 383.340 -999.990 ... L3 2005 02 08 12 04 52.7100 174.0800 40.00 194716 SHM 2005 01 23 23 30 3953-99 P co2 384.950 -999.990 +.. L3 2005 03 01 12 13 52.7100 174.0800 40.00 195851 SHM 2005 01 23 23 30 3954-99 P co2 382.980 -999.990 -.. L3 2005 03 01 12 27 52.7100 174.0800 40.00 195852 SHM 2005 02 01 12 30 4045-99 P co2 383.260 -999.990 ... L3 2005 03 01 11 44 52.7100 174.0800 40.00 195853 SHM 2005 02 01 12 30 4046-99 P co2 383.700 -999.990 ... L3 2005 03 01 11 58 52.7100 174.0800 40.00 195854 SHM 2005 02 09 22 30 4119-99 P co2 384.530 -999.990 ... L3 2005 03 16 14 09 52.7100 174.0800 40.00 196619 SHM 2005 02 09 22 30 4120-99 P co2 384.500 -999.990 ... L3 2005 03 16 14 23 52.7100 174.0800 40.00 196620 SHM 2005 02 13 23 45 4117-99 P co2 387.890 -999.990 .X. L3 2005 03 16 13 40 52.7100 174.0800 40.00 196617 SHM 2005 02 13 23 45 4118-99 P co2 387.750 -999.990 .X. L3 2005 03 16 13 55 52.7100 174.0800 40.00 196618 SHM 2005 02 21 23 50 1355-99 P co2 384.660 -999.990 ... L3 2005 04 05 12 47 52.7100 174.0800 40.00 197277 SHM 2005 02 21 23 50 1356-99 P co2 384.630 -999.990 ... L3 2005 04 05 13 01 52.7100 174.0800 40.00 197278 SHM 2005 02 28 23 30 1797-99 P co2 385.510 -999.990 ... L3 2005 04 05 12 19 52.7100 174.0800 40.00 197275 SHM 2005 02 28 23 30 1798-99 P co2 385.490 -999.990 ... L3 2005 04 05 12 33 52.7100 174.0800 40.00 197276 SHM 2005 03 06 23 50 565-99 P co2 384.520 -999.990 ... L3 2005 04 26 09 17 52.7100 174.0800 40.00 197823 SHM 2005 03 06 23 50 566-99 P co2 384.610 -999.990 ... L3 2005 04 26 09 31 52.7100 174.0800 40.00 197824 SHM 2005 03 17 03 15 2013-99 P co2 386.440 -999.990 ... L3 2005 04 26 09 45 52.7100 174.0800 40.00 197819 SHM 2005 03 17 03 15 2014-99 P co2 385.960 -999.990 ... L3 2005 04 26 09 59 52.7100 174.0800 40.00 197820 SHM 2005 03 20 23 45 2903-99 P co2 386.090 -999.990 ... L3 2005 04 26 11 41 52.7100 174.0800 40.00 197821 SHM 2005 03 20 23 45 2904-99 P co2 386.080 -999.990 ... L3 2005 04 26 11 55 52.7100 174.0800 40.00 197822 SHM 2005 03 28 12 45 3111-99 P co2 385.780 -999.990 ... L3 2005 04 26 10 13 52.7100 174.0800 40.00 197825 SHM 2005 03 28 12 45 3112-99 P co2 385.830 -999.990 ... L3 2005 04 26 10 27 52.7100 174.0800 40.00 197826 SHM 2005 04 03 23 45 6137-66 P co2 387.270 -999.990 ... L3 2005 05 18 15 30 52.7100 174.0800 40.00 198725 SHM 2005 04 03 23 45 6138-66 P co2 387.520 -999.990 ... L3 2005 05 18 15 44 52.7100 174.0800 40.00 198726 SHM 2005 04 13 12 45 2109-99 P co2 388.450 -999.990 ... L3 2005 05 18 15 02 52.7100 174.0800 40.00 198723 SHM 2005 04 13 12 45 2110-99 P co2 388.580 -999.990 ... L3 2005 05 18 15 16 52.7100 174.0800 40.00 198724 SHM 2005 04 17 23 30 2787-99 P co2 386.410 -999.990 ... L3 2005 06 15 12 20 52.7100 174.0800 40.00 199991 SHM 2005 04 17 23 30 2788-99 P co2 386.480 -999.990 ... L3 2005 06 15 12 35 52.7100 174.0800 40.00 199992 SHM 2005 04 24 23 15 3877-99 P co2 386.470 -999.990 ... L3 2005 06 15 13 46 52.7100 174.0800 40.00 199993 SHM 2005 04 24 23 15 3878-99 P co2 386.370 -999.990 ... L3 2005 06 15 14 00 52.7100 174.0800 40.00 199994 SHM 2005 05 02 23 30 2721-99 P co2 385.250 -999.990 ... L3 2005 06 21 12 02 52.7100 174.0800 40.00 200251 SHM 2005 05 02 23 30 2722-99 P co2 385.260 -999.990 ... L3 2005 06 21 12 16 52.7100 174.0800 40.00 200252 SHM 2005 05 08 23 30 3835-99 P co2 386.220 -999.990 ... L3 2005 06 21 12 30 52.7100 174.0800 40.00 200265 SHM 2005 05 08 23 30 3836-99 P co2 386.350 -999.990 ... L3 2005 06 21 12 44 52.7100 174.0800 40.00 200266 SHM 2005 05 15 23 30 2349-99 P co2 386.860 -999.990 ... L3 2005 07 18 13 38 52.7100 174.0800 40.00 201771 SHM 2005 05 15 23 30 2350-99 P co2 386.370 -999.990 ... L3 2005 07 18 13 52 52.7100 174.0800 40.00 201772 SHM 2005 05 22 13 45 3739-99 P co2 385.780 -999.990 ... L3 2005 07 18 14 06 52.7100 174.0800 40.00 201769 SHM 2005 05 22 13 45 3740-99 P co2 386.100 -999.990 ... L3 2005 07 18 14 20 52.7100 174.0800 40.00 201770 SHM 2005 05 29 23 30 2769-99 P co2 384.620 -999.990 ... L3 2005 07 21 11 58 52.7100 174.0800 40.00 201841 SHM 2005 05 29 23 30 2770-99 P co2 384.460 -999.990 ... L3 2005 07 21 12 13 52.7100 174.0800 40.00 201842 SHM 2005 06 05 23 30 2821-99 P co2 383.880 -999.990 ... L3 2005 07 21 12 27 52.7100 174.0800 40.00 201843 SHM 2005 06 05 23 30 2822-99 P co2 384.140 -999.990 ... L3 2005 07 21 12 41 52.7100 174.0800 40.00 201844 SHM 2005 06 12 12 30 2385-99 P co2 382.110 -999.990 ... L3 2005 08 19 15 10 52.7100 174.0800 40.00 203577 SHM 2005 06 12 12 30 2386-99 P co2 382.250 -999.990 ... L3 2005 08 19 15 24 52.7100 174.0800 40.00 203578 SHM 2005 06 19 12 30 1803-99 P co2 382.240 -999.990 ... L3 2005 08 22 08 49 52.7100 174.0800 40.00 203579 SHM 2005 06 19 12 30 1804-99 P co2 382.220 -999.990 ... L3 2005 08 22 09 03 52.7100 174.0800 40.00 203580 SHM 2005 06 26 23 45 6537-66 P co2 379.890 -999.990 ... L3 2005 08 19 14 41 52.7100 174.0800 40.00 203619 SHM 2005 06 26 23 45 6538-66 P co2 379.510 -999.990 ... L3 2005 08 19 14 56 52.7100 174.0800 40.00 203620 SHM 2005 07 03 23 30 6871-66 P co2 379.960 -999.990 ... L3 2005 08 22 09 18 52.7100 174.0800 40.00 203581 SHM 2005 07 03 23 30 6872-66 P co2 379.680 -999.990 ... L3 2005 08 22 09 32 52.7100 174.0800 40.00 203582 SHM 2005 07 10 23 35 3307-99 P co2 375.160 -999.990 ... L3 2006 01 13 10 50 52.7100 174.0800 40.00 211173 SHM 2005 07 10 23 35 3308-99 P co2 374.920 -999.990 ... L3 2006 01 13 11 04 52.7100 174.0800 40.00 211174 SHM 2005 07 17 23 45 1693-99 P co2 371.150 -999.990 ... L3 2006 01 13 10 21 52.7100 174.0800 40.00 211175 SHM 2005 07 17 23 45 1694-99 P co2 371.160 -999.990 ... L3 2006 01 13 10 35 52.7100 174.0800 40.00 211176 SHM 2005 11 20 22 30 3747-99 P co2 388.340 -999.990 -.. L3 2006 01 18 16 08 52.7100 174.0800 40.00 211283 SHM 2005 11 20 22 30 3748-99 P co2 390.420 -999.990 +.. L3 2006 01 18 16 22 52.7100 174.0800 40.00 211284 SHM 2005 11 29 12 45 1888-99 P co2 385.850 -999.990 ... L3 2006 01 18 16 36 52.7100 174.0800 40.00 211282 SHM 2005 12 18 23 30 2787-99 P co2 388.170 -999.990 +.. L3 2006 02 15 14 10 52.7100 174.0800 40.00 212640 SHM 2005 12 18 23 30 2788-99 P co2 387.310 -999.990 -.. L3 2006 02 15 14 24 52.7100 174.0800 40.00 212641 SHM 2005 12 26 00 30 1877-99 P co2 388.140 -999.990 -.. L3 2006 02 15 14 38 52.7100 174.0800 40.00 212638 SHM 2005 12 26 00 30 1878-99 P co2 389.190 -999.990 +.. L3 2006 02 15 14 53 52.7100 174.0800 40.00 212639 SHM 2006 01 15 23 55 925-99 P co2 388.420 -999.990 +.. L3 2006 03 09 10 34 52.7100 174.0800 40.00 213551 SHM 2006 01 15 23 55 926-99 P co2 385.620 -999.990 -.. L3 2006 03 09 10 48 52.7100 174.0800 40.00 213552 SHM 2006 01 31 23 59 2421-99 P co2 385.730 -999.990 ... L3 2006 03 09 11 31 52.7100 174.0800 40.00 213553 SHM 2006 01 31 23 59 2422-99 P co2 385.760 -999.990 ... L3 2006 03 09 11 45 52.7100 174.0800 40.00 213554 SHM 2006 02 05 23 45 3289-99 P co2 388.040 -999.990 ... L3 2006 03 09 11 02 52.7100 174.0800 40.00 213557 SHM 2006 02 05 23 45 3290-99 P co2 387.940 -999.990 ... L3 2006 03 09 11 17 52.7100 174.0800 40.00 213558 SHM 2006 02 15 12 30 3545-99 P co2 389.230 -999.990 ... L3 2006 03 09 11 59 52.7100 174.0800 40.00 213555 SHM 2006 02 15 12 30 3546-99 P co2 389.150 -999.990 ... L3 2006 03 09 12 14 52.7100 174.0800 40.00 213556 SHM 2006 04 02 23 45 1551-99 P co2 388.160 -999.990 ... L3 2006 05 04 15 24 52.7100 174.0800 40.00 215914 SHM 2006 04 02 23 45 1552-99 P co2 388.250 -999.990 ... L3 2006 05 04 15 38 52.7100 174.0800 40.00 215915 SHM 2006 04 08 23 40 965-99 P co2 388.800 -999.990 ... L3 2006 05 04 14 55 52.7100 174.0800 40.00 215916 SHM 2006 04 08 23 40 966-99 P co2 388.720 -999.990 ... L3 2006 05 04 15 09 52.7100 174.0800 40.00 215917 SHM 2006 05 08 00 20 2073-99 P co2 388.430 -999.990 ... L3 2006 06 05 14 34 52.7100 174.0800 40.00 217323 SHM 2006 05 08 00 20 2074-99 P co2 388.450 -999.990 ... L3 2006 06 05 14 49 52.7100 174.0800 40.00 217324 SHM 2006 05 22 00 30 67-99 P co2 390.660 -999.990 +.. L3 2006 06 27 11 26 52.7100 174.0800 40.00 218208 SHM 2006 05 22 00 30 68-99 P co2 390.120 -999.990 -.. L3 2006 06 27 11 40 52.7100 174.0800 40.00 218209 SHM 2006 05 28 00 30 2091-99 P co2 388.650 -999.990 ... L3 2006 06 27 10 58 52.7100 174.0800 40.00 218206 SHM 2006 05 28 00 30 2092-99 P co2 388.350 -999.990 ... L3 2006 06 27 11 12 52.7100 174.0800 40.00 218207 SHM 2006 06 18 11 35 377-99 P co2 387.630 -999.990 +.. L3 2006 07 24 15 51 52.7100 174.0800 40.00 219492 SHM 2006 06 18 11 35 378-99 P co2 386.360 -999.990 -.. L3 2006 07 24 16 06 52.7100 174.0800 40.00 219493 SHM 2006 06 25 00 10 55-99 P co2 383.680 -999.990 ... L3 2006 07 24 16 20 52.7100 174.0800 40.00 219494 SHM 2006 06 25 00 10 56-99 P co2 383.250 -999.990 ... L3 2006 07 24 16 34 52.7100 174.0800 40.00 219495 SHM 2006 07 09 11 20 3747-99 P co2 383.290 -999.990 .X. L3 2006 08 11 14 45 52.7100 174.0800 40.00 220318 SHM 2006 07 09 11 20 3748-99 P co2 383.270 -999.990 .X. L3 2006 08 11 14 30 52.7100 174.0800 40.00 220319 SHM 2006 07 16 00 15 4257-99 P co2 377.780 -999.990 ... L3 2006 08 11 13 05 52.7100 174.0800 40.00 220316 SHM 2006 07 16 00 15 4258-99 P co2 377.480 -999.990 ... L3 2006 08 11 13 19 52.7100 174.0800 40.00 220317 SHM 2006 07 23 11 30 3307-99 P co2 384.760 -999.990 -.. L3 2006 09 12 11 21 52.7100 174.0800 40.00 221901 SHM 2006 07 23 11 30 3308-99 P co2 386.310 -999.990 +.. L3 2006 09 12 11 35 52.7100 174.0800 40.00 221902 SHM 2006 08 06 23 50 577-99 P co2 372.820 -999.990 ... L3 2006 09 12 11 49 52.7100 174.0800 40.00 221903 SHM 2006 08 06 23 50 578-99 P co2 372.660 -999.990 ... L3 2006 09 12 12 04 52.7100 174.0800 40.00 221904 SHM 2006 08 13 23 45 2337-99 P co2 374.220 -999.990 ... L3 2006 09 12 10 52 52.7100 174.0800 40.00 221897 SHM 2006 08 13 23 45 2338-99 P co2 374.160 -999.990 ... L3 2006 09 12 11 07 52.7100 174.0800 40.00 221898 SHM 2006 08 20 23 37 1301-99 P co2 373.230 -999.990 ... L3 2006 09 12 10 24 52.7100 174.0800 40.00 221899 SHM 2006 08 20 23 37 1302-99 P co2 373.100 -999.990 ... L3 2006 09 12 10 38 52.7100 174.0800 40.00 221900 SHM 2006 08 27 23 30 941-99 P co2 371.190 -999.990 ... L3 2006 10 11 11 40 52.7100 174.0800 40.00 223335 SHM 2006 08 27 23 30 942-99 P co2 370.960 -999.990 ... L3 2006 10 11 11 54 52.7100 174.0800 40.00 223336 SHM 2006 09 06 02 00 705-99 P co2 376.380 -999.990 -.. L3 2006 10 11 12 08 52.7100 174.0800 40.00 223333 SHM 2006 09 06 02 00 706-99 P co2 377.780 -999.990 +.. L3 2006 10 11 12 23 52.7100 174.0800 40.00 223334 SHM 2006 09 17 23 30 2013-99 P co2 376.290 -999.990 ... L3 2006 11 08 09 50 52.7100 174.0800 40.00 224535 SHM 2006 09 17 23 30 2014-99 P co2 376.220 -999.990 ... L3 2006 11 08 10 04 52.7100 174.0800 40.00 224536 SHM 2006 09 24 23 45 2845-99 P co2 378.950 -999.990 ... L3 2006 11 08 10 19 52.7100 174.0800 40.00 224533 SHM 2006 09 24 23 45 2846-99 P co2 378.940 -999.990 ... L3 2006 11 08 10 33 52.7100 174.0800 40.00 224534 SHM 2006 10 01 23 50 855-99 P co2 394.820 -999.990 +.. L3 2006 11 06 11 47 52.7100 174.0800 40.00 224378 SHM 2006 10 01 23 50 856-99 P co2 381.730 -999.990 -.. L3 2006 11 06 12 01 52.7100 174.0800 40.00 224379 SHM 2006 10 08 23 45 55-99 P co2 382.280 -999.990 ... L3 2006 11 06 12 15 52.7100 174.0800 40.00 224376 SHM 2006 10 08 23 45 56-99 P co2 382.470 -999.990 ... L3 2006 11 06 12 29 52.7100 174.0800 40.00 224377 SHM 2006 10 16 12 45 4157-99 P co2 382.050 -999.990 ... L3 2006 11 10 09 41 52.7100 174.0800 40.00 224704 SHM 2006 10 16 12 45 4158-99 P co2 382.050 -999.990 ... L3 2006 11 10 09 55 52.7100 174.0800 40.00 224705 SHM 2006 10 23 12 30 3611-99 P co2 383.200 -999.990 ... L3 2006 11 10 10 37 52.7100 174.0800 40.00 224706 SHM 2006 10 23 12 30 3612-99 P co2 383.060 -999.990 ... L3 2006 11 10 10 52 52.7100 174.0800 40.00 224707 SHM 2006 10 30 00 05 3133-99 P co2 391.400 -999.990 .X. L3 2006 11 24 14 40 52.7100 174.0800 40.00 225353 SHM 2006 10 30 00 05 3134-99 P co2 391.100 -999.990 .X. L3 2006 11 24 14 54 52.7100 174.0800 40.00 225354 SHM 2006 11 05 11 30 2967-99 P co2 390.970 -999.990 +.. L3 2006 11 24 14 11 52.7100 174.0800 40.00 225355 SHM 2006 11 05 11 30 2968-99 P co2 384.090 -999.990 -.. L3 2006 11 24 14 25 52.7100 174.0800 40.00 225356 SHM 2006 11 12 11 30 3889-99 P co2 385.550 -999.990 ... L3 2007 01 15 11 48 52.7100 174.0800 40.00 226936 SHM 2006 11 12 11 30 3890-99 P co2 385.630 -999.990 ... L3 2007 01 15 12 02 52.7100 174.0800 40.00 226937 SHM 2006 11 19 23 45 753-99 P co2 388.760 -999.990 -.. L3 2007 01 15 12 16 52.7100 174.0800 40.00 226934 SHM 2006 11 19 23 45 754-99 P co2 389.880 -999.990 +.. L3 2007 01 15 12 31 52.7100 174.0800 40.00 226935 SHM 2006 11 26 23 30 2681-99 P co2 386.960 -999.990 -.. L3 2007 01 31 09 04 52.7100 174.0800 40.00 227707 SHM 2006 11 26 23 30 2682-99 P co2 387.580 -999.990 +.. L3 2007 01 31 09 19 52.7100 174.0800 40.00 227708 SHM 2006 12 06 12 30 2715-99 P co2 392.350 -999.990 -.. L3 2007 01 31 09 33 52.7100 174.0800 40.00 227709 SHM 2006 12 06 12 30 2716-99 P co2 394.380 -999.990 +.. L3 2007 01 31 09 47 52.7100 174.0800 40.00 227710 SHM 2006 12 10 23 30 4293-99 P co2 404.320 -999.990 -.. L3 2007 01 31 10 30 52.7100 174.0800 40.00 227713 SHM 2006 12 10 23 30 4294-99 P co2 407.120 -999.990 +.. L3 2007 01 31 10 44 52.7100 174.0800 40.00 227714 SHM 2006 12 24 23 50 1115-99 P co2 387.690 -999.990 ... L3 2007 01 31 10 01 52.7100 174.0800 40.00 227711 SHM 2006 12 24 23 50 1116-99 P co2 387.890 -999.990 ... L3 2007 01 31 10 16 52.7100 174.0800 40.00 227712 SHM 2006 12 31 23 45 3307-99 P co2 389.490 -999.990 +.. L3 2007 02 20 13 59 52.7100 174.0800 40.00 229174 SHM 2006 12 31 23 45 3308-99 P co2 388.470 -999.990 -.. L3 2007 02 20 14 14 52.7100 174.0800 40.00 229175 SHM 2007 01 07 23 30 1963-99 P co2 389.540 -999.990 ... L3 2007 02 20 12 34 52.7100 174.0800 40.00 229172 SHM 2007 01 07 23 30 1964-99 P co2 389.080 -999.990 ... L3 2007 02 20 12 48 52.7100 174.0800 40.00 229173 SHM 2007 01 14 23 30 2205-99 P co2 392.620 -999.990 +.. L3 2007 02 15 13 37 52.7100 174.0800 40.00 229210 SHM 2007 01 14 23 30 2206-99 P co2 388.770 -999.990 -.. L3 2007 02 15 13 51 52.7100 174.0800 40.00 229211 SHM 2007 01 21 23 39 101-99 P co2 388.890 -999.990 ... L3 2007 02 15 13 08 52.7100 174.0800 40.00 229208 SHM 2007 01 21 23 39 102-99 P co2 388.840 -999.990 ... L3 2007 02 15 13 22 52.7100 174.0800 40.00 229209 SHM 2007 01 29 23 45 1339-99 P co2 389.140 -999.990 ... L3 2007 03 16 15 07 52.7100 174.0800 40.00 230698 SHM 2007 01 29 23 45 1340-99 P co2 389.260 -999.990 ... L3 2007 03 16 15 22 52.7100 174.0800 40.00 230699 SHM 2007 02 05 12 45 4271-99 P co2 388.910 -999.990 ... L3 2007 03 16 15 36 52.7100 174.0800 40.00 230696 SHM 2007 02 05 12 45 4272-99 P co2 388.940 -999.990 ... L3 2007 03 16 15 50 52.7100 174.0800 40.00 230697 SHM 2007 02 11 23 50 2407-99 P co2 389.290 -999.990 ... L3 2007 03 16 12 10 52.7100 174.0800 40.00 230702 SHM 2007 02 11 23 50 2408-99 P co2 389.120 -999.990 ... L3 2007 03 16 12 25 52.7100 174.0800 40.00 230703 SHM 2007 02 19 23 30 533-99 P co2 389.490 -999.990 ... L3 2007 03 16 12 39 52.7100 174.0800 40.00 230700 SHM 2007 02 19 23 30 534-99 P co2 389.480 -999.990 ... L3 2007 03 16 12 53 52.7100 174.0800 40.00 230701 SHM 2007 02 25 23 35 1145-99 P co2 390.390 -999.990 ... L3 2007 04 13 15 23 52.7100 174.0800 40.00 232230 SHM 2007 02 25 23 35 1146-99 P co2 390.220 -999.990 ... L3 2007 04 13 15 37 52.7100 174.0800 40.00 232231 SHM 2007 03 04 23 45 3143-99 P co2 391.700 -999.990 -.. L3 2007 04 13 15 51 52.7100 174.0800 40.00 232232 SHM 2007 03 04 23 45 3144-99 P co2 392.550 -999.990 +.. L3 2007 04 13 16 06 52.7100 174.0800 40.00 232233 SHM 2007 03 11 12 45 2549-99 P co2 391.310 -999.990 ... L3 2007 04 25 14 34 52.7100 174.0800 40.00 232802 SHM 2007 03 11 12 45 2550-99 P co2 391.200 -999.990 ... L3 2007 04 25 14 48 52.7100 174.0800 40.00 232803 SHM 2007 03 20 12 25 2101-99 P co2 390.150 -999.990 ... L3 2007 04 25 15 02 52.7100 174.0800 40.00 232804 SHM 2007 03 20 12 25 2102-99 P co2 389.880 -999.990 ... L3 2007 04 25 15 17 52.7100 174.0800 40.00 232805 SHM 2007 03 25 22 30 2033-99 P co2 391.030 -999.990 ... L3 2007 04 25 15 31 52.7100 174.0800 40.00 232808 SHM 2007 03 25 22 30 2034-99 P co2 391.280 -999.990 ... L3 2007 04 25 15 45 52.7100 174.0800 40.00 232809 SHM 2007 04 01 23 30 327-99 P co2 391.140 -999.990 ... L3 2007 04 25 15 59 52.7100 174.0800 40.00 232806 SHM 2007 04 01 23 30 328-99 P co2 391.100 -999.990 ... L3 2007 04 25 16 14 52.7100 174.0800 40.00 232807 SHM 2007 04 07 23 25 3459-99 P co2 391.750 -999.990 ... L3 2007 05 09 09 57 52.7100 174.0800 40.00 233635 SHM 2007 04 07 23 25 3460-99 P co2 391.640 -999.990 ... L3 2007 05 09 10 12 52.7100 174.0800 40.00 233636 SHM 2007 04 14 14 00 1631-99 P co2 390.520 -999.990 ... L3 2007 05 09 09 29 52.7100 174.0800 40.00 233633 SHM 2007 04 14 14 00 1632-99 P co2 390.600 -999.990 ... L3 2007 05 09 09 43 52.7100 174.0800 40.00 233634 SHM 2007 04 22 22 30 1161-99 P co2 389.890 -999.990 ... L8 2007 05 21 14 21 52.7100 174.0800 40.00 234267 SHM 2007 04 22 22 30 1162-99 P co2 390.140 -999.990 ... L8 2007 05 21 14 35 52.7100 174.0800 40.00 234268 SHM 2007 04 29 22 30 1857-99 P co2 389.910 -999.990 ... L3 2007 05 21 14 51 52.7100 174.0800 40.00 234269 SHM 2007 04 29 22 30 1858-99 P co2 389.930 -999.990 ... L3 2007 05 21 15 05 52.7100 174.0800 40.00 234270 SHM 2007 05 06 22 30 2499-99 P co2 389.610 -999.990 ... L3 2007 06 15 10 44 52.7100 174.0800 40.00 235809 SHM 2007 05 06 22 30 2500-99 P co2 389.730 -999.990 ... L3 2007 06 15 10 59 52.7100 174.0800 40.00 235810 SHM 2007 05 14 02 00 1783-99 P co2 390.250 -999.990 ... L3 2007 06 15 09 47 52.7100 174.0800 40.00 235807 SHM 2007 05 14 02 00 1784-99 P co2 390.290 -999.990 ... L3 2007 06 15 10 02 52.7100 174.0800 40.00 235808 SHM 2007 05 28 12 00 1053-99 P co2 386.210 -999.990 ... L3 2007 06 27 15 02 52.7100 174.0800 40.00 236942 SHM 2007 05 28 12 00 1054-99 P co2 386.170 -999.990 ... L3 2007 06 27 15 16 52.7100 174.0800 40.00 236943 SHM 2007 06 04 12 00 4521-99 P co2 392.520 -999.990 .X. L3 2007 06 27 15 30 52.7100 174.0800 40.00 236944 SHM 2007 06 04 12 00 4522-99 P co2 392.790 -999.990 .X. L3 2007 06 27 15 45 52.7100 174.0800 40.00 236945 SHM 2007 06 11 12 00 1011-99 P co2 387.510 -999.990 -.. L3 2007 07 18 13 28 52.7100 174.0800 40.00 238449 SHM 2007 06 11 12 00 1012-99 P co2 388.230 -999.990 +.. L3 2007 07 18 13 42 52.7100 174.0800 40.00 238450 SHM 2007 06 18 02 00 3161-99 P co2 382.000 -999.990 ... L3 2007 07 18 12 59 52.7100 174.0800 40.00 238451 SHM 2007 06 18 02 00 3162-99 P co2 382.150 -999.990 ... L3 2007 07 18 13 13 52.7100 174.0800 40.00 238452 SHM 2007 06 24 10 30 1333-99 P co2 381.500 -999.990 ... L3 2007 07 31 14 54 52.7100 174.0800 40.00 239104 SHM 2007 06 24 10 30 1334-99 P co2 381.560 -999.990 ... L3 2007 07 31 15 09 52.7100 174.0800 40.00 239105 SHM 2007 07 01 10 30 4445-99 P co2 380.200 -999.990 ... L3 2007 07 31 15 23 52.7100 174.0800 40.00 239106 SHM 2007 07 01 10 30 4446-99 P co2 380.160 -999.990 ... L3 2007 07 31 15 37 52.7100 174.0800 40.00 239107 SHM 2007 07 08 10 30 3867-99 P co2 375.860 -999.990 ... L3 2007 07 31 13 57 52.7100 174.0800 40.00 239102 SHM 2007 07 08 10 30 3868-99 P co2 376.290 -999.990 ... L3 2007 07 31 14 12 52.7100 174.0800 40.00 239103 SHM 2007 07 16 01 30 2769-99 P co2 377.120 -999.990 ... L3 2007 07 31 14 26 52.7100 174.0800 40.00 239100 SHM 2007 07 16 01 30 2770-99 P co2 377.350 -999.990 ... L3 2007 07 31 14 40 52.7100 174.0800 40.00 239101 SHM 2007 07 22 23 45 2866-99 P co2 373.960 -999.990 ... L3 2007 08 21 11 13 52.7100 174.0800 40.00 240284 SHM 2007 07 22 23 45 3673-99 P co2 373.510 -999.990 ... L3 2007 08 21 10 59 52.7100 174.0800 40.00 240283 SHM 2007 07 29 18 15 3517-99 P co2 379.200 -999.990 .X. L3 2007 08 21 13 21 52.7100 174.0800 40.00 240285 SHM 2007 08 05 01 30 2885-99 P co2 370.100 -999.990 .X. L3 2007 08 30 11 32 52.7100 174.0800 40.00 240645 SHM 2007 08 05 01 30 2886-99 P co2 369.940 -999.990 .X. L3 2007 08 30 11 46 52.7100 174.0800 40.00 240646 SHM 2007 08 12 00 30 3001-99 P co2 370.470 -999.990 ... L3 2007 08 30 12 00 52.7100 174.0800 40.00 240643 SHM 2007 08 12 00 30 3002-99 P co2 370.670 -999.990 ... L3 2007 08 30 12 15 52.7100 174.0800 40.00 240644 SHM 2007 08 19 11 10 1857-99 P co2 375.810 -999.990 ... L3 2007 09 11 14 08 52.7100 174.0800 40.00 241373 SHM 2007 08 19 11 10 1858-99 P co2 375.550 -999.990 ... L3 2007 09 11 14 22 52.7100 174.0800 40.00 241374 SHM 2007 08 26 23 30 135-99 P co2 374.360 -999.990 ... L3 2007 09 11 12 42 52.7100 174.0800 40.00 241371 SHM 2007 08 26 23 30 136-99 P co2 374.430 -999.990 ... L3 2007 09 11 12 56 52.7100 174.0800 40.00 241372 SHM 2007 09 02 22 50 2597-99 P co2 371.970 -999.990 .X. L8 2007 09 28 13 42 52.7100 174.0800 40.00 242453 SHM 2007 09 02 22 50 2598-99 P co2 371.750 -999.990 .X. L8 2007 09 28 13 56 52.7100 174.0800 40.00 242454 SHM 2007 09 09 11 15 4897-99 P co2 377.740 -999.990 ... L3 2007 10 01 14 34 52.7100 174.0800 40.00 242556 SHM 2007 09 09 11 15 4898-99 P co2 377.740 -999.990 ... L3 2007 10 01 14 48 52.7100 174.0800 40.00 242557 SHM 2007 09 16 23 30 4893-99 P co2 388.540 -999.990 +.. L3 2007 10 01 15 03 52.7100 174.0800 40.00 242558 SHM 2007 09 16 23 30 4894-99 P co2 378.830 -999.990 -.. L3 2007 10 01 15 17 52.7100 174.0800 40.00 242559 SHM 2007 09 24 11 00 4891-99 P co2 381.920 -999.990 -.. L3 2007 10 16 16 00 52.7100 174.0800 40.00 243331 SHM 2007 09 24 11 00 4892-99 P co2 382.710 -999.990 +.. L3 2007 10 16 16 14 52.7100 174.0800 40.00 243332 SHM 2007 09 30 23 00 4889-99 P co2 380.080 -999.990 ... L3 2007 10 16 16 28 52.7100 174.0800 40.00 243329 SHM 2007 09 30 23 00 4890-99 P co2 380.160 -999.990 ... L3 2007 10 16 16 42 52.7100 174.0800 40.00 243330 SHM 2007 10 07 22 45 3993-99 P co2 382.690 -999.990 ... L3 2007 11 05 11 50 52.7100 174.0800 40.00 244299 SHM 2007 10 07 22 45 3994-99 P co2 382.780 -999.990 ... L3 2007 11 05 12 04 52.7100 174.0800 40.00 244300 SHM 2007 10 14 22 45 3341-99 P co2 379.710 -999.990 .X. L3 2007 11 05 12 18 52.7100 174.0800 40.00 244301 SHM 2007 10 14 22 45 3342-99 P co2 379.790 -999.990 .X. L3 2007 11 05 12 32 52.7100 174.0800 40.00 244302 SHM 2007 10 21 10 45 2683-99 P co2 384.900 -999.990 ... L3 2007 11 27 15 04 52.7100 174.0800 40.00 245318 SHM 2007 10 21 10 45 2684-99 P co2 384.610 -999.990 ... L3 2007 11 27 15 18 52.7100 174.0800 40.00 245319 SHM 2007 10 28 22 45 1681-99 P co2 383.630 -999.990 ... L3 2007 11 27 14 35 52.7100 174.0800 40.00 245317 SHM 2007 11 04 22 45 1148-99 P co2 387.400 -999.990 ... L3 2007 12 14 10 43 52.7100 174.0800 40.00 246098 SHM 2007 11 04 22 45 1427-99 P co2 387.880 -999.990 ... L3 2007 12 14 10 29 52.7100 174.0800 40.00 246097 SHM 2007 11 11 22 45 2825-99 P co2 386.740 -999.990 ... L3 2007 12 14 10 12 52.7100 174.0800 40.00 246096 SHM 2007 11 11 22 45 287-99 P co2 386.650 -999.990 ... L3 2007 12 14 09 58 52.7100 174.0800 40.00 246095 SHM 2007 11 18 22 45 4893-99 P co2 387.250 -999.990 ... L3 2007 12 14 14 16 52.7100 174.0800 40.00 246113 SHM 2007 11 18 22 45 4894-99 P co2 387.220 -999.990 ... L3 2007 12 14 14 31 52.7100 174.0800 40.00 246114 SHM 2007 11 25 23 40 137-99 P co2 386.860 -999.990 ... L3 2007 12 14 12 23 52.7100 174.0800 40.00 246111 SHM 2007 11 25 23 40 138-99 P co2 386.780 -999.990 ... L3 2007 12 14 12 37 52.7100 174.0800 40.00 246112 SHM 2007 12 02 00 21 1237-99 P co2 388.700 -999.990 ... L3 2008 01 17 10 50 52.7100 174.0800 40.00 247539 SHM 2007 12 02 00 21 4627-99 P co2 388.870 -999.990 ... L3 2008 01 17 11 04 52.7100 174.0800 40.00 247540 SHM 2007 12 09 23 30 4210-99 P co2 388.680 -999.990 +.. L3 2008 01 17 11 18 52.7100 174.0800 40.00 247537 SHM 2007 12 09 23 30 4392-99 P co2 388.120 -999.990 -.. L3 2008 01 17 11 32 52.7100 174.0800 40.00 247538 SHM 2007 12 16 23 45 1156-99 P co2 388.290 -999.990 ... L3 2008 01 29 10 51 52.7200 174.0800 40.00 248566 SHM 2007 12 16 23 45 818-99 P co2 388.290 -999.990 ... L3 2008 01 29 10 37 52.7200 174.0800 40.00 248565 SHM 2007 12 23 23 45 4571-99 P co2 388.180 -999.990 ... L3 2008 01 29 11 05 52.7200 174.0800 40.00 248564 SHM 2007 12 30 22 45 4531-99 P co2 391.370 -999.990 ... L3 2008 01 29 11 34 52.7200 174.0800 40.00 248569 SHM 2007 12 30 22 45 4532-99 P co2 391.390 -999.990 ... L3 2008 01 29 11 48 52.7200 174.0800 40.00 248570 SHM 2008 01 06 22 45 3813-99 P co2 392.490 -999.990 ... L3 2008 01 29 10 08 52.7200 174.0800 40.00 248567 SHM 2008 01 06 22 45 3814-99 P co2 392.570 -999.990 ... L3 2008 01 29 10 22 52.7200 174.0800 40.00 248568 SHM 2008 01 15 22 30 1647-99 P co2 390.260 -999.990 ... L8 2008 02 22 10 15 52.7200 174.0800 40.00 249826 SHM 2008 01 15 22 30 4510-99 P co2 389.970 -999.990 ... L8 2008 02 22 10 30 52.7200 174.0800 40.00 249827 SHM 2008 01 21 10 30 1086-99 P co2 406.340 -999.990 +.. L3 2008 02 21 17 12 52.7200 174.0800 40.00 249825 SHM 2008 01 21 10 30 156-99 P co2 390.330 -999.990 -.. L3 2008 02 21 16 57 52.7200 174.0800 40.00 249824 SHM 2008 01 29 03 15 3993-99 P co2 391.410 -999.990 ... L8 2008 03 04 15 03 52.7200 174.0800 40.00 250260 SHM 2008 01 29 03 15 3994-99 P co2 391.560 -999.990 ... L8 2008 03 04 15 19 52.7200 174.0800 40.00 250261 SHM 2008 02 04 06 30 2273-99 P co2 392.050 -999.990 ... L8 2008 03 04 15 34 52.7200 174.0800 40.00 250262 SHM 2008 02 04 06 30 2274-99 P co2 391.870 -999.990 ... L8 2008 03 04 15 49 52.7200 174.0800 40.00 250263 SHM 2008 02 10 22 45 2317-99 P co2 392.010 -999.990 ... L8 2008 03 24 10 53 52.7200 174.0800 40.00 251237 SHM 2008 02 10 22 45 2318-99 P co2 391.540 -999.990 ... L8 2008 03 24 11 09 52.7200 174.0800 40.00 251238 SHM 2008 02 17 22 45 201-99 P co2 392.160 -999.990 ... L8 2008 03 24 11 24 52.7200 174.0800 40.00 251239 SHM 2008 02 17 22 45 202-99 P co2 392.570 -999.990 ... L8 2008 03 24 11 40 52.7200 174.0800 40.00 251240 SHM 2008 03 02 22 45 2169-99 P co2 391.710 -999.990 ... L8 2008 03 28 10 54 52.7200 174.0800 40.00 251570 SHM 2008 03 02 22 45 2170-99 P co2 391.530 -999.990 ... L8 2008 03 28 11 09 52.7200 174.0800 40.00 251571 SHM 2008 03 09 22 40 3407-99 P co2 390.430 -999.990 ... L8 2008 03 28 10 23 52.7200 174.0800 40.00 251572 SHM 2008 03 09 22 40 3408-99 P co2 390.460 -999.990 ... L8 2008 03 28 10 38 52.7200 174.0800 40.00 251573 SHM 2008 03 15 23 10 3511-99 P co2 393.130 -999.990 ... L3 2008 04 11 12 05 52.7200 174.0800 40.00 252305 SHM 2008 03 15 23 10 3512-99 P co2 393.200 -999.990 ... L3 2008 04 11 12 19 52.7200 174.0800 40.00 252306 SHM 2008 03 23 22 42 2775-99 P co2 391.660 -999.990 ... L3 2008 04 11 12 34 52.7200 174.0800 40.00 252307 SHM 2008 03 23 22 42 2776-99 P co2 391.630 -999.990 ... L3 2008 04 11 12 48 52.7200 174.0800 40.00 252308 SHM 2008 03 30 22 40 3503-99 P co2 391.390 -999.990 ... L3 2008 05 07 11 25 52.7200 174.1000 40.00 253918 SHM 2008 03 30 22 40 3504-99 P co2 391.450 -999.990 ... L3 2008 05 07 11 40 52.7200 174.1000 40.00 253919 SHM 2008 04 06 22 45 2967-99 P co2 402.300 -999.990 +.. L8 2008 05 07 10 19 52.7200 174.1000 40.00 253920 SHM 2008 04 06 22 45 2968-99 P co2 401.730 -999.990 -.. L8 2008 05 07 10 34 52.7200 174.1000 40.00 253921 SHM 2008 04 13 23 45 1855-99 P co2 393.070 -999.990 -.. L8 2008 06 03 14 29 52.7200 174.1000 40.00 254928 SHM 2008 04 13 23 45 1856-99 P co2 393.810 -999.990 +.. L8 2008 06 03 14 45 52.7200 174.1000 40.00 254929 SHM 2008 04 20 11 45 1229-99 P co2 394.260 -999.990 ... L8 2008 06 03 13 59 52.7200 174.1000 40.00 254930 SHM 2008 04 20 11 45 1230-99 P co2 394.190 -999.990 ... L8 2008 06 03 14 14 52.7200 174.1000 40.00 254931 SHM 2008 04 28 23 45 1130-99 P co2 394.250 -999.990 ... L8 2008 06 06 13 02 52.7200 174.1000 40.00 255146 SHM 2008 04 28 23 45 955-99 P co2 393.920 -999.990 ... L8 2008 06 06 12 46 52.7200 174.1000 40.00 255145 SHM 2008 05 04 23 45 3312-99 P co2 395.980 -999.990 -.. L8 2008 06 06 12 31 52.7200 174.1000 40.00 255148 SHM 2008 05 04 23 45 740-99 P co2 402.060 -999.990 +.. L8 2008 06 06 12 16 52.7200 174.1000 40.00 255147 SHM 2008 05 12 10 45 2161-99 P co2 395.960 -999.990 +.. L8 2008 06 27 11 13 52.7200 174.1000 40.00 256435 SHM 2008 05 12 10 45 2162-99 P co2 394.520 -999.990 -.. L8 2008 06 27 11 29 52.7200 174.1000 40.00 256436 SHM 2008 05 18 22 45 1231-99 P co2 393.740 -999.990 +.. L8 2008 06 27 10 43 52.7200 174.1000 40.00 256437 SHM 2008 05 18 22 45 1232-99 P co2 393.050 -999.990 -.. L8 2008 06 27 10 58 52.7200 174.1000 40.00 256438 SHM 2008 05 25 22 45 1259-99 P co2 391.070 -999.990 -.. L8 2008 07 02 12 13 52.7200 174.1000 40.00 256718 SHM 2008 05 25 22 45 1260-99 P co2 392.060 -999.990 +.. L8 2008 07 02 12 28 52.7200 174.1000 40.00 256719 SHM 2008 06 01 22 45 1383-99 P co2 390.890 -999.990 ... L8 2008 07 02 12 44 52.7200 174.1000 40.00 256716 SHM 2008 06 01 22 45 1384-99 P co2 390.920 -999.990 ... L8 2008 07 02 12 59 52.7200 174.1000 40.00 256717 SHM 2008 06 08 23 45 1920-99 P co2 390.180 -999.990 +.. L8 2008 07 29 12 39 52.7200 174.1000 40.00 258008 SHM 2008 06 08 23 45 638-99 P co2 389.520 -999.990 -.. L8 2008 07 29 12 23 52.7200 174.1000 40.00 258007 SHM 2008 06 15 23 45 2504-99 P co2 388.580 -999.990 ... L8 2008 07 29 11 53 52.7200 174.1000 40.00 258009 SHM 2008 06 15 23 45 2891-99 P co2 388.610 -999.990 ... L8 2008 07 29 12 08 52.7200 174.1000 40.00 258010 SHM 2008 06 22 10 45 4423-99 P co2 389.650 -999.990 .X. L8 2008 09 05 16 31 52.7200 174.1000 40.00 260288 SHM 2008 06 22 10 45 4424-99 P co2 389.710 -999.990 .X. L8 2008 09 05 16 47 52.7200 174.1000 40.00 260289 SHM 2008 06 29 22 45 3511-99 P co2 380.240 -999.990 .X. L8 2008 09 05 16 00 52.7200 174.1000 40.00 260290 SHM 2008 06 29 22 45 3512-99 P co2 380.280 -999.990 .X. L8 2008 09 05 16 16 52.7200 174.1000 40.00 260291 SHM 2008 07 06 22 45 2279-99 P co2 380.870 -999.990 ... L8 2008 08 20 11 57 52.7200 174.1000 40.00 259157 SHM 2008 07 06 22 45 2825-99 P co2 380.880 -999.990 ... L8 2008 08 20 12 12 52.7200 174.1000 40.00 259158 SHM 2008 07 13 10 45 113-99 P co2 379.630 -999.990 ... L8 2008 08 20 12 29 52.7200 174.1000 40.00 259155 SHM 2008 07 13 10 45 950-99 P co2 379.560 -999.990 ... L8 2008 08 20 12 44 52.7200 174.1000 40.00 259156 SHM 2008 07 22 02 45 2687-99 P co2 378.980 -999.990 ... L8 2008 08 20 11 26 52.7200 174.1000 40.00 259153 SHM 2008 07 22 02 45 2688-99 P co2 378.870 -999.990 ... L8 2008 08 20 11 41 52.7200 174.1000 40.00 259154 SHM 2008 07 27 22 45 2291-99 P co2 378.800 -999.990 ... L8 2008 08 20 10 55 52.7200 174.1000 40.00 259151 SHM 2008 07 27 22 45 2292-99 P co2 378.810 -999.990 ... L8 2008 08 20 11 10 52.7200 174.1000 40.00 259152 SHM 2008 08 03 23 01 433-99 P co2 371.060 -999.990 .X. L8 2008 09 02 11 10 52.7200 174.1000 40.00 259948 SHM 2008 08 03 23 01 434-99 P co2 370.680 -999.990 .X. L8 2008 09 02 11 26 52.7200 174.1000 40.00 259949 SHM 2008 08 10 22 50 1617-99 P co2 375.110 -999.990 ... L8 2008 09 02 11 41 52.7200 174.1000 40.00 259946 SHM 2008 08 10 22 50 1618-99 P co2 374.890 -999.990 ... L8 2008 09 02 11 56 52.7200 174.1000 40.00 259947 SHM 2008 08 17 22 45 3453-99 P co2 374.570 -999.990 ... L8 2008 09 22 13 30 52.7200 174.1000 40.00 261172 SHM 2008 08 17 22 45 3454-99 P co2 374.460 -999.990 ... L8 2008 09 22 13 45 52.7200 174.1000 40.00 261173 SHM 2008 08 24 22 45 327-99 P co2 380.210 -999.990 +.. L8 2008 09 22 14 00 52.7200 174.1000 40.00 261170 SHM 2008 08 24 22 45 328-99 P co2 378.460 -999.990 -.. L8 2008 09 22 14 16 52.7200 174.1000 40.00 261171 SHM 2008 08 31 10 45 1361-99 P co2 380.950 -999.990 .X. L8 2008 10 24 12 11 52.7200 174.1000 40.00 262821 SHM 2008 08 31 10 45 1362-99 P co2 380.990 -999.990 .X. L8 2008 10 24 12 26 52.7200 174.1000 40.00 262822 SHM 2008 09 07 10 45 5039-99 P co2 378.640 -999.990 ... L8 2008 10 24 12 41 52.7200 174.1000 40.00 262819 SHM 2008 09 07 10 45 5040-99 P co2 378.980 -999.990 ... L8 2008 10 24 12 57 52.7200 174.1000 40.00 262820 SHM 2008 09 15 11 15 3775-99 P co2 378.920 -999.990 ... L8 2008 10 24 13 12 52.7200 174.1000 40.00 262823 SHM 2008 09 15 11 15 3776-99 P co2 378.910 -999.990 ... L8 2008 10 24 13 27 52.7200 174.1000 40.00 262824 SHM 2008 09 21 22 45 3327-99 P co2 379.800 -999.990 ... L8 2008 10 24 13 43 52.7200 174.1000 40.00 262825 SHM 2008 09 21 22 45 3328-99 P co2 379.880 -999.990 ... L8 2008 10 24 13 58 52.7200 174.1000 40.00 262826 SHM 2008 09 28 22 45 4307-99 P co2 387.870 -999.990 .Z. L3 2008 11 21 16 19 52.7200 174.1000 40.00 264291 SHM 2008 09 28 22 45 4683-99 P co2 387.660 -999.990 .Z. L3 2008 11 21 16 34 52.7200 174.1000 40.00 264292 SHM 2008 10 07 10 45 3221-99 P co2 382.880 -999.990 ... L3 2008 11 21 15 51 52.7200 174.1000 40.00 264293 SHM 2008 10 07 10 45 3894-99 P co2 383.030 -999.990 ... L3 2008 11 21 16 05 52.7200 174.1000 40.00 264294 SHM 2008 10 19 22 45 563-99 P co2 386.930 -999.990 +.. L8 2008 11 24 10 59 52.7200 174.1000 40.00 264297 SHM 2008 10 19 22 45 564-99 P co2 386.410 -999.990 -.. L8 2008 11 24 11 14 52.7200 174.1000 40.00 264298 SHM 2008 10 27 01 20 2611-99 P co2 384.750 -999.990 ... L8 2008 11 24 10 28 52.7200 174.1000 40.00 264295 SHM 2008 10 27 01 20 2612-99 P co2 384.590 -999.990 ... L8 2008 11 24 10 43 52.7200 174.1000 40.00 264296 SHM 2008 11 11 10 45 5021-99 P co2 390.740 -999.990 +.. L8 2008 12 19 13 29 52.7200 174.1000 40.00 265931 SHM 2008 11 11 10 45 832-99 P co2 388.880 -999.990 -.. L8 2008 12 19 13 13 52.7200 174.1000 40.00 265930 SHM 2008 11 16 22 30 1596-99 P co2 389.220 -999.990 ... L8 2008 12 19 12 43 52.7200 174.1000 40.00 265928 SHM 2008 11 16 22 30 4958-99 P co2 389.230 -999.990 ... L8 2008 12 19 12 58 52.7200 174.1000 40.00 265929 SHM 2008 11 25 04 00 2256-99 P co2 388.960 -999.990 ... L8 2008 12 19 11 56 52.7200 174.1000 40.00 265925 SHM 2008 11 25 04 00 649-99 P co2 388.890 -999.990 ... L8 2008 12 19 11 41 52.7200 174.1000 40.00 265924 SHM 2008 11 30 22 45 1598-99 P co2 388.970 -999.990 ... L8 2008 12 19 12 27 52.7200 174.1000 40.00 265927 SHM 2008 11 30 22 45 4741-99 P co2 388.830 -999.990 ... L8 2008 12 19 12 12 52.7200 174.1000 40.00 265926 SHM 2008 12 08 22 45 459-99 P co2 394.360 -999.990 +.. L3 2009 01 06 16 01 52.7200 174.1000 40.00 266786 SHM 2008 12 08 22 45 605-99 P co2 393.310 -999.990 -.. L3 2009 01 06 16 16 52.7200 174.1000 40.00 266787 SHM 2008 12 14 23 45 2450-99 P co2 391.300 -999.990 ... L3 2009 01 06 15 33 52.7200 174.1000 40.00 266785 SHM 2008 12 14 23 45 3312-99 P co2 391.260 -999.990 ... L3 2009 01 06 15 47 52.7200 174.1000 40.00 266784 SHM 2008 12 23 11 30 2353-99 P co2 392.870 -999.990 ... L8 2009 01 20 13 43 52.7200 174.1000 40.00 267517 SHM 2008 12 23 11 30 2354-99 P co2 392.920 -999.990 ... L8 2009 01 20 13 59 52.7200 174.1000 40.00 267518 SHM 2008 12 28 22 45 4117-99 P co2 391.610 -999.990 ... L8 2009 01 20 14 14 52.7200 174.1000 40.00 267515 SHM 2008 12 28 22 45 4118-99 P co2 391.540 -999.990 ... L8 2009 01 20 14 30 52.7200 174.1000 40.00 267516 SHM 2009 01 04 10 45 1361-99 P co2 391.330 -999.990 ... L8 2009 02 17 11 31 52.7200 174.1000 40.00 269473 SHM 2009 01 04 10 45 1362-99 P co2 391.540 -999.990 ... L8 2009 02 17 11 47 52.7200 174.1000 40.00 269474 SHM 2009 01 12 10 45 2995-99 P co2 391.670 -999.990 ... L8 2009 02 17 12 33 52.7200 174.1000 40.00 269471 SHM 2009 01 12 10 45 2996-99 P co2 391.740 -999.990 ... L8 2009 02 17 12 48 52.7200 174.1000 40.00 269472 SHM 2009 01 18 22 45 2087-99 P co2 392.670 -999.990 ... L8 2009 03 05 12 09 52.7200 174.1000 40.00 270608 SHM 2009 01 18 22 45 2088-99 P co2 392.450 -999.990 ... L8 2009 03 05 12 24 52.7200 174.1000 40.00 270609 SHM 2009 01 25 22 45 3775-99 P co2 392.300 -999.990 ... L8 2009 03 05 11 38 52.7200 174.1000 40.00 270606 SHM 2009 01 25 22 45 3776-99 P co2 392.400 -999.990 ... L8 2009 03 05 11 53 52.7200 174.1000 40.00 270607 SHM 2009 02 01 10 45 502-99 P co2 392.460 -999.990 ... L8 2009 03 04 14 56 52.7200 174.1000 40.00 270590 SHM 2009 02 01 10 45 954-99 P co2 392.700 -999.990 ... L8 2009 03 04 15 11 52.7200 174.1000 40.00 270591 SHM 2009 02 09 10 45 2108-99 P co2 392.140 -999.990 ... L8 2009 03 04 14 25 52.7200 174.1000 40.00 270592 SHM 2009 02 09 10 45 4439-99 P co2 392.180 -999.990 ... L8 2009 03 04 14 41 52.7200 174.1000 40.00 270593 SHM 2009 02 17 10 45 1217-99 P co2 393.970 -999.990 ... L8 2009 04 06 14 41 52.7200 174.1000 40.00 272949 SHM 2009 02 17 10 45 1428-99 P co2 394.330 -999.990 ... L8 2009 04 06 14 56 52.7200 174.1000 40.00 272950 SHM 2009 02 23 10 45 1113-99 P co2 397.140 -999.990 .X. L8 2009 04 09 11 44 52.7200 174.1000 40.00 272915 SHM 2009 02 23 10 45 1212-99 P co2 397.040 -999.990 .X. L8 2009 04 09 11 59 52.7200 174.1000 40.00 272916 SHM 2009 03 01 22 45 4739-99 P co2 394.230 -999.990 ... L8 2009 04 22 15 02 52.7200 174.1000 40.00 274107 SHM 2009 03 01 22 45 6417-66 P co2 394.520 -999.990 ... L8 2009 04 22 15 17 52.7200 174.1000 40.00 274108 SHM 2009 03 09 01 45 2173-99 P co2 400.130 -999.990 -.. L8 2009 04 22 14 31 52.7200 174.1000 40.00 274109 SHM 2009 03 09 01 45 2401-99 P co2 400.860 -999.990 +.. L8 2009 04 22 14 47 52.7200 174.1000 40.00 274110 SHM 2009 05 19 21 45 3117-99 P co2 393.320 -999.990 ... L3 2009 08 03 14 14 52.7200 174.1000 40.00 280405 SHM 2009 05 19 21 45 3118-99 P co2 393.470 -999.990 ... L3 2009 08 03 14 29 52.7200 174.1000 40.00 280406 SHM 2009 05 24 10 45 2753-99 P co2 393.540 -999.990 ... L3 2009 08 03 13 46 52.7200 174.1000 40.00 280403 SHM 2009 05 24 10 45 2754-99 P co2 393.130 -999.990 ... L3 2009 08 03 14 00 52.7200 174.1000 40.00 280404 SHM 2009 05 31 22 45 2723-99 P co2 383.920 -999.990 .X. L3 2009 07 24 16 06 52.7200 174.1000 40.00 279769 SHM 2009 05 31 22 45 2724-99 P co2 383.880 -999.990 .X. L3 2009 07 24 16 20 52.7200 174.1000 40.00 279770 SHM 2009 06 08 10 45 3223-99 P co2 390.300 -999.990 ... L3 2009 07 24 15 37 52.7200 174.1000 40.00 279767 SHM 2009 06 08 10 45 3224-99 P co2 390.190 -999.990 ... L3 2009 07 24 15 51 52.7200 174.1000 40.00 279768 SHM 2009 06 15 10 45 1253-99 P co2 377.030 -999.990 .X. L10 2009 08 13 14 47 52.7200 174.1000 40.00 281084 SHM 2009 06 15 10 45 1254-99 P co2 377.230 -999.990 .X. L10 2009 08 13 15 02 52.7200 174.1000 40.00 281085 SHM 2009 06 21 22 45 4427-99 P co2 380.360 -999.990 .X. L10 2009 08 13 15 48 52.7200 174.1000 40.00 281082 SHM 2009 06 21 22 45 4428-99 P co2 380.060 -999.990 .X. L10 2009 08 13 16 04 52.7200 174.1000 40.00 281083 SHM 2009 06 28 22 45 3329-99 P co2 384.880 -999.990 ... L10 2009 08 13 15 17 52.7200 174.1000 40.00 281088 SHM 2009 06 28 22 45 3330-99 P co2 384.520 -999.990 ... L10 2009 08 13 15 33 52.7200 174.1000 40.00 281089 SHM 2009 07 05 22 45 399-99 P co2 380.040 -999.990 ... L10 2009 08 13 16 19 52.7200 174.1000 40.00 281086 SHM 2009 07 05 22 45 400-99 P co2 380.170 -999.990 ... L10 2009 08 13 16 34 52.7200 174.1000 40.00 281087 SHM 2009 07 19 10 45 3631-99 P co2 377.240 -999.990 ... L10 2009 09 08 10 54 52.7200 174.1000 40.00 282858 SHM 2009 07 19 10 45 3632-99 P co2 377.270 -999.990 ... L10 2009 09 08 11 09 52.7200 174.1000 40.00 282859 SHM 2009 07 26 10 45 4063-99 P co2 376.630 -999.990 ... L10 2009 09 04 15 21 52.7200 174.1000 40.00 282856 SHM 2009 07 26 10 45 4064-99 P co2 376.240 -999.990 ... L10 2009 09 04 15 36 52.7200 174.1000 40.00 282857 SHM 2009 08 02 22 45 502-99 P co2 376.060 -999.990 ... L3 2009 09 14 15 10 52.7200 174.1000 40.00 283189 SHM 2009 08 02 22 45 954-99 P co2 376.070 -999.990 ... L3 2009 09 14 15 24 52.7200 174.1000 40.00 283190 SHM 2009 08 17 00 44 1176-99 P co2 373.430 -999.990 ... L3 2009 09 14 15 39 52.7200 174.1000 40.00 283191 SHM 2009 08 17 00 44 1595-99 P co2 373.430 -999.990 ... L3 2009 09 14 15 53 52.7200 174.1000 40.00 283192 SHM 2009 08 23 23 30 1860-99 P co2 378.390 -999.990 +.. L10 2009 09 17 13 48 52.7200 174.1000 40.00 283346 SHM 2009 08 23 23 30 693-99 P co2 377.880 -999.990 -.. L10 2009 09 17 13 33 52.7200 174.1000 40.00 283345 SHM 2009 08 30 02 06 1251-99 P co2 374.240 -999.990 ... L10 2009 09 17 13 02 52.7200 174.1000 40.00 283347 SHM 2009 08 30 02 06 2557-99 P co2 374.220 -999.990 ... L10 2009 09 17 13 17 52.7200 174.1000 40.00 283348 SHM 2009 09 06 22 45 222-99 P co2 378.860 -999.990 ... L10 2009 10 13 13 02 52.7200 174.1000 40.00 284661 SHM 2009 09 06 22 45 2796-99 P co2 379.030 -999.990 ... L10 2009 10 13 13 17 52.7200 174.1000 40.00 284662 SHM 2009 09 13 10 45 2556-99 P co2 388.910 -999.990 .X. L10 2009 10 13 13 48 52.7200 174.1000 40.00 284664 SHM 2009 09 13 10 45 446-99 P co2 388.970 -999.990 .X. L10 2009 10 13 13 33 52.7200 174.1000 40.00 284663 SHM 2009 09 20 22 45 3563-99 P co2 378.680 -999.990 ... L10 2009 11 17 15 17 52.7200 174.1000 40.00 286036 SHM 2009 09 20 22 45 3847-99 P co2 378.860 -999.990 ... L10 2009 11 17 15 32 52.7200 174.1000 40.00 286037 SHM 2009 09 27 22 45 3674-99 P co2 383.550 -999.990 ... L10 2009 11 17 14 46 52.7200 174.1000 40.00 286038 SHM 2009 09 27 22 45 4525-99 P co2 383.570 -999.990 ... L10 2009 11 17 15 01 52.7200 174.1000 40.00 286039 SHM 2009 10 11 22 45 2084-99 P co2 383.650 -999.990 ... L10 2009 12 16 18 22 52.7200 174.1000 40.00 287660 SHM 2009 10 11 22 45 973-99 P co2 383.710 -999.990 ... L10 2009 12 16 18 06 52.7200 174.1000 40.00 287659 SHM 2009 11 22 23 15 2393-99 P co2 393.230 -999.990 ... L10 2009 12 16 18 37 52.7200 174.1000 40.00 287657 SHM 2009 11 22 23 15 3710-99 P co2 392.860 -999.990 ... L10 2009 12 16 18 52 52.7200 174.1000 40.00 287658 SHM 2009 12 10 13 21 1591-99 P co2 393.520 -999.990 +.. L10 2010 01 28 13 17 52.7200 174.1000 40.00 289106 SHM 2009 12 10 13 21 463-99 P co2 392.890 -999.990 -.. L10 2010 01 28 13 01 52.7200 174.1000 40.00 289105 SHM 2009 12 16 13 09 45-99 P co2 390.810 -999.990 ... L10 2010 01 28 13 32 52.7200 174.1000 40.00 289103 SHM 2009 12 16 13 09 6780-66 P co2 390.730 -999.990 ... L10 2010 01 28 13 47 52.7200 174.1000 40.00 289104 SHM 2009 12 20 22 45 1309-99 P co2 393.870 -999.990 ... L10 2010 02 03 13 44 52.7200 174.1000 40.00 289379 SHM 2009 12 20 22 45 1310-99 P co2 394.370 -999.990 ... L10 2010 02 03 14 00 52.7200 174.1000 40.00 289380 SHM 2009 12 27 23 45 3535-99 P co2 392.630 -999.990 ... L10 2010 02 03 14 15 52.7200 174.1000 40.00 289381 SHM 2009 12 27 23 45 3536-99 P co2 392.390 -999.990 ... L10 2010 02 03 14 30 52.7200 174.1000 40.00 289382 SHM 2010 01 03 23 45 4217-99 P co2 392.140 -999.990 ... L10 2010 03 09 14 34 52.7200 174.1000 40.00 291452 SHM 2010 01 03 23 45 4219-99 P co2 392.010 -999.990 ... L10 2010 03 09 14 49 52.7200 174.1000 40.00 291453 SHM 2010 01 10 22 45 4164-99 P co2 394.210 -999.990 ... L10 2010 03 09 15 05 52.7200 174.1000 40.00 291454 SHM 2010 01 10 22 45 4536-99 P co2 394.200 -999.990 ... L10 2010 03 09 15 20 52.7200 174.1000 40.00 291455 SHM 2010 01 17 23 15 1455-99 P co2 394.320 -999.990 ... L10 2010 03 26 10 31 52.7200 174.1000 40.00 292293 SHM 2010 01 17 23 15 1456-99 P co2 394.410 -999.990 ... L10 2010 03 26 10 46 52.7200 174.1000 40.00 292294 SHM 2010 02 01 23 30 3025-99 P co2 394.780 -999.990 ... L10 2010 03 26 11 01 52.7200 174.1000 40.00 292291 SHM 2010 02 01 23 30 3026-99 P co2 394.740 -999.990 ... L10 2010 03 26 11 16 52.7200 174.1000 40.00 292292 SHM 2010 02 14 20 45 2317-99 P co2 396.560 -999.990 +.. L10 2010 04 06 13 12 52.7200 174.1000 40.00 293083 SHM 2010 02 14 20 45 2318-99 P co2 395.470 -999.990 -.. L10 2010 04 06 13 28 52.7200 174.1000 40.00 293084 SHM 2010 02 22 20 45 1603-99 P co2 394.310 -999.990 ... L10 2010 04 06 13 43 52.7200 174.1000 40.00 293085 SHM 2010 02 22 20 45 1604-99 P co2 394.160 -999.990 ... L10 2010 04 06 13 58 52.7200 174.1000 40.00 293086 SHM 2010 03 14 22 45 3434-99 P co2 396.500 -999.990 ... L8 2010 04 12 14 00 52.7200 174.1000 40.00 293703 SHM 2010 03 14 22 45 3974-99 P co2 396.640 -999.990 ... L8 2010 04 12 14 14 52.7200 174.1000 40.00 293704 SHM 2010 03 21 23 30 2413-99 P co2 395.520 -999.990 ... L8 2010 04 12 14 29 52.7200 174.1000 40.00 293701 SHM 2010 03 21 23 30 2876-99 P co2 395.650 -999.990 ... L8 2010 04 12 14 44 52.7200 174.1000 40.00 293702 SHM 2010 03 29 00 15 5149-99 P co2 397.540 -999.990 +.. L8 2010 04 20 11 48 52.7200 174.1000 40.00 294892 SHM 2010 03 29 00 15 5150-99 P co2 396.620 -999.990 -.. L8 2010 04 20 12 03 52.7200 174.1000 40.00 294893 SHM 2010 04 04 23 45 1959-99 P co2 395.620 -999.990 ... L8 2010 04 20 11 13 52.7200 174.1000 40.00 294894 SHM 2010 04 04 23 45 1960-99 P co2 396.080 -999.990 ... L8 2010 04 20 11 28 52.7200 174.1000 40.00 294895 SHM 2010 04 18 22 30 3084-99 P co2 396.580 -999.990 ... L10 2010 05 26 12 44 52.7200 174.1000 40.00 296831 SHM 2010 04 26 10 45 859-99 P co2 396.650 -999.990 ... L8 2010 05 26 11 37 52.7200 174.1000 40.00 296832 SHM 2010 04 26 10 45 860-99 P co2 396.590 -999.990 ... L8 2010 05 26 11 52 52.7200 174.1000 40.00 296833 SHM 2010 05 03 01 30 1469-99 P co2 396.660 -999.990 ... L8 2010 06 15 10 21 52.7200 174.1000 40.00 298398 SHM 2010 05 03 01 30 1509-99 P co2 396.620 -999.990 ... L8 2010 06 15 10 36 52.7200 174.1000 40.00 298399 SHM 2010 05 09 22 45 1485-99 P co2 393.850 -999.990 +.. L8 2010 06 15 10 50 52.7200 174.1000 40.00 298400 SHM 2010 05 09 22 45 4509-99 P co2 392.950 -999.990 -.. L8 2010 06 15 11 05 52.7200 174.1000 40.00 298401 SHM 2010 05 23 22 45 6301-66 P co2 398.300 -999.990 +.. L8 2010 06 30 12 44 52.7200 174.1000 40.00 299330 SHM 2010 05 23 22 45 6334-66 P co2 396.980 -999.990 -.. L8 2010 06 30 12 59 52.7200 174.1000 40.00 299331 SHM 2010 05 30 22 45 3644-99 P co2 392.720 -999.990 ... L8 2010 06 30 13 13 52.7200 174.1000 40.00 299332 SHM 2010 05 30 22 45 4082-99 P co2 392.750 -999.990 ... L8 2010 06 30 13 28 52.7200 174.1000 40.00 299333 SHM 2010 06 06 22 45 2336-99 P co2 397.280 -999.990 .X. L8 2010 06 30 12 07 52.7200 174.1000 40.00 299328 SHM 2010 06 06 22 45 5045-99 P co2 397.440 -999.990 .X. L8 2010 06 30 12 22 52.7200 174.1000 40.00 299329 SHM 2010 06 14 11 50 1295-99 P co2 389.730 -999.990 ... L8 2010 06 30 11 38 52.7200 174.1000 40.00 299326 SHM 2010 06 14 11 50 1371-99 P co2 389.660 -999.990 ... L8 2010 06 30 11 53 52.7200 174.1000 40.00 299327 SHM 2010 06 20 22 48 3917-99 P co2 385.290 -999.990 ... L8 2010 07 29 10 45 52.7200 174.1000 40.00 300739 SHM 2010 06 20 22 48 3918-99 P co2 385.200 -999.990 ... L8 2010 07 29 10 59 52.7200 174.1000 40.00 300740 SHM 2010 06 27 23 46 4145-99 P co2 386.110 -999.990 ... L10 2010 07 27 15 37 52.7200 174.1000 40.00 300737 SHM 2010 06 27 23 46 4146-99 P co2 386.070 -999.990 ... L10 2010 07 27 15 52 52.7200 174.1000 40.00 300738 SHM 2010 07 05 01 00 3399-99 P co2 381.310 -999.990 ... L8 2010 07 16 11 29 52.7200 174.1000 40.00 300270 SHM 2010 07 05 01 00 3400-99 P co2 381.170 -999.990 ... L8 2010 07 16 11 44 52.7200 174.1000 40.00 300271 SHM 2010 07 14 22 00 1297-99 P co2 383.920 -999.990 ... L8 2010 08 17 13 57 52.7200 174.1000 40.00 301950 SHM 2010 07 14 22 00 338-99 P co2 383.840 -999.990 ... L8 2010 08 17 13 42 52.7200 174.1000 40.00 301949 SHM 2010 07 18 22 45 2534-99 P co2 382.290 -999.990 -.. L8 2010 08 17 14 12 52.7200 174.1000 40.00 301951 SHM 2010 07 18 22 45 4496-99 P co2 383.510 -999.990 +.. L8 2010 08 17 14 26 52.7200 174.1000 40.00 301952 SHM 2010 07 25 22 15 2276-99 P co2 381.630 -999.990 ... L8 2010 08 17 15 25 52.7200 174.1000 40.00 301954 SHM 2010 07 25 22 15 312-99 P co2 381.680 -999.990 ... L8 2010 08 17 15 10 52.7200 174.1000 40.00 301953 SHM 2010 08 01 22 15 1102-99 P co2 386.300 -999.990 .Z. L8 2010 08 17 14 41 52.7200 174.1000 40.00 301955 SHM 2010 08 01 22 15 1756-99 P co2 386.480 -999.990 .Z. L8 2010 08 17 14 56 52.7200 174.1000 40.00 301956 SHM 2010 08 15 10 45 5211-99 P co2 379.280 -999.990 ... L8 2010 09 28 13 48 52.7200 174.1000 40.00 304446 SHM 2010 08 15 10 45 5212-99 P co2 379.440 -999.990 ... L8 2010 09 28 14 02 52.7200 174.1000 40.00 304447 SHM 2010 08 22 10 45 5209-99 P co2 378.900 -999.990 ... L10 2010 09 28 12 44 52.7200 174.1000 40.00 304444 SHM 2010 08 22 10 45 5210-99 P co2 379.050 -999.990 ... L10 2010 09 28 13 00 52.7200 174.1000 40.00 304445 SHM 2010 08 29 22 45 458-99 P co2 385.040 -999.990 .X. L8 2010 10 05 15 10 52.7200 174.1000 40.00 304880 SHM 2010 08 29 22 45 4792-99 P co2 385.060 -999.990 .X. L8 2010 10 05 15 25 52.7200 174.1000 40.00 304881 SHM 2010 09 05 22 45 249-99 P co2 385.040 -999.990 ... L8 2010 10 05 14 55 52.7200 174.1000 40.00 304883 SHM 2010 09 05 22 45 73-99 P co2 385.060 -999.990 ... L8 2010 10 05 14 41 52.7200 174.1000 40.00 304882 SHM 2010 09 19 23 45 4523-99 P co2 384.230 -999.990 ... L10 2010 10 12 14 26 52.7200 174.1000 40.00 305414 SHM 2010 09 19 23 45 4524-99 P co2 384.120 -999.990 ... L10 2010 10 12 14 41 52.7200 174.1000 40.00 305415 SHM 2010 09 28 12 00 2419-99 P co2 386.040 -999.990 ... L10 2010 10 12 13 55 52.7200 174.1000 40.00 305416 SHM 2010 09 28 12 00 2420-99 P co2 385.860 -999.990 ... L10 2010 10 12 14 10 52.7200 174.1000 40.00 305417 SHM 2010 10 04 12 16 3315-99 P co2 387.670 -999.990 ... L8 2010 10 25 15 59 52.7200 174.1000 40.00 306161 SHM 2010 10 04 12 16 3316-99 P co2 387.600 -999.990 ... L8 2010 10 25 16 13 52.7200 174.1000 40.00 306162 SHM 2010 10 10 22 55 3781-99 P co2 388.180 -999.990 ... L8 2010 10 25 16 28 52.7200 174.1000 40.00 306159 SHM 2010 10 10 22 55 3782-99 P co2 388.270 -999.990 ... L8 2010 10 25 16 43 52.7200 174.1000 40.00 306160 SHM 2010 10 18 01 11 2694-99 P co2 388.990 -999.990 ... L8 2010 12 09 11 24 52.7200 174.1000 40.00 308947 SHM 2010 10 18 01 11 3295-99 P co2 389.420 -999.990 ... L8 2010 12 09 11 39 52.7200 174.1000 40.00 308948 SHM 2010 10 24 22 45 2272-99 P co2 394.060 -999.990 ... L8 2010 12 09 10 55 52.7200 174.1000 40.00 308945 SHM 2010 10 24 22 45 2933-99 P co2 394.160 -999.990 ... L8 2010 12 09 11 09 52.7200 174.1000 40.00 308946 SHM 2010 11 08 00 45 4395-99 P co2 394.110 -999.990 ... L8 2010 12 20 15 07 52.7200 174.1000 40.00 309544 SHM 2010 11 08 00 45 807-99 P co2 394.210 -999.990 ... L8 2010 12 20 14 52 52.7200 174.1000 40.00 309543 SHM 2010 11 14 22 45 3091-99 P co2 391.770 -999.990 -.. L8 2010 12 20 14 23 52.7200 174.1000 40.00 309545 SHM 2010 11 14 22 45 4715-99 P co2 481.560 -999.990 +.. L8 2010 12 20 14 38 52.7200 174.1000 40.00 309546 SHM 2010 12 05 23 15 2474-99 P co2 394.160 -999.990 ... L10 2011 01 07 13 26 52.7200 174.1000 40.00 310600 SHM 2010 12 05 23 15 4020-99 P co2 394.150 -999.990 ... L10 2011 01 07 13 42 52.7200 174.1000 40.00 310601 SHM 2010 12 12 23 00 2744-99 P co2 394.560 -999.990 ... L8 2011 01 07 12 30 52.7200 174.1000 40.00 310602 SHM 2010 12 12 23 00 3808-99 P co2 394.290 -999.990 ... L8 2011 01 07 12 45 52.7200 174.1000 40.00 310603 SHM 2010 12 23 12 00 2126-99 P co2 395.870 -999.990 ... L10 2011 01 07 16 24 52.7200 174.1000 40.00 310576 SHM 2010 12 23 12 00 2907-99 P co2 395.670 -999.990 ... L10 2011 01 07 16 08 52.7200 174.1000 40.00 310577 SHM 2010 12 27 00 42 4034-99 P co2 396.340 -999.990 ... L10 2011 01 07 15 36 52.7200 174.1000 40.00 310578 SHM 2010 12 27 00 42 4566-99 P co2 396.040 -999.990 ... L10 2011 01 07 15 52 52.7200 174.1000 40.00 310579